CN109896398A CN201711296648.8A CN201711296648A CN109896398A CN 109896398 A CN109896398 A CN 109896398A CN 201711296648 A CN201711296648 A CN 201711296648A CN 109896398 A CN109896398 A CN 109896398A
Authority
CN
China
Prior art keywords
hoistway
body frame
upper layer
elevator shaft
basic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711296648.8A
Other languages
Chinese (zh)
Inventor
高松
高永健
吴榕曦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Orr Machinery Manufacturing Co Ltd
Original Assignee
Hubei Orr Machinery Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Orr Machinery Manufacturing Co Ltd filed Critical Hubei Orr Machinery Manufacturing Co Ltd
Priority to CN201711296648.8A priority Critical patent/CN109896398A/en
Publication of CN109896398A publication Critical patent/CN109896398A/en
Pending legal-status Critical Current

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The invention discloses a kind of elevator shaft connection structure and installation and connection methods, the connection structure includes basic hoistway, upper layer hoistway, hoistway body frame, connection collar tie beam and casing, the basis hoistway and upper layer hoistway have the hoistway body frame of surrounding and intermediate connection collar tie beam to be welded, the upper end of hoistway body frame is welded with casing, on the hoistway body frame for being nested in upper layer hoistway of the casing welded on basic hoistway;The hoistway body frame lower end of the basis hoistway is welded with firm banking, and surrounding passes through reinforcing rib firm welding;The lower end of the hoistway body frame of the upper layer hoistway offers welding hole.This kind of elevator shaft connection structure is by the casing of basic hoistway and the hoistway body frame of upper layer hoistway is nested forms, during the installation process, the inside that next layer of upper sleeve portion is inserted into one layer of hoistway body frame need to only be inserted the cannula into, at abutment joint and inner sleeve carries out welding and the connection of elevator shaft can be completed, it is easy to operate, it is connected firmly, time cost needed for having saved installation process.

Description

A kind of elevator shaft connection structure and installation and connection method
Technical field
The invention belongs to elevator mounting technique fields, and in particular to a kind of elevator shaft connection structure and installation connection side Method.
Background technique
In China most cities, there is also the residential building of some the 80s and 90s in last century, these existing buildings Due to not having to plan the installation of elevator when building at that time, nowadays the part existing building still has certain design inhabitation time limit, Increase with the development of economy with the age of resident, the residential building functionality that these are fitted without is incomplete, to going out for user Row causes great inconvenience.In this context, how on similar residential building quickly to install elevator additional, become one it is urgent and Technical problem urgently to be resolved.
The channel that elevator shaft is run up and down as elevator, it is particularly important for residential building elevator mentioned above, due to Such elevator can only be set to building volume surrounding during installation, therefore entire steel structure lift shaft is safety when such elevator is run Stable necessary guarantee.Currently, integrated hoistway with steel structure becomes the elevator shaft structure for installing elevator first choice additional, major lift boy Cheng Congye unit also studies the construction and installation technology of integrated hoistway with steel structure, also obtained widely answer on the market With.
Currently, elevator shaft mostly uses hoisting during the installation process, bilevel hoistway unit is right in the sky It connects, in docking site, outer layer installs coating additional, is then fastened by bolts and realizes being connected and fixed for hoistway.The elevator of the prior art Hoistway structure and traditional bolt connection have also carried out a variety of improvement, special as filed in applicant's on July 20th, 2017 The patent of invention of benefit numbers 201710596844.0, title " a kind of hoistway module assembling system and assembling method ", discloses utilization Rope traction, gear and the elevator shaft splicing structure and method that rack gear matches of creeping.But due to being bolted presence Gap, and the vibration generated in running process of elevator can also make bolt generate loosening, cause to be not connected firmly, and above-mentioned various peaces Dress process takes long time, and very big influence is brought to the living environment of residential block.
Summary of the invention
The object of the invention is that in order to overcome drawbacks described above existing in the prior art, by the connection knot of elevator shaft Structure by it is existing be bolted be improved to be more convenient, firm nested encryptions, provide a kind of elevator shaft connection structure and peace Fill connection method.
The present invention is achieved through the following technical solutions above-mentioned purpose, a kind of elevator shaft connection structure, including basic well Road, upper layer hoistway, hoistway body frame, connection collar tie beam and casing, basic hoistway and upper layer hoistway are by the hoistway body frame of surrounding in Between connection collar tie beam be welded, the upper end of the hoistway body frame is welded with casing, the casing welded on basic hoistway can It is nested on the hoistway body frame of upper layer, the two forms nested encryptions structure.
In above-mentioned technical proposal, described sleeve pipe is hollow square steel pipe, and the outer diameter of casing is less than the interior of hoistway body frame Diameter size, the difference of the two are 1-80mm.
In above-mentioned technical proposal, the hoistway body frame lower end of the basis hoistway is welded with firm banking, and surrounding passes through reinforcement Muscle firm welding;The lower end of the hoistway body frame of upper layer hoistway, which is opened, is then equipped with welding hole, and it is empty to reserve necessary operation to welding process Between.
In above-mentioned technical proposal, the hoistway body frame is hollow square steel pipe, and sectional dimension meets the related cold-drawn of national standard Or the requirement of hot-rolled square steel pipe size, outer diameter are not more than 400mm × 400mm.
In above-mentioned technical proposal, the basis hoistway and upper layer hoistway are welded with 2 connection collar tie beams on one side, in addition three faces 4 connection collar tie beams are welded with, connection collar tie beam is also square steel tube, and outer diameter is less than the outer diameter ruler of square steel tube selected by hoistway body frame It is very little.
In general, through the invention it is contemplated above technical scheme is compared with the prior art, can achieve following has Beneficial effect:
1, the connection structure utilizes the type of attachment of fitting docking, leads to two elevator shaft unit connection procedure applications To, and upper and lower two layers of hoistway is not in dislocation and significantly shakes in subsequent welding process, keeps connection procedure more steady It is fixed reliable, the set-up time is greatly saved, reduces the danger and degree-of-difficulty factor of aerial work;
2, it is welded again after the completion of nested docking, the connection between each elevator shaft unit can be made stronger.
Detailed description of the invention
Specific embodiments of the present invention are further described in detail with reference to the accompanying drawing, in which:
Fig. 1 is the overall structure diagram of a kind of elevator shaft connection structure of the present invention and installation method;
Fig. 2 is the section view for indicating assembled state when a kind of elevator shaft connection structure of the invention is used to connect two elevator shafts Figure;
In figure: the basis 1- hoistway, the upper layer 2- hoistway, 3- hoistway body frame, 4- connection collar tie beam, 5- casing, 6- firm banking, 7- Reinforcing rib, 8- welding hole, the basis 9- hoistway body frame, the upper layer 10- hoistway body frame.
Specific embodiment
As shown in Figure 1, being a kind of overall structure diagram of elevator shaft connection structure, including basic hoistway 1, upper layer well Road 2, hoistway body frame 3, connection collar tie beam 4 and casing 5, the basis hoistway 1 and upper layer hoistway 2 have 3 He of hoistway body frame of surrounding Intermediate connection collar tie beam 4 is welded, and is welded with casing 5 in the upper end of every hoistway body frame 3, welds on basic hoistway 1 On the hoistway body frame 3 for being nested in upper layer hoistway 2 of casing 5, using casing 5 and 3 optimized integration hoistway 1 of hoistway body frame with it is upper The nested docking of layer hoistway 2.
As a kind of technical optimization scheme of the invention, described sleeve pipe 5 is hollow square steel pipe, and the outer diameter of casing 5 is small In the internal diameter of hoistway body frame 3, the difference of the two dimensionally is 1-80mm.
As a kind of technical optimization scheme of the invention, 3 lower end of hoistway body frame of the basis hoistway 1 is welded with fixed bottom Seat 6, surrounding pass through 7 firm welding of reinforcing rib;The lower end of the hoistway body frame 3 of upper layer hoistway 2, which is opened, is then equipped with welding hole 8, to welding Process reserves necessary operating space.
As a kind of technical optimization scheme of the invention, the hoistway body frame 3 is hollow square steel pipe, and dimensions meets National standard is not more than 400mm × 400mm in relation to the requirement of the size of cold-drawn or hot finished steel pipe, outer diameter.
As a kind of technical optimization scheme of the invention, the basis hoistway 1 and upper layer hoistway 2 are welded with 2 on one side Collar tie beam 4 is connected, in addition three faces are welded with 4 connection collar tie beams 4, and connection collar tie beam 4 is also square steel tube, and outer diameter is less than hoistway master The outer diameter of square steel tube selected by frame 3.
As shown in Fig. 2, assembled state when being used to connect two elevator shafts for a kind of elevator shaft connection structure of the present invention Cross-sectional view, specific installation and connection method the following steps are included:
A. basic hoistway 1 is lifted to elevator design installation site, using fot screw by the firm banking of basic hoistway 1 6 are fixed in the pre- concrete foundation for being embedded in underground, and with level meter centering;
B. upper layer hoistway 2 to be sling using crane, the bottom surface to upper layer hoistway body frame 10 is higher than the casing 5 of basic hoistway 1, The lifting in shutheight direction, while the casing 5 of crane realization upper layer hoistway body frame 10 and basic hoistway 1 is manipulated in front and back, a left side Alignment in right direction, and basic hoistway 1 and upper layer hoistway 2 be welded with 2 connection collar tie beams 4 facing towards consistent;
C. slowly decline the sling height of crane, until basic hoistway body frame 9 is in contact with upper layer hoistway body frame 10, make upper layer Hoistway body frame 10 is nested in completely on the casing 5 of basic hoistway 1;
D., soldering appliance is protruded into the inside of hoistway body frame 3 by the welding hole 8 that hoistway body frame 10 lower end in upper layer opens up, it is right Upper layer hoistway body frame 10 and the connecting portion of the casing 5 of basic hoistway 1 are welded;
E. it according to the height of design elevator shaft, repeats step b-d, is sequentially completed the connection of remaining upper layer hoistway 2, i.e., it is complete At the installation of entire elevator shaft.
It is simple using a kind of installation method of elevator shaft connection structure of the present invention, and it is conducive to high altitude operation, using nesting Dock the connection method welded again, it is ensured that the stronger stabilization of connection of entire elevator shaft.
As it will be easily appreciated by one skilled in the art that the foregoing is merely illustrative of the preferred embodiments of the present invention, it is not used to The limitation present invention, any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should all include Within protection scope of the present invention.

Claims (7)

1. a kind of elevator shaft connection structure, including basic hoistway (1), upper layer hoistway (2), hoistway body frame (3), connection collar tie beam (4) and casing (5), the basis hoistway (1) and upper layer hoistway (2) have the hoistway body frame (3) of surrounding and the clamping ring of centre Beam (4) is welded, it is characterised in that: the upper end of the hoistway body frame (3) is welded with casing (5), is welded on basic hoistway (1) On the hoistway body frame (3) for being nested in upper layer hoistway (2) of the casing (5) connect.
2. elevator shaft connection structure according to claim 1, it is characterised in that: described sleeve pipe (5) and hoistway body frame (3) For hollow square steel pipe, the outer diameter of casing (5) is less than the internal diameter of hoistway body frame (3), and the difference of the two is 1-80mm.
3. elevator shaft connection structure according to claim 1, it is characterised in that: the hoistway master of the basis hoistway (1) Frame (3) lower end is welded with firm banking (6), and surrounding passes through reinforcing rib (7) firm welding.
4. elevator shaft connection structure according to claim 1, it is characterised in that: the hoistway master of the upper layer hoistway (2) The upper and lower ends of frame (3) offer welding hole (8).
5. elevator shaft connection structure according to claim 1-4, it is characterised in that: the hoistway body frame (3) For hollow square steel pipe, outer diameter is not more than 400mm × 400mm.
6. elevator shaft connection structure according to claim 1, it is characterised in that: the basis hoistway (1) and upper layer well Road (2) is welded with 2 connection collar tie beams (4) on one side, and in addition three faces are welded with 4 connection collar tie beams (4).
7. a kind of installation and connection method of elevator shaft, it is characterised in that: method includes the following steps:
A. basic hoistway (1) is lifted to elevator design installation site, using fot screw by the firm banking of basic hoistway (1) (6) it is fixed in the pre- concrete foundation for being embedded in underground, and with level meter centering;
B. upper layer hoistway (2) is sling using crane, the bottom surface to upper layer hoistway body frame (10) is higher than the casing of basic hoistway (1) (5), the lifting in shutheight direction, while manipulating the casing (5) that crane realizes upper layer hoistway body frame (10) and basic hoistway (1) Alignment on the direction of front and rear, left and right, and basic hoistway (1) and upper layer hoistway (2) are welded with facing for 2 connections collar tie beam (4) To consistent;
C. slowly the sling height of decline crane makes until basic hoistway body frame (9) is in contact with upper layer hoistway body frame (10) Layer hoistway body frame (10) is nested in completely on the casing (5) of basic hoistway (1);
D., soldering appliance is protruded into the inside of hoistway body frame (3) by the welding hole (8) that upper layer hoistway body frame (10) lower end opens up, Upper layer hoistway body frame (10) and the connecting portion of the casing (5) of basic hoistway (1) are welded;
E. according to the height of design elevator shaft, step b-d is repeated, the connection of remaining upper layer hoistway (2) is sequentially completed, that is, completes The installation of entire elevator shaft.
CN201711296648.8A 2017-12-08 2017-12-08 A kind of elevator shaft connection structure and installation and connection method Pending CN109896398A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711296648.8A CN109896398A (en) 2017-12-08 2017-12-08 A kind of elevator shaft connection structure and installation and connection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711296648.8A CN109896398A (en) 2017-12-08 2017-12-08 A kind of elevator shaft connection structure and installation and connection method

Publications (1)

Publication Number Publication Date
CN109896398A true CN109896398A (en) 2019-06-18

Family

ID=66940679

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711296648.8A Pending CN109896398A (en) 2017-12-08 2017-12-08 A kind of elevator shaft connection structure and installation and connection method

Country Status (1)

Country Link
CN (1) CN109896398A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102180397A (en) * 2011-05-30 2011-09-14 张凡 Module-type steel structure lift shaft
CN102583130A (en) * 2011-01-04 2012-07-18 张向阳 Elevator shaft wall assembled by combined shaft frame
CN103991773A (en) * 2014-05-28 2014-08-20 江苏润安电梯工程技术服务有限公司 Design and installation method of assembly-type modularized steel structure elevator shaft
CN204096827U (en) * 2014-10-16 2015-01-14 广东亚太西奥电梯有限公司 Stacked steelframe elevator hoistways
CN107117517A (en) * 2017-05-26 2017-09-01 广东易佳梯科技有限公司 A kind of modularization elevator hoistways monomer and its elevator hoistways

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102583130A (en) * 2011-01-04 2012-07-18 张向阳 Elevator shaft wall assembled by combined shaft frame
CN102180397A (en) * 2011-05-30 2011-09-14 张凡 Module-type steel structure lift shaft
CN103991773A (en) * 2014-05-28 2014-08-20 江苏润安电梯工程技术服务有限公司 Design and installation method of assembly-type modularized steel structure elevator shaft
CN204096827U (en) * 2014-10-16 2015-01-14 广东亚太西奥电梯有限公司 Stacked steelframe elevator hoistways
CN107117517A (en) * 2017-05-26 2017-09-01 广东易佳梯科技有限公司 A kind of modularization elevator hoistways monomer and its elevator hoistways

Similar Documents

Publication Publication Date Title
CN103938616B (en) Diaphram wall reinforcement cage structure and its construction method
CN208563588U (en) The connection structure of Assembled Building bench and spandrel girder
CN109736438A (en) A kind of steel pipe connecting device for steel pipe concrete and its construction method
CN105863042A (en) All-steel structure building and construction method thereof
CN109113306A (en) A kind of modularization elevator shaft and its construction method
CN106930313A (en) A kind of coastal waters wind energy project stake bucket combination foundation and its construction method
CN206143757U (en) It expands bored concrete pile stake pipe and pile driver to add elongated immersed tube rammer
CN203546728U (en) Improved installation fixing device of top-down steel pipe column
CN202466844U (en) Top layer node connecting structure for concrete-filled steel tube column and steel reinforced concrete beam
CN205063056U (en) Anticorrosion structure of node is hung futilely to assembly type structure outer wall
CN102041806A (en) Construction method for inserting steel column in bored pile
CN102494536B (en) Construction method for dust-fall pipe of sintering chamber
CN201581648U (en) Reserved joint bar structure of reinforced concrete column
CN104594343A (en) Fabricated pile and construction method thereof
CN109896398A (en) A kind of elevator shaft connection structure and installation and connection method
CN106948267B (en) A kind of memorial archway bar formula bridge cable tower king-post method for synchronously constructing
CN102865083A (en) Working well free shield arrival engineering method and structure of existing basement structure
CN205242441U (en) Oval contrary shaft of doing of suspension type
CN204608833U (en) Municipal administration manhole
CN204456816U (en) One can promote supporting leg type elevator hoistway construction platform
CN108277817B (en) Construction method of high-pile bearing platform tower crane foundation reinforcing structure
CN202925975U (en) Steel funnel for coal blending bunker
CN108086695B (en) Auxiliary sleeve type lifting tool and construction method
CN214994007U (en) A positioning frame for connecting bridge steel casing and steel cage
CN109881896B (en) A connecting body lifting method for super high-rise buildings

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190618