CN109989416A - Stabilized pile platform and construction method for pile driving construction of offshore wind power monopile foundation - Google Patents
Stabilized pile platform and construction method for pile driving construction of offshore wind power monopile foundation Download PDFInfo
- Publication number
- CN109989416A CN109989416A CN201910419531.7A CN201910419531A CN109989416A CN 109989416 A CN109989416 A CN 109989416A CN 201910419531 A CN201910419531 A CN 201910419531A CN 109989416 A CN109989416 A CN 109989416A
- Authority
- CN
- China
- Prior art keywords
- pile
- holding frame
- auxiliary
- opening
- frame system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 38
- 238000012546 transfer Methods 0.000 claims abstract description 26
- 230000006641 stabilisation Effects 0.000 abstract description 24
- 238000011105 stabilization Methods 0.000 abstract description 24
- 239000003381 stabilizer Substances 0.000 abstract 1
- 238000000034 method Methods 0.000 description 9
- 238000013461 design Methods 0.000 description 5
- 230000000087 stabilizing effect Effects 0.000 description 5
- 230000009286 beneficial effect Effects 0.000 description 4
- 210000000078 claw Anatomy 0.000 description 2
- 238000009795 derivation Methods 0.000 description 2
- 238000005259 measurement Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D13/00—Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
- E02D13/04—Guide devices; Guide frames
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/44—Foundations for machines, engines or ordnance
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/52—Submerged foundations, i.e. submerged in open water
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
本发明公开了一种用于海上风电单桩基础沉桩施工的稳桩平台及施工方法,其中,稳桩平台包括开口船和抱桩架系统,抱桩架系统包括抱桩架、辅助桩,辅助桩通过限位锁定装置实现与抱桩架可拆卸连接固定,抱桩架能够相对辅助桩以及开口船升降移动,抱桩架系统还包括用于锁定抱桩架相对辅助桩的升降位置的稳桩支撑装置,抱桩架系统通过转移支撑装置支撑于开口船的开口处。本方案提供的稳桩平台在机位间转移时,开口船支撑整个抱桩架系统,节省海上施工时间,提高施工效率;本方案通过解除限位锁定装置,稳桩平台的辅助桩可以直接插入泥面以完成辅助桩沉桩作业,方便快捷,可快速搭设单桩稳桩平台。
The invention discloses a pile stabilization platform and a construction method for pile driving construction of an offshore wind power single-pile foundation, wherein the pile stabilization platform includes an open ship and a pile holding frame system, and the pile holding frame system includes a pile holding frame and an auxiliary pile. The auxiliary pile is detachably connected and fixed with the pile-holding frame through the limit locking device. The pile-holding frame can move up and down relative to the auxiliary pile and the open boat. The pile-holding frame system also includes a stabilizer for locking the lifting position of the pile-holding frame relative to the auxiliary pile. The pile support device, the pile frame system is supported at the opening of the open boat through the transfer support device. When the pile stabilization platform provided by this scheme is transferred between stations, the open boat supports the entire pile holding frame system, which saves offshore construction time and improves construction efficiency; in this scheme, by releasing the limit locking device, the auxiliary piles of the pile stabilization platform can be directly inserted into The mud surface is used to complete the auxiliary pile driving operation, which is convenient and quick, and can quickly set up a single pile stable pile platform.
Description
技术领域technical field
本发明涉及海上风电装备施工技术领域,尤其涉及一种用于海上风电单桩基础沉桩施工的稳桩平台及施工方法。The invention relates to the technical field of offshore wind power equipment construction, in particular to a stable pile platform and a construction method used for pile driving construction of offshore wind power monopile foundations.
背景技术Background technique
目前国内单桩基础稳桩施工大多采用抱桩架系统,抱桩架系统放置于自升式作业平台或海上风电作业双体船上,到达要施工机位后,在抱桩架套筒内插入辅助桩并插入泥面以下,抱桩架与辅助桩形成单桩基础施工稳桩平台。由于国内自升式作业平台和双体船资源紧缺,抱桩架系统在机位间转移需将辅助桩全部拔出、放倒运输至下一机位,运至下一机位后稳桩平台搭设需重新插入抱桩架套筒,花费较长时间,而海上施工作业窗口期比较关键。At present, most of the domestic single-pile foundation stabilization pile construction adopts the pile-holding frame system. The pile-holding frame system is placed on the jack-up operation platform or the offshore wind power operation catamaran. The pile is inserted below the mud surface, and the pile holder and the auxiliary pile form a stable pile platform for the construction of the single pile foundation. Due to the shortage of domestic jack-up operation platform and catamaran resources, the transfer of pile-holding frame system between stations requires all auxiliary piles to be pulled out, put down and transported to the next station, and then the pile platform is stabilized after being transported to the next station. It takes a long time to re-insert the pile frame sleeve for erection, and the window period of offshore construction operation is more critical.
因此,如何在机位间转移和快速搭设稳桩平台,是本领域技术人员目前需要解决的技术问题。Therefore, how to transfer between the positions and quickly set up the stable pile platform is a technical problem that those skilled in the art need to solve at present.
