CN110076372B - Construction equipment for installing antenna - Google Patents

Construction equipment for installing antenna Download PDF

Info

Publication number
CN110076372B
CN110076372B CN201910478234.XA CN201910478234A CN110076372B CN 110076372 B CN110076372 B CN 110076372B CN 201910478234 A CN201910478234 A CN 201910478234A CN 110076372 B CN110076372 B CN 110076372B
Authority
CN
China
Prior art keywords
cavity
lifting
fixedly connected
drilling
gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910478234.XA
Other languages
Chinese (zh)
Other versions
CN110076372A (en
Inventor
余丹丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGXI POWER LINE EQUIPMENT AND FITTING FACTORY Co.,Ltd.
Nanning Power Supply Bureau of Guangxi Power Grid Co Ltd
Original Assignee
Guangxi Power Line Equipment And Fitting Factory Co ltd
Nanning Power Supply Bureau of Guangxi Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Power Line Equipment And Fitting Factory Co ltd, Nanning Power Supply Bureau of Guangxi Power Grid Co Ltd filed Critical Guangxi Power Line Equipment And Fitting Factory Co ltd
Priority to CN201910478234.XA priority Critical patent/CN110076372B/en
Publication of CN110076372A publication Critical patent/CN110076372A/en
Application granted granted Critical
Publication of CN110076372B publication Critical patent/CN110076372B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23BTURNING; BORING
    • B23B41/00Boring or drilling machines or devices specially adapted for particular work; Accessories specially adapted therefor
    • B23B41/02Boring or drilling machines or devices specially adapted for particular work; Accessories specially adapted therefor for boring deep holes; Trepanning, e.g. of gun or rifle barrels
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q5/00Driving or feeding mechanisms; Control arrangements therefor
    • B23Q5/22Feeding members carrying tools or work
    • B23Q5/28Electric drives

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)
  • Drilling And Boring (AREA)

Abstract

The construction equipment for mounting the antenna comprises a drilling cavity and a piling cavity, wherein a drilling mechanism is arranged in the drilling cavity, the piling cavity is internally provided with the piling mechanism, the drilling mechanism and the piling mechanism are connected through a power conversion mechanism arranged in the power conversion cavity, the drilling mechanism comprises a drilling screw rod and a drill bit, a power motor is arranged in the power conversion mechanism, and the screw rod and the drill bit are connected through a connector; the device is simple in mechanism and convenient to use, can combine the drilling and piling processes to form a good connection effect, is controlled by the motor, saves labor force during drilling and piling on the high-rise wall, and most importantly, eliminates a plurality of unnecessary potential safety hazards and ensures the personal safety of workers.

Description

Construction equipment for installing antenna
Technical Field
The invention relates to the technical field of antenna installation, in particular to a construction device for installing an antenna.
Background
Conventionally, need punch the operation during antenna setting, traditional adoption manual work's mode, workman's potential safety hazard problem is serious, consequently, the urgent need a be convenient for operate, the high drilling equipment of safety and stability nature.
Disclosure of Invention
Aiming at the defects of the technology, the invention provides a construction device for mounting an antenna.
The invention relates to a construction device for mounting an antenna and an operation method thereof, the construction device comprises a drilling cavity and a piling cavity, wherein a drilling mechanism is arranged in the drilling cavity, a piling mechanism is arranged in the piling cavity, the drilling mechanism and the piling mechanism are connected through a power conversion mechanism arranged in the power conversion cavity, the drilling mechanism comprises a drilling screw rod and a drill bit, a power motor is arranged in the power conversion mechanism, the screw rod is connected with the drill bit through a connector, the drilling mechanism is driven to drill through the power conversion mechanism during drilling, the piling mechanism comprises a pushing slide block, the pushing slide block pushes a wood pile to enter a drilled hole during piling, a piling connecting wheel is also arranged in the piling cavity, a power connecting gear, a lifting screw rod with a section of smooth shaft end at the upper end and the lower end and a thread block are also arranged in the power conversion cavity, the power connection gear is accessible the lift lead screw with the thread piece is in do the oscilaltion motion in the power conversion chamber, construction equipment still is equipped with the lift chamber be equipped with elevating system in the lift chamber, be equipped with elevator motor in the lift chamber mechanism, elevator motor realizes through the cooperation of gear and rack construction equipment's raising and lowering functions.
Preferably, the drilling mechanism comprises a thread block fixedly arranged in the drilling cavity, the thread block is in fit connection with the drilling screw rod, a rotating gear fixedly connected to the screw rod is arranged in the drilling cavity, a fourth rotating shaft is rotatably arranged in the left wall body and the right wall body in the drilling cavity, a full-meshed gear fixedly connected to the fourth rotating shaft is arranged in the drilling cavity, a third rotating shaft is rotatably connected in the drilling cavity in the horizontal direction, a transmission gear fixedly connected to the right end of the third rotating shaft is arranged in the drilling cavity, a connecting gear fixedly connected to the left end of the third rotating shaft is arranged in the drilling cavity, a second rotating shaft is rotatably connected in the drilling cavity in the horizontal direction, a sun gear fixedly connected to the right end of the second rotating shaft is arranged in the drilling cavity, planet gears are symmetrically arranged around the sun gear, and the sun gear is meshed with the planet gears, an inner gear ring is arranged on the outer side of the meshing of the planet gears, a connecting frame is fixedly connected to the right side of the inner gear ring, the connecting frame is meshed with the connecting gear, a driven bevel gear fixedly connected to the left end of the second rotating shaft is arranged in the drilling cavity, a first rotating shaft is arranged in the drilling cavity in a vertical rotating mode, a driving bevel gear fixedly connected to the first rotating shaft is arranged in the drilling cavity, and the drilling connecting wheel is fixedly connected to the first rotating shaft and located above the driving bevel gear.
Preferably, drilling mechanism still including set up in the drilling hole chamber and fixed connection in the lead screw right-hand member the connector, the connector with drill bit fixed connection, drill bit left side fixedly connected with connecting axle, connecting axle left side fixed surface is connected with the spline wheel, the spline wheel with connector internal surface splined connection, spline wheel left side fixed surface is connected with the locking lever, fixedly connected with dog on the locking lever, be equipped with the locking groove on the connector, it is equipped with the locking slider to lock the inslot slip, the locking slider pass through locking spring with locking inslot diapire fixed connection, it has the pinch bar to articulate on the locking slider, pinch bar upper end fixedly connected with trades the head button.
Preferably, the piling mechanism comprises a connecting slide block slidably disposed in the piling cavity, the piling cavity is provided with a push rod fixedly connected to the right surface of the connecting slide block, the right end of the piling cavity is fixedly connected with the pushing slide block, the pushing slide block can push a wooden pile into a hole, the piling cavity is provided with a connecting rod hinged to the connecting slide block, the front wall and the rear wall of the piling cavity are rotatably provided with a second rotating shaft, the piling cavity is provided with a rotating wheel fixedly connected to the front end of the second rotating shaft, the front surface of the rotating wheel is fixedly connected with a rotating rod, the rotating rod is hinged to the connecting rod, the piling cavity is provided with a driven bevel gear fixedly connected to the rear end of the second rotating shaft, the piling cavity is vertically rotatably provided with a first rotating shaft, the piling cavity is provided with a driving bevel gear fixedly connected to the lower end of the first rotating shaft, and the driving bevel gear is meshed with the driven bevel gear, the piling connecting wheel is fixedly connected to the upper end of the first rotating shaft.
Preferably, the power conversion mechanism comprises a power input shaft which is arranged in the power conversion cavity and is in power connection with the lower surface of the power motor, a driving wheel which is fixedly connected to the power input shaft is arranged in the power conversion cavity, a driving wheel which is fixedly connected to the lower end of the power input shaft is arranged in the power conversion cavity, the thread block is fixedly connected to the power conversion cavity, the lower end of the lifting screw rod is fixedly connected with the power connection gear, the thread block is connected with the lifting screw rod in a matching manner, and the power provided by the power motor can enable the power connection gear to be respectively meshed with the drilling connection wheel and the piling connection wheel.
Preferably, the lifting mechanism comprises a lifting motor fixedly arranged at the bottom of the lifting cavity, the upper surface of the lifting motor is in power connection with a lifting input shaft, a lifting driving bevel gear fixedly connected to the upper end of the lifting input shaft is arranged in the lifting cavity, a lifting transmission shaft is arranged in the lifting cavity in a forward and backward rotating manner, a lifting driven bevel gear fixedly connected to the front end of the lifting transmission shaft is arranged in the lifting cavity, the lifting driven bevel gear is meshed with the lifting driving bevel gear, a lifting driving belt wheel fixedly connected to the lifting transmission shaft and positioned behind the lifting driven bevel gear is arranged in the lifting cavity, a second transmission shaft is arranged in the lifting cavity in a forward and backward rotating manner, a lifting gear fixedly connected to the second transmission shaft is arranged in the lifting cavity, and a lifting driven belt wheel fixedly connected to the front end of the second transmission shaft is arranged in the lifting, the right side of the lifting cavity is provided with a lifting rack fixedly connected with the rear walls of the pile driving cavity and the drilling cavity, the lifting gear is meshed with the lifting rack, the pile driving connecting wheel drives the driving bevel gear to rotate through the first rotating shaft, the driving bevel gear drives the driven bevel gear to rotate, the driven bevel gear drives the rotating wheel to rotate through the second rotating shaft, the rotating wheel drives the rotating rod to rotate, the rotating rod pushes the connecting slider to move rightwards through the connecting rod, the connecting slider pushes the pushing slider to move rightwards through the push rod, the pushing slider pushes the wood pile to enter the hole, and then the power motor rotates forwards and drives each part to reset.
In conclusion, the device is simple in mechanism and easy and convenient to use, the drilling and piling processes can be combined to form a good connection effect, the processes are controlled by the motor, labor force is saved during drilling and piling on the high-rise wall, most importantly, many unnecessary potential safety hazards are eliminated, and the personal safety of workers is guaranteed more.
Drawings
In order to more clearly illustrate the embodiments of the invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the invention, and it is obvious for those skilled in the art that other drawings can be obtained based on these drawings without creative efforts.
Fig. 1 is a schematic view showing an overall structure of a construction equipment for installing an antenna according to the present invention;
FIG. 2 is a schematic view of the structure at A-A in FIG. 1;
FIG. 3 is a schematic view of the structure at B-B in FIG. 1;
fig. 4 is a schematic structural diagram at C in fig. 1.
Detailed Description
All of the features disclosed in this specification, or all of the steps in any method or process so disclosed, may be combined in any combination, except combinations of features and/or steps that are mutually exclusive.
Any feature disclosed in this specification (including any accompanying claims, abstract and drawings), may be replaced by alternative features serving equivalent or similar purposes, unless expressly stated otherwise. That is, unless expressly stated otherwise, each feature is only an example of a generic series of equivalent or similar features.
As shown in fig. 1-4, the construction equipment 100 for mounting an antenna of the device of the present invention includes a drilling cavity 101 and a piling cavity 201, wherein a drilling mechanism is disposed in the drilling cavity 101, a piling mechanism is disposed in the piling cavity 201, the drilling mechanism and the piling mechanism are connected by a power conversion mechanism disposed in the power conversion cavity 301, the drilling mechanism includes a drilling screw 103 and a drill 105, a power motor 305 is disposed in the power conversion mechanism, the screw 103 and the drill 105 are connected by a connector 104, the drilling mechanism is driven by the power conversion mechanism to drill a hole during drilling, the piling mechanism includes a pushing slider 203, the pushing slider 203 pushes a wood pile into the drilled hole during piling, a piling connection wheel 216 is further disposed in the piling cavity 201, and a power connection gear 304 is further disposed in the power conversion cavity 301, The upper end and the lower end of the lifting screw rod 302 and the thread block 303 are respectively provided with a section of smooth shaft end, the power connecting gear 304 can pass through the lifting screw rod 302 and the thread block 303 to do up-and-down lifting motion in the power conversion cavity 301, the construction equipment 100 is also provided with a lifting cavity 401, a lifting mechanism is arranged in the lifting cavity 401, a lifting motor 411 is arranged in the lifting cavity 401, and the lifting motor 411 is matched with a rack through a gear to realize the lifting function of the construction equipment 100.
Advantageously, the drilling mechanism comprises a threaded block 102 fixedly arranged in the drilling cavity 101, the threaded block 102 is in fit connection with the drilling screw 103, a rotary gear 120 fixedly connected to the screw 103 is arranged in the drilling cavity 101, a fourth rotating shaft 106 is rotatably arranged in the left and right walls of the drilling cavity 101, a fully meshed gear 107 fixedly connected to the fourth rotating shaft 106 is arranged in the drilling cavity 101, a third rotating shaft 109 is rotatably connected to the drilling cavity 101 in the horizontal direction, a transmission gear 108 fixedly connected to the right end of the third rotating shaft 109 is arranged in the drilling cavity 101, a connecting gear 110 fixedly connected to the left end of the third rotating shaft 109 is arranged in the drilling cavity 101, a second rotating shaft 115 is rotatably connected to the drilling cavity 101 in the horizontal direction, a sun gear 112 fixedly connected to the right end of the second rotating shaft 115 is arranged in the drilling cavity 101, the sun gear 112 is symmetrically provided with planet gears 113 around, the sun gear 112 is meshed with the planet gears 113, an inner gear ring 114 is arranged on the outer side of the meshing of the planet gears 113, the right side of the inner gear ring 114 is fixedly connected with a connecting frame 111, the connecting frame 111 is meshed with the connecting gear 110, a driven bevel gear 116 fixedly connected to the left end of the second rotating shaft 115 is arranged in the drilling cavity 101, the drilling cavity 101 is provided with a first rotating shaft 118 in the vertical direction in a rotating mode, a driving bevel gear 117 fixedly connected to the first rotating shaft 118 is arranged in the drilling cavity 101, and the drilling connecting gear 119 is fixedly connected to the first rotating shaft 118 and located above the driving bevel gear 117.
Beneficially, the drilling mechanism further includes the connector 104 disposed in the drilling cavity 101 and fixedly connected to the right end of the lead screw 103, the connector 104 is fixedly connected to the drill 105, the left side of the drill 105 is fixedly connected to the connecting shaft 130, the left surface of the connecting shaft 130 is fixedly connected to the spline wheel 121, the spline wheel 121 is connected to the inner surface of the connector 104 through splines, the left surface of the spline wheel 121 is fixedly connected to the locking rod 122, the locking block 129 is fixedly connected to the locking rod 122, the connector 104 is provided with the locking groove 123, the locking slider 124 is slidably disposed in the locking groove 123, the locking slider 124 is fixedly connected to the inner bottom wall of the locking groove 123 through a locking spring, the locking slider 124 is hinged to the pry bar 126, and the upper end of the pry bar 126 is fixedly connected to the head-.
Advantageously, the piling mechanism comprises a connecting slide block 207 slidably disposed in the piling cavity 201, the piling cavity 201 is provided with a push rod 206 fixedly connected to the right surface of the connecting slide block 207, the right end of the push rod 206 is fixedly connected to the push slide block 203, the push slide block 203 can push a wooden pile 204 into a hole, the piling cavity 201 is provided with a connecting rod 208 hinged to the connecting slide block 207, the front and rear walls of the piling cavity 201 are rotatably provided with a second rotating shaft 209, the piling cavity 201 is provided with a rotating wheel 210 fixedly connected to the front end of the second rotating shaft 209, the front surface of the rotating wheel 210 is fixedly connected with a rotating rod 211, the rotating rod 211 is hinged to the connecting rod 208, the piling cavity 201 is provided with a driven bevel gear 212 fixedly connected to the rear end of the second rotating shaft 209, the piling cavity 201 is vertically rotatably provided with a first rotating shaft 215, the piling cavity 201 is provided with a driving bevel gear 214 fixedly connected to the lower end of the first rotating shaft 215, the drive bevel gear 214 is engaged with the driven bevel gear 212, and a pile driving coupling wheel 216 is fixedly coupled to an upper end of the first shaft 215.
Advantageously, the power conversion mechanism comprises a power input shaft 307 which is arranged in the power conversion cavity 301 and is in power connection with the lower surface of the power motor 305, a driving wheel 306 which is fixedly connected to the power input shaft 307 is arranged in the power conversion cavity 301, a driving wheel 308 which is fixedly connected to the lower end of the power input shaft 307 is arranged in the power conversion cavity 301, the threaded block 303 is fixedly connected in the power conversion cavity 301, the lower end of the lifting screw rod 302 is fixedly connected with the power connection gear 304, the threaded block 303 is in fit connection with the lifting screw rod 302, and the power provided by the power motor 305 can enable the power connection gear 304 to be respectively meshed with the drilling connection wheel 119 and the piling connection wheel 216.
Advantageously, the lifting mechanism comprises a lifting motor 411 fixedly arranged at the bottom of the lifting chamber 401, a lifting input shaft 412 is dynamically connected to the upper surface of the lifting motor 411, a lifting driving bevel gear 410 fixedly connected to the upper end of the lifting input shaft 412 is arranged in the lifting chamber 401, a lifting transmission shaft 409 is arranged in the lifting chamber 401 in a forward and backward rotating manner, a lifting driven bevel gear 408 fixedly connected to the front end of the lifting transmission shaft 409 is arranged in the lifting chamber 401, the lifting driven bevel gear 408 is engaged with the lifting driving bevel gear 410, a lifting driving pulley 407 fixedly connected to the lifting transmission shaft 409 and located behind the lifting driven bevel gear 408 is arranged in the lifting chamber 401, a second transmission shaft 404 is arranged in the lifting chamber 401 in a forward and backward rotating manner, and a lifting gear 406 fixedly connected to the second transmission shaft 404 is arranged in the lifting chamber 401, a lifting driven pulley 405 fixedly connected to the front end of the second transmission shaft 404 is arranged in the lifting cavity 401, a lifting rack 402 fixedly connected to the piling cavity 201 and the rear wall of the drilling cavity 101 is arranged on the right side of the lifting cavity 401, and the lifting gear 406 is meshed with the lifting rack 402.
The applicant will now specifically describe an antenna-mounting construction apparatus of the present application with reference to figures 1 to 4 and the above description:
in the initial state, the power motor 305 and the lifting motor 411 are not started, and the driving wheel 306 is meshed with the power connecting gear 304;
when the drilling machine starts to work, the power motor 305 starts to rotate forwards, the power input shaft 307 drives the driving wheel 306 to rotate, the power connecting gear 304 is driven to rotate backwards, so as to drive the drilling connecting wheel 119 to rotate, the drilling connecting wheel 119 drives the driving bevel gear 117 to rotate through the first rotating shaft 118, the driving bevel gear 117 drives the driven bevel gear 116 to rotate, the driven bevel gear 116 drives the sun gear 112 to rotate through the second rotating shaft 115, the sun gear 112 drives the planet gear 113 and the inner gear ring 114 to rotate in a speed reducing manner, the inner gear ring 114 drives the planet carrier 111 to rotate, the planet carrier 111 drives the connecting gear 110 to rotate, the connecting gear 110 drives the transmission gear 108 to rotate through the third rotating shaft 109, and the transmission gear 108 drives the rotating gear 120 to rotate through the full-meshed gear 107, the rotary gear 120 drives the drilling screw rod 103 to rotate, the drilling screw rod 103 simultaneously rotates and linearly moves through the thread block 102 to drive the drill 105 to drill a hole, after the hole is drilled, the power motor 305 rotates reversely, at the same time, the lifting motor 411 is started to drive the lifting driving bevel gear 410 to rotate, the lifting driving bevel gear 410 drives the lifting driven bevel gear 408 to rotate, the lifting driven bevel gear 408 drives the lifting driving pulley 407 to rotate through the lifting transmission shaft 409, the lifting driving pulley 407 drives the lifting driven pulley 405 to rotate, the lifting driven pulley 405 drives the lifting gear 406 to rotate through the second transmission shaft 404, the lifting gear 406 drives the lifting rack 402 to ascend, at the same time, the power connection gear 304 rotates forwardly, and the lifting screw rod 302 is driven by the thread block 303 to simultaneously rotate and linearly move, until the power connecting gear 304 is meshed with the pile driving connecting wheel 216, the pile driving connecting wheel 216 drives the driving bevel gear 214 to rotate through the first rotating shaft 215, the driving bevel gear 214 drives the driven bevel gear 212 to rotate, the driven bevel gear 212 drives the rotating wheel 210 to rotate through the second rotating shaft 209, the rotating wheel 210 drives the rotating rod 211 to rotate, the rotating rod 211 pushes the connecting slider 207 to move rightwards through the connecting rod 208, the connecting slider 207 pushes the pushing slider 203 to move rightwards through the push rod 206, the pushing slider 203 pushes the wood pile 204 to enter a hole, and then an antenna and the wood pile 204 are installed and connected in a matched mode subsequently, then the power motor 305 rotates forwards, and the lifting motor 411 rotates backwards to drive all parts to reset.
In conclusion, the device is simple in mechanism and easy and convenient to use, the drilling and piling processes can be combined to form a good connection effect, the processes are controlled by the motor, labor force is saved during drilling and piling on the high-rise wall, most importantly, many unnecessary potential safety hazards are eliminated, and the personal safety of workers is guaranteed more.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are merely illustrative of the principles of the invention, but that various changes and modifications may be made without departing from the spirit and scope of the invention, which fall within the scope of the invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (1)

1. The utility model provides a construction equipment of installation antenna, construction equipment is including being equipped with drilling chamber and pile chamber, its characterized in that: the drilling cavity is internally provided with a drilling mechanism, the piling cavity is internally provided with a piling mechanism, the drilling mechanism is connected with the piling mechanism through a power conversion mechanism arranged in the power conversion cavity, the drilling mechanism comprises a drilling screw rod and a drill bit, the power conversion mechanism is internally provided with a power motor, the screw rod is connected with the drill bit through a connector, the drilling mechanism is driven by the power conversion mechanism to drill during drilling, the piling mechanism comprises a pushing slider, the pushing slider pushes a timber pile to enter a drilled hole during piling, the piling cavity is also internally provided with a piling connecting wheel, the power conversion cavity is also internally provided with a power connecting gear, a lifting screw rod and a threaded block, the upper end and the lower end of the lifting screw rod are respectively provided with a section of smooth shaft end, and the power connecting gear can move up and down in the power conversion cavity through the lifting screw rod and the threaded block, the construction equipment is also provided with a lifting cavity, a lifting mechanism is arranged in the lifting cavity, a lifting motor is arranged in the lifting cavity mechanism, and the lifting motor realizes the lifting function of the construction equipment through the matching of a gear and a rack; the drilling mechanism comprises a thread block fixedly arranged in the drilling cavity, the thread block is matched and connected with the drilling screw rod, a rotating gear fixedly connected to the screw rod is arranged in the drilling cavity, a fourth rotating shaft is rotatably arranged in the left wall body and the right wall body in the drilling cavity, a full-meshed gear fixedly connected to the fourth rotating shaft is arranged in the drilling cavity, a third rotating shaft is rotatably connected in the drilling cavity in the horizontal direction, a transmission gear fixedly connected to the right end of the third rotating shaft is arranged in the drilling cavity, a connecting gear fixedly connected to the left end of the third rotating shaft is arranged in the drilling cavity, a second rotating shaft is rotatably connected in the drilling cavity in the horizontal direction, a sun gear fixedly connected to the right end of the second rotating shaft is arranged in the drilling cavity, planet gears are symmetrically arranged around the sun gear, and the sun gear is meshed with the planet gears, an inner gear ring is arranged on the meshing outer side of the planet gear, a connecting frame is fixedly connected to the right side of the inner gear ring, the connecting frame is meshed with the connecting gear, a driven bevel gear fixedly connected to the left end of the second rotating shaft is arranged in the drilling cavity, a first rotating shaft is arranged in the drilling cavity in a vertical rotating mode, a driving bevel gear fixedly connected to the first rotating shaft is arranged in the drilling cavity, and the drilling connecting wheel is fixedly connected to the first rotating shaft and located above the driving bevel gear; the drilling mechanism further comprises a connector which is arranged in the drilling cavity and fixedly connected to the right end of the screw rod, the connector is fixedly connected with the drill bit, the left side of the drill bit is fixedly connected with a connecting shaft, the left surface of the connecting shaft is fixedly connected with a spline wheel, the spline wheel is connected with an inner surface spline of the connector, the left surface of the spline wheel is fixedly connected with a locking rod, a stop block is fixedly connected onto the locking rod, a locking groove is formed in the connector, a locking sliding block is arranged in the locking groove in a sliding manner, the locking sliding block is fixedly connected with an inner bottom wall of the locking groove through a locking spring, a pry bar is hinged onto the locking sliding block, and a head changing button is fixedly; the pile driving mechanism comprises a connecting slide block which is arranged in the pile driving cavity in a sliding manner, the pile driving cavity is provided with a push rod which is fixedly connected to the right surface of the connecting slide block, the right end of the pile driving cavity is fixedly connected with the push slide block, the push slide block can push a wooden pile to enter a hole, a connecting rod which is hinged to the connecting slide block is arranged in the pile driving cavity, a second rotating shaft is rotatably arranged in the front wall and the rear wall of the pile driving cavity, a rotating wheel which is fixedly connected to the front end of the second rotating shaft is arranged in the pile driving cavity, a rotating rod is fixedly connected to the front surface of the rotating wheel and hinged to the connecting rod, a driven bevel gear which is fixedly connected to the rear end of the second rotating shaft is arranged in the pile driving cavity, a first rotating shaft is rotatably arranged in the vertical direction in the pile driving cavity, a driving bevel gear which is fixedly connected to the lower end, the piling connecting wheel is fixedly connected to the upper end of the first rotating shaft; the power conversion mechanism comprises a power input shaft which is arranged in the power conversion cavity and is in power connection with the lower surface of the power motor, a driving wheel which is fixedly connected to the power input shaft is arranged in the power conversion cavity, the driving wheel which is fixedly connected to the lower end of the power input shaft is arranged in the power conversion cavity, the thread block is fixedly connected in the power conversion cavity, the lower end of the lifting screw rod is fixedly connected with the power connection gear, the thread block is in matched connection with the lifting screw rod, and the power provided by the power motor can enable the power connection gear to be respectively meshed with the drilling connection wheel and the piling connection wheel; the lifting mechanism comprises a lifting motor fixedly arranged at the bottom of the lifting cavity, the upper surface of the lifting motor is in power connection with a lifting input shaft, a lifting driving bevel gear fixedly connected to the upper end of the lifting input shaft is arranged in the lifting cavity, a lifting transmission shaft is arranged in the lifting cavity in a front-back rotating manner, a lifting driven bevel gear fixedly connected to the front end of the lifting transmission shaft is arranged in the lifting cavity, the lifting driven bevel gear is meshed with the lifting driving bevel gear, a lifting driving belt wheel fixedly connected to the lifting transmission shaft and positioned behind the lifting driven bevel gear is arranged in the lifting cavity, a second transmission shaft is arranged in the lifting cavity in a front-back rotating manner, a lifting gear fixedly connected to the second transmission shaft is arranged in the lifting cavity, and a lifting driven belt wheel fixedly connected to the front end of the second transmission shaft is arranged in the, the right side of the lifting cavity is provided with a lifting rack fixedly connected to the rear walls of the piling cavity and the drilling cavity, and the lifting gear is meshed with the lifting rack.
CN201910478234.XA 2019-06-03 2019-06-03 Construction equipment for installing antenna Active CN110076372B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910478234.XA CN110076372B (en) 2019-06-03 2019-06-03 Construction equipment for installing antenna

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910478234.XA CN110076372B (en) 2019-06-03 2019-06-03 Construction equipment for installing antenna

Publications (2)

Publication Number Publication Date
CN110076372A CN110076372A (en) 2019-08-02
CN110076372B true CN110076372B (en) 2020-12-22

Family

ID=67423282

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910478234.XA Active CN110076372B (en) 2019-06-03 2019-06-03 Construction equipment for installing antenna

Country Status (1)

Country Link
CN (1) CN110076372B (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107248799A (en) * 2017-08-01 2017-10-13 安徽达来电机有限公司 Motor assembly jig

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202016006630U1 (en) * 2016-10-27 2016-11-18 Geotechnik Dunkel Gmbh & Co. Kg Modular handheld ramming sounder
CN208395818U (en) * 2018-06-25 2019-01-18 安徽泰恒之源科技有限公司 A kind of mounting device of high speed highway guardrail upright post
CN109057708B (en) * 2018-07-23 2020-06-12 江苏富源广建设发展有限公司 Building engineering piling and drilling device with cleaning mechanism
CN208685605U (en) * 2018-08-24 2019-04-02 江苏省交通技师学院 A kind of mobile automatic pile driver in construction site
CN208845100U (en) * 2018-09-20 2019-05-10 深圳市中地建设工程有限公司 A kind of civil construction drilling piling machine
CN109736306B (en) * 2018-12-26 2020-11-24 涡阳县禾淼建筑工程有限公司 Pile driver for engineering

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107248799A (en) * 2017-08-01 2017-10-13 安徽达来电机有限公司 Motor assembly jig

Also Published As

Publication number Publication date
CN110076372A (en) 2019-08-02

Similar Documents

Publication Publication Date Title
CN110656884B (en) Safe mine drilling equipment
CN110155688B (en) Shunting station luggage security check machine
CN208416280U (en) A kind of automobile gate glass lifter
CN110076372B (en) Construction equipment for installing antenna
CN111747241A (en) Threading construction auxiliary device for electrical engineering
CN111039240A (en) Intelligent elevator device
CN105019830B (en) A kind of new and effective convenient rig
CN110921526B (en) Crane with adjustable supporting point
CN111362117A (en) Safe building feeding equipment
CN112576160A (en) Security door rock wool filling equipment
CN110924857B (en) Hydraulic rock drill with retaining mechanism
CN111456477B (en) Automatic cleaning and maintaining device for column-shaped steel structure
CN110885031B (en) Domestic hoisting apparatus
CN108437085B (en) A plate drilling device
CN111456481A (en) Building curtain wall replacing and maintaining device
CN113459301A (en) Auxiliary device for marble slab processing
CN112360346A (en) Visual bar planting equipment integrating hole expanding and cleaning
CN112497519A (en) Electric drill device that ceramic tile crack control high efficiency was punched for fitment
CN112482793A (en) Construction mechanism and construction method of concrete precast slab for intelligent building construction
CN221442090U (en) Horizontal truss connecting piece of attached lifting scaffold
CN218061509U (en) Concrete finishing equipment for construction engineering machinery
CN221524789U (en) Electric control single crescent elevator
CN112727117A (en) Automatic installation device of rock plate curtain wall
CN112658350B (en) Automatic milling device with feed amount degressive function
CN111531084A (en) Construction steel bar processing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20201208

Address after: 530000, 43, Xingguang Road, Jiangnan District, the Guangxi Zhuang Autonomous Region, Nanning

Applicant after: NANNING POWER SUPPLY BUREAU OF GUANGXI POWER GRID Co.,Ltd.

Applicant after: GUANGXI POWER LINE EQUIPMENT AND FITTING FACTORY Co.,Ltd.

Address before: 310000 No. 165 Yuanpu Street, Zhuantang Street, Xihu District, Hangzhou City, Zhejiang Province

Applicant before: HANGZHOU QILING CLOTHING Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant