CN110155085A - Train is over long distances, heavy grade, the method for protecting on road surface - Google Patents
Train is over long distances, heavy grade, the method for protecting on road surface Download PDFInfo
- Publication number
- CN110155085A CN110155085A CN201910410015.8A CN201910410015A CN110155085A CN 110155085 A CN110155085 A CN 110155085A CN 201910410015 A CN201910410015 A CN 201910410015A CN 110155085 A CN110155085 A CN 110155085A
- Authority
- CN
- China
- Prior art keywords
- train
- stopway
- road surface
- descending
- heavy grade
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60M—POWER SUPPLY LINES, AND DEVICES ALONG RAILS, FOR ELECTRICALLY- PROPELLED VEHICLES
- B60M1/00—Power supply lines for contact with collector on vehicle
- B60M1/12—Trolley lines; Accessories therefor
- B60M1/13—Trolley wires
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60M—POWER SUPPLY LINES, AND DEVICES ALONG RAILS, FOR ELECTRICALLY- PROPELLED VEHICLES
- B60M3/00—Feeding power to supply lines in contact with collector on vehicles; Arrangements for consuming regenerative power
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61B—RAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
- B61B1/00—General arrangement of stations, platforms, or sidings; Railway networks; Rail vehicle marshalling systems
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61D—BODY DETAILS OR KINDS OF RAILWAY VEHICLES
- B61D43/00—Devices for using the energy of the movements of the vehicles
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T30/00—Transportation of goods or passengers via railways, e.g. energy recovery or reducing air resistance
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Transportation (AREA)
- Electric Propulsion And Braking For Vehicles (AREA)
Abstract
Train is over long distances, heavy grade, descending and upward slope road surface are when driving, how train is guaranteed, at high speed, at full capacity, safety and stability traveling is an extremely important problem, I have invented increase the stopway that multiple bands 15 ‰ go up a slope beside heavy grade descending road surface to lay down the potential energy that failure train is generated in big descending using it thus, avoid the occurrence of great traffic accident, increase multiple groups stopway beside heavy grade upward slope road surface simultaneously, the stopway that wherein every group of band 15 ‰ goes up a slope lays down the heterodromous train of appearance with it and avoids the occurrence of major traffic accidents in the potential energy that big descending generates, also to build a stopway identical with the main line gradient, if the train of front when there is counter motion subsequent train to avoid car to car impact accident into the stopway in advance, after having above-mentioned safe avoidance measure, just can Guarantee that train drives safely on heavy grade road surface, and the potential energy that train generates can be converted into electric energy.
Description
Technical field
The present invention relates to a kind of trains over long distances, and how heavy grade, descending and upward slope road surface when driving, guarantee train,
At high speed, at full capacity, the technology of safety and stability traveling, it exists to train, long range, heavy grade, on road surface, improves train speed
Degree increases transport capacity, guarantees that transportation safety has extremely important effect.
Background technique
Due to having more than the huge drop of 5000m or more between the western and eastern, China, with the continuous development of railway construction,
The length on railway gradient road surface is increasingly longer, and in central and west regions, the gradient exists, the heavy grade road surface of (6 ‰ -30 ‰) account for 85% with
On, there have been a problems very serious in this way, because train can generate automatic add on heavy grade descending road surface when driving
Speed, such as: train will automatically speed up 0,69 kilometers in every 1 second on 20 ‰ descending road surface, it is therefore necessary to by reducing speed,
Freight volume is reduced, to guarantee the safety of train, if while in the brake system failure train meeting of heavy grade upward slope road surface
There is inverted running, will be caused a significant threat to subsequent train, in order to guarantee train in heavy grade descending road surface and great Po
Degree can be safely operated on upward slope road surface, there is an urgent need to invent new brake technology and building security support facility, for fire
The safe operation of vehicle provides guarantee, thoroughly solves the weight that train generates in long range, heavy grade descending road surface and upward slope road surface
Big security risk.
I has invented train over long distances by long-term research, and heavy grade, the safety protection technique on road surface, it is to pass through
Increase the stopway that band 15 ‰ goes up a slope in railway line, train is laid down on heavy grade road surface by it because self weight and difference in height produce
Raw potential energy guarantees the safety of train, while by building helistop near stopway, guarantee to repair rapidly therefore
Hinder train.
Summary of the invention
It is very more on Southwestern China Railways In Northwest China heavy grade road surface, wherein 6 ‰ or more heavy grade road surface accounts for sum
85% or more, the gradient is 10 ‰ -30 ‰, and length is many in tens kilometers up to a hundred kilometers have, since train is long in heavy grade
When apart from descending road surface, uplink is sailed, it is necessary to guarantee transportation safety by slowing down and reducing trailing weight, therefore exist at train
Train speed is improved on heavy grade road surface and increases the bottleneck of transport capacity, and there are also trains in operation if there is big over long distances
It has to carry out continuous cyclic brake when gradient road surface, since continuous brake block can heat up to reduce after multiple friction
Coefficient of friction causes Train brake power to reduce when brake force reaches a low value, will be unable to control the speed of train to fire
The safe operation harm of vehicle is very big, and in order to solve this problem I have invented a kind of multifunctional train compartments, it can pass through
Regenerative Braking Technology makes train have powerful brake force on heavy grade descending road surface, while the electricity of recycling power grid can also be sent
Enter upward slope power grid be upward slope road surface on traction motor power such train go up a slope when just have powerful tractive force, therefore energy
Enough make train on heavy grade ascents and descents road surface can, at full capacity, run at high speed, foregoing invention makes train in heavy grade
There is powerful brake force on descending road surface, has powerful tractive force on heavy grade upward slope road surface, moreover it is possible to which train is produced on descending road surface
Raw potential energy is converted into electric energy, but how to guarantee that there is also defects on transportation safety, thus in order to improve the relevant technologies I
Safety protection technique of the train on heavy grade, long range road surface has been invented again.
Invention be first on the descending road surface of heavy grade, from highest point to one recycling grid line of minimum point design,
The compartment of axle driven generator is largely used in manufacture, is consolidating for traction motor power supply saving battery for each column train configuration two
Determine compartment, there is heating in each the inside made of heat-resisting material of installation one before each wheel on the compartment with generator
The seal box of resistance, suitable for reading to connect with high steam pressing tube, lower mouth alignment wheel and track, in the gradient (5 ‰ -30 ‰), length 20 is public
In more than, heavy grade descending road surface on, all build a recycling grid line from highest point to minimum point, connection recycling grid line
One 2 kilometers or so of isolation power grid is all built in place, wherein grid line, and grid line is isolated, and is recycled grid line, is all used insulation material
Material is kept apart, but the local pantograph connected between them is wanted to pass through, and repairs one below isolation grid line
Rail road surface with 2 ‰ descendings.
New Regenerative Braking Technology can be carried out after the completion of above-mentioned preparation, specific method is;
(1) increase on descending track and build stopway
(2) also increase on upward slope track and build stopway
(3) helistop is built in the place close to stopway
(4) substation is being built close to the place of recycling power grid
I am train in long range, heavy grade descending road surface and long range, the method for operation on heavy grade upward slope road surface below
It is specifically described.
1. building stopway on descending track
In order to enable train not only to have powerful brake force on the heavy grade descending road surface of (10 ‰ -30 ‰) but also want
More safety and stability uses new Regenerative Braking Technology in invention, is exactly the highest in heavy grade descending surface railway track
Above point to the minimum point of railroad track, a recycling power grid is individually built, recycling power grid is using original grid line, only
Recycling power grid and grid line are disconnected in highs and lows with insulating materials, but pantograph is wanted in grid line and to return
It is smoothly current to receive the place connected between grid line, recycling power grid so just becomes an abortive haul without any electric energy, fire
Vehicle is to draw train running by the fixed compartment of battery powered 2 section, then by the electrical power generators on brake equipped cars big
The potential energy that gradient descending road surface train generates is converted to electric energy by regenerative braking, then to build close to the place of recycling power grid
The traction motor that the grid line that upward slope is sent into after the electricity regulation of recycling power grid is upward slope is powered by it by one substation,
The electricity of traction motor consumption is equal when the electricity and train issued according to (law of conservation of energy) train descending goes up a slope, in this way
The energy consumption of train flat pavement running can complete the traction work on heavy grade upward slope road surface, while can also be other use electric energy
Electric unit power supply.
Train can be made to have powerful brake force on heavy grade descending road surface using invention above, but if regeneration is made
Train will be out of hand when dynamic failure, hidden due to not having evacuation facility that can generate great safety to entire transportation route
Suffer from, in order to solve this problem I am according to the different situations of every route, and on descending road surface according to the speed of train, the gradient is long
Degree, difference multiple stopways are set as the case may be respectively on different routes, stopway entrance and descending track
Main line connection, outlet are also connected with the main line of descending track, and stopway and main line are built side by side, and stopway is from entering
Mouth will have 15 ‰ upward slope track to top, lay down train after the potential energy that descending track generates with it, train is made to be parked in parking
Be below arc at the top of stopway be descending track with a slope on road, just pass through when train will reply operation top curve from
Stopway outlet enters main line, since train is the fixation compartment traction train fortune with two whose power supplieds in big descending track
Row, therefore being drawn with it can be extremely difficult when train passes through upward slope arc, therefore to prepare a traction locomotive and help train
Entering descending by arc track makes train export injection main line from stopway.
Pass through tele-control system if when train regenerative braking breaks down in this way to remove, or by manually removing
Road makes the train main line that de-orbits enter stopway, then the upward slope of stopway 15 ‰ is recycled to lay down train in downhill path
The potential energy that face generates makes train be parked in stopway, then transports maintenance personal and maintenance package using helicopter and carries out to stopway
It repairs, train is pushed through using traction locomotive after the completion of train maintenance and enters descending track at the top of the arc of stopway by stopping
Lane outlet injection main line continue to run, this ensures that descending track whenever the train of full line can
Enough continual safety operates normally.
2. increasing on upward slope track and building stopway
It, be close to recycling in order to enable train to have powerful tractive force on the heavy grade upward slope road surface of (10 ‰ -30 ‰)
A substation is built in the place of power grid, and the grid line that upward slope is sent into after the electricity of recycling power grid is regulated and controled by it is the traction gone up a slope
Motor, according to (law of conservation of energy) train, in descending, electricity and the train traction motor when going up a slope are consumed
Electricity it is equal, the energy consumption of such train flat pavement running can complete the traction work on heavy grade upward slope road surface, invention above
Train can be made to have powerful tractive force on heavy grade upward slope road surface, but if when heavy grade goes up a slope train traction motor
When failure runs out of steam, train just will appear counter motion, and great security risk can be generated to entire supply line, in order to
Solve this problem I on upward slope road surface according to the speed of train, the gradient of track, length is different, in different routes respectively
Distance respectively different multiple groups stopway is set, one group of stopway be two one of them build up 15 ‰ gradient, another is built
At identical with the main line gradient, they all build the side of main line in, if train trailer system failure train loses control
When producing existing counter motion, just by remotely control remove or manually remove make failure train de-orbit main line entrance
15 ‰ upward slope track is parked in failure train on stopway using the potential energy that upward slope track lays down train, while close below
The train of accident train running will not have acclive stop by automatically controlling to remove or manually remove to enter in advance from entrance yet
Lane avoids accident train, is thus avoided that car to car impact accident occur.It is just led using locomotive after the completion of the maintenance of failure train
Draw, reenters main line from outlet along gradient road surface and put into operation.
And below close to there is the train of counter motion failure train running, dispatcher first will be removed by automatically controlling
Either so that train is detached from main line by manually removing, enters the parking that stopway waits failure train to enter 15 ‰ from entrance
It reenters main line from stopway outlet behind road and continues to run, this makes it possible to the continual peaces of train for guaranteeing full line
Full orderly function, if using above-mentioned technology arrange rationally its safety and conevying efficiency can than the train of flat pavement running also than
Height can thoroughly solve the problems, such as that train can not travel at full capacity at high speed in heavy grade descending and upward slope road surface.
3. building helistop in the place close to stopway
It repairs, is just allowed for maintenance if building stopway in railway line and accident train being parked on stopway
Personnel, maintenance of equipment, maintenance and repair parts transport to rapidly stopway, but to be all that mountain area is repaired the roads extremely difficult on all heavy grade road surfaces,
Therefore it reaches the scene of the accident in order to transport maintenance personal and maintenance of equipment as early as possible and to build helistop near stopway, this
Sample had just not only saved road construction fund but also had improved maintenance speed, while can also pick people on duty on stopway on time using it
The road Gong Ban personnel are on and off duty.
4. building substation close to the place of recycling power grid
Train is one since the effect of speed and weight can generate very big potential energy when heavy grade descending road surface is run
A resource that can generate a large amount of electric energy, but these valuable resources are relevant due to not inventing in the world for a long time
Recovery technology is all by slatterning in vain, and the present invention seeks to fundamentally solve this problem, it is first in great Po
It spends on the rail road surface of descending and builds an independent recycling power grid, a substation is built near recycling power grid, then train
Recycling power grid is sent by the electricity that regenerative braking issues on descending road surface, the electricity on upward slope road surface is sent into after regulating and controlling using substation
Net is the traction motor power supply gone up a slope, and is disappeared according to law of conservation of energy descending regenerative braking electricity and upward slope traction motor
The electricity of consumption be it is identical, we are not only to recycle the electricity of power grid to have found electricity consumption outlet in this way, but also can be by upward slope
Power grid power supply can reduce the costs of a large amount of construction power transmission lines, realizing optimum organization keeps railway transportation more scientific and reasonable,
Transportation cost can be greatly lowered, while the electricity for recycling power grid can also power for other electricity units.
Explanation and specific embodiment with reference to the accompanying drawing, it is further to invention to be stated.
Detailed description of the invention
Fig. 1 train is going up a slope, and descending road surface powers on net and track schematic diagram
Two sections of Fig. 2 charged pool draw compartment schematic diagram
Fig. 3 substation power transmission line schematic diagram
The technical scheme is that building stopway using increasing beside railroad track main line, break down in train
When can timely enter stopway and repair, reenter track main line after the completion of maintenance and continue to run, thus both may be used
With guarantee full line train can continual continuous operation, and failure train can be enable to be repaired in time, moreover it is possible to
At electric energy, method is enough potential energies that train is generated on heavy grade road surface;
Referring to Fig. 1, Fig. 2, Fig. 3 build a recycling power grid 1 on the track 3 on 2 descending road surface of heavy grade first, it is
Make recycling power grid become one with insulated wire 10 and grid line disconnection respectively in the highs and lows of power grid 1 only to receive again
Raw braking issues the isolated power network of electricity, while also to build multiple stopways 4 on the side of gug 3 as needed, and stopway enters
Mouth is connected with descending track, and stopway outlet is also connected with descending track, and stopway 4 is built up 15 ‰ gradient top of a band
Portion is the stopway of arc.Its effect is if when the train of heavy grade descending breaks down out of hand, dispatcher can be with
So that train out of control is entered stopway 4 from entrance by remotely controlling to remove or notify manually to remove, then utilizes 15 ‰
Ramp, which lays down train and so that train is parked in stopway in the potential energy that heavy grade road surface generates, to be repaired, while attached in stopway 4
Helistop 17 closely is built, with helicopter maintenance personal, maintenance of equipment, maintenance and repair parts is transported to rapidly stopway, repaired
Injection main line is being exported after reforwarding from stopway using descending at the top of arc at rear train is pushed through using traction locomotive
Row, such failure train just not only will not influence the normal operation of full line train but also can guarantee that failure train obtains on-call maintenance
It puts into operation as early as possible, while the electricity of recycling power grid 1 is sent into the benefit after transformer regulates and controls of substation 14 by power transmission line 16
It is traction motor power supply that the power grid 5 to go up a slope is sent into power transmission line 15, since two batteries 11 of train of descending are powered
Fixed compartment 12 draws train and operates normally, by the motor band rotation traction train running of motor car wheel 13, then its power is
In the potential energy that train is generated on descending road surface using the electrical power generators on brake equipped cars at electric energy, passing through generator
The powerful brake force that power generation generates guarantees train safe operation, designs be not only able to the train to generate in heavy grade descending in this way
Potential energy is to ensure that train is safe steady at full capacity at high speed on heavy grade, long range descending road surface at electric energy
Fixed traveling, can be greatly improved conevying efficiency.
Referring to Fig. 1, Fig. 2, Fig. 3 build power grid 5 on the upward slope track 7 of heavy grade 6 first, then pass through substation's handle
The electricity for recycling power grid is powered after transformer regulates and controls for power grid 5, as the power supply of upward slope traction motor, while will also basis
Need to build multiple groups stopway 8,9 on the side of descending track 7, one group of stopway be two wherein 9 build up 15 ‰ upward slope, 8 build
Outlet and entrance is respectively set at identical with the main line gradient, they all build the side of main line 7 in, if train trailer system
Failure train is out of hand when there is counter motion, and just removing or manually remove by remotely control makes failure train
The main line that de-orbits enters 15 ‰ upward slope track 9, makes failure train using the potential energy that the gradient of upward slope track lays down train
It is parked on stopway 9, while also to be removed by automatically controlling close to the train of accident train running or manually be removed below
Entering in advance from entrance does not have acclive stopway 8 to avoid accident train, is thus avoided that car to car impact accident occur.Failure
Traction locomotive is just utilized after the completion of train maintenance, reenters main line investment fortune from outlet along the descending road surface of stopway 9
Row.When if the failure of train traction motor runs out of steam, counter motion occurs in train, dispatcher will be first by automatic
Control is removed or is passed through and manually removes, and so that the train run below is entered stopway 8 by the entrance of stopway and is detached from master
Route 7 is waited and being continued to run reentering main line from the outlet of stopway 8 after parking 9 of the failure train into 15 ‰,
This makes it possible to the continual safe and orderly operations of train for guaranteeing full line, as long as arranging rationally its safety using above-mentioned technology
Property and conevying efficiency can be more taller than the train of flat pavement running, can thoroughly solve train heavy grade upward slope road surface can not high speed
The problem of degree travels at full capacity.
Referring to, Fig. 1 is repaired if building stopway in descending railway line 3 and accident train being parked on stopway 4,
With regard to needing maintenance personal, maintenance of equipment, maintenance and repair parts transports to rapidly stopway, since the place of construction stopway is all mountain
Area repairs the roads extremely difficult, therefore the scene of the accident is reached in order to transport maintenance personal and maintenance of equipment as early as possible, so will be in stopway
Helistop 17 nearby is built, thus can be using helicopter maintenance personal, maintenance of equipment, maintenance and repair parts is transported to rapidly
Stopway repairs, and can thus save road construction fund but also improve maintenance speed, while can also be by using it
When pick that on duty on stopway manually to remove personnel on and off duty.
Referring to Fig. 1, Fig. 3 builds an independent recycling power grid 1 on the rail road surface of heavy grade descending first, in recycling electricity
Net nearby builds a substation 14, and then train is sent into the electricity that descending road surface is issued by regenerative braking by power transmission line 16
Substation 14 is the traction motor power supply gone up a slope in the power grid 5 for being sent into upward slope road surface by power transmission line 15 after regulation, this
We are just to recycle the electricity of power grid to have found electricity consumption outlet to sample, and can be a large amount of by can be reduced to the power supply of the power grid 5 of upward slope
The cost of power transmission line is built, realizing optimum organization keeps railway transportation more scientific and reasonable, transportation cost can be greatly lowered,
The electricity for recycling power grid simultaneously can also power for other electricity units.
Referring to fig. 2, train is that battery-powered fixed compartment 12 draws train fortune in descending heavy grade road traveling
Row, wherein battery 11 is that traction motor power supply transports the motor rotation band traction train running of motor car wheel 13.
Claims (1)
1. a kind of train is over long distances, heavy grade, the method for protecting on road surface when driving is mainly characterized by;
1. building an independent recycling grid line on heavy grade track road surface over long distances first, it is responsible for reclaiming braking hair
Electricity out,
2. on descending road surface according to the speed of train and the gradient of track, length is different, on different routes, respectively according to specific
Multiple stopways are arranged in situation, and stopway entrance is connected with the main line of descending track, and stopway will have from entrance to top
15 ‰ upward slope, laying down train with it is parked in train on stopway in the potential energy that descending track generates, and is arc at the top of stopway
Shape, outlet is descending track from arc to stopway, and train needs that train is pushed through arched top with locomotive when being driven out to stopway
Portion enters descending track and then enters main line from stopway outlet,
3. will be according to the speed of train and the gradient of track on upward slope road surface, length is different, on different routes, respectively according to tool
Multiple groups stopway is arranged in body situation, and stopway 2 are that one group of one of stopway is connected from entrance to top with main line
There is 15 ‰ upward slope, laying down train with it is parked in train on stopway in the potential energy that descending track generates, another parking
Road entrance and exit identical with the main line gradient is all connected to main line, and working method is;If there is event in train trailer system
Train is out of hand for barrier when there is counter motion, and just removing or manually remove by remotely control makes failure train be detached from rail
Road main line enters 15 ‰ upward slope track, is parked in failure train on stopway using the potential energy that upward slope track lays down train,
Also to be entered in advance by automatically controlling to remove or manually remove from entrance close to the train of accident train running below simultaneously
Do not have acclive stopway evacuation accident train, is thus avoided that car to car impact accident occur.After the completion of the maintenance of failure train
Locomotive traction just is utilized, main line is reentered from outlet along gradient road surface and puts into operation, and avoids the train of accident train
After waiting accident train enters stopway, main line is just reentered by locomotive traction from stopway outlet and is continued to run,
4. being repaired if building stopway in railway line and accident train being parked on stopway, just allow for maintenance people
Member, maintenance of equipment, maintenance and repair parts transport to rapidly stopway, but to be all that mountain area is repaired the roads extremely difficult on all heavy grade road surfaces, because
This reaches the scene of the accident and should build helistop near stopway to transport maintenance personal and maintenance of equipment as early as possible, this
Sample had just not only saved road construction fund but also had improved maintenance speed, while can also pick people on duty on stopway on time using it
The road Gong Ban personnel are on and off duty,
5. train is one since the effect of speed and weight can generate very big potential energy when heavy grade descending road surface is run
The resource of a large amount of electric energy can be generated, in order to will be first on the rail road surface of heavy grade descending at electric energy above-mentioned potential energy
An independent recycling power grid is built, a substation is built near recycling power grid, train is then passed through power generation on descending road surface
The electricity of machine regenerative braking sending is sent into recycling power grid, and the power grid that upward slope road surface is sent into after regulating and controlling using substation is leading for upward slope
Draw motor, is identical according to the electricity that law of conservation of energy descending regenerative braking electricity and upward slope traction motor consume
, we are not only to recycle the electricity of power grid to have found electricity consumption outlet in this way, but also can be by the power grid to upward slope for electric energy
Enough costs for reducing construction power transmission line, realizing optimum organization keeps railway transportation more scientific and reasonable, and fortune can be greatly lowered
Defeated cost,
6. traction power is completed by the fixation compartment of two whose power supplieds, power consumption can be very low after energy-saving design, simultaneously
The arc that train pushes through stopway is gone up a slope with locomotive.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910410015.8A CN110155085A (en) | 2019-05-13 | 2019-05-13 | Train is over long distances, heavy grade, the method for protecting on road surface |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910410015.8A CN110155085A (en) | 2019-05-13 | 2019-05-13 | Train is over long distances, heavy grade, the method for protecting on road surface |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110155085A true CN110155085A (en) | 2019-08-23 |
Family
ID=67631077
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910410015.8A Pending CN110155085A (en) | 2019-05-13 | 2019-05-13 | Train is over long distances, heavy grade, the method for protecting on road surface |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110155085A (en) |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200317158Y1 (en) * | 2003-03-25 | 2003-06-25 | 주식회사 남원건설엔지니어링 | Emergency braking facility using waste tire |
KR100541259B1 (en) * | 2005-09-21 | 2006-01-10 | 주식회사 선진엔지니어링 종합건축사 사무소 | A vehicle extraordinary stop equipment used road |
DE102005026822B3 (en) * | 2005-06-09 | 2006-08-03 | Reinhold Danz | Method for braking a transport device esp. for heavy railway vehicles, uses drive device with coupling having variable coupling intensity for varying braking force |
US20090032350A1 (en) * | 2007-08-01 | 2009-02-05 | Sandor Wayne Shapery | System and method for capturing energy from a railcar |
CN201411642Y (en) * | 2009-06-12 | 2010-02-24 | 陈斌 | Classified forced speed-reduction belt for large-sized vehicle |
CN101725491A (en) * | 2009-11-06 | 2010-06-09 | 侯维栋 | Device and method for power generation by potential energy of vehicles on high slope of highway |
CN102064666A (en) * | 2011-01-10 | 2011-05-18 | 李全瑞 | Kinetic energy generator and application system of railway train |
CN202671990U (en) * | 2012-07-17 | 2013-01-16 | 北京道从交通科技有限公司 | Bay type wire mesh emergency lane |
CN103950452A (en) * | 2014-03-26 | 2014-07-30 | 李全瑞 | Multifunctional railway carriage |
CN203741665U (en) * | 2014-01-13 | 2014-07-30 | 长安大学 | Combined harbor type hedge lane |
-
2019
- 2019-05-13 CN CN201910410015.8A patent/CN110155085A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200317158Y1 (en) * | 2003-03-25 | 2003-06-25 | 주식회사 남원건설엔지니어링 | Emergency braking facility using waste tire |
DE102005026822B3 (en) * | 2005-06-09 | 2006-08-03 | Reinhold Danz | Method for braking a transport device esp. for heavy railway vehicles, uses drive device with coupling having variable coupling intensity for varying braking force |
KR100541259B1 (en) * | 2005-09-21 | 2006-01-10 | 주식회사 선진엔지니어링 종합건축사 사무소 | A vehicle extraordinary stop equipment used road |
US20090032350A1 (en) * | 2007-08-01 | 2009-02-05 | Sandor Wayne Shapery | System and method for capturing energy from a railcar |
CN201411642Y (en) * | 2009-06-12 | 2010-02-24 | 陈斌 | Classified forced speed-reduction belt for large-sized vehicle |
CN101725491A (en) * | 2009-11-06 | 2010-06-09 | 侯维栋 | Device and method for power generation by potential energy of vehicles on high slope of highway |
CN102064666A (en) * | 2011-01-10 | 2011-05-18 | 李全瑞 | Kinetic energy generator and application system of railway train |
CN202671990U (en) * | 2012-07-17 | 2013-01-16 | 北京道从交通科技有限公司 | Bay type wire mesh emergency lane |
CN203741665U (en) * | 2014-01-13 | 2014-07-30 | 长安大学 | Combined harbor type hedge lane |
CN103950452A (en) * | 2014-03-26 | 2014-07-30 | 李全瑞 | Multifunctional railway carriage |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Douglas et al. | An assessment of available measures to reduce traction energy use in railway networks | |
CN104260759B (en) | A method and system for energy-saving optimization of urban rail transit | |
CN107554534A (en) | A kind of dual-purpose shared traffic system for overhead track in new energy vacant lot and operation method | |
CN103029710B (en) | Tube-rail transportation system | |
CN201186654Y (en) | City track traffic system | |
WO2009043203A1 (en) | Multi-station nonstop railway passenger transport system | |
CN113085912A (en) | Ultra-high-speed wheel-rail train unit battery replacement railway system | |
CN107571890B (en) | Intelligent rail transit system | |
CN201694190U (en) | Ropeway locomotive | |
CN102602401A (en) | Tube-rail transportation system | |
CN104129311A (en) | Regenerative braking technique for trains (subway trains and light rail trains) | |
CN203047260U (en) | Lithium-battery-driven energy accumulation type tramcar | |
Mittelman et al. | Techno-economic analysis of energy supply to personal rapid transit (PRT) systems | |
CN110155085A (en) | Train is over long distances, heavy grade, the method for protecting on road surface | |
CN103628373A (en) | Light-weight overhead intelligent bus system | |
CN102730012B (en) | New energy power-driven rail bus group | |
CN102463994A (en) | A double-deck two-way rail compatible green bus system | |
Sengor et al. | Determination of Potential Regenerative Braking Energy in Railway Systems: A Case Study for Istanbul M1A Light Metro Line | |
Singh | Efficient Utilization of Regenerative Braking in Railway Operations | |
CN106121941B (en) | The potential energy of subway train is become the method for electric energy | |
Liu et al. | Traffic management and energy optimization for high-speed trains: an overview of methods for saving energy | |
CN106809022A (en) | The braking recovery system and method for train and the control centre of control train operation | |
CN106240582B (en) | The train multifunctional railway carriage that can be generated electricity | |
CN205674878U (en) | A kind of electrified highway traffic system | |
CN216508318U (en) | Miniature rail transit system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190823 |
|
RJ01 | Rejection of invention patent application after publication |