发明内容SUMMARY OF THE INVENTION
有鉴于此,本发明的目的在于提供一种用于海上风电单桩基础沉桩施工的稳桩平台,该稳桩平台可以实现在机位间的转移,并且能够快速搭设,提高施工效率。本发明还提供了一种用于海上风电单桩基础沉桩施工的施工方法。In view of this, the purpose of the present invention is to provide a stable pile platform for pile driving construction of offshore wind power monopile foundation, which can realize transfer between positions, and can be quickly erected to improve construction efficiency. The invention also provides a construction method for pile driving construction of offshore wind power single pile foundation.
为了实现上述目的,本发明提供了如下技术方案:In order to achieve the above object, the present invention provides the following technical solutions:
一种用于海上风电单桩基础沉桩施工的稳桩平台,包括开口船和抱桩架系统,所述抱桩架系统包括抱桩架、辅助桩,所述辅助桩通过限位锁定装置实现与所述抱桩架可拆卸连接固定,所述抱桩架能够相对所述辅助桩以及所述开口船升降移动,所述抱桩架系统还包括用于锁定所述抱桩架相对所述辅助桩的升降位置的稳桩支撑装置,所述抱桩架系统通过转移支撑装置支撑于所述开口船的开口处。A stable pile platform for pile driving construction of offshore wind power monopile foundation, comprising an open boat and a pile-holding frame system, wherein the pile-holding frame system includes a pile-holding frame and an auxiliary pile, and the auxiliary pile is realized by a limit locking device It is detachably connected and fixed with the pile-holding frame, and the pile-holding frame can move up and down relative to the auxiliary pile and the open boat. The pile-holding frame system also includes a method for locking the pile-holding frame relative to the auxiliary pile A pile-stabilizing support device in the lifting position of the pile, the pile-holding frame system is supported at the opening of the open ship through the transfer support device.
本发明提供的稳桩平台的使用方法如下:开口船到达要施工的机位后进行定位,完成定位后即可开始辅助桩沉桩作业,此时,只需解除限位锁定装置即可快速完成辅助桩沉桩作业。辅助桩沉桩作业之后,将抱桩架吊至设计标高,然后将抱桩架与辅助桩通过稳桩支撑装置连接固定,即可迅速完成单桩稳桩平台的搭设,此时,即可进行单桩基础的沉桩施工。单桩沉桩作业完成后,将抱桩架下降并通过转移支撑装置支撑于开口船上,然后将辅助桩拔起后升高,再利用限位锁定装置将辅助桩与抱桩架固定连接,至此,稳桩平台支撑于开口船上,起锚后即可整体转移至下一机位。The method of using the pile stabilization platform provided by the present invention is as follows: positioning the open ship after reaching the position to be constructed, and then starting the auxiliary pile driving operation after the positioning is completed. Auxiliary pile driving operation. After the auxiliary pile driving operation, the pile holding frame is hoisted to the design elevation, and then the pile holding frame and the auxiliary pile are connected and fixed by the stabilizing pile support device, and the erection of the single-pile stabilizing pile platform can be quickly completed. Piling construction of monopile foundations. After the single pile driving operation is completed, the pile holding frame is lowered and supported on the open boat through the transfer support device, then the auxiliary pile is pulled up and raised, and the auxiliary pile and the pile holding frame are fixedly connected by the limit locking device. , The stabilized pile platform is supported on the open ship, and can be transferred to the next position as a whole after the anchor is lifted.
可见,本发明的有益效果如下:It can be seen that the beneficial effects of the present invention are as follows:
1)机位间转移时,开口船支撑整个抱桩架系统,节省海上施工时间,提高施工效率;1) When transferring between stations, the open boat supports the entire pile-holding frame system, saving offshore construction time and improving construction efficiency;
2)通过解除限位锁定装置,稳桩平台的辅助桩可以直接插入泥面,方便快捷,可快速搭设单桩稳桩平台。2) By releasing the limit locking device, the auxiliary pile of the pile stabilization platform can be directly inserted into the mud surface, which is convenient and quick, and the single pile stable pile platform can be quickly erected.
在一种优选方案中,所述限位锁定装置包括插销以及开设于所述辅助桩和所述抱桩架的套筒上的销孔。In a preferred solution, the limit locking device includes a pin and a pin hole opened on the auxiliary pile and the sleeve of the pile-holding frame.
优选地,所述转移支撑装置包括设置于所述抱桩架侧面的多个牛腿,所述抱桩架系统通过所述牛腿支撑于所述开口船的开口上端。Preferably, the transfer support device includes a plurality of corbels disposed on the side surfaces of the pile-holding frame, and the pile-holding rack system is supported on the open upper end of the open ship through the corbels.
优选地,所述开口船的开口处设置有限制所述牛腿移动的限位槽。Preferably, a limit groove for restricting the movement of the corbel is provided at the opening of the open boat.
优选地,所述稳桩支撑装置包括拉杆支撑件和管桩挂钩,所述拉杆支撑件的一端连接于所述抱桩架且另一端通过所述管桩挂钩挂在所述辅助桩的上端。Preferably, the pile stabilizing support device includes a tie rod support and a pipe pile hook, one end of the tie rod support is connected to the pile holding frame and the other end is hung on the upper end of the auxiliary pile through the pipe pile hook.
优选地,所述拉杆支撑件为总体长度可调节的花篮螺栓。Preferably, the tie rod support is a turnbuckle bolt with an overall length adjustable.
优选地,所述抱桩架上对应每个所述辅助桩的位置均设置有多个所述稳桩支撑装置。Preferably, a plurality of the pile-stabilizing support devices are provided at positions corresponding to each of the auxiliary piles on the pile-holding frame.
优选地,所述开口船为端部设有开口的平板驳。Preferably, the open ship is a flat barge with an opening at the end.
优选地,所述开口船的开口内侧设有伸缩支撑台,所述抱桩架系统通过所述转移支撑装置支撑于所述伸缩支撑台上。Preferably, a telescopic support platform is provided on the inner side of the opening of the open ship, and the pile-holding frame system is supported on the telescopic support platform through the transfer support device.
本发明还提供了一种用于海上风电单桩基础沉桩施工的施工方法,包括步骤:The present invention also provides a construction method for pile driving construction of offshore wind power single pile foundation, comprising the steps of:
辅助桩沉桩作业,利用如上任一项所述的稳桩平台到达要施工机位后进行定位,然后,解除限位锁定装置,完成辅助桩沉桩作业;For the auxiliary pile driving operation, use the stable pile platform as described in any one of the above to locate the position to be constructed, and then release the limit locking device to complete the auxiliary pile driving operation;
搭设稳桩平台,将抱桩架吊至设计标高,抱桩架与辅助桩通过稳桩支撑装置连接固定,形成单桩稳桩平台;Set up a stable pile platform, hoist the pile holding frame to the design elevation, and connect and fix the pile holding frame and the auxiliary pile through the stable pile support device to form a single pile stable pile platform;
单桩沉桩作业。Single pile driving work.
优选地,在单桩沉桩作业步骤结束后,还包括步骤:Preferably, after the single pile driving operation step is finished, it also includes the steps:
拆卸稳桩平台,将抱桩架下降并通过转移支撑装置支撑于开口船上;Remove the pile stabilization platform, lower the pile holding frame and support it on the open boat through the transfer support device;
组装抱桩架系统,将辅助桩拔起后升高,利用限位锁定装置将辅助桩与抱桩架固定,此时,组装好的抱桩架系统支撑于开口船上;Assemble the pile-holding frame system, pull up the auxiliary pile and raise it, and use the limit locking device to fix the auxiliary pile and the pile-holding frame. At this time, the assembled pile-holding frame system is supported on the open boat;
机位间转移,开口船起锚后带动抱桩架系统转移至其他机位。Transfer between positions. After the open ship lifts the anchor, it drives the pile-holding frame system to transfer to other positions.
本发明提供的施工方法产生的有益效果的推导过程与上述稳桩平台带来的有益效果的推导过程大体类似,故本文不再赘述。The derivation process of the beneficial effect produced by the construction method provided by the present invention is generally similar to the derivation process of the beneficial effect brought by the above-mentioned pile stabilization platform, so it is not repeated here.
附图说明Description of drawings
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to explain the embodiments of the present invention or the technical solutions in the prior art more clearly, the following briefly introduces the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description are only These are some embodiments of the present invention. For those of ordinary skill in the art, other drawings can also be obtained according to these drawings without creative efforts.
图1为本发明具体实施例中的稳桩平台的俯视图;Fig. 1 is the top view of the pile stabilization platform in the specific embodiment of the present invention;
图2为本发明具体实施例中的稳桩平台在机位间转移时的立面图;FIG. 2 is an elevation view of the pile stabilization platform in a specific embodiment of the present invention when it is transferred between positions;
图3为本发明具体实施例中的稳桩平台在单桩沉桩时的局部立面图;3 is a partial elevation view of the pile stabilization platform in the specific embodiment of the present invention when a single pile is driven;
图4为图3中A部分的局部放大图。FIG. 4 is a partial enlarged view of part A in FIG. 3 .
图1至图4中:In Figures 1 to 4:
1-开口船、2-开口、3-抱桩架、4-牛腿、5-辅助桩、6-管桩挂钩、7-花篮螺栓。1-Open boat, 2-Open, 3-Pile frame, 4-Corbel, 5-Auxiliary pile, 6-Pipe pile hook, 7-Tube bolt.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
请参照图1至图4,图1为本发明具体实施例中的稳桩平台的俯视图;图2为本发明具体实施例中的稳桩平台在机位间转移时的立面图;图3为本发明具体实施例中的稳桩平台在单桩沉桩时的局部立面图;图4为图3中A部分的局部放大图。Please refer to FIGS. 1 to 4 , FIG. 1 is a top view of the pile stabilization platform in a specific embodiment of the present invention; FIG. 2 is an elevation view of the pile stabilization platform in a specific embodiment of the present invention when transferring between positions; FIG. 3 It is a partial elevation view of the pile stabilization platform in the specific embodiment of the present invention when a single pile is driven; FIG. 4 is a partial enlarged view of part A in FIG. 3 .
本发明提供了一种用于海上风电单桩基础沉桩施工的稳桩平台,该稳桩平台包括开口船1和抱桩架系统。抱桩架系统包括抱桩架3和辅助桩5,即,本方案中的抱桩架系统是带有辅助桩5的抱桩架系统。辅助桩5通过限位锁定装置实现与抱桩架3可拆卸连接固定,抱桩架3能够相对辅助桩5以及开口船1升降移动,抱桩架系统还包括用于锁定抱桩架3相对辅助桩5的升降位置的稳桩支撑装置,抱桩架系统通过转移支撑装置支撑于开口船1的开口2处。The invention provides a pile stabilization platform used for pile driving construction of an offshore wind power monopile foundation, the pile stabilization platform includes an open ship 1 and a pile holding frame system. The pile-holding frame system includes a pile-holding frame 3 and an auxiliary pile 5 , that is, the pile-holding frame system in this solution is a pile-holding frame system with an auxiliary pile 5 . The auxiliary pile 5 is detachably connected and fixed with the pile-holding frame 3 through the limit locking device, and the pile-holding frame 3 can move up and down relative to the auxiliary pile 5 and the open ship 1. The pile-holding frame system also includes a relative auxiliary tool for locking the pile-holding frame 3 The pile stabilizing support device at the lifting position of the pile 5, the pile holding frame system is supported at the opening 2 of the open ship 1 through the transfer support device.
本发明提供的稳桩平台的使用方法如下:开口船1到达要施工的机位后进行定位,完成定位后即可开始辅助桩沉桩作业,此时,只需解除限位锁定装置即可快速完成辅助桩沉桩作业。辅助桩沉桩作业之后,将抱桩架3吊至设计标高,然后将抱桩架3与辅助桩5通过稳桩支撑装置连接固定,即可迅速完成单桩稳桩平台的搭设,此时,即可进行单桩基础的沉桩施工。单桩沉桩作业完成后,将抱桩架3下降并通过转移支撑装置支撑于开口船1上,然后将辅助桩5用振动锤拔起后升高,再利用限位锁定装置将辅助桩5与抱桩架3固定连接,至此,稳桩平台支撑于开口船1上,起锚后即可整体转移至下一机位。The method of using the pile stabilization platform provided by the present invention is as follows: the open ship 1 is positioned after reaching the position to be constructed, and the auxiliary pile driving operation can be started after the positioning is completed. Complete the auxiliary pile driving operation. After the auxiliary pile driving operation, the pile holding frame 3 is hoisted to the design elevation, and then the pile holding frame 3 and the auxiliary pile 5 are connected and fixed by the pile-stabilizing support device, and the erection of the single-pile pile-stabilizing platform can be completed quickly. The pile driving construction of the single pile foundation can be carried out. After the single pile driving operation is completed, the pile holding frame 3 is lowered and supported on the open ship 1 through the transfer support device, then the auxiliary pile 5 is pulled up with a vibrating hammer and then raised, and then the auxiliary pile 5 is moved by the limit locking device. It is fixedly connected with the pile holding frame 3. So far, the pile stabilization platform is supported on the open ship 1, and can be transferred to the next position as a whole after the anchor is lifted.
需要说明的是,本方案中的限位锁定装置可以设计为多种结构形式,例如插销结构、限位块结构或者卡爪结构等等,在一种优选方案中,限位锁定装置包括插销以及开设于辅助桩5和抱桩架3的套筒上的销孔。当需要辅助桩沉桩作业时,拔出插销(即解除限位锁定装置)就可以快速完成辅助桩沉桩作业,当需要转移机位时,将辅助桩5抬升到与抱桩架3销孔对应的位置后,插入插销可以将辅助桩5随抱桩架3一同转移。It should be noted that the limit locking device in this solution can be designed in various structural forms, such as a pin structure, a limit block structure or a claw structure, etc. In a preferred solution, the limit locking device includes a pin and A pin hole is opened on the sleeve of the auxiliary pile 5 and the pile-holding frame 3 . When the auxiliary pile driving operation is required, the auxiliary pile driving operation can be completed quickly by pulling out the bolt (ie, releasing the limit locking device). After the corresponding position, the auxiliary pile 5 can be transferred together with the pile holder 3 by inserting the bolt.
需要说明的是,转移支撑装置用于在该稳桩平台转移机位时支撑抱桩架系统,其可以设计成多种结构形式以满足整个抱桩架系统支撑在开口船1的开口2处,例如可以采用牛腿支撑,或者采用限位台与抱桩架3的下端支撑,或者采用吊索具吊装支撑等等。为了简化结构和便于操作,在一种优选方案中,转移支撑装置包括设置于抱桩架3侧面的多个牛腿4,抱桩架系统通过牛腿4支撑于开口船1的开口2上端。如图1所示,牛腿4设置于抱桩架3的套筒外侧,牛腿4与开口2两侧壁的上端面卡接支撑,可以实现将抱桩架系统平稳地支撑在开口2上端。It should be noted that the transfer support device is used to support the pile-holding frame system when the pile-stabilizing platform is transferred to the position, and it can be designed into various structural forms to satisfy the support of the entire pile-holding frame system at the opening 2 of the open ship 1, For example, it can be supported by corbels, or supported by the limit platform and the lower end of the pile-holding frame 3, or supported by slings for hoisting and so on. In order to simplify the structure and facilitate the operation, in a preferred solution, the transfer support device includes a plurality of corbels 4 arranged on the side of the pile-holding frame 3 , and the pile-holding rack system is supported on the upper end of the opening 2 of the open ship 1 through the corbels 4 . As shown in FIG. 1 , the corbel 4 is arranged on the outer side of the sleeve of the pile-holding frame 3 , and the corbel 4 is clamped and supported with the upper end faces of the two side walls of the opening 2 , so that the pile-holding frame system can be smoothly supported on the upper end of the opening 2 .
进一步优选地,为了在转移机位过程中保证抱桩架系统不会与开口船1发生相对移动,本方案在开口船1的开口2处设置有限制牛腿4移动的限位槽。Further preferably, in order to ensure that the pile-holding frame system does not move relative to the open ship 1 during the transfer of the camera position, in this solution, a limit groove is provided at the opening 2 of the open ship 1 to limit the movement of the corbel 4 .
需要说明的是,稳桩支撑装置用于在单桩沉桩作业过程中保证抱桩架3能够稳定地固定在辅助桩5上设定的位置处,其可以设计成例如吊索支撑装置,或者卡爪支撑装置,或者限位台支撑装置等等。优选地,本方案中的稳桩支撑装置包括拉杆支撑件和管桩挂钩6,拉杆支撑件的一端连接于抱桩架3且另一端通过管桩挂钩6挂在辅助桩的上端,如图3和图4所示,这样就可以将抱桩架3整体挂在辅助桩5上,从而保证稳桩平台的稳定。It should be noted that the pile-stabilizing support device is used to ensure that the pile-holding frame 3 can be stably fixed at the position set on the auxiliary pile 5 during the single-pile pile driving operation, and it can be designed as, for example, a sling support device, or Claw support device, or limit table support device, etc. Preferably, the pile stabilization support device in this solution includes a tie rod support and a pipe pile hook 6, one end of the tie rod support is connected to the pile holder 3 and the other end is hung on the upper end of the auxiliary pile through the pipe pile hook 6, as shown in FIG. 3 As shown in FIG. 4 , in this way, the pile-holding frame 3 can be hung on the auxiliary pile 5 as a whole, thereby ensuring the stability of the pile-stabilizing platform.
上述拉杆支撑件可以设计成固定长度的拉杆,也可以设计成为可调长度的拉杆连接件,优选地,上述拉杆支撑件为总体长度可调节的花篮螺栓7,如图4所示。辅助桩沉桩作业之后,吊抱桩架3至设计标高,抱桩架3与辅助桩4通过花篮螺栓7和管桩挂钩6连接固定,可迅速形成稳定的单桩稳桩平台,当辅助桩5沉桩标高不一致时,通过辅助桩5与抱桩架3之间的花篮螺栓7调节,可以使抱桩架3保持水平。同时,此稳桩平台可作为单桩施工测量的固定平台。The tie rod support can be designed as a tie rod with a fixed length, or can be designed as a tie rod connector with an adjustable length. Preferably, the tie rod support is a flower basket bolt 7 with an adjustable overall length, as shown in FIG. 4 . After the auxiliary pile driving operation, the pile-holding frame 3 is lifted to the design elevation, and the pile-holding frame 3 and the auxiliary pile 4 are connected and fixed by the turnbuckle bolt 7 and the pipe pile hook 6, which can quickly form a stable single-pile stabilization platform. 5. When the elevations of the piles are inconsistent, through the adjustment of the turnbuckles 7 between the auxiliary pile 5 and the pile-holding frame 3, the pile-holding frame 3 can be kept horizontal. At the same time, this stable pile platform can be used as a fixed platform for single pile construction measurement.
为了进一步保证抱桩架3与辅助桩5之间的支撑连接强度,优选地,抱桩架3上对应每个辅助桩5的位置均设置有多个稳桩支撑装置。In order to further ensure the support connection strength between the pile-holding frame 3 and the auxiliary piles 5 , preferably, a plurality of pile-stabilizing support devices are provided on the pile-holding frame 3 at positions corresponding to each auxiliary pile 5 .
需要说明的是,本方案中所述的开口船1可以为单独设计的带有开口的船舶,也可以由现有的平板驳改造而成,优选地,本方案中的开口船1为端部设有开口2的平板驳。平板驳的造价较低,并且,将平板驳的甲板开设出开口2易于改造。It should be noted that the open ship 1 in this scheme can be a separately designed ship with an opening, or can be transformed from an existing flat barge. Preferably, the open ship 1 in this scheme is an end part Flat barge with opening 2. The cost of the flat barge is low, and opening 2 on the deck of the flat barge is easy to transform.
上述开口船1的开口2一般为固定尺寸,可根据所应用的抱桩架3的尺寸来设计开口2的宽度,本具体实施例方案中的稳桩平台可以适用于直径5.5m~10m的单桩基础沉桩作业,为了使开口船1能够适用于其他规格的抱桩架系统,优选地,本方案还可以将开口船1的开口2设计为可调宽度的结构,具体的,开口船1的开口2内侧设有伸缩支撑台,抱桩架系统通过转移支撑装置支撑于伸缩支撑台上,伸缩支撑台可以通过调节伸缩长度,从而改变开口2两侧的宽度,这样就可以为不同宽度的抱桩架系统提供有效的支撑基础。The opening 2 of the above-mentioned open ship 1 is generally of a fixed size, and the width of the opening 2 can be designed according to the size of the pile-holding frame 3 to be applied. In the pile driving operation of the pile foundation, in order to make the open ship 1 suitable for other specifications of the pile-holding frame system, preferably, the opening 2 of the open ship 1 can also be designed as a structure with adjustable width in this solution. Specifically, the open ship 1 The inner side of opening 2 is provided with a telescopic support table, and the pile-holding frame system is supported on the telescopic support table through the transfer support device. The pile frame system provides an effective support base.
本发明还提供了一种用于海上风电单桩基础沉桩施工的施工方法,包括步骤:The present invention also provides a construction method for pile driving construction of offshore wind power single pile foundation, comprising the steps of:
S1:辅助桩沉桩作业,利用如上任一项所述的稳桩平台到达要施工机位后进行定位,然后,解除限位锁定装置,完成辅助桩沉桩作业;S1: Auxiliary pile driving operation, use the stable pile platform as described in any one of the above to locate the position to be constructed, and then release the limit locking device to complete the auxiliary pile driving operation;
S2:搭设稳桩平台,将抱桩架3吊至设计标高,抱桩架3与辅助桩5通过稳桩支撑装置连接固定,形成单桩稳桩平台;S2: Set up a stable pile platform, hoist the pile holding frame 3 to the design elevation, and connect and fix the pile holding frame 3 and the auxiliary pile 5 through the pile-stabilizing support device to form a single-pile stable pile platform;
S3:单桩沉桩作业。S3: Single pile driving operation.
上述方法主要是解决单桩沉桩作业施工中如何快速搭设单桩稳桩平台,该方法利用本发明提供的稳桩平台,可以大大提高单桩沉桩作业的施工效率,降低施工成本。The above method mainly solves how to quickly erect a single-pile stabilizing platform in the construction of single-pile piling operation. The method utilizes the pile-stabilizing platform provided by the present invention, which can greatly improve the construction efficiency of single-pile piling operation and reduce construction costs.
优选地,在单桩沉桩作业步骤结束后,还包括步骤:Preferably, after the single pile driving operation step is finished, it also includes the steps:
S4:拆卸稳桩平台,将抱桩:3下降并通过转移支撑装置支撑于开口船1上;S4: dismantle the pile stabilization platform, lower the pile: 3 and support it on the open ship 1 through the transfer support device;
S5:组装抱桩架系统,将辅助桩5拔起后升高,利用限位锁定装置将辅助桩5与抱桩架3固定,此时,组装好的抱桩架系统支撑于开口船1上;S5: Assemble the pile-holding frame system, pull up the auxiliary pile 5 and raise it, and use the limit locking device to fix the auxiliary pile 5 and the pile-holding frame 3. At this time, the assembled pile-holding frame system is supported on the open ship 1 ;
S6:机位间转移,开口船1起锚后带动抱桩架系统转移至其他机位。S6: Transfer between positions, after the opening ship 1 lifts the anchor, it drives the pile-holding frame system to transfer to other positions.
在该具体实施例方案中,本方法主要解决的是如何在单桩沉桩作业结束后,快速转移至下一个机位进行施工,该方法利用转移支撑装置可以将带有辅助桩5的抱桩架系统整体放置于开口船1的开口2处,从而实现稳桩平台整体在机位间的快速转移。In this specific embodiment scheme, this method mainly solves how to quickly transfer to the next machine position for construction after the completion of the single pile driving operation. The whole frame system is placed at the opening 2 of the open ship 1, so as to realize the rapid transfer of the whole pile stabilization platform between the positions.
可见,本发明的有益效果如下:It can be seen that the beneficial effects of the present invention are as follows:
1)机位间转移时,开口船1支撑整个抱桩架系统,节省海上施工时间,提高施工效率;1) When transferring between positions, the open ship 1 supports the entire pile-holding frame system, saving offshore construction time and improving construction efficiency;
2)通过解除限位锁定装置,稳桩平台的辅助桩可以直接插入泥面,方便快捷,可快速搭设单桩稳桩平台。2) By releasing the limit locking device, the auxiliary pile of the pile stabilization platform can be directly inserted into the mud surface, which is convenient and quick, and the single pile stable pile platform can be quickly erected.
3)通过花篮螺栓调节抱桩架水平度,高效快捷。3) The horizontality of the pile-holding frame can be adjusted through the flower basket bolts, which is efficient and fast.
对所公开的实施例的上述说明,使本领域专业技术人员能够实现或使用本发明。对这些实施例的多种修改对本领域的专业技术人员来说将是显而易见的,本文中所定义的一般原理可以在不脱离本发明的精神或范围的情况下,在其它实施例中实现。因此,本发明将不会被限制于本文所示的这些实施例,而是要符合与本文所公开的原理和新颖特点相一致的最宽的范围。The above description of the disclosed embodiments enables any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
Claims (11)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910419531.7A CN109989416A (en) | 2019-05-20 | 2019-05-20 | Stabilized pile platform and construction method for pile driving construction of offshore wind power monopile foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910419531.7A CN109989416A (en) | 2019-05-20 | 2019-05-20 | Stabilized pile platform and construction method for pile driving construction of offshore wind power monopile foundation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109989416A true CN109989416A (en) | 2019-07-09 |
Family
ID=67136823
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910419531.7A Pending CN109989416A (en) | 2019-05-20 | 2019-05-20 | Stabilized pile platform and construction method for pile driving construction of offshore wind power monopile foundation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109989416A (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111441354A (en) * | 2020-04-30 | 2020-07-24 | 中交第三航务工程局有限公司 | Underwater pile stabilizing system and pile sinking method based on self-elevating platform ship |
CN111501756A (en) * | 2020-05-29 | 2020-08-07 | 江苏亨通蓝德海洋工程有限公司 | Pile-embracing jacket and construction method thereof |
CN111535995A (en) * | 2020-05-29 | 2020-08-14 | 中交第一航务工程局有限公司 | Novel integral transportation and installation device and method for offshore wind turbine |
CN111962543A (en) * | 2020-08-12 | 2020-11-20 | 中交第三航务工程局有限公司江苏分公司 | Rapid connection and separation process of pile stabilizing platform and mother ship |
CN111962552A (en) * | 2020-08-12 | 2020-11-20 | 中交第三航务工程局有限公司江苏分公司 | Offshore wind power foundation driving-in type rock-socketed single pile construction process |
CN112627177A (en) * | 2020-12-09 | 2021-04-09 | 保利长大工程有限公司 | Leveling method of pile stabilizing platform |
CN112627176A (en) * | 2020-12-03 | 2021-04-09 | 保利长大工程有限公司 | Construction method of large-diameter single-pile stabilizing platform |
CN112832221A (en) * | 2021-01-15 | 2021-05-25 | 江苏佳美海洋工程装备有限公司 | Double-layer pile stabilizing platform with GPS |
CN113622397A (en) * | 2021-08-19 | 2021-11-09 | 中交第三航务工程局有限公司 | Locking device used between construction pile stabilizing platform and auxiliary pile |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105507325A (en) * | 2015-12-31 | 2016-04-20 | 中交第三航务工程局有限公司宁波分公司 | Pile stabilizing and positioning platform |
CN107130600A (en) * | 2017-05-25 | 2017-09-05 | 江苏蓝潮海洋风电工程建设有限公司 | One kind migrates formula automatic deviation correction single pile pile gripper construction mechanism and construction method |
CN108505522A (en) * | 2018-05-21 | 2018-09-07 | 中天科技集团海洋工程有限公司 | A kind of steady stake platform |
CN108547293A (en) * | 2018-03-07 | 2018-09-18 | 江苏龙源振华海洋工程有限公司 | A kind of embedding rock single pile plantation construction technology |
CN109629568A (en) * | 2018-12-30 | 2019-04-16 | 中交第三航务工程局有限公司江苏分公司 | The process for sinking of the steady stake platform of offshore wind farm jacket foundation steel pipe pile floating |
CN210341961U (en) * | 2019-05-20 | 2020-04-17 | 华电重工股份有限公司 | Pile stabilizing platform for offshore wind power single-pile foundation pile sinking construction |
-
2019
- 2019-05-20 CN CN201910419531.7A patent/CN109989416A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105507325A (en) * | 2015-12-31 | 2016-04-20 | 中交第三航务工程局有限公司宁波分公司 | Pile stabilizing and positioning platform |
CN107130600A (en) * | 2017-05-25 | 2017-09-05 | 江苏蓝潮海洋风电工程建设有限公司 | One kind migrates formula automatic deviation correction single pile pile gripper construction mechanism and construction method |
CN108547293A (en) * | 2018-03-07 | 2018-09-18 | 江苏龙源振华海洋工程有限公司 | A kind of embedding rock single pile plantation construction technology |
CN108505522A (en) * | 2018-05-21 | 2018-09-07 | 中天科技集团海洋工程有限公司 | A kind of steady stake platform |
CN109629568A (en) * | 2018-12-30 | 2019-04-16 | 中交第三航务工程局有限公司江苏分公司 | The process for sinking of the steady stake platform of offshore wind farm jacket foundation steel pipe pile floating |
CN210341961U (en) * | 2019-05-20 | 2020-04-17 | 华电重工股份有限公司 | Pile stabilizing platform for offshore wind power single-pile foundation pile sinking construction |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111441354A (en) * | 2020-04-30 | 2020-07-24 | 中交第三航务工程局有限公司 | Underwater pile stabilizing system and pile sinking method based on self-elevating platform ship |
CN111501756A (en) * | 2020-05-29 | 2020-08-07 | 江苏亨通蓝德海洋工程有限公司 | Pile-embracing jacket and construction method thereof |
CN111535995A (en) * | 2020-05-29 | 2020-08-14 | 中交第一航务工程局有限公司 | Novel integral transportation and installation device and method for offshore wind turbine |
CN111962543A (en) * | 2020-08-12 | 2020-11-20 | 中交第三航务工程局有限公司江苏分公司 | Rapid connection and separation process of pile stabilizing platform and mother ship |
CN111962552A (en) * | 2020-08-12 | 2020-11-20 | 中交第三航务工程局有限公司江苏分公司 | Offshore wind power foundation driving-in type rock-socketed single pile construction process |
CN112627176A (en) * | 2020-12-03 | 2021-04-09 | 保利长大工程有限公司 | Construction method of large-diameter single-pile stabilizing platform |
CN112627177A (en) * | 2020-12-09 | 2021-04-09 | 保利长大工程有限公司 | Leveling method of pile stabilizing platform |
CN112832221A (en) * | 2021-01-15 | 2021-05-25 | 江苏佳美海洋工程装备有限公司 | Double-layer pile stabilizing platform with GPS |
CN113622397A (en) * | 2021-08-19 | 2021-11-09 | 中交第三航务工程局有限公司 | Locking device used between construction pile stabilizing platform and auxiliary pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109989416A (en) | Stabilized pile platform and construction method for pile driving construction of offshore wind power monopile foundation | |
CN111139830B (en) | A bottom-seat inserted pile type single pile stabilizing frame and pile sinking method | |
CN210341961U (en) | Pile stabilizing platform for offshore wind power single-pile foundation pile sinking construction | |
WO2021052174A1 (en) | Negative-pressure barrel type single pile gripper construction mechanism and construction method thereof | |
CN110158566A (en) | Offshore wind power platform | |
CN205257825U (en) | Offshore platform fan hoisting system | |
CN210917364U (en) | Steel pipe pile positioning platform for crane ship | |
CN107268669A (en) | Piling jacket construction method, rear piling jacket construction component, jacket of driving piles afterwards afterwards | |
CN207160049U (en) | Piling jacket construction component, jacket of driving piles afterwards afterwards | |
JP6545965B2 (en) | Climbing crane | |
CN212222218U (en) | Single-point hoisting pile erecting system | |
CN210117149U (en) | A jacket sling platform | |
CN112320702A (en) | Electric power hoisting machine | |
CN211849420U (en) | Offshore large diameter steel pipe piling device | |
CN111547197B (en) | Marine wind power pile erection construction ship and pile erection construction method | |
CN212358027U (en) | A retractable semi-automatic movable lateral contact device | |
CN213294418U (en) | Lifting appliance suitable for concrete pipe pile | |
CN212267780U (en) | Offshore wind power pile vertical pile construction ship | |
CN109577323B (en) | Tubular pile reinforcing method | |
CN210140823U (en) | Construction platform for quickly assembling steel pipe pile and vibration hammer | |
CN111532983B (en) | Single-point hoisting pile erecting system and pile erecting construction method | |
CN211201154U (en) | Sliding template operation platform | |
CN220468807U (en) | Marine crane-free pile extension device | |
CN214784139U (en) | Auxiliary single pile for mounting wind power tower | |
CN220845202U (en) | Can improve steel sheet pile and press from both sides support of getting efficiency |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhang Qingtao Inventor after: Zhang Xingbo Inventor after: Liu Yufei Inventor after: Guo Xiaoliang Inventor after: Jia Zhaolin Inventor after: Xie Jinting Inventor after: Min Qiaoling Inventor before: Zhang Qingtao Inventor before: Zhang Xingbo Inventor before: Liu Yufei Inventor before: Guo Xiaoliang Inventor before: Jia Zhaolin Inventor before: Xie Jinting Inventor before: Min Qiaoling |
|
CB03 | Change of inventor or designer information | ||
CB02 | Change of applicant information |
Country or region after: China Address after: 100071 11 / F, block B, building 1, yard 6, Automobile Museum East Road, Fengtai District, Beijing Applicant after: Huadian Technology Co.,Ltd. Address before: Building B, Building 1, No. 6 East Road, Automobile Museum, Fengtai District, Beijing Applicant before: HUADIAN HEAVY INDUSTRIES Co.,Ltd. Country or region before: China |
|
CB02 | Change of applicant information |