CN109987478A - A kind of auxiliary positioning system and method for elevator guide rail bracket installation - Google Patents
A kind of auxiliary positioning system and method for elevator guide rail bracket installation Download PDFInfo
- Publication number
- CN109987478A CN109987478A CN201910313541.2A CN201910313541A CN109987478A CN 109987478 A CN109987478 A CN 109987478A CN 201910313541 A CN201910313541 A CN 201910313541A CN 109987478 A CN109987478 A CN 109987478A
- Authority
- CN
- China
- Prior art keywords
- guide rail
- positioning
- rail bracket
- installation
- elevator shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009434 installation Methods 0.000 title claims abstract description 45
- 238000000034 method Methods 0.000 title claims abstract description 16
- 238000001514 detection method Methods 0.000 claims abstract description 10
- 230000006835 compression Effects 0.000 claims description 6
- 238000007906 compression Methods 0.000 claims description 6
- 230000007246 mechanism Effects 0.000 claims description 6
- 230000000670 limiting effect Effects 0.000 claims description 4
- 238000010586 diagram Methods 0.000 description 6
- 238000011900 installation process Methods 0.000 description 5
- 230000008569 process Effects 0.000 description 4
- 230000006872 improvement Effects 0.000 description 3
- 230000009471 action Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000006698 induction Effects 0.000 description 1
- 230000001568 sexual effect Effects 0.000 description 1
- 125000006850 spacer group Chemical group 0.000 description 1
- 230000002195 synergetic effect Effects 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B7/00—Other common features of elevators
- B66B7/02—Guideways; Guides
- B66B7/023—Mounting means therefor
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B7/00—Other common features of elevators
- B66B7/02—Guideways; Guides
- B66B7/023—Mounting means therefor
- B66B7/027—Mounting means therefor for mounting auxiliary devices
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
本发明公布了一种用于电梯导轨支架安装的辅助定位系统,包括升降平台和竖直基准,多个竖直基准设置于电梯井内侧面处,升降平台上设有与控制台电性连接的定位装置,定位装置包括底座、回转机械臂、第一机械臂、第二机械臂、定位机械臂,底座安装于升降平台上;回转机械臂安装于底座上;第一机械臂一端与回转机械臂铰接,另一端与第二机械臂一端铰接;第二机械臂可绕水平轴转动,其另一端与定位机械臂一端铰接,定位机械臂可绕水平轴转动,其另一端设有检测元件。本发明的目的是,提供一种用于电梯导轨支架安装的辅助定位系统及方法,该系统通过定位装置与竖直基准协同作用对导轨支架底座进行定位、修正、安装,减少安装误差,保证安装质量。
The invention discloses an auxiliary positioning system for the installation of elevator guide rail brackets, which includes a lifting platform and a vertical reference, a plurality of vertical references are arranged on the inner side of the elevator shaft, and a positioning device electrically connected with the console is arranged on the lifting platform , the positioning device includes a base, a rotary mechanical arm, a first mechanical arm, a second mechanical arm, and a positioning mechanical arm. The base is installed on the lifting platform; the rotary mechanical arm is installed on the base; The other end is hinged with one end of the second mechanical arm; the second mechanical arm can rotate around the horizontal axis, and the other end is hinged with one end of the positioning mechanical arm, the positioning mechanical arm can rotate around the horizontal axis, and the other end is provided with a detection element. The purpose of the present invention is to provide an auxiliary positioning system and method for the installation of elevator guide rail brackets. The system can position, correct and install the guide rail bracket base through the synergy of the positioning device and the vertical reference, so as to reduce installation errors and ensure installation. quality.
Description
技术领域technical field
本发明属于电梯安装技术领域,具体为一种用于电梯导轨支架安装的辅助定位系统及方法。The invention belongs to the technical field of elevator installation, and in particular relates to an auxiliary positioning system and method for installation of an elevator guide rail bracket.
背景技术Background technique
电梯主要由曳引机、导轨、对重装置、安全装置(如限速器、安全钳和缓冲器等)、操纵系统、轿厢与厅门等组成。各部分安装在建筑物的井道和机房中,通常钢丝绳绕过曳引轮,两端分别连接轿厢和平衡重,电动机驱动曳引轮使轿厢升降,电梯要求安全可靠、输送效率高、平层准确和乘坐舒适等。The elevator is mainly composed of traction machine, guide rail, counterweight device, safety device (such as speed limiter, safety gear and buffer, etc.), control system, car and hall door, etc. Each part is installed in the hoistway and machine room of the building. Usually, the wire rope goes around the traction sheave, and the two ends are respectively connected to the car and the counterweight. The motor drives the traction sheave to lift the car up and down. Layer accuracy and ride comfort etc.
电梯导轨安装顺序是:在井道壁上固定导轨底座;测量导轨支架面与基准垂线的相对位置,在导轨底座上调整并安装导轨支架;测量电梯导轨侧面及顶面与基准垂线的位置,在导轨支架上调整并安装导轨。导轨支架安装质量好,导轨支架工作面可以作为导轨安装的定位面。导轨支架安装质量不好,则导轨支架工作面仅是固定面,需通过增设垫片来调整。电梯导轨支架安装质量取决于安装人员的工作经验及水平,有很大的波动性,提高导轨支架安装质量可减少导轨安装时调整工作量。The installation sequence of the elevator guide rail is: fix the guide rail base on the hoistway wall; measure the relative position of the guide rail support surface and the reference vertical line, adjust and install the guide rail support on the guide rail base; measure the position of the side and top surface of the elevator guide rail and the reference vertical line, Adjust and install the rails on the rail brackets. The installation quality of the guide rail bracket is good, and the working surface of the guide rail bracket can be used as the positioning surface for the guide rail installation. If the installation quality of the rail bracket is not good, the working surface of the rail bracket is only a fixed surface, which needs to be adjusted by adding spacers. The installation quality of the guide rail bracket of the elevator depends on the work experience and level of the installer, and has great fluctuation. Improving the installation quality of the guide rail bracket can reduce the adjustment workload during the installation of the guide rail.
现有导轨支架安装工艺在整个安装过程要不断测量安装面与基准垂线的相对位置误差并作相应调整,在夹紧-调整过程中耗时耗力。如能确定导轨安装支架工作面位置及姿态,提供其定位面,可以减少导轨支架安装工作量,提高工作效率。In the existing guide rail bracket installation process, the relative position error between the installation surface and the reference vertical line must be continuously measured and adjusted accordingly during the entire installation process, which is time-consuming and labor-intensive during the clamping-adjustment process. If the position and posture of the working surface of the guide rail mounting bracket can be determined, and its positioning surface can be provided, the workload of the guide rail support installation can be reduced and the work efficiency can be improved.
发明内容SUMMARY OF THE INVENTION
本发明的目的是针对以上问题,提供一种用于电梯导轨支架安装的辅助定位系统,该系统通过升降平台上的定位装置与竖直基准协同作用对导轨支架底座进行定位安装,同时修正导轨支架底座与电梯井壁的定位面,减少安装过程中因安装人员差异造成的误差,有助于保证安装质量的稳定性。The purpose of the present invention is to solve the above problems and provide an auxiliary positioning system for the installation of elevator guide rail brackets. The positioning surface of the base and the elevator shaft wall reduces the error caused by the difference of the installer during the installation process, and helps to ensure the stability of the installation quality.
为实现以上目的,本发明采用的技术方案是:一种用于电梯导轨支架安装的辅助定位系统,包括升降平台和竖直基准,所述升降平台可于电梯井内竖直移动,多个所述的竖直基准设置于电梯井内侧面处,其用于导轨校准,所述升降平台上设有与控制台电性连接的定位装置,所述定位装置包括底座、回转机械臂、第一机械臂、第二机械臂、定位机械臂,所述底座安装于升降平台上;回转机械臂安装于底座上,其可绕竖直轴转动;第一机械臂一端与回转机械臂铰接,其可绕水平轴转动,另一端与第二机械臂一端铰接;第二机械臂可绕水平轴转动,其另一端与定位机械臂一端铰接,所述定位机械臂可绕水平轴转动,其另一端设有与控制台电性连接的检测元件。In order to achieve the above purpose, the technical solution adopted in the present invention is: an auxiliary positioning system for the installation of elevator guide rail brackets, including a lifting platform and a vertical reference, the lifting platform can move vertically in the elevator shaft, and a plurality of the The vertical reference of the elevator shaft is set at the inner side of the elevator shaft, which is used for the alignment of the guide rail. The lifting platform is provided with a positioning device that is electrically connected to the console. The positioning device includes a base, a rotating mechanical arm, a first mechanical arm, a first Two manipulators and positioning manipulators, the base is installed on the lifting platform; the rotating manipulator is installed on the base, which can rotate around the vertical axis; one end of the first manipulator is hinged with the rotating manipulator, which can rotate around the horizontal axis , the other end is hinged with one end of the second mechanical arm; the second mechanical arm can be rotated around the horizontal axis, the other end of which is hinged with one end of the positioning mechanical arm, the positioning mechanical arm can be rotated around the horizontal axis, and the other end of the second mechanical arm is provided with an electrical connection to the console. Detection element for sexual connection.
进一步的,所述电梯井内搭设有方形框架,所述升降平台设置于方形框架上端;电梯井顶部设有绞磨机,所述绞磨机的卷筒上绕有绞磨绳,绞磨绳的另一端与升降平台连接。Further, a square frame is set up in the elevator shaft, and the lifting platform is arranged on the upper end of the square frame; the top of the elevator shaft is provided with a grinder, and the reel of the grinder is wound with a grinder rope. The other end is connected with the lifting platform.
进一步的,所述方形框架四周设有与电梯井内壁接触的滚轮,所述滚轮通过螺杆与方形框架上的安装座连接,同时通过螺母锁紧;所述螺杆上还套设有使滚轮顶紧电梯井内壁的压紧弹簧。Further, around the square frame, there are rollers that are in contact with the inner wall of the elevator shaft. The rollers are connected to the mounting seat on the square frame through screws, and are locked by nuts; Compression springs on the inner wall of the elevator shaft.
进一步的,所述定位机械臂上靠近电梯井内壁的一端上端面设有限位平面。Further, a limit plane is provided on the upper end face of one end of the positioning robot arm close to the inner wall of the elevator shaft.
进一步的,所述限位平面上设有永久磁铁。Further, a permanent magnet is provided on the limiting plane.
采用上述用于电梯导轨支架安装的辅助定位系统的定位方法,包括以下步骤:The positioning method using the above-mentioned auxiliary positioning system for the installation of elevator guide rail brackets includes the following steps:
步骤A、平台与基准搭设:先在电梯井内搭设可竖直移动的升降平台,然后于电梯井内侧壁处设立竖直基准,竖直基准上端通向电梯井顶部,下端固定于电梯井最下端地基上;Step A, platform and benchmark erection: first erect a vertically movable lifting platform in the elevator shaft, then set up a vertical benchmark at the inner side wall of the elevator shaft, the upper end of the vertical benchmark leads to the top of the elevator shaft, and the lower end is fixed at the lowest end of the elevator shaft on the foundation;
步骤B、导轨支架底座预定位:升降平台上移至待安装位,定位装置初始化后,定位机械臂端部的检测元件对竖直基准进行位置检测,并将该信息反馈给控制台,控制台经过处理后对定位机械臂进行调节;包括控制回转机械臂转动,第一机械臂、第二机械臂、定位机械臂相对转动,保证定位机械臂端部处于预定安装位,将导轨支架底座放置于定位机械臂上靠近电梯井壁的一端并锁紧;Step B. Pre-positioning of the base of the guide rail bracket: the lifting platform is moved up to the position to be installed. After the positioning device is initialized, the detection element at the end of the positioning robot arm detects the position of the vertical reference, and feeds the information back to the console. After processing, the positioning manipulator is adjusted; including controlling the rotation of the rotary manipulator, the relative rotation of the first manipulator, the second manipulator, and the positioning manipulator, ensuring that the end of the positioning manipulator is in the predetermined installation position, and placing the guide rail bracket base on the Position the end of the robotic arm close to the elevator shaft wall and lock it tightly;
步骤C、导轨支架底座安装:将操作根据导轨支架底座上的安装孔对电梯井壁进行打孔,然后选择一定数量、厚度的垫片,通过螺栓将导轨支架底座安装在电梯井壁上,并通过导轨支架将导轨固定安装于导轨支架底座上;Step C. Installation of the guide rail bracket base: Drill holes on the elevator shaft wall according to the installation holes on the guide rail bracket base, then select a certain number and thickness of gaskets, and install the guide rail bracket base on the elevator shaft wall through bolts. Fix the guide rail on the base of the guide rail bracket through the guide rail bracket;
步骤D、下一工位安装:定位装置回收至起始位,升降平台上升至下一工位后停止,重复上述步骤B、C,直到所有导轨支架底座完成安装为止。Step D, installation at the next station: the positioning device is recovered to the starting position, the lifting platform is raised to the next station and then stops, and the above steps B and C are repeated until all the guide rail bracket bases are installed.
进一步的,所述步骤B中升降平台上的多个定位装置同时对导轨支架底座进行预定位,以减少导轨安装误差。Further, in the step B, the plurality of positioning devices on the lifting platform simultaneously pre-position the guide rail bracket base to reduce the installation error of the guide rail.
进一步的,所述步骤B中定位机械臂端部采用夹持机构或磁性吸合机构对导轨支架底座进行抓持。Further, in the step B, the end of the positioning mechanical arm uses a clamping mechanism or a magnetic attraction mechanism to grasp the base of the guide rail bracket.
本发明的有益效果:该系统通过升降平台上的定位装置与竖直基准协同作用对导轨支架底座进行定位安装,同时修正导轨支架底座与电梯井壁的定位面,减少安装过程中因安装人员差异造成的误差,有助于保证安装质量的稳定性。Beneficial effects of the present invention: the system positions and installs the guide rail bracket base through the synergistic action of the positioning device on the lifting platform and the vertical reference, and at the same time corrects the positioning surface of the guide rail bracket base and the elevator shaft wall, reducing the difference between the installation personnel during the installation process. The resulting errors help to ensure the stability of the installation quality.
1、本发明中通过绞磨机抖动绞磨绳,从而拉动升降平台上移,最安装单元简单,易操作。1. In the present invention, the grinding rope is shaken by the grinding machine, thereby pulling the lifting platform to move up, and the installation unit is simple and easy to operate.
2、本发明中当升降平台在电梯井内上移时,在压紧弹簧弹力的作用下,滚轮始终与其内壁压紧,保证升降平台基本保持在电梯井的中心处。2. In the present invention, when the lifting platform moves up in the elevator shaft, under the action of the elastic force of the compression spring, the roller is always pressed against its inner wall to ensure that the lifting platform is basically kept at the center of the elevator shaft.
3、本发明中机械手臂的结构紧凑小巧,运动轻快、平稳、灵活。3. The structure of the mechanical arm in the present invention is compact and compact, and the movement is brisk, stable and flexible.
4、本发明中无需再测量导轨支架安装面与基准系统的误差及作后续的调整过程、可提高安装工作效率,适于大量推广使用。4. In the present invention, there is no need to measure the error between the installation surface of the guide rail bracket and the reference system and perform subsequent adjustment processes, which can improve the installation work efficiency and is suitable for mass popularization.
附图说明Description of drawings
图1为本发明主视结构示意图。FIG. 1 is a schematic diagram of the front view structure of the present invention.
图2为本发明图1中A-A剖面结构示意图。FIG. 2 is a schematic diagram of the cross-sectional structure of A-A in FIG. 1 of the present invention.
图3为本发明图1中定位装置立体结构示意图。FIG. 3 is a schematic three-dimensional structural diagram of the positioning device in FIG. 1 of the present invention.
图4为本发明图1中导轨与电梯井安装关系结构示意图。FIG. 4 is a schematic structural diagram of the installation relationship between the guide rail and the elevator shaft in FIG. 1 of the present invention.
图5为本发明图4中B处局部放大结构示意图。FIG. 5 is a schematic diagram of a partially enlarged structure at B in FIG. 4 of the present invention.
图6为本发明图5中导轨与俯视结构示意图。FIG. 6 is a schematic diagram of the guide rail and top view structure of FIG. 5 of the present invention.
图中所述文字标注表示为:1、升降平台;2、竖直基准;3、底座;4、回转机械臂;5、第一机械臂;6、第二机械臂;7、定位机械臂;8、检测元件;9、方形框架;10、绞磨机;11、绞磨绳;12、滚轮;13、螺杆;14、安装座;15、螺母;16、压紧弹簧;17、限位平面;18、电梯井;19、导轨;20、导轨支架底座;21、导轨支架。The text annotations in the figure are: 1. Lifting platform; 2. Vertical reference; 3. Base; 4. Rotating robotic arm; 5. First robotic arm; 6. Second robotic arm; 7. Positioning robotic arm; 8. Detection element; 9. Square frame; 10. Grinding machine; 11. Grinding rope; 12. Roller; 13. Screw; 14. Mounting seat; 15. Nut; 16. Compression spring; 17. Limit plane ; 18, elevator shaft; 19, guide rail; 20, guide rail bracket base; 21, guide rail bracket.
具体实施方式Detailed ways
为了使本领域技术人员更好地理解本发明的技术方案,下面结合附图对本发明进行详细描述,本部分的描述仅是示范性和解释性,不应对本发明的保护范围有任何的限制作用。In order to make those skilled in the art better understand the technical solutions of the present invention, the present invention will be described in detail below with reference to the accompanying drawings. The description in this part is only exemplary and explanatory, and should not have any limiting effect on the protection scope of the present invention. .
如图1-6所示,本发明的具体结构为:一种用于电梯导轨支架安装的辅助定位系统,包括升降平台1和竖直基准2,该竖直基准2优选为感应钢丝绳,其下端锚固在地基上,上端固定在电梯井顶部,所述升降平台1可于电梯井内竖直移动,多个所述的竖直基准2设置于电梯井内侧面处,即需要安装导轨的电梯井侧壁处,其用于导轨校准,所述升降平台1上设有与控制台电性连接的定位装置,所述定位装置包括底座3、回转机械臂4、第一机械臂5、第二机械臂6、定位机械臂7,所述底座3安装于升降平台1上;回转机械臂4安装于底座3上,其可绕竖直轴转动;第一机械臂5一端与回转机械臂4铰接,其可绕水平轴转动,另一端与第二机械臂6一端铰接;第二机械臂6可绕水平轴转动,其另一端与定位机械臂7一端铰接,所述定位机械臂7可绕水平轴转动,其另一端设有与控制台电性连接的检测元件8,检测元件8优选为图像识别单元,将拍摄到的竖直基准2位置信息反馈给控制台,控制台多从而精确控制回转机械臂4、第一机械臂5、第二机械臂6、定位机械臂7相应动作调整。As shown in Figures 1-6, the specific structure of the present invention is: an auxiliary positioning system for the installation of elevator guide rail brackets, comprising a lifting platform 1 and a vertical reference 2, the vertical reference 2 is preferably an induction wire rope, and its lower end Anchored on the foundation, the upper end is fixed on the top of the elevator shaft, the lifting platform 1 can move vertically in the elevator shaft, and a plurality of the vertical benchmarks 2 are arranged at the inner side of the elevator shaft, that is, the side wall of the elevator shaft where the guide rails need to be installed It is used for guide rail calibration. The lifting platform 1 is provided with a positioning device that is electrically connected to the console. The positioning device includes a base 3, a rotating robotic arm 4, a first robotic arm 5, a second robotic arm 6, Positioning mechanical arm 7, the base 3 is installed on the lifting platform 1; the rotating mechanical arm 4 is installed on the base 3, which can rotate around a vertical axis; one end of the first mechanical arm 5 is hinged with the rotating mechanical arm 4, which can rotate around The horizontal axis rotates, and the other end is hinged with one end of the second mechanical arm 6; the second mechanical arm 6 can rotate around the horizontal axis, and the other end is hinged with one end of the positioning mechanical arm 7, and the positioning mechanical arm 7 can rotate around the horizontal axis. The other end is provided with a detection element 8 that is electrically connected to the console. The detection element 8 is preferably an image recognition unit, which feeds back the position information of the vertical reference 2 photographed to the console. A robotic arm 5, a second robotic arm 6, and a positioning robotic arm 7 are adjusted accordingly.
优选的,所述电梯井内搭设有方形框架9,所述升降平台1设置于方形框架9上端;电梯井顶部设有绞磨机10,所述绞磨机10的卷筒上绕有绞磨绳11,绞磨绳11的另一端与升降平台1连接。通过绞磨机10抖动绞磨绳11,从而拉动升降平台1上移,使安装单元简单,易操作。Preferably, a square frame 9 is set up in the elevator shaft, and the lifting platform 1 is arranged on the upper end of the square frame 9; the top of the elevator shaft is provided with a grinder 10, and the reel of the grinder 10 is wound with a grinder rope 11. The other end of the grinding rope 11 is connected to the lifting platform 1. By shaking the grinding rope 11 by the grinding machine 10, the lifting platform 1 is pulled upward, so that the installation unit is simple and easy to operate.
优选的,所述方形框架9四周设有与电梯井内壁接触的滚轮12,便于移动,减少阻力,所述滚轮12通过螺杆13与方形框架9上的安装座14连接,同时通过螺母15锁紧,螺母15与螺杆13配合,可调节其伸出长度;所述螺杆13上还套设有使滚轮12顶紧电梯井内壁的压紧弹簧16。当升降平台1在电梯井内上移时,在压紧弹簧16弹力的作用下,滚轮12始终与其内壁压紧,保证升降平台1基本保持在电梯井的中心处。Preferably, around the square frame 9, there are rollers 12 in contact with the inner wall of the elevator shaft, which is convenient for movement and reduces resistance. The nut 15 cooperates with the screw rod 13, and its extension length can be adjusted; the screw rod 13 is also sleeved with a compression spring 16 that makes the roller 12 press against the inner wall of the elevator shaft. When the lift platform 1 moves up in the elevator shaft, under the action of the elastic force of the compression spring 16, the roller 12 is always pressed against its inner wall to ensure that the lift platform 1 is basically kept at the center of the elevator shaft.
优选的,所述定位机械臂7上靠近电梯井内壁的一端上端面设有限位平面17。用于放平导轨支架底座。所述限位平面17上设有永久磁铁。便于对导轨支架底座进行快速取放,方便操作。Preferably, a limit plane 17 is provided on the upper end face of one end of the positioning mechanical arm 7 which is close to the inner wall of the elevator shaft. For leveling the rail bracket base. Permanent magnets are arranged on the limiting plane 17 . It is convenient to quickly pick and place the base of the rail bracket, which is convenient for operation.
采用上述用于电梯导轨支架安装的辅助定位系统的定位方法,包括以下步骤:The positioning method using the above-mentioned auxiliary positioning system for the installation of elevator guide rail brackets includes the following steps:
步骤A、平台与基准搭设:先在电梯井内搭设可竖直移动的升降平台1,然后于电梯井内侧壁处设立竖直基准2,竖直基准2上端通向电梯井顶部,下端固定于电梯井最下端地基上;Step A, platform and datum erection: first erect a vertically movable lifting platform 1 in the elevator shaft, then set up a vertical datum 2 at the inner side wall of the elevator shaft, the upper end of the vertical datum 2 leads to the top of the elevator shaft, and the lower end is fixed on the elevator on the foundation at the bottom of the well;
步骤B、导轨支架底座预定位:升降平台1上移至待安装位,定位装置初始化后,定位机械臂7端部的检测元件8对竖直基准2进行位置检测,并将该信息反馈给控制台,控制台经过处理后对定位机械臂7进行调节;包括控制回转机械臂4转动,第一机械臂5、第二机械臂6、定位机械臂7相对转动,保证定位机械臂7端部处于预定安装位,将导轨支架底座放置于定位机械臂7(其上端处于水平状态)上靠近电梯井壁的一端并锁紧;Step B. Pre-positioning of the guide rail bracket base: the lifting platform 1 is moved up to the position to be installed, and after the positioning device is initialized, the detection element 8 at the end of the positioning mechanical arm 7 performs position detection on the vertical reference 2, and feeds the information back to the control The console adjusts the positioning robot arm 7 after processing; including controlling the rotation of the rotary robot arm 4, the relative rotation of the first robot arm 5, the second robot arm 6, and the positioning robot arm 7 to ensure that the end of the positioning robot arm 7 is in Predetermined installation position, place the base of the guide rail bracket on the end of the positioning robot arm 7 (the upper end of which is in a horizontal state) close to the elevator shaft wall and lock it tightly;
步骤C、导轨支架底座安装:将操作根据导轨支架底座上的安装孔对电梯井壁进行打孔,然后选择一定数量、厚度的垫片,其中包括楔形垫片(导轨支架底座与电梯井壁面不平行),通过螺栓将导轨支架底座安装在电梯井壁上,并通过导轨支架将导轨固定安装于导轨支架底座上;Step C. Installation of the guide rail bracket base: Drill holes on the elevator shaft wall according to the installation holes on the guide rail bracket base, and then select a certain number and thickness of gaskets, including wedge-shaped gaskets (the guide rail bracket base and the elevator shaft wall surface are different. Parallel), install the guide rail bracket base on the elevator shaft wall through bolts, and fix the guide rail on the guide rail bracket base through the guide rail bracket;
步骤D、下一工位安装:定位装置回收至起始位,升降平台1上升至下一工位后停止,重复上述步骤B、C,直到所有导轨支架底座完成安装为止。Step D, installation at the next station: the positioning device is recovered to the starting position, the lifting platform 1 rises to the next station and then stops, and the above steps B and C are repeated until all the guide rail bracket bases are installed.
优选的,所述步骤B中升降平台1上的多个定位装置同时对导轨支架底座进行预定位,以减少导轨安装误差。Preferably, in the step B, the plurality of positioning devices on the lifting platform 1 pre-position the guide rail bracket base at the same time, so as to reduce the installation error of the guide rail.
优选的,所述步骤B中定位机械臂7端部采用夹持机构或磁性吸合机构对导轨支架底座进行抓持。Preferably, in the step B, the end of the positioning mechanical arm 7 uses a clamping mechanism or a magnetic attraction mechanism to grasp the base of the guide rail bracket.
具体使用时,先在电梯井内搭设可竖直移动的升降平台1,然后于电梯井内侧壁处设立竖直基准2,竖直基准2上端通向电梯井顶部,下端固定于电梯井最下端地基上;然后,升降平台1上移至待安装位,定位装置初始化后,定位机械臂7端部的检测元件8对竖直基准2进行位置检测,并将该信息反馈给控制台,控制台经过处理后对定位机械臂7进行调节;包括控制回转机械臂4转动,第一机械臂5、第二机械臂6、定位机械臂7相对转动,保证定位机械臂7端部处于预定安装位,将导轨支架底座放置于定位机械臂7(其上端处于水平状态)上靠近电梯井壁的一端并锁紧;将操作根据导轨支架底座上的安装孔对电梯井壁进行打孔,然后选择一定数量、厚度的垫片,其中包括楔形垫片,导轨支架底座与电梯井壁面不平行,通过螺栓将导轨支架底座安装在电梯井壁上,并通过导轨支架将导轨固定安装于导轨支架底座上;定位装置回收至起始位,升降平台1上升至下一工位后停止,重复上述步骤B、C,直到所有导轨支架底座完成安装为止。通过升降平台上的定位装置与竖直基准协同作用对导轨支架底座进行定位安装,同时修正导轨支架底座与电梯井壁的定位面,减少安装过程中因安装人员差异造成的误差,有助于保证安装质量的稳定性。In specific use, a vertically movable lifting platform 1 is first erected in the elevator shaft, and then a vertical reference 2 is set up at the inner side wall of the elevator shaft. The upper end of the vertical reference 2 leads to the top of the elevator shaft, and the lower end is fixed to the bottom foundation of the elevator shaft. Then, the lifting platform 1 is moved up to the position to be installed. After the positioning device is initialized, the detection element 8 at the end of the positioning mechanical arm 7 performs position detection on the vertical reference 2, and feeds the information back to the console. After processing, the positioning robot arm 7 is adjusted; including controlling the rotation of the rotary robot arm 4, the relative rotation of the first robot arm 5, the second robot arm 6, and the positioning robot arm 7, to ensure that the end of the positioning robot arm 7 is in the predetermined installation position, and the The guide rail bracket base is placed on the end of the positioning robot arm 7 (the upper end of which is in a horizontal state), which is close to the elevator shaft wall and locked. The thickness of the gasket, including the wedge-shaped gasket, the guide rail bracket base is not parallel to the elevator shaft wall, the guide rail bracket base is installed on the elevator shaft wall through bolts, and the guide rail is fixed on the guide rail bracket base through the guide rail bracket; positioning device Return to the starting position, the lifting platform 1 rises to the next station and then stops, repeating the above steps B and C until all the guide rail bracket bases are installed. The guide rail bracket base is positioned and installed through the synergy of the positioning device on the lifting platform and the vertical reference, and the positioning surface of the guide rail support base and the elevator shaft wall is corrected at the same time, so as to reduce the error caused by the difference of the installation personnel during the installation process, which helps to ensure Stability of installation quality.
需要说明的是,在本文中,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。It should be noted that, herein, the terms "comprising", "comprising" or any other variation thereof are intended to encompass non-exclusive inclusion, such that a process, method, article or device comprising a series of elements includes not only those elements, It also includes other elements not expressly listed or inherent to such a process, method, article or apparatus.
本文中应用了具体个例对本发明的原理及实施方式进行了阐述,以上实例的说明只是用于帮助理解本发明的方法及其核心思想。以上所述仅是本发明的优选实施方式,应当指出,由于文字表达的有限性,而客观上存在无限的具体结构,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进、润饰或变化,也可以将上述技术特征以适当的方式进行组合;这些改进润饰、变化或组合,或未经改进将发明的构思和技术方案直接应用于其它场合的,均应视为本发明的保护范围。Specific examples are used herein to illustrate the principles and implementations of the present invention, and the descriptions of the above examples are only used to help understand the method and the core idea of the present invention. The above are only the preferred embodiments of the present invention. It should be pointed out that, due to the limited expression of words, there are objectively unlimited specific structures. For those of ordinary skill in the art, without departing from the principles of the present invention However, several improvements, modifications or changes can also be made, and the above-mentioned technical features can also be combined in an appropriate manner; these improvements, modifications, or combinations, or the concept and technical solutions of the invention are directly applied to other occasions without improvement. should be regarded as the protection scope of the present invention.
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910313541.2A CN109987478A (en) | 2019-04-18 | 2019-04-18 | A kind of auxiliary positioning system and method for elevator guide rail bracket installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910313541.2A CN109987478A (en) | 2019-04-18 | 2019-04-18 | A kind of auxiliary positioning system and method for elevator guide rail bracket installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109987478A true CN109987478A (en) | 2019-07-09 |
Family
ID=67134931
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910313541.2A Pending CN109987478A (en) | 2019-04-18 | 2019-04-18 | A kind of auxiliary positioning system and method for elevator guide rail bracket installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109987478A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111923057A (en) * | 2020-07-28 | 2020-11-13 | 日立楼宇技术(广州)有限公司 | Elevator guide rail automatic installation equipment, method, device and system |
CN113173471A (en) * | 2021-03-30 | 2021-07-27 | 广州明森合兴科技有限公司 | Automatic installation equipment and method for elevator guide rail |
CN113800358A (en) * | 2021-09-16 | 2021-12-17 | 无锡瑞吉德机械有限公司 | Elevator well is just gentle and is filled up wall mechanism |
CN114455429A (en) * | 2022-02-21 | 2022-05-10 | 无锡瑞吉德机械有限公司 | Device for measuring straightness of elevator guide rail and automatically calibrating straightness of elevator guide rail and application of device |
JP7572844B2 (en) | 2020-11-24 | 2024-10-24 | 株式会社日立ビルシステム | Elevator Work Device |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05278968A (en) * | 1992-04-03 | 1993-10-26 | Hitachi Ltd | Elevator guide rail centering device and method thereof |
JP2008179469A (en) * | 2006-12-25 | 2008-08-07 | Matsushita Home Elevator Kk | Guide rail arranging method in elevator device |
CN106064800A (en) * | 2015-04-23 | 2016-11-02 | 通力股份公司 | For installing method and the facility of cage guide |
CN106064776A (en) * | 2015-04-23 | 2016-11-02 | 通力股份公司 | The method and apparatus installed for automatic elevator |
CN106115394A (en) * | 2015-05-06 | 2016-11-16 | 通力股份公司 | For being directed at guide rail and the apparatus and method of layer door in elevator |
CN107848768A (en) * | 2015-07-24 | 2018-03-27 | 因温特奥股份公司 | For the assembly equipment for the automation that installation is performed in the lift well of lift facility |
CN109205445A (en) * | 2018-11-23 | 2019-01-15 | 燕山大学 | It is a kind of for install cage guide from climbing robot |
CN209778005U (en) * | 2019-04-18 | 2019-12-13 | 湖南电气职业技术学院 | Auxiliary positioning system for installing elevator guide rail bracket |
-
2019
- 2019-04-18 CN CN201910313541.2A patent/CN109987478A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05278968A (en) * | 1992-04-03 | 1993-10-26 | Hitachi Ltd | Elevator guide rail centering device and method thereof |
JP2008179469A (en) * | 2006-12-25 | 2008-08-07 | Matsushita Home Elevator Kk | Guide rail arranging method in elevator device |
CN106064800A (en) * | 2015-04-23 | 2016-11-02 | 通力股份公司 | For installing method and the facility of cage guide |
CN106064776A (en) * | 2015-04-23 | 2016-11-02 | 通力股份公司 | The method and apparatus installed for automatic elevator |
CN106115394A (en) * | 2015-05-06 | 2016-11-16 | 通力股份公司 | For being directed at guide rail and the apparatus and method of layer door in elevator |
CN107848768A (en) * | 2015-07-24 | 2018-03-27 | 因温特奥股份公司 | For the assembly equipment for the automation that installation is performed in the lift well of lift facility |
CN109205445A (en) * | 2018-11-23 | 2019-01-15 | 燕山大学 | It is a kind of for install cage guide from climbing robot |
CN209778005U (en) * | 2019-04-18 | 2019-12-13 | 湖南电气职业技术学院 | Auxiliary positioning system for installing elevator guide rail bracket |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111923057A (en) * | 2020-07-28 | 2020-11-13 | 日立楼宇技术(广州)有限公司 | Elevator guide rail automatic installation equipment, method, device and system |
JP7572844B2 (en) | 2020-11-24 | 2024-10-24 | 株式会社日立ビルシステム | Elevator Work Device |
CN113173471A (en) * | 2021-03-30 | 2021-07-27 | 广州明森合兴科技有限公司 | Automatic installation equipment and method for elevator guide rail |
CN113800358A (en) * | 2021-09-16 | 2021-12-17 | 无锡瑞吉德机械有限公司 | Elevator well is just gentle and is filled up wall mechanism |
CN113800358B (en) * | 2021-09-16 | 2023-03-24 | 无锡瑞吉德机械有限公司 | Elevator well is just gentle and is filled up wall mechanism |
CN114455429A (en) * | 2022-02-21 | 2022-05-10 | 无锡瑞吉德机械有限公司 | Device for measuring straightness of elevator guide rail and automatically calibrating straightness of elevator guide rail and application of device |
CN114455429B (en) * | 2022-02-21 | 2023-06-23 | 无锡瑞吉德机械有限公司 | Elevator guide rail straightness measurement and automatic calibration device and application thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109987478A (en) | A kind of auxiliary positioning system and method for elevator guide rail bracket installation | |
CN214834928U (en) | A prefabricated building exterior wall construction device | |
CN209778005U (en) | Auxiliary positioning system for installing elevator guide rail bracket | |
CN217765354U (en) | Dynamic balance testing device of generator rotor | |
CN214560338U (en) | Mechanical and electrical positioning device | |
CN219779634U (en) | Vertical cable laying device | |
CN107388010A (en) | A kind of platform is got in stocks the safety device of mouth | |
CN215885938U (en) | Speed limiter mounting structure with adjustable mounting angle | |
CN217847907U (en) | Slowly, carry and draw control system and be equipped with this control system's cleaning machine | |
CN206985454U (en) | Ceiling mounting type passageway lift track and ceiling mounting type passageway lift | |
CN215371306U (en) | Be used for building antidetonation a gallows structure | |
JPH07300284A (en) | Guide rail centering device | |
CN218931612U (en) | Portable hydraulic swing arm lifting equipment | |
CN217274557U (en) | Safe type building air condensing units installation auxiliary structure based on architectural design | |
CN221276691U (en) | High-pressure jet grouting pile deviation correcting device | |
CN216867951U (en) | Equipment fixing strutting arrangement based on electromechanical engineering is used | |
CN217478823U (en) | Install support frame for elevator additional | |
CN217949666U (en) | Auxiliary device for mounting and supporting rotary ceramic tile | |
CN220055527U (en) | Material bearing mechanism | |
CN110790144A (en) | A material conveying elevator | |
CN220265111U (en) | Hydropower station electromechanical device installation lifting device | |
CN221836583U (en) | A support and hanger structure for installing electromechanical equipment | |
CN217356337U (en) | Screw rod lifting device for electronic equipment | |
CN118243074B (en) | Building engineering measuring device | |
CN220811719U (en) | Pipeline installation auxiliary machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190709 |