A kind of control structure and control method of work transmission line soil erosion Download PDF

Info

Publication number
CN110042825A
CN110042825A CN201910305161.4A CN201910305161A CN110042825A CN 110042825 A CN110042825 A CN 110042825A CN 201910305161 A CN201910305161 A CN 201910305161A CN 110042825 A CN110042825 A CN 110042825A
Authority
CN
China
Prior art keywords
transmission line
soil erosion
work transmission
control
fixing layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910305161.4A
Other languages
Chinese (zh)
Inventor
景志洋
景兆才
董鉴颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningxia Huixinde Technology Consulting Service Co Ltd
Original Assignee
Ningxia Huixinde Technology Consulting Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningxia Huixinde Technology Consulting Service Co Ltd filed Critical Ningxia Huixinde Technology Consulting Service Co Ltd
Priority to CN201910305161.4A priority Critical patent/CN110042825A/en
Publication of CN110042825A publication Critical patent/CN110042825A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/005Soil-conditioning by mixing with fibrous materials, filaments, open mesh or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Soil Sciences (AREA)
  • Agronomy & Crop Science (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses the control structures and control method of a kind of work transmission line soil erosion.A kind of work transmission line prevention and control of soil erosion structure, planting groove, spongy layer, sandbag fixing layer and nylon wire including being successively bonded setting, the sandbag fixing layer are that multilayer is alternately laid with and by movable hanging structure connection composition.Using the control method of the work transmission line soil erosion of the work transmission line prevention and control of soil erosion structure, comprising the following steps: slope reinforcing;Plant vegetation;Intercept protection;Dredge processing.The present invention can either be designed by the connection of sandbag fixing layer convenient for being laid with transmission line of electricity in sandbag fixing layer and avoid sliding to guarantee that route stablizes safety, and can have preferable protecting against shock effect according to sandbag characteristic to avoid route damaged, improve safety;Whole design is simple, and protection comprehensively, can effectively ensure that and prevent erosion on the basis of transmission line safety.

Description

A kind of control structure and control method of work transmission line soil erosion
Technical field
The present invention relates to technical field of environmental science, the control structure of specifically a kind of work transmission line soil erosion and Control method.
Background technique
Soil erosion refer to the influence due to nature or human factor, rainwater be unable to on-site elimination, take advantage of a situation it is dirty, wash away soil Earth, the phenomenon that causing moisture and soil while being lost.Main cause is that ground line gradient is big, land use is improper, ground vegetation meets with It destroys, farming technique is unreasonable, soil property is loose, deforestation, overgrazes.The harm of soil erosion is mainly manifested in: soil Earth arable layer is etched, destroys, and makes land fertility failure increasingly;Silt river, channel, reservoir up, reduces benefit of water project, very To bloods and droughts is caused, industrial and agricultural production is seriously affected;Soil erosion is produced to mountain farming and downstream river course is brought sternly It threatens again.
In work transmission line construction, need for route to be embedded in underground, thus for the prevention and treatment of soil erosion require compared with Height, need to guarantee while prevention and treatment transmission line of electricity stablizes safety.
Summary of the invention
The purpose of the present invention is to provide a kind of control methods of work transmission line soil erosion, to solve above-mentioned background The problem of being proposed in technology.
To achieve the above object, the invention provides the following technical scheme:
A kind of work transmission line prevention and control of soil erosion structure, planting groove, spongy layer, sandbag including being successively bonded setting Fixing layer and nylon wire, the sandbag fixing layer are that multilayer is alternately laid with and by movable hanging structure connection composition.
Further, the planting groove is that cement pours the hollow structure unit to be formed splicing composition, the planting groove bottom Portion, which is inlayed, is provided with grid, and the planting groove lower end is equipped with spongy layer.
Further, it is inlayed on the nylon wire and is provided with multiple groups gasket, activity is provided through ground connection on the gasket Bolt.
Further, the movable hanging structure by both ends connection structure and is vertically connected with structure composition.
Further, the both ends connection structure is by the fixed link that is divided into the ball cover of adjacent sandbag fixing layer end face and another First hook activity of one sandbag fixing layer end face, which is cooperatively connected, to be formed, and the ball cover and first hook are divided into the sand Bag fixing layer both ends.
Further, second hook and " u "-shaped for being vertically connected with structure and fixing layer surface by being divided into adjacent sandbag Card activity, which is cooperatively connected, to be formed, and second hook is separately positioned on the two sides up and down of sandbag fixing layer with the " u "-shaped card.
A kind of control method of work transmission line soil erosion, comprising the following steps:
1) a kind of work transmission line prevention and control of soil erosion structure, first laying nylon wire slope reinforcing: are used And fixed by earth stud, then sandbag fixing layer is sequentially connected and is laid on above nylon wire, after being then laid with spongy layer, Planting groove is disposed on spongy layer;
2) plant vegetation: to engineering ground carry out it is substantially smooth after, in planting groove carry out vegetation plantation, and to vegetation into Row consolidation process;
3) it intercepts protection: block enclosure wall is poured using cement to the lower section bottom end of engineering slope surface;
4) dredge processing: building anti-Great Gulch around the enclosure wall for intercepting protection, and increase gutter in slope surface, anti-Great Gulch and The bottom in gutter is equipped with drainage grade.
It compared with prior art, can in spongy layer the beneficial effects of the present invention are: can be used for planting green plant in planting groove With water storage to avoid soil desiccation, to improve vegetation survival rate;Adjacent sandbag fixing layer passes through the second hook and " u "-shaped card Flexible connection can be improved the connective stability of vertical direction, consequently facilitating being laid with transmission line of electricity in sandbag fixing layer, both It can be designed by the connection of sandbag fixing layer and avoid sliding to guarantee that route stablizes safety, and can had according to sandbag characteristic Preferable protecting against shock effect avoids the route damaged, improves safety;Whole design is simple, and protection comprehensively, can effectively ensure that It prevents erosion on the basis of transmission line safety.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of work transmission line prevention and control of soil erosion structure.
Fig. 2 is a kind of enlarged diagram of a-quadrant in work transmission line prevention and control of soil erosion structure.
Fig. 3 is a kind of enlarged diagram of B area in work transmission line prevention and control of soil erosion structure.
In figure: 1- planting groove, 2- grid, 3- spongy layer, 4- sandbag fixing layer, 41- ball cover, 42- fixed link, 43- first Hook, 44- second are linked up with, 45- " u "-shaped card, 5- nylon wire, 6- gasket, 7- earth stud.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Embodiment 1
A kind of control method of work transmission line soil erosion, comprising the following steps:
1) it plants vegetation: after substantially smooth to the progress of engineering ground, carrying out vegetation plantation, and carry out at reinforcing to vegetation Reason;
2) slope reinforcing: upper stoneledge is built to the slope surface between vegetation, loose position utilizes screw bolt reinforcing;
3) it intercepts protection: block enclosure wall is poured using cement to the lower section bottom end of engineering slope surface;
4) dredge processing: building anti-Great Gulch around the enclosure wall for intercepting protection, and increase gutter in slope surface, anti-Great Gulch and The bottom in gutter is equipped with drainage grade.
Embodiment 2
Please refer to Fig. 1~3, in the embodiment of the present invention, a kind of work transmission line prevention and control of soil erosion structure, including successively It is bonded planting groove 1, spongy layer 3, sandbag fixing layer 4 and the nylon wire 5 of setting, the sandbag fixing layer 4 is that multilayer is alternately laid with And pass through movable hanging structure connection composition.
The planting groove 1 is that cement pours the hollow structure unit to be formed splicing composition, and 1 bottom of planting groove, which is inlayed, to be set It is equipped with grid 2,1 lower end of planting groove is equipped with spongy layer 3.It can be used for planting green plant in planting groove 1, it can in spongy layer 3 With water storage to avoid soil desiccation, to improve vegetation survival rate.
It is inlayed on the nylon wire 5 and is provided with multiple groups gasket 6, activity is provided through earth stud 7 on the gasket 6, The nylon wire 5 is fixed on earth's surface by the earth stud 7 on gasket 6.
The activity hanging structure is by both ends connection structure and is vertically connected with structure composition, and the both ends connection structure is by dividing First hook 43 of fixed link 42 and another 4 end face of sandbag fixing layer in adjacent 4 end face ball cover 41 of sandbag fixing layer is living The dynamic composition that is cooperatively connected, the ball cover 41 and first hook 43 are divided into 4 both ends of sandbag fixing layer, and the sandbag is solid Given layer 4, which joins end to end, is capable of forming bar shaped, consequently facilitating level is laid with.
The structure that is vertically connected with is lived by the second hook 44 and " u "-shaped card 45 for being divided into adjacent 4 surface of sandbag fixing layer The dynamic composition that is cooperatively connected, second hook 44 and the " u "-shaped card 45 are separately positioned on the two sides up and down of sandbag fixing layer 4 Face, adjacent sandbag fixing layer 4 can be improved the connection of vertical direction by the flexible connection of the second hook 44 and " u "-shaped card 45 Stability can either be designed by the connection of sandbag fixing layer 4 and be kept away consequently facilitating being laid with transmission line of electricity in sandbag fixing layer 4 Exempt from sliding to guarantee that route stablizes safety, and there can be preferable protecting against shock effect according to sandbag characteristic to avoid route broken Damage improves safety.
A kind of control method of work transmission line soil erosion, comprising the following steps:
1) a kind of work transmission line prevention and control of soil erosion structure, first laying nylon wire 5 slope reinforcing: are used And it is fixed by earth stud 7, then sandbag fixing layer 4 is sequentially connected to and is laid on 5 top of nylon wire, then it is laid with spongy layer After 3, planting groove 1 is disposed on spongy layer 3;
2) it plants vegetation: after substantially smooth to the progress of engineering ground, vegetation plantation is carried out in planting groove 1, and to vegetation Carry out consolidation process;
3) it intercepts protection: block enclosure wall is poured using cement to the lower section bottom end of engineering slope surface;
4) dredge processing: building anti-Great Gulch around the enclosure wall for intercepting protection, and increase gutter in slope surface, anti-Great Gulch and The bottom in gutter is equipped with drainage grade.
The standardized element that the present invention uses can commercially, and shaped piece is according to specification and attached drawing note Load can carry out customized, and the specific connection type of each part is all made of in the prior art mature bolt, rivet, welding etc. Conventional means, mechanical, part and equipment are all made of in the prior art, conventional model, in addition circuit connection uses the prior art Middle conventional connection type, this will not be detailed here.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (7)

