CN110053720A - Immersed tube combination transport installs equipment and transportation installation method - Google Patents

Immersed tube combination transport installs equipment and transportation installation method Download PDF

Info

Publication number
CN110053720A
CN110053720A CN201910429089.6A CN201910429089A CN110053720A CN 110053720 A CN110053720 A CN 110053720A CN 201910429089 A CN201910429089 A CN 201910429089A CN 110053720 A CN110053720 A CN 110053720A
Authority
CN
China
Prior art keywords
immersed tube
hull
equipment
floating body
beam frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910429089.6A
Other languages
Chinese (zh)
Other versions
CN110053720B (en
Inventor
刘德进
冯海暴
苏长玺
冯甲鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority to CN201910429089.6A priority Critical patent/CN110053720B/en
Publication of CN110053720A publication Critical patent/CN110053720A/en
Application granted granted Critical
Publication of CN110053720B publication Critical patent/CN110053720B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/08Arrangement of ship-based loading or unloading equipment for cargo or passengers of winches
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/10Arrangement of ship-based loading or unloading equipment for cargo or passengers of cranes

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Earth Drilling (AREA)
  • Ship Loading And Unloading (AREA)

Abstract

本发明公开了一种沉管组合式运输安装设备及运输安装方法,该设备包括漂浮式浮体横梁机构,两条平行设置的船体和安装在船体上的绞车,漂浮式浮体横梁机构设有用于连接绞车绳缆的牵引点;漂浮式浮体横梁机构包括起重横梁和浮体起重横梁包括两端分别可拆卸连接两条船体的横梁架,以及设于两条船体之间用于吊装沉管的吊装组件,所述横梁架的两端部作为连接端,连接端搭设在船体甲板上,船体甲板上设有用于连接连接端的连接部件,吊装组件安装在横梁架上,浮体安装于横梁架下方以使横梁架浮于水面上。该设备结构简单,生产成本较低,可降低施工成本,可根据施工需求灵活组装和拆解,方便应用于沉管施工作业,可提高设备的利用率,同时方便施工调遣。

The invention discloses an immersed tube combined transport and installation equipment and a transport and installation method. The equipment comprises a floating floating body beam mechanism, two hulls arranged in parallel and a winch installed on the hull. The floating floating body beam mechanism is provided with a beam for connecting The traction point of the winch cable; the floating floating body beam mechanism includes a lifting beam and a floating body lifting beam, including a beam frame at both ends that can be detachably connected to the two hulls, and a hoisting device installed between the two hulls for hoisting immersed tubes The two ends of the beam frame are used as connecting ends. The connecting ends are placed on the hull deck. The hull deck is provided with connecting parts for connecting the connecting ends. The hoisting assembly is installed on the beam frame, and the floating body is installed under the beam frame to make the The beam frame floats on the water. The equipment is simple in structure, low in production cost, can reduce construction cost, can be flexibly assembled and disassembled according to construction requirements, can be easily applied to immersed pipe construction operations, can improve the utilization rate of equipment, and facilitate construction dispatch.

Description

沉管组合式运输安装设备及运输安装方法Immersed tube combined transportation and installation equipment and transportation and installation method

技术领域technical field

本发明涉及沉管隧道建设技术,具体涉及沉管组合式运输安装设备及运输安装方法。The invention relates to an immersed tube tunnel construction technology, in particular to an immersed tube combined transportation and installation equipment and a transportation and installation method.

背景技术Background technique

沉管法是在水底建筑隧道的一种施工方法。沉管隧道就是将若干段预制好的沉管分别浮运到水面施工现场,并一个接一个地沉放安装在已疏浚好的基槽内,以此方法修建的水下隧道。现有的沉管浮运工艺一般要采用多条大功率拖船配合拖拽运输沉管,采用多条拖船运输沉管,存在船舶间调度安排复杂,施工周期长成本高的问题。The immersed tube method is a construction method for building tunnels underwater. The immersed tube tunnel is an underwater tunnel constructed by floating several sections of prefabricated immersed tubes to the water surface construction site, and then sinking and installing them in the dredged foundation groove one by one. The existing immersed tube flotation technology generally uses multiple high-power tugboats to drag and transport the immersed tube, and multiple tugboats are used to transport the immersed tube, which has the problems of complicated scheduling arrangement between ships, long construction period and high cost.

为了解决这一问题,中国专利CN206187298U公开了一种自航式水下隧道沉管运载安装一体船,根据沉管的结构独立设计了一种专门用于沉管运输的整体化的船舶设备,但是这种专用船舶设备需单独生产,且仅能用于运输沉管,设备生产成本高,设备利用率低,采用这种专用设备会造成施工成本的升高,同时,专用船舶设备各机构位置相对固定造成整体体积较大,其调遣过程中对航道水深和航道宽度都有较高的要求,限制了设备的使用,不方便施工调遣。In order to solve this problem, Chinese patent CN206187298U discloses a self-propelled underwater tunnel immersed tube carrying and installation integrated ship. According to the structure of the immersed tube, an integrated ship equipment specially used for immersed tube transportation is independently designed, but This kind of special marine equipment needs to be produced separately and can only be used for transporting immersed tubes. The production cost of the equipment is high and the utilization rate of the equipment is low. The use of this kind of special equipment will increase the construction cost. The fixation causes the overall volume to be relatively large. During the dispatching process, there are high requirements on the water depth and width of the channel, which restricts the use of equipment and is inconvenient for construction and dispatching.

发明内容SUMMARY OF THE INVENTION

针对现有技术不足,本发明要解决的技术问题是,提供沉管组合式运输安装设备及运输安装方法,该设备结构简单,以现有运输船舶作为主要组成机构,设备生产成本较低,可降低施工成本,且可根据施工需求将设备装配为整体化的沉管运输设备,方便应用于沉管运输安装施工,在完成沉管运输安装后可灵活拆解为多个可独立施工、调遣的机构,可提高设备的利用率,同时方便施工调遣。In view of the deficiencies of the prior art, the technical problem to be solved by the present invention is to provide an immersed tube combined transport and installation equipment and a transport and installation method. The equipment has a simple structure, uses the existing transport ship as the main component, and the equipment production cost is low and can be The construction cost is reduced, and the equipment can be assembled into integrated immersed pipe transportation equipment according to construction requirements, which is convenient for application in immersed pipe transportation and installation. The mechanism can improve the utilization rate of equipment and facilitate construction dispatch.

为了达到上述目的,本发明采用的技术方案为:In order to achieve the above object, the technical scheme adopted in the present invention is:

一种沉管组合式运输安装设备,包括漂浮式浮体横梁机构,两条平行设置的船体和安装在所述船体上的绞车,所述漂浮式浮体横梁机构设有用于连接所述绞车绳缆的牵引点;所述漂浮式浮体横梁机构包括起重横梁和吃水深度可调的浮体,所述起重横梁包括两端分别可拆卸连接两条船体的横梁架,以及设于两条船体之间用于吊装沉管的吊装组件,所述横梁架的两端部作为所述横梁架与所述船体的连接端,所述连接端搭设在船体甲板上,所述船体甲板上设有用于连接所述连接端的连接部件,所述吊装组件安装在所述横梁架上,所述浮体安装于所述横梁架下方以使所述横梁架浮于水面上。An immersed tube combined transport and installation equipment includes a floating floating body beam mechanism, two parallel hulls and a winch mounted on the hull, the floating floating body beam mechanism is provided with a cable for connecting the winch cable. towing point; the floating floating body beam mechanism includes a lifting beam and a floating body with adjustable draft, the lifting beam includes a beam frame with two ends detachably connecting the two hulls, and a beam frame arranged between the two hulls. In the hoisting assembly for hoisting the immersed pipe, the two ends of the beam frame are used as the connecting ends of the beam frame and the hull, and the connecting ends are erected on the hull deck, and the hull deck is provided with a connecting end for connecting the For the connecting part of the connecting end, the hoisting assembly is installed on the beam frame, and the floating body is installed under the beam frame to make the beam frame float on the water surface.

一种沉管组合式运输安装设备,包括漂浮式浮体横梁机构,两条平行设置的船体和安装在所述船体上的绞车,所述漂浮式浮体横梁机构设有用于连接所述绞车绳缆的牵引点;所述漂浮式浮体横梁机构包括起重横梁和吃水深度可调的浮体,所述起重横梁包括两端分别可拆卸连接两条船体的横梁架,以及设于两条船体之间用于吊装沉管的吊装组件,所述吊装组件安装在所述横梁架上,所述浮体安装于所述横梁架下方以使所述横梁架浮于水面上。An immersed tube combined transport and installation equipment includes a floating floating body beam mechanism, two parallel hulls and a winch mounted on the hull, the floating floating body beam mechanism is provided with a cable for connecting the winch cable. towing point; the floating floating body beam mechanism includes a lifting beam and a floating body with adjustable draft, the lifting beam includes a beam frame with two ends detachably connecting the two hulls, and a beam frame arranged between the two hulls. For the hoisting assembly for hoisting the immersed tube, the hoisting assembly is installed on the beam frame, and the floating body is installed under the beam frame to make the beam frame float on the water surface.

作为优选,所述船体可设为方驳。Preferably, the hull can be set as a square barge.

作为优选,所述牵引点可为设于所述横梁架上的吊点,所述牵引点至少设为两个。Preferably, the traction point can be a hanging point provided on the beam frame, and the traction point is set to at least two.

作为优选,所述横梁架垂直于所述船体长度方向设置,所述连接部件为设于所述船体甲板上的拉结点,所述拉结点可系绳连接搭设于其上方的所述连接端。Preferably, the beam frame is arranged perpendicular to the length direction of the hull, and the connecting member is a tie point set on the deck of the hull, and the tie point can be tied to the connection above it. end.

作为优选,所述连接端的长度为0.5-1m。Preferably, the length of the connecting end is 0.5-1 m.

作为优选,所述浮体包括设有压载水舱的浮箱,所述压载水舱设有注排水单元。Preferably, the floating body includes a floating tank provided with a ballast water tank, and the ballast water tank is provided with an injection and drainage unit.

作为优选,所述注排水单元可包括与所述压载水舱连通的注排水口,所述注排水口连通双向水泵的一条水管,所述双向水泵的另一条水管可插入浮箱所在水体中。Preferably, the injection and drainage unit may include an injection and drainage port communicating with the ballast water tank, the injection and drainage port is connected to a water pipe of a bidirectional water pump, and the other water pipe of the bidirectional water pump can be inserted into the water body where the floating tank is located .

作为优选,所述浮箱设为两个,所述浮箱设于所述两条船体之间,且两个浮箱对称设于沉管两侧。Preferably, there are two pontoons, the pontoons are arranged between the two hulls, and the two pontoons are symmetrically arranged on both sides of the immersed tube.

作为优选,所述浮箱为长方体浮箱,所述浮箱的长度方向平行于所述船体长度方向设置。Preferably, the pontoon is a rectangular parallelepiped pontoon, and the length direction of the pontoon is parallel to the length direction of the hull.

作为优选,所述吊装组件包括缆索升降机构,所述缆索升降机构的绳缆端部设有挂钩,所述挂钩可连接沉管顶部预设的吊点。Preferably, the hoisting assembly includes a cable lifting mechanism, and the cable end of the cable lifting mechanism is provided with a hook, and the hook can be connected to a preset lifting point on the top of the immersed tube.

作为优选,所述缆绳升降机构包括两个可沿竖直方向升降缆索的卷扬机,所述卷扬机对称设于沉管中轴线所在竖直平面两侧,所述卷扬机本体安装在所述横梁架下方。Preferably, the cable lifting mechanism includes two hoists that can lift cables vertically, the hoists are symmetrically arranged on both sides of the vertical plane where the central axis of the immersed tube is located, and the hoist body is installed below the beam frame.

作为优选,所述漂浮式浮体横梁机构设为多个。Preferably, a plurality of the floating floating body beam mechanisms are provided.

作为优选,所述漂浮式浮体横梁机构设为两个,两个漂浮式浮体横梁机构的横梁架平行设置。Preferably, there are two floating floating body beam mechanisms, and the beam frames of the two floating floating body beam mechanisms are arranged in parallel.

本发明还公开了采用上述的沉管组合式运输安装设备的沉管运输安装工艺,包括以下步骤:The invention also discloses an immersed tube transportation and installation process using the above-mentioned immersed tube combined transportation and installation equipment, which includes the following steps:

船体就位:两条平行设置的船体移动至指定的设备组装位置后定位;The hull is in place: the two parallel hulls are moved to the designated equipment assembly position and positioned;

设备组装:船体上的绞车的绳缆通过挂钩连接所述漂浮式浮体横梁机构的牵引点,启动绞车以拖动所述漂浮式浮体横梁机构绞移至两船体之间的预设位置后,下调所述浮体的吃水深度至所述横梁架的连接端下降至与船体甲板接触,通过连接部件可拆卸的连接所述连接端和船体,即完成所述沉管组合式运输安装设备组装;Equipment assembly: the cable of the winch on the hull is connected to the traction point of the floating floating body beam mechanism through the hook, start the winch to drag the floating floating body beam mechanism to the preset position between the two hulls, and then lower the The draught of the floating body is lowered to the point where the connecting end of the beam frame is in contact with the hull deck, and the connecting end and the hull are detachably connected by connecting parts, that is, the assembly of the immersed tube combined transportation and installation equipment is completed;

沉管装载:启动所述船体以带动沉管组合式运输安装设备到达沉管所在位置,使用所述吊装组件连接吊起沉管,即完成沉管装载;Immersed tube loading: start the hull to drive the immersed tube combined transport and installation equipment to the location of the immersed tube, and use the hoisting assembly to connect and hoist the immersed tube, that is, to complete the immersed tube loading;

沉管运输安装:启动所述船体拖带沉管将沉管浮运至指定安装位置后所述船体定位,沉管在所述吊装组件的牵引下下沉至指定沉放位置后,解除沉管与所述吊装组件的连接,即完成沉管安装;Immersed tube transportation and installation: start the hull towing the immersed tube to float the immersed tube to the designated installation position, and then position the hull. The connection of the hoisting components completes the installation of the immersed pipe;

设备解体:解除所述横梁架的连接端与所述船体的连接部件间的连接,使所述船体与所述漂浮式浮体横梁机构相分离,即完成所述沉管组合式运输安装设备分解。Equipment disassembly: release the connection between the connecting end of the beam frame and the connecting parts of the hull, separate the hull from the floating floating body beam mechanism, and complete the disassembly of the immersed tube combined transportation and installation equipment.

与现有技术相比,本发明的优点和积极效果在于:本发明提供了沉管组合式运输安装设备及运输安装方法,该设备结构简单,以现有运输船舶作为主要组成机构,设备生产成本较低,可降低施工成本,且可根据施工需求将设备装配为整体化的沉管运输设备,方便应用于沉管运输安装施工,在完成沉管运输安装后可灵活拆解为多个可独立施工、调遣的机构,可提高设备的利用率,同时方便施工调遣。Compared with the prior art, the advantages and positive effects of the present invention are as follows: the present invention provides an immersed tube combined transport and installation equipment and a transport and installation method, the equipment is simple in structure, and the existing transport ship is used as the main component, and the production cost of the equipment is low. It is relatively low, which can reduce the construction cost, and the equipment can be assembled into an integrated immersed tube transportation equipment according to the construction requirements, which is convenient for application in the transportation and installation of immersed tubes. The organization of construction and dispatch can improve the utilization rate of equipment and facilitate construction and dispatch.

附图说明Description of drawings

图1为本发明的沉管组合式运输安装设备组合状态俯视图;Fig. 1 is the top view of the combined state of the immersed pipe combined transport and installation equipment of the present invention;

图2为本发明的沉管组合式运输安装设备组合状态结构示意图;FIG. 2 is a schematic structural diagram of the combined state of the immersed tube combined transportation and installation equipment of the present invention;

图3为本发明的漂浮式浮体横梁机构的结构示意图;3 is a schematic structural diagram of the floating floating body beam mechanism of the present invention;

图4为本发明的沉管组合式运输安装设备组装过程示意图;4 is a schematic diagram of the assembly process of the immersed tube combined transport and installation equipment of the present invention;

以上个图中:1-起重横梁,11-横梁架,111-连接端,112-吊点,12-吊装组件,121-卷扬机,122-绳缆,2-船体,21-拉结点,3-绞车,4-浮体,41-浮箱,5-沉管。In the above pictures: 1- Lifting beam, 11- Beam frame, 111- Connection end, 112- Lifting point, 12- Lifting component, 121- Hoist, 122- Rope, 2- Hull, 21- Pull knot, 3- Winch, 4- Floating body, 41- Floating tank, 5- Sinking tube.

具体实施方式Detailed ways

下面,通过示例性的实施方式对本发明进行具体描述。然而应当理解,在没有进一步叙述的情况下,一个实施方式中的元件、结构和特征也可以有益地结合到其他实施方式中。Hereinafter, the present invention will be specifically described through exemplary embodiments. It should be understood, however, that elements, structures and features of one embodiment may be beneficially combined in other embodiments without further recitation.

需要说明的是,在本发明的描述中,术语“内”、“外”、“上”、“下”、“左”、“右”、“前”、“后”等指示的方位或位置关系为基于附图所示的位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。It should be noted that, in the description of the present invention, the terms "inside", "outside", "upper", "lower", "left", "right", "front", "rear" and the like indicate the orientation or position The relationship is based on the positional relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood to limit the present invention.

实施例:Example:

如图1至图4所示,一种沉管组合式运输安装设备,包括漂浮式浮体横梁机构,两条平行设置的船体2和安装在所述船体2上的绞车3,所述漂浮式浮体横梁机构设有用于连接所述绞车3绳缆的牵引点;所述漂浮式浮体横梁机构包括起重横梁1和吃水深度可调的浮体4,所述起重横梁1包括两端分别可拆卸连接两条船体2的横梁架11,以及设于两条船体2之间用于吊装沉管5的吊装组件12,所述横梁架11的两端部作为所述横梁架11与所述船体2的连接端111,所述连接端111搭设在船体2甲板上,所述船体2甲板上设有用于连接所述连接端111的连接部件,所述吊装组件12安装在所述横梁架11上,所述浮体4安装于所述横梁架11下方以使所述横梁架11浮于水面上。As shown in Figures 1 to 4, an immersed tube combined transport and installation equipment includes a floating floating body beam mechanism, two parallel hulls 2 and a winch 3 installed on the hull 2. The floating floating body The beam mechanism is provided with a traction point for connecting the cables of the winch 3; the floating floating body beam mechanism includes a lifting beam 1 and a floating body 4 with adjustable draft, and the lifting beam 1 includes detachable connections at both ends. The beam frames 11 of the two hulls 2 and the hoisting components 12 arranged between the two hulls 2 for hoisting the immersed tube 5 . Connecting end 111, the connecting end 111 is erected on the deck of the hull 2, the deck of the hull 2 is provided with a connecting part for connecting the connecting end 111, the hoisting assembly 12 is installed on the beam frame 11, so The floating body 4 is installed under the beam frame 11 to make the beam frame 11 float on the water surface.

采用上述的沉管组合式运输安装设备的沉管运输安装工艺,包括以下步骤:The immersed tube transportation and installation process using the above-mentioned immersed tube combined transportation and installation equipment includes the following steps:

船体就位:两条平行设置的船体2移动至指定的设备组装位置后定位,所述船体1可采用任何一种常规方式运动至指定位置,也可采用任一种现有定位方式定位,如船体2可利用锚机绞移至指定位置后锚泊定位;The hull is in place: the two parallel hulls 2 are moved to the specified equipment assembly position and then positioned. The hull 1 can be moved to the specified position by any conventional method, or can be positioned by any existing positioning method, such as The hull 2 can be moored and positioned by using the windlass to move to the designated position;

设备组装:船体2上的绞车3的绳缆通过挂钩连接所述漂浮式浮体横梁机构的牵引点,启动绞车3以拖动所述漂浮式浮体横梁机构绞移至两船体2之间的预设位置后,下调所述浮体4的吃水深度至所述横梁架11的连接端111下降至与船体2甲板接触,通过连接部件可拆卸的连接所述连接端111和船体2,即完成所述沉管组合式运输安装设备组装;Equipment assembly: The cable of the winch 3 on the hull 2 is connected to the traction point of the floating floating body beam mechanism through the hook, and the winch 3 is started to drag the floating floating body beam mechanism to the preset between the two hulls 2. After the position, the draft of the floating body 4 is lowered to the point where the connecting end 111 of the beam frame 11 is lowered to contact with the deck of the hull 2, and the connecting end 111 and the hull 2 are detachably connected by connecting parts, that is, the sinking is completed. Pipe combined transport installation equipment assembly;

沉管装载:启动所述船体2以带动沉管组合式运输安装设备到达沉管5所在位置,使用所述吊装组件12连接吊起沉管5,即完成沉管5装载;Immersed tube loading: start the hull 2 to drive the immersed tube combined transport and installation equipment to the position of the immersed tube 5, and use the hoisting assembly 12 to connect and hoist the immersed tube 5, that is, to complete the loading of the immersed tube 5;

沉管运输安装:启动所述船体2拖带沉管5将沉管5浮运至指定安装位置后所述船体2定位,沉管5在所述吊装组件12的牵引下下沉至指定沉放位置后,解除沉管5与所述吊装组件12的连接,即完成沉管5安装;Immersed tube transportation and installation: start the hull 2 to tow the immersed tube 5 to float the immersed tube 5 to the designated installation position, and then position the hull 2, and the immersed tube 5 sinks to the designated sinking position under the traction of the hoisting assembly 12 After that, the connection of the immersed pipe 5 and the hoisting assembly 12 is released, that is, the installation of the immersed pipe 5 is completed;

设备解体:解处所述横梁架11的连接端111与所述船体2的连接部件间的连接,使所述船体2与所述漂浮式浮体横梁机构相分离,即完成所述沉管组合式运输安装设备分解。Equipment disassembly: Disassemble the connection between the connecting end 111 of the beam frame 11 and the connecting parts of the hull 2, so that the hull 2 and the floating floating body beam mechanism are separated, that is, the immersed tube combined type is completed. Transport installation equipment disassembled.

本实施例的沉管组合式运输安装设备结构简单,以现有运输船舶船体2作为主要组成机构,可充分利用现有施工船舶,降低设备生产成本,进而降低施工成本,采用上述设备和施工工艺,可根据施工需求将设备组装装配为整体化的沉管5运输设备,方便应用于沉管5运输安装施工,在完成沉管5运输安装后可将整体化的设备灵活拆解为多个可独立施工、调遣的两条运输船舶和漂浮式浮体横梁机构,可提高设备的利用率,同时拆解后的设备在通航时对航道水深和航道宽度的要求较低,方便施工调遣。The immersed tube combined transport and installation equipment of the present embodiment has a simple structure, and the existing transport ship hull 2 is used as the main component, which can make full use of the existing construction ship, reduce equipment production costs, and further reduce construction costs. The above equipment and construction technology are used. , the equipment can be assembled and assembled into an integrated immersed tube 5 transportation equipment according to the construction requirements, which is convenient for the transportation and installation of the immersed tube 5. After the transportation and installation of the immersed tube 5 is completed, the integrated equipment can be flexibly disassembled into multiple The independent construction and dispatch of two transport ships and the floating floating body beam mechanism can improve the utilization rate of the equipment. At the same time, the dismantled equipment has lower requirements on the water depth and width of the channel during navigation, which is convenient for construction and deployment.

具体的,所述船体2可设为方驳等常规的运输船舶。Specifically, the hull 2 can be set as a conventional transport vessel such as a square barge.

具体的,所述牵引点可为设于所述横梁架11上的吊点112,所述牵引点至少设为两个,如两条船体1上各设置一个绞车3,所述横梁架11上方对应设置两个吊点112。Specifically, the traction point may be a lifting point 112 provided on the beam frame 11 , and the traction points are at least two. Correspondingly, two hanging points 112 are set.

具体的,所述横梁架11垂直于所述船体2长度方向设置,所述连接部件为设于所述船体2甲板上的拉结点21,所述拉结点21可系绳连接搭设于其上方的连接端111。以固定设于船体2甲板上的拉结点21作为连接部件,并通过绳索连接连接端111和拉结点21可以方便的实现连接端111和船体2的连接和分解,从而方便的实现设备的组合装配和分解,方便设备的灵活使用。Specifically, the beam frame 11 is arranged perpendicular to the length direction of the hull 2 , and the connecting component is a tie point 21 provided on the deck of the hull 2 , and the tie point 21 can be connected and erected on the hull 2 . Connection end 111 above. The connection and disassembly of the connection end 111 and the hull 2 can be easily realized by connecting the connection end 111 and the tension node 21 by using the pull node 21 fixed on the deck of the hull 2 as the connecting component, so as to realize the convenient operation of the equipment. Combined assembly and disassembly facilitates the flexible use of equipment.

具体的,所述连接端的长度为0.5-1m。连接端设为适当的长度,可在保证船体2与横梁架11稳定连接的前提下,避免横梁架11伸出的连接端111过长,影响所述漂浮式浮体横梁机构的出运。Specifically, the length of the connecting end is 0.5-1 m. The connecting end is set to an appropriate length, so as to ensure the stable connection between the hull 2 and the beam frame 11, to avoid the connecting end 111 extending from the beam frame 11 from being too long and affecting the shipping of the floating floating body beam mechanism.

具体的,所述浮体4包括设有压载水舱的浮箱41,所述压载水舱设有注排水单元。通过浮箱41压载水舱的注排水可以方便的实现对浮箱吃水深度,注排水单元为压载水舱注水,可是浮箱41下沉,吃水深度加大,注排水单元为压载水舱排水,可是浮箱41上浮,吃水深度减小,采用的现在的压载水量可调的浮箱41,可方便的实现浮箱41上方的起重横梁1的高度调整。Specifically, the floating body 4 includes a floating tank 41 provided with a ballast water tank, and the ballast water tank is provided with a water injection and drainage unit. The draught depth of the floating tank can be easily achieved through the water injection and drainage of the ballast water tank of the floating tank 41. The water injection and drainage unit is the ballast water tank, but the floating tank 41 sinks and the draft increases, and the injection and drainage unit is the ballast water. The tank is drained, but the floating tank 41 floats up and the draft decreases. The current floating tank 41 with adjustable ballast water volume can easily adjust the height of the lifting beam 1 above the floating tank 41 .

具体的,所述注排水单元可包括与所述压载水舱连通的注排水口,所述注排水口连通双向水泵的一条水管,所述双向水泵的另一条水管可插入浮箱41所在水体中。Specifically, the injection and drainage unit may include an injection and drainage port connected to the ballast water tank, the injection and drainage port is connected to a water pipe of a bidirectional water pump, and the other water pipe of the bidirectional water pump can be inserted into the water body where the floating tank 41 is located middle.

具体的,所述浮箱41设为两个,所述浮箱41设于所述两条船体之间,且两个浮箱41对称设于沉管5两侧。Specifically, there are two floating boxes 41 , the floating boxes 41 are arranged between the two hulls, and the two floating boxes 41 are symmetrically arranged on both sides of the immersed tube 5 .

具体的,所述浮箱41为长方体浮箱,所述浮箱41的长度方向平行于所述船体2长度方向设置。Specifically, the pontoon 41 is a rectangular parallelepiped pontoon, and the length direction of the pontoon 41 is arranged parallel to the length direction of the hull 2 .

具体的,所述吊装组件12包括缆索升降机构,所述缆索升降机构的绳缆122端部设有挂钩,所述挂钩可连接沉管5顶部预设的吊点。Specifically, the hoisting assembly 12 includes a cable lifting mechanism, and a hook is provided at the end of the cable 122 of the cable lifting mechanism, and the hook can be connected to a preset lifting point on the top of the immersed tube 5 .

具体的,所述缆绳升降机构包括两个可沿竖直方向升降缆索的卷扬机121,所述卷扬机121对称设于沉管5中轴线所在竖直平面的两侧,所述卷扬机121本体安装在所述横梁架11下方。通过卷扬机的收放绳可实现沉管吊装高度的升降,方便沉管的运输和沉放。Specifically, the cable lifting mechanism includes two hoists 121 that can lift cables in a vertical direction. The hoists 121 are symmetrically arranged on both sides of the vertical plane where the central axis of the immersed tube 5 is located, and the hoist 121 body is installed on the below the beam frame 11. The hoisting height of the immersed pipe can be raised and lowered through the retractable and unwinding rope of the hoist, which is convenient for the transportation and sinking of the immersed pipe.

除此之外,也可采用其他的能够实现沉管吊装高度调整的吊装装置作为所述吊装组件12。Besides, other hoisting devices capable of adjusting the hoisting height of the immersed tube can also be used as the hoisting assembly 12 .

具体的,所述漂浮式浮体横梁机构设为多个。采用多个漂浮式浮体横梁机构同时吊装运输安装同一段沉管,可以更好的确保运输和沉放作业的稳定性。Specifically, a plurality of the floating floating body beam mechanisms are provided. Using multiple floating floating body beam mechanisms to hoist, transport and install the same section of immersed pipe at the same time can better ensure the stability of transportation and sinking operations.

具体的,所述漂浮式浮体横梁机构设为两个,两个漂浮式浮体横梁机构的横梁架11平行设置。Specifically, there are two floating floating body beam mechanisms, and the beam frames 11 of the two floating floating body beam mechanisms are arranged in parallel.

以上所述,仅是本发明的较佳实施例而已,并非是对本发明作其它形式的限制,任何熟悉本专业的技术人员可能利用上述揭示的技术内容加以变更或改型为等同变化的等效实施例应用于其它领域,但是凡是未脱离本发明技术方案内容,依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与改型,仍属于本发明技术方案的保护范围。The above are only preferred embodiments of the present invention, and are not intended to limit the present invention in other forms. Any person skilled in the art may use the technical content disclosed above to make changes or modifications to equivalent changes. The embodiments are applied to other fields, but any simple modifications, equivalent changes and modifications made to the above embodiments according to the technical essence of the present invention still belong to the protection scope of the technical solutions of the present invention without departing from the content of the technical solutions of the present invention.

Claims (10)

1. a kind of immersed tube combination transport installs equipment, which is characterized in that including floatation type floating body beam mechanism, two set in parallel The hull set and the winch being mounted on the hull, the floatation type floating body beam mechanism are equipped with for connecting the winch rope The towing point of cable;The floatation type floating body beam mechanism includes lifting beam and the adjustable floating body of draft, and the lifting is horizontal Beam includes the cross beam frame that both ends are detachably connected two hulls respectively, and for lifting hanging for immersed tube between two hulls Arrangement, connecting pin of the both ends of the cross beam frame as the cross beam frame and the hull, the connecting pin rides upon ship On body deck, the deck in ship structure is equipped with the connecting component for connecting the connecting pin, and the hanging component is mounted on institute It states on cross beam frame, on the floating body is installed below the cross beam frame so that the cross beam frame bubbles through the water column.
2. immersed tube combination transport according to claim 1 installs equipment, which is characterized in that the cross beam frame is perpendicular to institute The setting of ship length direction is stated, the connecting component is the drawknot node in the deck in ship structure, and the drawknot node can tether The connecting pin square thereon is set up in connection.
3. immersed tube combination transport according to claim 2 installs equipment, which is characterized in that the length of the connecting pin is 0.5-1m。
4. immersed tube combination transport according to claim 1 installs equipment, which is characterized in that the floating body includes being equipped with pressure The buoyancy tank of water tank is carried, the ballast tank is equipped with water injection unit.
5. immersed tube combination transport according to claim 4 installs equipment, which is characterized in that the buoyancy tank is set as two, The buoyancy tank is set between two hulls, and two buoyancy tanks are symmetrically set in immersed tube two sides.
6. immersed tube combination transport according to claim 4 installs equipment, which is characterized in that the buoyancy tank is floating for cuboid Case, the length direction of the buoyancy tank are parallel to the ship length direction setting.
7. immersed tube combination transport according to claim 1 installs equipment, which is characterized in that the hanging component includes cable The cable end of rope elevating mechanism, the cable elevating mechanism is equipped with hook, and the hook can connect hanging for immersed tube top preset Point.
8. immersed tube combination transport according to claim 1 installs equipment, which is characterized in that the hawser elevating mechanism packet Include two can hoisting cable along the vertical direction hoist engine, the hoist engine is symmetrically set in perpendicular two where immersed tube central axes Side, the hoist engine ontology are mounted below the cross beam frame.
9. immersed tube combination transport according to claim 1 installs equipment, which is characterized in that the floatation type floating body crossbeam Mechanism is set as multiple.
10. a kind of immersed tube transportation installation method, which is characterized in that transported using the immersed tube combined type of any one of claims 1 to 9 Defeated installation equipment, comprising the following steps:
Hull is in place: two hulls disposed in parallel position after being moved to specified equipment assembled position;
Equipment assembling: the cable of the winch on hull connects the towing point of the floatation type floating body beam mechanism by hook, opens After dynamic winch moves to the predeterminated position between two hulls to drag the floatation type floating body beam mechanism strand, the floating body is lowered The connecting pin of draft to the cross beam frame is dropped to be contacted with deck in ship structure, removably connected by connecting component described in Connecting pin and hull complete the immersed tube combination transport installation equipment assembling;
Immersed tube loads: starting the hull to drive immersed tube combination transport installation equipment to reach immersed tube position, uses institute It states hanging component connection and slings immersed tube, is i.e. completion immersed tube loads;
Immersed tube transport installation: starting the hull traction immersed tube and position hull described after immersed tube transportation by driving to designated mounting position, After immersed tube sinks down into specified sinking position under the traction of the hanging component, the connection of immersed tube and the hanging component is released, Complete immersed tube installation;
Equipment disintegrate: release the connection between the connecting pin of the cross beam frame and the connecting component of the hull, make the hull with The floatation type floating body beam mechanism mutually separates, that is, completes the immersed tube combination transport installation equipment and decompose.
CN201910429089.6A 2019-05-22 2019-05-22 Immersed tube combined type transportation and installation equipment and transportation and installation method Active CN110053720B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910429089.6A CN110053720B (en) 2019-05-22 2019-05-22 Immersed tube combined type transportation and installation equipment and transportation and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910429089.6A CN110053720B (en) 2019-05-22 2019-05-22 Immersed tube combined type transportation and installation equipment and transportation and installation method

Publications (2)

Publication Number Publication Date
CN110053720A true CN110053720A (en) 2019-07-26
CN110053720B CN110053720B (en) 2024-10-29

Family

ID=67324044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910429089.6A Active CN110053720B (en) 2019-05-22 2019-05-22 Immersed tube combined type transportation and installation equipment and transportation and installation method

Country Status (1)

Country Link
CN (1) CN110053720B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110450913A (en) * 2019-09-02 2019-11-15 中交天航滨海环保浚航工程有限公司 A kind of spar structures that can adjust direction
CN113148028A (en) * 2021-04-23 2021-07-23 中交第一航务工程局有限公司 Semi-submersible type immersed tube transportation and installation integrated ship and construction process
CN114348871A (en) * 2021-11-29 2022-04-15 中交第四航务工程局有限公司 Floating device and transportation method for immersed tube
WO2022135606A1 (en) * 2021-04-23 2022-06-30 中交第一航务工程局有限公司 Semi-submersible-type immersed tube transportation and mounting integrated ship and construction process
CN118850276A (en) * 2024-08-19 2024-10-29 安徽省留香特种船舶有限责任公司 Combined water excavation platform
WO2025000717A1 (en) * 2023-06-29 2025-01-02 中交第一航务工程局有限公司 Integrated barge for gravel bed leveling and immersed tube sinking and mounting, and immersed tube tunnel construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2390460C1 (en) * 2009-03-24 2010-05-27 ФГОУ Московская государственная академия водного транспорта Complex to surface and carry sunken submarines and other ships
US20100162935A1 (en) * 2006-12-13 2010-07-01 Jon Khachaturian Marine Lifting Apparatus
US20110150623A1 (en) * 2008-06-13 2011-06-23 Pierre-Armand Thomas Structure for transporting and installing or retrieving underwater equipment and method of transporting and of installing or retrieving underwater equipment
KR20120009081A (en) * 2010-07-22 2012-02-01 한국해양연구원 Floating Land Vehicle System
CN206141776U (en) * 2016-11-17 2017-05-03 中交第一航务工程局有限公司 Large -scale component transportation of self -navigation formula installs integrative ship
WO2018090875A1 (en) * 2016-11-17 2018-05-24 中交第一航务工程局有限公司 Self-sailing integrated vessel for carrying and mounting submerged tubes of underwater tunnel
CN108327857A (en) * 2018-02-06 2018-07-27 贾红梅 A kind of multi-functional marine engineering equipment
CN210126614U (en) * 2019-05-22 2020-03-06 中交一航局第二工程有限公司 Immersed tube combined type transportation and installation equipment

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100162935A1 (en) * 2006-12-13 2010-07-01 Jon Khachaturian Marine Lifting Apparatus
US20110150623A1 (en) * 2008-06-13 2011-06-23 Pierre-Armand Thomas Structure for transporting and installing or retrieving underwater equipment and method of transporting and of installing or retrieving underwater equipment
RU2390460C1 (en) * 2009-03-24 2010-05-27 ФГОУ Московская государственная академия водного транспорта Complex to surface and carry sunken submarines and other ships
KR20120009081A (en) * 2010-07-22 2012-02-01 한국해양연구원 Floating Land Vehicle System
CN206141776U (en) * 2016-11-17 2017-05-03 中交第一航务工程局有限公司 Large -scale component transportation of self -navigation formula installs integrative ship
WO2018090875A1 (en) * 2016-11-17 2018-05-24 中交第一航务工程局有限公司 Self-sailing integrated vessel for carrying and mounting submerged tubes of underwater tunnel
CN108327857A (en) * 2018-02-06 2018-07-27 贾红梅 A kind of multi-functional marine engineering equipment
CN210126614U (en) * 2019-05-22 2020-03-06 中交一航局第二工程有限公司 Immersed tube combined type transportation and installation equipment

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110450913A (en) * 2019-09-02 2019-11-15 中交天航滨海环保浚航工程有限公司 A kind of spar structures that can adjust direction
CN110450913B (en) * 2019-09-02 2024-02-13 中交(天津)疏浚工程有限公司 Buoy structure capable of adjusting direction
CN113148028A (en) * 2021-04-23 2021-07-23 中交第一航务工程局有限公司 Semi-submersible type immersed tube transportation and installation integrated ship and construction process
WO2022135606A1 (en) * 2021-04-23 2022-06-30 中交第一航务工程局有限公司 Semi-submersible-type immersed tube transportation and mounting integrated ship and construction process
JP2023516218A (en) * 2021-04-23 2023-04-18 中交第一航▲務▼工程局有限公司 Semi-submersible submersible box transport installation integrated ship and construction process
US11674283B2 (en) 2021-04-23 2023-06-13 Cccc First Harbor Engineering Co., Ltd. Semi-submersible immersed tube transportation and installation integrated ship and construction process
JP7291302B2 (en) 2021-04-23 2023-06-14 中交第一航▲務▼工程局有限公司 Semi-submersible submersible box transport installation integrated ship and construction process
CN114348871A (en) * 2021-11-29 2022-04-15 中交第四航务工程局有限公司 Floating device and transportation method for immersed tube
CN114348871B (en) * 2021-11-29 2025-03-18 中交第四航务工程局有限公司 A floating device and transportation method for a submerged tube
WO2025000717A1 (en) * 2023-06-29 2025-01-02 中交第一航务工程局有限公司 Integrated barge for gravel bed leveling and immersed tube sinking and mounting, and immersed tube tunnel construction method
CN118850276A (en) * 2024-08-19 2024-10-29 安徽省留香特种船舶有限责任公司 Combined water excavation platform
CN118850276B (en) * 2024-08-19 2025-04-04 安徽省留香特种船舶有限责任公司 Combined water excavation platform

Also Published As

Publication number Publication date
CN110053720B (en) 2024-10-29

Similar Documents

Publication Publication Date Title
CN110053720A (en) Immersed tube combination transport installs equipment and transportation installation method
JP6545895B2 (en) Self-lifting submersible submersible platform boat and method of using the same
US7849810B2 (en) Mating of buoyant hull structure with truss structure
EP1611005A2 (en) A vessel for transporting wind turbines, methods of moving a wind turbine, and a wind turbine for an off-shore wind farm
CN114348871B (en) A floating device and transportation method for a submerged tube
CN110155262B (en) Trunk tree semi-submersible platform with self-installation function
GB2120606A (en) Lifting of support framework of offshore structures
CN210126614U (en) Immersed tube combined type transportation and installation equipment
CN115653002A (en) Long-distance underwater transportation method for immersed tube
KR100967816B1 (en) Mounting thrusters of semi-submersible rigs
CN104192277B (en) The liftable of the anti-popin platform of a kind of floating strengthens continuation control method
CN221541898U (en) A modular assembled catamaran for building a photovoltaic power station
CN112498622B (en) Pile foundation installation method of deepwater ocean platform
CN106628024B (en) Overwater piling operation platform
CN216549278U (en) Floating transportation device for immersed tube
CN214607976U (en) Hoisting equipment on water
CN108018778B (en) Catwalk cable erection traction system and catwalk cable rapid erection method for non-navigable water area
CN106892056B (en) Construction method of overwater photovoltaic power station
CN115465400A (en) Self-adaptive type transportation device for offshore jacket and using method thereof
CN213768915U (en) Floating transportation system for dragging double-wall steel sleeve box in water
CN105059484B (en) It goes ashore on a kind of Large Offshore Structures operating type
CN112027005B (en) Marine installation method of multifunctional marine engineering device
CN209778121U (en) Crane vessel
JP2020019440A (en) Floating body device
CN2604377Y (en) Seabeach self-navigating steel bottom base floating well site

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant