CN110195878A CN201910329811.9A CN201910329811A CN110195878A CN 110195878 A CN110195878 A CN 110195878A CN 201910329811 A CN201910329811 A CN 201910329811A CN 110195878 A CN110195878 A CN 110195878A
Authority
CN
China
Prior art keywords
chimney
hot
secondary air
hot secondary
outer cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910329811.9A
Other languages
Chinese (zh)
Inventor
杨立辉
李双江
谢英柏
范晓颖
闫占良
李青松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Electric Power Construction Group Hebei Electric Survey And Design Research Institute Co Ltd
Original Assignee
China Electric Power Construction Group Hebei Electric Survey And Design Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Electric Power Construction Group Hebei Electric Survey And Design Research Institute Co Ltd filed Critical China Electric Power Construction Group Hebei Electric Survey And Design Research Institute Co Ltd
Priority to CN201910329811.9A priority Critical patent/CN110195878A/en
Publication of CN110195878A publication Critical patent/CN110195878A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J15/00Arrangements of devices for treating smoke or fumes
    • F23J15/006Layout of treatment plant
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J15/00Arrangements of devices for treating smoke or fumes
    • F23J15/02Arrangements of devices for treating smoke or fumes of purifiers, e.g. for removing noxious material
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J15/00Arrangements of devices for treating smoke or fumes
    • F23J15/06Arrangements of devices for treating smoke or fumes of coolers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J15/00Arrangements of devices for treating smoke or fumes
    • F23J15/08Arrangements of devices for treating smoke or fumes of heaters

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chimneys And Flues (AREA)

Abstract

The present invention relates to a kind of hot Secondary Air heating chimneys to prevent gypsum rain system, belongs to coal fired power plant electricity generation system technical field.A kind of hot Secondary Air heating chimney prevents gypsum rain system, including flue gas system and hot Secondary Air heating system;The flue gas system includes boiler, air preheater, deduster, desulfurizing tower and the chimney outer cylinder successively mutually connected from beginning to end by the hot air duct in heat primary air road;The hot Secondary Air heating system includes the primary air fan and secondary air fan that air preheater side is arranged in, and connection air preheater and the control valve and boiler side shutdown flashboard on the hot air duct of the hot secondary air duct of chimney outer cylinder is arranged in.A kind of hot Secondary Air heating chimney provided by the invention prevents gypsum rain system, by improving chimney breast smoke temperature, to avoid the generation of " gypsum rain ".

Description

A kind of hot Secondary Air heating chimney prevents gypsum rain system
Technical field
The invention belongs to coal fired power plant electricity generation system technical fields, and in particular to a kind of hot Secondary Air heating chimney prevents stone Cream rain system.
Background technique
In recent years, country pays much attention to environmental protection, and the coal-burning power plant for having more than 90% is mounted with lime stone-gypsum wet Flue gas desulphurization system (WFGD), the technology are the most widely used desulfurization technologies in China.This system is divided into or without cigarette Two kinds of gas reheater (GGH), GGH are mainly used for neat stress after heating desulfurization and since its running environment is severe are easy to happen corrosion And clogging phenomenon, so that Frequent Troubles, so new-built unit no longer installs GGH device mostly, original system has also been cancelled GGH device.There is no the WFGD system of GGH, it is difficult after saturation wet flue gas discharge because in smokeless reheating measure, exhaust gas temperature is reduced To be effectively lifted, spread, the gypsum slurries carried in flue gas are gathered near chimney, and landing forms " gypsum rain ", not only seriously Influence power plant's surrounding enviroment, or even corrosion equipment.
Summary of the invention
The object of the present invention is to provide a kind of hot Secondary Air heating chimneys to prevent gypsum rain system, by improving chimney breast Smoke temperature, to avoid the generation of " gypsum rain ".
To achieve the goals above, the technical solution adopted by the present invention is that:
A kind of hot Secondary Air heating chimney prevents gypsum rain system, including flue gas system and hot Secondary Air heating system;The cigarette Gas system includes the boiler successively mutually connected from beginning to end by the hot air duct in heat primary air road, air preheater, deduster, takes off Sulphur tower and chimney outer cylinder;The hot Secondary Air heating system includes the primary air fan and Secondary Air that air preheater side is arranged in Machine, and connection air preheater and the control valve and boiler side on the hot air duct of the hot secondary air duct of chimney outer cylinder are set Turn off flashboard.
Technical solution of the present invention further improvement lies in that: the hot air duct of hot secondary air duct enters the position in chimney outer cylinder It is set at the 1/2 of chimney outer cylinder height.
Technical solution of the present invention further improvement lies in that: further include chimney internal cylinder, the chimney internal cylinder and chimney outer cylinder Between chimney body on be evenly arranged with heat release hole.
Technical solution of the present invention further improvement lies in that: on the chimney body between chimney internal cylinder and chimney outer cylinder be arranged heat dissipation The number in hole is 6-10.
Technical solution of the present invention further improvement lies in that: into the hot secondary air duct between chimney outer cylinder and chimney internal cylinder The end of hot air duct be provided with elbow vertically upward.
Technical solution of the present invention further improvement lies in that: into the hot secondary air duct between chimney outer cylinder and chimney internal cylinder Hot air duct be two strands, two strands of hot air ducts are arranged symmetrically about the central axes of chimney outer cylinder.
By adopting the above-described technical solution, the technical effect that the present invention obtains has:
A kind of hot Secondary Air heating chimney provided by the invention prevents gypsum rain system, comes for heating the hot Secondary Air of chimney From the air preheater heated by high-temperature flue gas, external source is not quoted, reduces other energy consumptions, reaches energy saving purpose, simultaneously Eliminate " gypsum rain " phenomenon.
A kind of hot Secondary Air heating chimney provided by the invention prevents gypsum rain system, makes full use of electric power factory equipment itself Allowance, technical risk is smaller, and construction investment volume is smaller, is easily installed implementation.
A kind of hot Secondary Air heating chimney provided by the invention prevents gypsum rain system, the hot air duct of hot secondary air duct into Entering the position in chimney outer cylinder is at the 1/2 of chimney outer cylinder height, and reasonable height setting is so that the hot wind of hot secondary air duct returns It flows in chimney and is fully used and desired technical effect can be obtained.
A kind of hot Secondary Air heating chimney provided by the invention prevents gypsum rain system, and chimney is provided with chimney outer cylinder and cigarette Chimney inner cylinder, the number that heat release hole is arranged on the chimney body between chimney internal cylinder and chimney outer cylinder is 6-10, and enters chimney outer cylinder The hot air duct of hot secondary air duct between chimney internal cylinder is two strands, central axes pair of two strands of hot air ducts about chimney outer cylinder Claim arrangement;The topology layout so optimized enable itself a high temperature gases recirculating secondary hot-air uniformly and effectively to cigarette Flue-gas temperature in chimney avoids the appearance of subsequent gypsum rain.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that a kind of hot Secondary Air heating chimney of the invention prevents gypsum rain system;
Fig. 2 is the partial structural diagram that a kind of hot Secondary Air heating chimney of the invention prevents gypsum rain system;
Fig. 3 is the schematic partial cross-sectional view that a kind of hot Secondary Air heating chimney of the invention prevents gypsum rain system;
Wherein, 1, boiler, 2, air preheater, 3, primary air fan, 4, secondary air fan, 5, deduster, 6, desulfurizing tower, 7, outside chimney Cylinder, 8, chimney internal cylinder, 9, control valve, 10, boiler side shutdown flashboard, 11, hot air duct, 12, heat release hole.
Specific embodiment
With reference to the accompanying drawing and specific embodiment is described in further details the present invention:
The invention discloses a kind of hot Secondary Air heating chimneys to prevent gypsum rain system, chimney breast smoke temperature is improved, to avoid The generation of " gypsum rain ".Here is specific embodiment:
A kind of hot Secondary Air heating chimney of the invention as shown in Fig. 1 prevents the structural schematic diagram present invention of gypsum rain system A kind of disclosed hot Secondary Air heating chimney prevents gypsum rain system, including flue gas system and hot Secondary Air heating system;It is described Flue gas system includes the boiler 1 successively mutually connected from beginning to end by the hot air duct 11 in heat primary air road, air preheater 2, removes Dirt device 5, desulfurizing tower 6 and chimney outer cylinder 7;The hot Secondary Air heating system includes 2 side of air preheater is arranged in primary Blower 3 and secondary air fan 4, and be arranged on the hot air duct 11 of hot secondary air duct of connection air preheater 2 and chimney outer cylinder 7 Control valve 9 and boiler side turn off flashboard 10.
Further, the position that the hot air duct 11 of hot secondary air duct enters in chimney outer cylinder 7 is 7 height of chimney outer cylinder At 1/2.
Specifically, chimney type is steel inner cylinder sleeve-type chimney in embodiment provided by the invention, chimney height is 210 meters.The hot blast temperature extracted out of hot secondary air duct hot air duct 11 is 360 DEG C, hot air flow 10%.To guarantee cigarette The temperature field of chimney outer wall, which can be realized, to be uniformly distributed, and hot wind is entered in chimney outer cylinder 7 by the hot air duct 11 of hot secondary air duct Entrance height be 96 meters.
Further, a kind of hot Secondary Air heating chimney of the invention as shown in Fig. 3 prevents the office of gypsum rain system Portion's schematic cross-section, it further includes chimney internal cylinder 8, institute that a kind of hot Secondary Air heating chimney provided by the invention, which prevents gypsum rain system, It states and is evenly arranged with heat release hole 12 on the chimney body between chimney internal cylinder 8 and chimney outer cylinder 7.
The number that heat release hole 12 is arranged on chimney body between chimney internal cylinder 8 and chimney outer cylinder 7 is 6-10.Specifically, In embodiment provided by the invention, the quantity of chimney top hot wind heat release hole 12 is 8,0.76 meter of diameter, away from chimney outer cylinder 7 0.12 meter of outer wall;Setting not only can guarantee that hot wind can heat the flue gas in inner cylinder very well in this way, but also can be by the heat after heating chimney Wind discharges in time.
Further, a kind of hot Secondary Air heating chimney of the invention as shown in Fig. 2 prevents the office of gypsum rain system Portion's structural schematic diagram is provided with into the end of the hot air duct 11 of the hot secondary air duct between chimney outer cylinder 7 and chimney internal cylinder 8 Elbow vertically upward.Into the hot secondary air duct between chimney outer cylinder 7 and chimney internal cylinder 8 hot air duct 11 be two strands, two Stock hot air duct 11 is arranged symmetrically about the central axes of chimney outer cylinder 8.
To sum up, the hot wind extracted from hot secondary air duct by hot air duct 11 enter chimney outer cylinder 7 and chimney internal cylinder 8 it Between heat release hole 12 flue gas, the hot wind in chimney is entered by the control of control valve 9 on the hot air duct 11 of hot secondary air duct Flow effectively improves chimney breast smoke temperature to realize, avoids the appearance of subsequent gypsum rain.
Obviously, the above embodiments are merely examples for clarifying the description, and does not limit the embodiments.It is right For those of ordinary skill in the art, can also make on the basis of the above description it is other it is various forms of variation or It changes.There is no necessity and possibility to exhaust all the enbodiments.And it is extended from this it is obvious variation or It changes still within the protection scope of the invention.

Claims (6)

1. a kind of hot Secondary Air heating chimney prevents gypsum rain system, it is characterised in that: add including flue gas system and hot Secondary Air Hot systems;The flue gas system include by the hot air duct (11) in heat primary air road successively mutually the boiler (1) of head and the tail connection, Air preheater (2), deduster (5), desulfurizing tower (6) and chimney outer cylinder (7);The hot Secondary Air heating system includes that setting exists The primary air fan (3) and secondary air fan (4) of air preheater (2) side, and setting is outside connection air preheater (2) and chimney Control valve (9) and boiler side shutdown flashboard (10) on the hot air duct (11) of the hot secondary air duct of cylinder (7).
2. a kind of hot Secondary Air heating chimney according to claim 1 prevents gypsum rain system, it is characterised in that: heat is secondary The hot air duct (11) in air duct enters at the position in chimney outer cylinder (7) is chimney outer cylinder (7) height 1/2.
3. a kind of hot Secondary Air heating chimney according to claim 1 prevents gypsum rain system, it is characterised in that: further include Chimney internal cylinder (8) is evenly arranged with heat release hole (12) on the chimney body between the chimney internal cylinder (8) and chimney outer cylinder (7).
4. a kind of hot Secondary Air heating chimney according to claim 3 prevents gypsum rain system, it is characterised in that: in chimney The number that heat release hole (12) are arranged on chimney body between cylinder (8) and chimney outer cylinder (7) is 6-10.
5. a kind of hot Secondary Air heating chimney according to claim 3 prevents gypsum rain system, it is characterised in that: enter cigarette The end of the hot air duct (11) of hot secondary air duct between chimney outer cylinder (7) and chimney internal cylinder (8) is provided with vertically upward curved Head.
6. a kind of hot Secondary Air heating chimney according to claim 3 prevents gypsum rain system, it is characterised in that: enter cigarette The hot air duct (11) of hot secondary air duct between chimney outer cylinder (7) and chimney internal cylinder (8) is two strands, and two bursts of hot air ducts (11) are closed It is arranged symmetrically in the central axes of chimney outer cylinder (8).
CN201910329811.9A 2019-04-23 2019-04-23 A kind of hot Secondary Air heating chimney prevents gypsum rain system Pending CN110195878A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910329811.9A CN110195878A (en) 2019-04-23 2019-04-23 A kind of hot Secondary Air heating chimney prevents gypsum rain system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910329811.9A CN110195878A (en) 2019-04-23 2019-04-23 A kind of hot Secondary Air heating chimney prevents gypsum rain system

Publications (1)

Publication Number Publication Date
CN110195878A true CN110195878A (en) 2019-09-03

Family

ID=67752020

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910329811.9A Pending CN110195878A (en) 2019-04-23 2019-04-23 A kind of hot Secondary Air heating chimney prevents gypsum rain system

Country Status (1)

Country Link
CN (1) CN110195878A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1438499A (en) * 1972-12-21 1976-06-09 Beaumont Ltd F E Method for the treatment of flue gases in chimneys
CN202915385U (en) * 2012-11-14 2013-05-01 辽宁省电力有限公司电力科学研究院 Mixed type smoke purifying and heating device
CN204358747U (en) * 2014-12-17 2015-05-27 合肥恒力电子装备公司 A kind of industrial electro kiln band heating chimney
CN206508767U (en) * 2017-02-27 2017-09-22 天津普惠节能换热设备有限公司 Flue gas disappears white equipment
CN109631071A (en) * 2018-12-06 2019-04-16 李申强 A method of eliminating white smoke device and heating eliminating white smoke are heated for coal steam-electric plant smoke

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1438499A (en) * 1972-12-21 1976-06-09 Beaumont Ltd F E Method for the treatment of flue gases in chimneys
CN202915385U (en) * 2012-11-14 2013-05-01 辽宁省电力有限公司电力科学研究院 Mixed type smoke purifying and heating device
CN204358747U (en) * 2014-12-17 2015-05-27 合肥恒力电子装备公司 A kind of industrial electro kiln band heating chimney
CN206508767U (en) * 2017-02-27 2017-09-22 天津普惠节能换热设备有限公司 Flue gas disappears white equipment
CN109631071A (en) * 2018-12-06 2019-04-16 李申强 A method of eliminating white smoke device and heating eliminating white smoke are heated for coal steam-electric plant smoke

Similar Documents

Publication Publication Date Title
CN203082914U (en) Air preheating device of power plant boiler
CN104832930B (en) Slag cooling device applicable to dry slag discharge machines and application thereof
CN104208995B (en) A kind of thermal device improving boiler wet method desulfurization neat stress temperature and method
CN207268458U (en) The system for preventing ammonium hydrogen sulfate from blocking air preheater after SCR denitration transformation
CN202915385U (en) Mixed type smoke purifying and heating device
CN204611798U (en) A kind of employing hydronic dried slag removing equipment of low temperature neat stress and furnace cinder cooling device thereof
CN204534555U (en) A kind of flue gas recirculation device for reducing NO_x formation
CN110195878A (en) A kind of hot Secondary Air heating chimney prevents gypsum rain system
CN102600695B (en) Energy-saving desulfuration and denitrification dust collector for large boiler
CN201992682U (en) Cold end heat-accumulating plate corrosion resistant system for rotary air preheater
CN207907273U (en) It is a kind of prevent coal-burning boiler denitration be transformed after tail portion dust deposit in flue device
CN202221098U (en) Hybrid GGH System
CN204534642U (en) A kind of band by-pass collar air preheater
CN204829978U (en) Middle -size and small -size boiler denitration reactor with temperature compensated equipment
CN210268277U (en) Arrangement structure of natural ventilation direct air cooling and smoke tower integrated combined unit
CN204301104U (en) Cigarette temperature and smoke waste heat utilization system fall in boiler for deeply
CN204943525U (en) A kind of device improving SCR reactor cigarette temperature
CN204213962U (en) The combustion-supporting air feed system of energy saving industrial furnace secondary preheating
CN103075740A (en) Chimney white mist removal system and method
CN208591715U (en) Energy-saving combustion gas suitable for medium small boiler takes off white device
CN110319713A (en) A kind of arrangement of gravity-flow ventilation Direct Air-Cooled and nicotinic acids combination unit
CN207599980U (en) A kind of gas fired-boiler
CN106440841A (en) Exhaust gas recovery system for rotary kiln
CN204187662U (en) A kind of layout loop of blower fan high-efficiency operation of connecting
CN205447806U (en) Energy -conserving air duct device and flue gas air system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190903

RJ01 Rejection of invention patent application after publication