1. a kind of work transmission line prevention and control of soil erosion structure, including be successively bonded the planting groove (1) of setting, spongy layer (3), Sandbag fixing layer (4) and nylon wire (5), which is characterized in that the sandbag fixing layer (4) is that multilayer is alternately laid with and passes through activity Hanging structure connection composition.
2. a kind of work transmission line prevention and control of soil erosion structure according to claim 1, which is characterized in that the plantation Slot (1) is that cement pours the hollow structure unit to be formed splicing composition, and planting groove (1) bottom, which is inlayed, is provided with grid (2), Planting groove (1) lower end is equipped with spongy layer (3).
3. a kind of work transmission line prevention and control of soil erosion structure according to claim 1, which is characterized in that the nylon It inlays and is provided with multiple groups gasket (6) on net (5), activity is provided through earth stud (7) on the gasket (6).
4. a kind of work transmission line prevention and control of soil erosion structure according to claim 1, which is characterized in that the activity Hanging structure is by both ends connection structure and is vertically connected with structure composition.
5. a kind of work transmission line prevention and control of soil erosion structure according to claim 1, which is characterized in that the both ends Connection structure is by the fixed link (42) being divided into adjacent sandbag fixing layer (4) end face ball cover (41) and another sandbag fixing layer (4) the first hook (43) activity of end face, which is cooperatively connected, forms, and the ball cover (41) and first hook (43) are divided into institute State sandbag fixing layer (4) both ends.
6. a kind of work transmission line prevention and control of soil erosion structure according to claim 1, which is characterized in that above and below described Connection structure is cooperatively connected by the second hook (44) and " u "-shaped card (45) activity for being divided into adjacent sandbag fixing layer (4) surface Composition, second hook (44) and the " u "-shaped card (45) are separately positioned on the two sides up and down of sandbag fixing layer (4).
7. a kind of control method of work transmission line soil erosion, which is characterized in that using such as any institute of claim 1~6 State work transmission line prevention and control of soil erosion structure, comprising the following steps:
1) slope reinforcing: using a kind of work transmission line prevention and control of soil erosion structure, is laid with nylon wire (5) first and by connecing Ground bolt (7) is fixed, then sandbag fixing layer (4) is sequentially connected and is laid on above nylon wire (5), is then laid with spongy layer (3) after, planting groove (1) is disposed on spongy layer (3);
2) plant vegetation: to engineering ground carry out it is substantially smooth after, carry out vegetation plantation in the planting groove (1), and to vegetation into Row consolidation process;
3) it intercepts protection: block enclosure wall is poured using cement to the lower section bottom end of engineering slope surface;
4) it dredges processing: building anti-Great Gulch around the enclosure wall for intercepting protection, and increase gutter, anti-Great Gulch and draining in slope surface The bottom of ditch is equipped with drainage grade.
CN201910305161.4A 2019-04-16 2019-04-16 A kind of control structure and control method of work transmission line soil erosion Pending CN110042825A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910305161.4A CN110042825A (en) 2019-04-16 2019-04-16 A kind of control structure and control method of work transmission line soil erosion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910305161.4A CN110042825A (en) 2019-04-16 2019-04-16 A kind of control structure and control method of work transmission line soil erosion

Publications (1)

Publication Number Publication Date
CN110042825A true CN110042825A (en) 2019-07-23

Family

ID=67277356

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910305161.4A Pending CN110042825A (en) 2019-04-16 2019-04-16 A kind of control structure and control method of work transmission line soil erosion

Country Status (1)

Country Link
CN (1) CN110042825A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05176606A (en) * 1991-12-26 1993-07-20 Sankosha:Kk Sandbag for plantation and application of the sandbag
JP2001090077A (en) * 1999-09-20 2001-04-03 Ibiden Greentec Co Ltd Sandbag for planting and planting method using the same
JP2009002083A (en) * 2007-06-22 2009-01-08 Chubu Electric Power Co Inc Slope vegetation protection method and slope vegetation protection structure
CN103806430A (en) * 2012-11-09 2014-05-21 李忠久 Method for preventing and controlling water loss and soil erosion in power transmission and transformation projects
CN104452729A (en) * 2013-09-16 2015-03-25 姜丹宁 Water and soil conservation method of electric power transmission line engineering construction
CN205369272U (en) * 2016-01-01 2016-07-06 三峡大学 Realize living brick of planting of domatic reinforcement and ecological recovery function

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05176606A (en) * 1991-12-26 1993-07-20 Sankosha:Kk Sandbag for plantation and application of the sandbag
JP2001090077A (en) * 1999-09-20 2001-04-03 Ibiden Greentec Co Ltd Sandbag for planting and planting method using the same
JP2009002083A (en) * 2007-06-22 2009-01-08 Chubu Electric Power Co Inc Slope vegetation protection method and slope vegetation protection structure
CN103806430A (en) * 2012-11-09 2014-05-21 李忠久 Method for preventing and controlling water loss and soil erosion in power transmission and transformation projects
CN104452729A (en) * 2013-09-16 2015-03-25 姜丹宁 Water and soil conservation method of electric power transmission line engineering construction
CN205369272U (en) * 2016-01-01 2016-07-06 三峡大学 Realize living brick of planting of domatic reinforcement and ecological recovery function

Similar Documents

Publication Publication Date Title
CN202672096U (en) Vegetated interlocking protective slope building block and vegetated interlocking protective slope
CN208701710U (en) A kind of landslide control slope retaining structure
CN103397613A (en) Biological check dam used for erosion gully control and construction method
CN110593281A (en) Ecological Protection System and Construction Method for High and Steep Rock Slope
CN112854260A (en) Ecological concrete rock-soil slope protection structure and construction method
CN213358516U (en) Slope protection structure of river bank side slope
CN204825783U (en) Ecological slope protection structure of dykes and dams upstream face
CN203960699U (en) Road cutting type protecting immersion road structure
CN108951546A (en) The anti-erosion slope protection system of clear stream river valley Soft Rock Slope
CN104818734B (en) Control completely decomposed granite side slope damage by water waterproof and water drainage system and construction method thereof
CN102071696B (en) Steep slope protective soft frame and construction method thereof
CN110042825A (en) A kind of control structure and control method of work transmission line soil erosion
CN111519639A (en) Ecological side slope protective structure
CN205954574U (en) Ecological bank protection of river course dykes and dams
CN202755371U (en) Plant protective structure of soil slope protection and slope rain water evacuation
CN210122706U (en) Check dam structure of hydraulic and hydroelectric engineering
CN206538735U (en) A kind of environmental compound shore structure
CN109853596B (en) Highway slope protection greening structure and construction process thereof
KR100461664B1 (en) Structures and system of construction based on the use of plants growing block that protect a shore
CN209277100U (en) A kind of soil and water conservation ecological slope protection
CN208056098U (en) A kind of flexible retaining wall
CN206800318U (en) A kind of slope protecting device suitable for river course
CN207512691U (en) A kind of hydraulic engineering ecological protection slope
CN205917649U (en) River bank slope protection structure
CN218813812U (en) Ecological protection system applied to steep slope

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination