CN109892995A - A kind of ventilation device and its construction method for the installation of embedded steaming and baking box - Google Patents
A kind of ventilation device and its construction method for the installation of embedded steaming and baking box Download PDFInfo
- Publication number
- CN109892995A CN109892995A CN201910262743.9A CN201910262743A CN109892995A CN 109892995 A CN109892995 A CN 109892995A CN 201910262743 A CN201910262743 A CN 201910262743A CN 109892995 A CN109892995 A CN 109892995A
- Authority
- CN
- China
- Prior art keywords
- plate
- ventilating duct
- concrete foundation
- side plate
- connecting plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
- Commercial Cooking Devices (AREA)
Abstract
The invention discloses a kind of ventilation devices and its construction method for the installation of embedded steaming and baking box, including the first concrete foundation and the second concrete foundation, first concrete foundation is equipped with the first ventilating duct, second concrete foundation is equipped with the second ventilating duct, bracing reinforcement device is equipped in first concrete foundation, the end of the end of the first ventilating duct and the second ventilating duct is equipped with air grid.This method comprises: a, fluting;B, bracing reinforcement device is installed;C, the first concrete foundation and the second concrete foundation are poured;D, the second side plate and the installation of the first side plate;E, the first ventilating duct is connected to the second ventilating duct.The present invention is connected to the second ventilating duct by the first ventilating duct and carries out air flowing, is avoided the first ventilating duct for placing steaming and baking box from disrepair phenomenon occur, is guaranteed embedded steaming and baking box trouble free service.In construction method, the first ventilating duct and the junction of the second ventilating duct can be made gap do not occur, can guarantee the cleaning inside the first ventilating duct and the second ventilating duct.
Description
Technical field
The invention belongs to embedded steaming and baking box mounting technique fields, and in particular to it is a kind of for embedded steaming and baking box installation
Ventilation device and its construction method.
Background technique
The principle of heating of steaming and baking box is to allow resistance wire (stick) energization heating, so that electric energy is become thermal energy, so that the intracorporal temperature of case
Degree improves, and then be baked to food ripe, this process is by outside to inside.
Steaming and baking box processed food is a roasting process, and open fire is directly roasting to generate carcinogen, but uses steaming and baking box, is caused
Cancer substance is nearly free from.Therefore, it can be said that being the safe processing method of comparison using steaming and baking box processed food.
In the prior art, by steaming and baking box installation by adhering in large-scale cabinet.And box house Spatial General 6 R in steaming and baking box
For the cube of rule, therefore two fixed links of the used grill for steaming and baking box are arranged in parallel.Steaming and baking box is embedding
When entering formula and being mounted in large-scale cabinet, steaming and baking box is placed on, and heat is easily assembled in the bottom of steaming and baking box, is caused to place and be scorched
Easily there is disrepair phenomenon in the bottom plate of case.
Summary of the invention
Above-mentioned deficiency present in present invention aims to solve the prior art provides a kind of for embedded steaming and baking box peace
The ventilation device and its construction method of dress, are connected to the second ventilating duct by the first ventilating duct and carry out air flowing, and first is logical
Air duct is aerated heat dissipation to the bottom of steaming and baking box, and the second ventilating duct avoids being used for heat dissipation is aerated on rear side of steaming and baking box
There is disrepair phenomenon in the first ventilating duct for placing steaming and baking box, guarantees embedded steaming and baking box trouble free service.In construction method, first pacify
Bracing reinforcement device is filled, then pours the first concrete foundation and the second concrete foundation, so that bracing reinforcement device and first mixes
Solidifying earth foundation forms an entirety, and the first concrete foundation connects integral with the second concrete foundation, can increase bracing reinforcement
The bearing capacity of device reduces by the first ventilating duct and deformation occurs;Second side plate and the first side plate are installed again, then by first
Ventilating duct is connected to the second ventilating duct, and the second side plate and the first side plate can be made to connect well, so that the first ventilating duct
There is not gap with the junction of the second ventilating duct, moreover it is possible to carry out to the first bottom plate, the first side plate, the second bottom plate and the second side plate
Wiping guarantees the cleaning inside the first ventilating duct and the second ventilating duct.
In order to solve the above-mentioned technical problem, the present invention adopts the following technical scheme:
A kind of ventilation device for the installation of embedded steaming and baking box, it is characterised in that: including the first coagulation being laterally arranged
Earth foundation and the second vertically arranged concrete foundation, the first concrete foundation are horizontally installed with the first ventilating duct, the second coagulation
Earth foundation is vertically equipped with the second ventilating duct, and the second ventilating duct is connected to the first ventilating duct, and branch is equipped in the first concrete foundation
Bracing means is supportted, bracing reinforcement device is fixedly connected with the first ventilating duct, the end of the end of the first ventilating duct and the second ventilating duct
Portion is equipped with air grid.The present invention is connected to the second ventilating duct by the first ventilating duct and carries out air flowing, the first ventilation
Road is aerated heat dissipation to the bottom of steaming and baking box, and the second ventilating duct is avoided to heat dissipation is aerated on rear side of steaming and baking box for putting
There is disrepair phenomenon in the first ventilating duct for setting steaming and baking box, guarantees embedded steaming and baking box trouble free service;In the end of the first ventilating duct
It is respectively provided with air grid with the end of the second ventilating duct, prevents sundries from entering the first ventilating duct and the second ventilating duct, can avoid the
One ventilating duct and the second ventilating duct occur blocking phenomenon, guarantee that the first ventilating duct and the ventilation of the second ventilating duct are smooth.
Further, the first ventilating duct includes the first bottom plate, the first top plate and the first side plate, the first bottom plate and the first concrete
It basis, can be by the first bottom plate securely in the first concrete foundation by steel nail connection.First bottom plate and the first top plate are set in parallel
It sets, the first side plate is set between the first bottom plate and the first top plate, is pushed up set on the air grid of the end of the first ventilating duct and first
Plate is detachably connected, and easy disassembly is set to the air grid of the end of the first ventilating duct.First side plate and bracing reinforcement device are solid
Fixed connection, the first side plate are connect with the first top plate by self-tapping screw, and fast and easy installs entire first ventilating duct.
Further, the air grid set on the end of the first ventilating duct is connect with the first top plate by fixed screw, is realized
Air grid set on the end of the first ventilating duct is detachably connected with the first top plate, and dismounting mode is simple, easy to operate.
Further, bracing reinforcement device includes L-type steel and connecting plate, L-type steel along the first concrete foundation length side
To being uniformly distributed, it is equipped with reinforcing bar along the L-type steel on the length direction of the first concrete foundation, connecting plate is removably connected to
On reinforcing bar, connecting plate passes through the first bottom plate, is connected between connecting plate and the first side plate by self-tapping screw.L-type steel is for installing
Reinforcing bar, and the setting of reinforcing bar height is positioned;Reinforcing bar is determined for installing connecting plate, and to the setting of connecting plate height
Position;Connecting plate generates active force, the power that the first ventilating duct is subject to for realizing the first concrete foundation and the first side plate
It shares onto the first concrete foundation;By L-type steel, reinforcing bar and connecting plate, so that entire bracing reinforcement device and the first coagulation
Earth foundation forms an entirety, is conducive to support and reinforcement effect of the bracing reinforcement device to the first ventilating duct.
Further, connecting plate is equipped with groove, and reinforcing bar is set in groove, and connecting plate sets that there are two the through-hole that is distributed up and down, steel
Muscle clamping has U-shaped locking member, and U-shaped locking member passes through through-hole, and U-shaped locking member is threaded with nut, and nut is tightened against connecting plate
Side on.When nut, which is in, unscrews state, can slide U-shaped locking member is horizontal on reinforcing bar, so that connecting plate exists
Horizontal sliding on reinforcing bar, adjusts setting position of the connecting plate on reinforcing bar, guarantees that connecting plate can pass through self tapping spiral shell with the first side plate
Silk connection.
Further, the second ventilating duct includes the second bottom plate, the second top plate and the second side plate, the second bottom plate and the second concrete
It basis, can be by the second bottom plate securely in the second concrete foundation by steel nail connection.Second bottom plate and the second top plate are set in parallel
It sets, the second side plate is set between the second bottom plate and the second top plate, is pushed up set on the air grid of the end of the second ventilating duct and second
Plate is detachably connected, and easy disassembly is set to the air grid of the end of the second ventilating duct.Second bottom plate is connected by self-tapping screw
There is chock, is connected between the second side plate and chock by self-tapping screw, the second side plate is connect with the second top plate by self-tapping screw,
Fast and easy installs entire second ventilating duct.
Further, the air grid set on the end of the second ventilating duct is connect with the second top plate by fixed screw.
A kind of construction method of the ventilation device for the installation of embedded steaming and baking box, it is characterised in that include the following steps:
A, according to the size of the first concrete foundation and the second vertically arranged concrete foundation that are laterally arranged, on ground
Upper carry out surveying and locating, then to slotting at setting-out;
B, bracing reinforcement device is installed:
1) setting-out is measured to the corresponding slot of the first concrete foundation, marks the installation site of L-type steel, then using swollen
L-type steel is installed to the installed position of L-type steel by swollen screw;
2) it is passed through reinforcing bar between the L-type steel in the length direction along the first concrete foundation is worn, then reinforcing bar is carried out
Then horizontal position adjustment welds reinforcing bar and L-type steel;
3) reinforcing bar is measured, the installation site of connecting plate is marked on reinforcing bar, then the groove of connecting plate is arranged
Onto reinforcing bar, it is then caught in U-shaped locking member on reinforcing bar, and U-shaped locking member is passed through to the through-hole of connecting plate, then by connecting plate
The installed position of connecting plate is moved on to, then keeps connecting plate state in a vertical shape, nut is then screwed on U-shaped locking member, and will
Nut is tightened against on the side of connecting plate;
C, the first concrete foundation is poured in the corresponding slot of the first concrete foundation, it is corresponding in the second concrete foundation
The second concrete foundation is poured in slot;
D, the second side plate and the installation of the first side plate:
1) the second bottom plate is fixed in the second concrete foundation using steel nail, then setting-out is measured to the second bottom plate, drawn
The installation site of second side plate out, then chock is arranged in the intersection between the installation site of the second side plate and the second bottom plate,
And chock is fixed on the second bottom plate using self-tapping screw, then the second side plate is placed into the installation site of the second side plate
Place, and the second side plate is fixed on chock using self-tapping screw;
2) the first bottom plate is placed on connecting plate, then drawn lines to connecting plate and the first contacts baseplate position, then
To progress aperture at setting-out, then the hole that connecting plate is opened up passes through connecting plate, and the first bottom plate is fixed on first using steel nail
In concrete foundation, the first side plate is then placed on the first bottom plate, the side of the first side plate and the side of the second side plate is tight
Patch, then be fixedly connected with connecting plate with the first side plate using self-tapping screw;
3) the first bottom plate, the first side plate, the second bottom plate and the second side plate are wiped using rag;
E, the first ventilating duct is connected to the second ventilating duct:
1) the first top plate is fixed on the first side plate using self-tapping screw, is fixed to the second top plate using self-tapping screw
On second side plate;
2) air grid is installed on the second top plate and the second top plate using fixed screw.
Further, in step b 1) part, foundation trench is opened up in the installation site of L-type steel, the size of foundation trench is can put down
Subject to L-type steel, then in the foundation trench of L-type steel is installed to L-type steel using setscrew installed position.L-type steel can be carried out
Positioning operation, convenient for L-type steel is fixed using setscrew.
The present invention is by adopting the above-described technical solution, have the advantages that
1, the present invention is connected to the second ventilating duct by the first ventilating duct and carries out air flowing, and the first ventilating duct is to scorching
The bottom of case is aerated heat dissipation, and the second ventilating duct is avoided to heat dissipation is aerated on rear side of steaming and baking box for placing steaming and baking box
The first ventilating duct there is disrepair phenomenon, guarantee embedded steaming and baking box trouble free service.
It is respectively provided with air grid in the end of the first ventilating duct and the end of the second ventilating duct, prevents sundries from entering first logical
Air duct and the second ventilating duct can avoid the first ventilating duct and the second ventilating duct and occur blocking phenomenon, guarantee the first ventilating duct and the
The ventilation of two ventilating ducts is smooth.
2, bracing reinforcement device of the invention includes L-type steel and connecting plate, L-type steel along the first concrete foundation length
Direction is uniformly distributed, and is equipped with reinforcing bar along the L-type steel on the length direction of the first concrete foundation, connecting plate is detachably connected
In on reinforcing bar, connecting plate passes through the first bottom plate, is connected between connecting plate and the first side plate by self-tapping screw.L-type steel is for pacifying
Steel loading muscle, and the setting of reinforcing bar height is positioned;Reinforcing bar is carried out for installing connecting plate, and to the setting height of connecting plate
Positioning;Connecting plate generates active force for realizing the first concrete foundation and the first side plate, so that the power that the first ventilating duct is subject to
It can share onto the first concrete foundation;By L-type steel, reinforcing bar and connecting plate, so that entire bracing reinforcement device and first mixes
Solidifying earth foundation forms an entirety, is conducive to support and reinforcement effect of the bracing reinforcement device to the first ventilating duct.
3, the present invention first installs bracing reinforcement device, the setting height of reinforcing bar is determined by L-type steel in construction method,
Determine the setting height of connecting plate by reinforcing bar, then determine the installation site of connecting plate by the label of reinforcing bar, then by
It is caught in U-shaped locking member on reinforcing bar, and U-shaped locking member is passed through to the through-hole of connecting plate, connecting plate can be moved on to the installation of connecting plate
At position, and connecting plate can be kept vertical state, be conducive to later period connecting plate and be close to be fixedly connected with the first side plate.Again
The first concrete foundation and the second concrete foundation are poured, so that bracing reinforcement device and the first concrete foundation formation one are whole
Body, the first concrete foundation and the second concrete foundation connect integral, can increase the bearing capacity of bracing reinforcement device, reduce
There is deformation in first ventilating duct.Second side plate and the first side plate are installed, are first fixed on the second side plate using self-tapping screw
On chock, then self-tapping screw is used to be fixedly connected with connecting plate with the first side plate, can be installed in this way according to the position of the second side plate
Then first ventilating duct is connected to by the first side plate with the second ventilating duct, the second side plate and the first side plate can be made to connect well,
So that there is not gap in the junction of the first ventilating duct and the second ventilating duct, moreover it is possible to the first bottom plate, the first side plate, second
Bottom plate and the second side plate are wiped, and guarantee the cleaning inside the first ventilating duct and the second ventilating duct.The first ventilation after connection
Road and the second ventilating duct are aerated heat dissipation to embedded steaming and baking box.
Detailed description of the invention
The present invention will be further explained below with reference to the attached drawings:
Fig. 1 is the structural schematic diagram of bracing reinforcement device in the present invention;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the structural schematic diagram that U-shaped locking member is connected with nut in the present invention;
Fig. 4 is the present invention in structural schematic diagram when pouring the first concrete foundation and the second concrete foundation;
Fig. 5 is the structural schematic diagram when present invention is installed in the second side plate and the first side plate;
Fig. 6 is the present invention in structural schematic diagram when being connected to the first ventilating duct with the second ventilating duct;
Fig. 7 be the present invention in it is a kind of for embedded steaming and baking box installation not set first concrete foundation of ventilation device and
The structural schematic diagram of second concrete foundation.
In figure, the first concrete foundation of 1-;The second concrete foundation of 2-;The first ventilating duct of 3-;The second ventilating duct of 4-;5- branch
Support bracing means;6- air grid;The first bottom plate of 7-;The first top plate of 8-;The first side plate of 9-;10-L fashioned iron;11- connecting plate;12-
Reinforcing bar;13- groove;14- through-hole;15-U type locking member;16- nut;The second bottom plate of 17-;The second top plate of 18-;19- second side
Plate;20- chock.
Specific embodiment
It as shown in Figures 1 to 7, is the ventilation device for the installation of embedded steaming and baking box a kind of in the present invention, including transverse direction
The first concrete foundation 1 and the second vertically arranged concrete foundation 2 being arranged, the first concrete foundation 1 are horizontally installed with
One ventilating duct 3, the second concrete foundation 2 are vertically equipped with the second ventilating duct 4, and the second ventilating duct 4 is connected to the first ventilating duct 3.
Bracing reinforcement device 5 is equipped in first concrete foundation 1, bracing reinforcement device 5 is fixedly connected with the first ventilating duct 3.First is logical
The end in air duct 3 and the end of the second ventilating duct 4 are equipped with air grid 6.Embedded steaming and baking box is placed on the first ventilating duct 3
On, the rear side of embedded steaming and baking box is arranged on the second ventilating duct 4, connects to power supply for the ease of embedded steaming and baking box, can be
Be encased inside limited block between embedded steaming and baking box and the second ventilating duct 4 so that the rear side of embedded steaming and baking box and the second ventilating duct 4 it
Between there are certain space, the two sides of embedded steaming and baking box and the planks of cabinet to be attached.
First ventilating duct 3 includes the first bottom plate 7, the first top plate 8 and the first side plate 9, the first bottom plate 7 and the first coagulation soil matrix
Plinth 1 is connected by steel nail, can be by the first bottom plate 7 securely in the first concrete foundation 1.First bottom plate 7 is parallel with the first top plate 8
Setting, the first side plate 9 are set between the first bottom plate 7 and the first top plate 8.Set on the end of the first ventilating duct 3 air grid 6 with
First top plate 8 is detachably connected, and easy disassembly is set to the air grid 6 of the end of the first ventilating duct 3.First side plate 9 and support
Bracing means 5 is fixedly connected, and the first side plate 9 is connect with the first top plate 8 by self-tapping screw, and fast and easy installation entire first is logical
Air duct 3.
Air grid 6 set on the end of the first ventilating duct 3 is connect with the first top plate 8 by fixed screw, and realization is set to
The air grid 6 of the end of first ventilating duct 3 is detachably connected with the first top plate 8, and dismounting mode is simple, easy to operate.
Bracing reinforcement device 5 include L-type steel 10 and connecting plate 11, L-type steel 10 along the first concrete foundation 1 length side
To being uniformly distributed, it is equipped with reinforcing bar 12 along the L-type steel 10 on the length direction of the first concrete foundation 1, connecting plate 11 is removable
It unloads and is connected on reinforcing bar 12, connecting plate 11 passes through the first bottom plate 7, is connected between connecting plate 11 and the first side plate 9 by self-tapping screw
It connects.L-type steel 10 is positioned for installing reinforcing bar 12, and to the setting of reinforcing bar 12 height;Reinforcing bar 12 is used to install connecting plate 11,
And the setting of connecting plate 11 height is positioned;Connecting plate 11 generates for realizing the first concrete foundation 1 and the first side plate 9
Active force, the power that the first ventilating duct 3 is subject to are shared onto the first concrete foundation 1;Pass through L-type steel 10,12 and of reinforcing bar
Connecting plate 11 is conducive to bracing reinforcement dress so that entire bracing reinforcement device 5 and the first concrete foundation 1 form an entirety
Set the support and reinforcement effect of 5 pair of first ventilating duct 3.
Connecting plate 11 is equipped with groove 13, and reinforcing bar 12 is set in groove 13, and connecting plate 11 sets that there are two the through-holes that are distributed up and down
14,12 clamping of reinforcing bar has U-shaped locking member 15, and U-shaped locking member 15 passes through through-hole 14, and U-shaped locking member 15 is threaded with nut 16,
Nut 16 is tightened against on the side of connecting plate 11.It, can be by U-shaped locking member 15 on reinforcing bar 12 when nut 16, which is in, unscrews state
Level sliding, so that the horizontal sliding on reinforcing bar 12 of connecting plate 11, adjusts setting position of the connecting plate 11 on reinforcing bar 12,
Guarantee that connecting plate 11 can be connect with the first side plate 9 by self-tapping screw.
Second ventilating duct 4 includes the second bottom plate 17, the second top plate 18 and the second side plate 19, the second bottom plate 17 and the second coagulation
Earth foundation 2 is connected by steel nail, can be by the second bottom plate 17 securely in the second concrete foundation 2.Second bottom plate 17 and the second top
Plate 18 is arranged in parallel, and the second side plate 19 is set between the second bottom plate 17 and the second top plate 18, set on the end of the second ventilating duct 4
Air grid 6 is detachably connected with the second top plate 18, and easy disassembly is set to the air grid 6 of the end of the second ventilating duct 4.Second
Bottom plate 17 is connected with chock 20 by self-tapping screw, is connected between the second side plate 19 and chock 20 by self-tapping screw, second side
Plate 19 is connect with the second top plate 18 by self-tapping screw, and fast and easy installs entire second ventilating duct 4.Set on the second ventilating duct 4
The air grid 6 of end connect with the second top plate 18 by fixed screw.
The present invention is connected to the second ventilating duct 4 by the first ventilating duct 3 and carries out air flowing, and the first 3 pairs of ventilating duct steams
The bottom of oven is aerated heat dissipation, and the second ventilating duct 4 avoids scorching for placing to heat dissipation is aerated on rear side of steaming and baking box
There is disrepair phenomenon in first ventilating duct 3 of case, guarantees embedded steaming and baking box trouble free service.In the end of the first ventilating duct 3 and
The end of two ventilating ducts 4 is respectively provided with air grid 6, prevents sundries from entering the first ventilating duct 3 and the second ventilating duct 4, can avoid the
One ventilating duct 3 and the second ventilating duct 4 occur blocking phenomenon, and it is smooth to guarantee that the first ventilating duct 3 and the second ventilating duct 4 are divulged information.
A kind of construction method of the ventilation device for the installation of embedded steaming and baking box, includes the following steps:
A, according to the size of the first concrete foundation 1 and the second vertically arranged concrete foundation 2 that are laterally arranged, on ground
Carry out surveying and locating on face, then to slotting at setting-out.
B, bracing reinforcement device 5 is installed:
1) setting-out is measured to the corresponding slot of the first concrete foundation 1, marks the installation site of L-type steel 10, then adopt
L-type steel 10 is installed to the installed position of L-type steel 10 with setscrew.
When specific operation: foundation trench is opened up in the installation site of L-type steel 10, the size of foundation trench, which is subject to, can put down L-type steel 10,
In the foundation trench for the installed position that L-type steel 10 is installed to L-type steel 10 using setscrew again.L-type steel 10 can be positioned
Operation, convenient for L-type steel 10 is fixed using setscrew.
2) it is passed through reinforcing bar 12 between the L-type steel 10 in the length direction along the first concrete foundation 1 is worn, then to reinforcing bar
12 carry out horizontal position adjustment, then weld reinforcing bar 12 and L-type steel 10.
3) reinforcing bar 12 is measured, marks the installation site of connecting plate 11 on reinforcing bar 12, then by connecting plate 11
In the setting to reinforcing bar 12 of groove 13.Then it is caught in U-shaped locking member 15 on reinforcing bar 12, and U-shaped locking member 15 is passed through into connecting plate
11 through-hole 14.Then connecting plate 11 is moved on to the installed position of connecting plate 11, then keep the state in a vertical shape of connecting plate 11, so
Nut 16 is screwed on U-shaped locking member 15 afterwards, and nut 16 is tightened against on the side of connecting plate 11.
C, the first concrete foundation 1 is poured in the corresponding slot of the first concrete foundation 1, it is right in the second concrete foundation 2
The second concrete foundation 2 is poured in the slot answered.
D, the second side plate 19 and the installation of the first side plate 9:
1) the second bottom plate 17 is fixed in the second concrete foundation 2 using steel nail, then the second bottom plate 17 is measured and is put
Sample draws the installation site of the second side plate 19.Then the boundary between the installation site of the second side plate 19 and the second bottom plate 17
Place's setting chock 20, and chock 20 is fixed on the second bottom plate 17 using self-tapping screw.Then the second side plate 19 is placed into
The installed position of second side plate 19, and the second side plate 19 is fixed on chock 20 using self-tapping screw.
2) the first bottom plate 7 is placed on connecting plate 11, then picture is carried out to connecting plate 11 and 7 contact position of the first bottom plate
Line, then to progress aperture at setting-out, then the hole that connecting plate 11 is opened up passes through connecting plate 11, and uses steel nail by the first bottom plate
7 are fixed in the first concrete foundation 1.Then the first side plate 9 is placed on the first bottom plate 7, by the side of the first side plate 9 and the
The side of two side plates 19 is close to, then is fixedly connected with connecting plate 11 with the first side plate 9 using self-tapping screw.
3) the first bottom plate 7, the first side plate 9, the second bottom plate 17 and the second side plate 19 are wiped using rag.
E, the first ventilating duct 3 is connected to the second ventilating duct 4:
1) the first top plate 8 is fixed on the first side plate 9 using self-tapping screw, is consolidated the second top plate 18 using self-tapping screw
Determine onto the second side plate 19.
2) air grid 6 is installed on the second top plate 18 and the second top plate 18 using fixed screw.
The present invention first installs bracing reinforcement device 5 in construction method, determines that the setting of reinforcing bar 12 is high by L-type steel 10
Degree determines the setting height of connecting plate 11 by reinforcing bar 12, then the installation site of connecting plate 11 is determined by the label of reinforcing bar 12,
Then by being caught in U-shaped locking member 15 on reinforcing bar 12, and U-shaped locking member 15 can will be connected across the through-hole 14 of connecting plate 11
Fishplate bar 11 moves on to the installed position of connecting plate 11, and connecting plate 11 can be kept vertical state, is conducive to later period connecting plate 11
It is close to be fixedly connected with the first side plate 9.The first concrete foundation 1 and the second concrete foundation 2 are poured again, so that support adds
Be fixedly mounted with set 5 and first concrete foundation 1 form an entirety, the first concrete foundation 1 and the second concrete foundation 2 connect into whole
Body can increase the bearing capacity of bracing reinforcement device 5, reduces by the first ventilating duct 3 and deformation occurs.Second side plate, 19 He is installed
Second side plate 19 is first fixed on chock 20 using self-tapping screw by the first side plate 9, then using self-tapping screw by connecting plate 11 with
First side plate 9 is fixedly connected, and can install the first side plate 9 according to the position of the second side plate 19 in this way, then by the first ventilating duct 3 with
The connection of second ventilating duct 4, can be such that the second side plate 19 and the first side plate 9 connects well, so that the first ventilating duct 3 and the
There is not gap in the junction of two ventilating ducts 4, moreover it is possible to the first bottom plate 7, the first side plate 9, the second bottom plate 17 and the second side plate 19
It is wiped, guarantees the cleaning inside the first ventilating duct 3 and the second ventilating duct 4.The first ventilating duct 3 and the second ventilation after connection
Road 4 is aerated heat dissipation to embedded steaming and baking box.
The above is only specific embodiments of the present invention, but technical characteristic of the invention is not limited thereto.It is any with this hair
Based on bright, to solve essentially identical technical problem, essentially identical technical effect is realized, made simple change, etc.
With replacement or modification etc., all it is covered by among protection scope of the present invention.
Claims (9)
1. a kind of ventilation device for the installation of embedded steaming and baking box, it is characterised in that: including the first concrete being laterally arranged
The second basic and vertically arranged concrete foundation, first concrete foundation are horizontally installed with the first ventilating duct, and described
Two concrete foundations are vertically equipped with the second ventilating duct, and second ventilating duct is connected to first ventilating duct, and described first
Bracing reinforcement device is equipped in concrete foundation, the bracing reinforcement device is fixedly connected with first ventilating duct, and described the
The end of one ventilating duct and the end of second ventilating duct are equipped with air grid.
2. a kind of ventilation device for the installation of embedded steaming and baking box according to claim 1, it is characterised in that: described the
One ventilating duct includes the first bottom plate, the first top plate and the first side plate, and first bottom plate passes through with first concrete foundation
Steel nail connection, first bottom plate and first top plate are arranged in parallel, and first side plate is set to first bottom plate and institute
It states between the first top plate, the air grid and first top plate set on the end of first ventilating duct detachably connect
It connects, first side plate is fixedly connected with the bracing reinforcement device, and first side plate and first top plate pass through self tapping
Screw connection.
3. a kind of ventilation device for the installation of embedded steaming and baking box according to claim 2, it is characterised in that: be set to institute
The air grid for stating the end of the first ventilating duct is connect with first top plate by fixed screw.
4. a kind of ventilation device for the installation of embedded steaming and baking box according to claim 2, it is characterised in that: the branch
Supportting bracing means includes L-type steel and connecting plate, and the L-type steel is uniformly divided along the length direction of first concrete foundation
Cloth is equipped with reinforcing bar along the L-type steel on the length direction of first concrete foundation, and the connecting plate detachably connects
It is connected on the reinforcing bar, the connecting plate passes through first bottom plate, by certainly between the connecting plate and first side plate
Tapping connection.
5. a kind of ventilation device for the installation of embedded steaming and baking box according to claim 4, it is characterised in that: the company
Fishplate bar is equipped with groove, and the reinforcing bar is set in the groove, and the connecting plate sets that there are two the through-hole that is distributed up and down, the reinforcing bars
Clamping has U-shaped locking member, and the U-shaped locking member passes through the through-hole, and the U-shaped locking member is threaded with nut, the spiral shell
Mother is tightened against on the side of the connecting plate.
6. a kind of ventilation device for the installation of embedded steaming and baking box according to claim 1, it is characterised in that: described the
Two ventilating ducts include the second bottom plate, the second top plate and the second side plate, and second bottom plate passes through with second concrete foundation
Steel nail connection, second bottom plate and second top plate are arranged in parallel, and second side plate is set to second bottom plate and institute
It states between the second top plate, the air grid and second top plate set on the end of second ventilating duct detachably connect
It connects, second bottom plate is connected with chock by self-tapping screw, passes through self-tapping screw between second side plate and the chock
Connection, second side plate are connect with second top plate by self-tapping screw.
7. a kind of ventilation device for the installation of embedded steaming and baking box according to claim 6, it is characterised in that: be set to institute
The air grid for stating the end of the second ventilating duct is connect with second top plate by fixed screw.
8. based on a kind of construction method of the ventilation device for the installation of embedded steaming and baking box described in claim 1, feature
It is to include the following steps:
A, according to the size of the first concrete foundation and the second vertically arranged concrete foundation that are laterally arranged, on the ground into
Row surveying and locating, then to slotting at setting-out;
B, bracing reinforcement device is installed:
1) setting-out is measured to the corresponding slot of the first concrete foundation, marks the installation site of L-type steel, then use expanding screw
L-type steel is installed to the installed position of L-type steel by silk;
2) it is passed through reinforcing bar between the L-type steel in the length direction along the first concrete foundation is worn, then reinforcing bar is carried out horizontal
Position adjustment, then welds reinforcing bar and L-type steel;
3) reinforcing bar is measured, the installation site of connecting plate is marked on reinforcing bar, then the groove of connecting plate is arranged to steel
On muscle, it is then caught in U-shaped locking member on reinforcing bar, and U-shaped locking member is passed through to the through-hole of connecting plate, then moves on to connecting plate
The installed position of connecting plate, then keep connecting plate state in a vertical shape, is then screwed into nut on U-shaped locking member, and by nut
It is tightened against on the side of connecting plate;
C, the first concrete foundation is poured in the corresponding slot of the first concrete foundation, in the corresponding slot of the second concrete foundation
Pour the second concrete foundation;
D, the second side plate and the installation of the first side plate:
1) the second bottom plate is fixed in the second concrete foundation using steel nail, then setting-out is measured to the second bottom plate, draw the
The installation site of two side plates, then chock is arranged in the intersection between the installation site of the second side plate and the second bottom plate, and adopts
Chock is fixed on the second bottom plate with self-tapping screw, then the second side plate is placed into the installed position of the second side plate, and
The second side plate is fixed on chock using self-tapping screw;
2) the first bottom plate is placed on connecting plate, then drawn lines to connecting plate and the first contacts baseplate position, then to picture
Aperture is carried out at line, then the hole that connecting plate is opened up passes through connecting plate, and the first bottom plate is fixed on the first coagulation using steel nail
On earth foundation, the first side plate is then placed on the first bottom plate, and the side of the first side plate is close to the side of the second side plate, then
Connecting plate is fixedly connected with the first side plate using self-tapping screw;
3) the first bottom plate, the first side plate, the second bottom plate and the second side plate are wiped using rag;
E, the first ventilating duct is connected to the second ventilating duct:
1) the first top plate is fixed on the first side plate using self-tapping screw, the second top plate is fixed to second using self-tapping screw
On side plate;
2) air grid is installed on the second top plate and the second top plate using fixed screw.
9. a kind of construction method of ventilation device for the installation of embedded steaming and baking box according to claim 8, feature
It is: in step b 1) part, opens up foundation trench in the installation site of L-type steel, the size of foundation trench, which is subject to, can put down L-type steel,
In the foundation trench for the installed position that L-type steel is installed to L-type steel using setscrew again.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910262743.9A CN109892995B (en) | 2019-04-02 | 2019-04-02 | Ventilating device for installing embedded steaming and baking box and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910262743.9A CN109892995B (en) | 2019-04-02 | 2019-04-02 | Ventilating device for installing embedded steaming and baking box and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109892995A true CN109892995A (en) | 2019-06-18 |
CN109892995B CN109892995B (en) | 2023-05-16 |
Family
ID=66954374
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910262743.9A Active CN109892995B (en) | 2019-04-02 | 2019-04-02 | Ventilating device for installing embedded steaming and baking box and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109892995B (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1106729A2 (en) * | 1999-12-02 | 2001-06-13 | Joma-Polytec Kunststofftechnik GmbH | Cross flow heat exchanger for laundry drier with condenser |
JP2002078619A (en) * | 2000-09-06 | 2002-03-19 | Paloma Ind Ltd | Gas grill |
CN203521556U (en) * | 2013-10-18 | 2014-04-02 | 丰田自动车株式会社 | Battery cooling structure |
CN204207607U (en) * | 2014-09-29 | 2015-03-18 | 杭州老板电器股份有限公司 | A kind of built-in electric oven two air channels cycle cooling system |
CN206275588U (en) * | 2016-08-31 | 2017-06-27 | 陈鸿正 | A kind of household mosaic electricity steaming and baking box |
CN207990740U (en) * | 2018-03-23 | 2018-10-19 | 浙江蓝炬星电器有限公司 | A kind of integrated kitchen range with outlet air guider |
CN208459944U (en) * | 2018-08-09 | 2019-02-01 | 北京优科达拓信息技术有限公司 | A kind of computer host box based on longitudinal air flow path heat dissipation |
CN209966169U (en) * | 2019-04-02 | 2020-01-21 | 浙江蓝炬星电器有限公司 | Ventilation device for installing embedded steaming and baking oven |
-
2019
- 2019-04-02 CN CN201910262743.9A patent/CN109892995B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1106729A2 (en) * | 1999-12-02 | 2001-06-13 | Joma-Polytec Kunststofftechnik GmbH | Cross flow heat exchanger for laundry drier with condenser |
JP2002078619A (en) * | 2000-09-06 | 2002-03-19 | Paloma Ind Ltd | Gas grill |
CN203521556U (en) * | 2013-10-18 | 2014-04-02 | 丰田自动车株式会社 | Battery cooling structure |
CN204207607U (en) * | 2014-09-29 | 2015-03-18 | 杭州老板电器股份有限公司 | A kind of built-in electric oven two air channels cycle cooling system |
CN206275588U (en) * | 2016-08-31 | 2017-06-27 | 陈鸿正 | A kind of household mosaic electricity steaming and baking box |
CN207990740U (en) * | 2018-03-23 | 2018-10-19 | 浙江蓝炬星电器有限公司 | A kind of integrated kitchen range with outlet air guider |
CN208459944U (en) * | 2018-08-09 | 2019-02-01 | 北京优科达拓信息技术有限公司 | A kind of computer host box based on longitudinal air flow path heat dissipation |
CN209966169U (en) * | 2019-04-02 | 2020-01-21 | 浙江蓝炬星电器有限公司 | Ventilation device for installing embedded steaming and baking oven |
Also Published As
Publication number | Publication date |
---|---|
CN109892995B (en) | 2023-05-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207427708U (en) | A kind of automatic adjustment cabinet | |
CN208707162U (en) | A kind of energy-saving rain-proof power distribution cabinet | |
CN109892995A (en) | A kind of ventilation device and its construction method for the installation of embedded steaming and baking box | |
CN110063169A (en) | A kind of vertical greening wall construction | |
CN206442636U (en) | A kind of rack backboard, rack and its air cooling equipment | |
KR20130100531A (en) | Automatic water supply for stall | |
CN107830321B (en) | Flush type foundation bolt for electrical bracket positions levelling device | |
CN206931867U (en) | Power distribution cabinet | |
CN203715663U (en) | Cast steel refining furnace | |
CN209263193U (en) | A kind of high intensity outdoor machine of air-conditioner mounting bracket | |
CN208874128U (en) | A kind of radiating control cabinet | |
CN211967922U (en) | Universal adjusting type embedded part fixing and mounting frame | |
CN211063168U (en) | Electric box cabinet | |
CN208735850U (en) | A kind of air-conditioning draught fan electric machine support | |
CN210743889U (en) | Network circuit breaker device supporting network control | |
CN207659482U (en) | A kind of energy-efficient annealing device for casting | |
CN218379353U (en) | Electromagnetism steam generator integral type frame and electromagnetism steam generator | |
CN206457161U (en) | A kind of heat treatment suspender | |
CN206320413U (en) | A kind of interim fire protection pipeline hangs drawing component | |
CN217904973U (en) | Novel mechatronic heat dissipation case | |
CN210016124U (en) | Indoor wall-mounted power distribution cabinet | |
CN218195915U (en) | Get curing box of putting material | |
CN210833030U (en) | Single coil furnace body mounting structure | |
CN219414323U (en) | Hanging structure of wall-mounted electric appliance and wall-mounted electric appliance | |
CN109850740A (en) | A kind of curtain wall unit body Lift-on/Lift-off System and its hanging method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A ventilation device and its construction method for the installation of embedded steam ovens Effective date of registration: 20231201 Granted publication date: 20230516 Pledgee: Shaoxing Bank Co.,Ltd. Shengzhou sub branch Pledgor: ZHEJIANG LAJOSON ELECTRICAL APPLIANCES Co.,Ltd. Registration number: Y2023980068566 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |