[go: up one dir, main page]

CN109882869A - A kind of sulfur furnace furnace drying method - Google Patents

A kind of sulfur furnace furnace drying method Download PDF

Info

Publication number
CN109882869A
CN109882869A CN201910119919.5A CN201910119919A CN109882869A CN 109882869 A CN109882869 A CN 109882869A CN 201910119919 A CN201910119919 A CN 201910119919A CN 109882869 A CN109882869 A CN 109882869A
Authority
CN
China
Prior art keywords
sulfur furnace
furnace
baker
sulfur
diesel oil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910119919.5A
Other languages
Chinese (zh)
Inventor
张如庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Shenyuan New Materials Co Ltd
Original Assignee
Fujian Shenyuan New Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Shenyuan New Materials Co Ltd filed Critical Fujian Shenyuan New Materials Co Ltd
Priority to CN201910119919.5A priority Critical patent/CN109882869A/en
Publication of CN109882869A publication Critical patent/CN109882869A/en
Pending legal-status Critical Current

Links

Landscapes

  • Manufacture And Refinement Of Metals (AREA)

Abstract

The present invention provides a kind of sulfur furnace furnace drying method, the preparation before baker: sulfur furnace, which is built, to be completed and can carry out baker in gravity-flow ventilation 15 days or more;Before baker, opened in sulfur furnace steel shell upper surface Hole is not less than 8, is welded after baker;The furnace drying method is as follows: step 1: starting heating blower, is sent into air into sulfur furnace sulfur furnace;Step 2: starting diesel pump, diesel oil is sent into sulfur furnace;Step 3: starting burner, lights diesel oil, start baker;Step 4: being controlled by adjusting heating fan outlet valve into sulfur furnace air capacity, is controlled by adjusting diesel pump outlet valve into sulfur furnace diesel oil amount, the heating rate of sulfur furnace is controlled with air capacity and diesel oil amount.The present invention can make free water, the crystallization water in sulfur furnace are i.e. remaining water slow evaporation is combined to be precipitated, and guarantee that sulfur furnace safely comes into operation, improve the service life of sulfur furnace.

Description

A kind of sulfur furnace furnace drying method
[technical field]
Present invention relates particularly to a kind of sulfur furnace furnace drying methods of sulphuric acid process.
[background technique]
Sulfur furnace especially belongs to considerable safety equipment in sulphur burning process in gas washing in SA production.Sulfur furnace was being constructed Cheng Zhong, liner brick setting and castable refractory combine water containing a large amount of free waters, the crystallization water and remnants, to avoid moisture rapid evaporation And furnace wall is caused to damage, it is necessary to using the method for baker, make free water, the crystallization water and remnants that water slow evaporation be combined to be precipitated.It is slow It is slow and to be uniformly heated up be the key point for guaranteeing stove quality.Therefore, sulfur furnace must be carried out before device start-of-run Baker evaporates moisture content gradually, avoids lining, furnace wall from generating crack and deformation, otherwise influences service life.
Through retrieving, related sulfur furnace furnace drying method application Chinese patent, there is no and be related to sulfuric acid apparatus sulfur furnace baker at present Patent application.
[summary of the invention]
The technical problem to be solved in the present invention is to provide a kind of sulfur furnace furnace drying method, can make the trip in sulfur furnace It is remaining in conjunction with the precipitation of water slow evaporation from water, the crystallization water, guarantees that sulfur furnace safely comes into operation, that improves sulfur furnace uses the longevity Life.
The present invention is implemented as follows:
A kind of sulfur furnace furnace drying method, the preparation before baker: sulfur furnace, which is built, to be completed and gravity-flow ventilation 15 days or more It can carry out baker;Before baker, opened in sulfur furnace steel shell upper surfaceThe hole~40mm is not less than 8, is welded after baker;
Steps are as follows for the furnace drying method:
Step 1: starting heating blower, is sent into air into sulfur furnace sulfur furnace;
Step 2: starting diesel pump, diesel oil is sent into sulfur furnace;
Step 3: starting burner, lights diesel oil, start baker;
Step 4: being controlled by adjusting heating fan outlet valve into sulfur furnace air capacity, by adjusting diesel oil pump discharge Valve is controlled into sulfur furnace diesel oil amount, and the heating rate of sulfur furnace is controlled with air capacity and diesel oil amount;
Sulfur furnace baker rate is as follows:
1, room temperature is to 120 DEG C, 15 DEG C/h of heating rate, and in 120 DEG C of constant temperature 72h;
2,120 DEG C to 250 DEG C, 10 DEG C/h of heating rate, and in 250 DEG C of constant temperature 60h;
3,250 DEG C to 350 DEG C, 10 DEG C/h of heating rate, and in 350 DEG C of constant temperature 10h;
4,350 DEG C to 650 DEG C, 10 DEG C/h of heating rate, and 650 DEG C of constant temperature for 24 hours;
5,650 DEG C to 950 DEG C, 30 DEG C/h of heating rate, and in 950 DEG C of constant temperature 8h;
After 950 DEG C of bakers, sulfur furnace manhole is sealed, cold stoking cooling is carried out to sulfur furnace, sulfur furnace temperature is down to 200 DEG C When, openable sulfur furnace manhole carries out Temperature fall to sulfur furnace, is down to room temperature;
The 1 sulfur furnace exit gas moisture of detection in every 2 hours before sulfur furnace baker terminates, moisture are baker lower than 2.5% Qualification terminates baker work.
The present invention has the advantage that
The present invention uses slow, uniform heating method, can make the free water in sulfur furnace, the crystallization water are i.e. remaining to combine Water slow evaporation is precipitated, and sulfur furnace lining, furnace wall is avoided to generate crack and deformation, guarantees that sulfur furnace safely comes into operation, raising is burnt The service life of sulphur furnace, the new sulfur furnace suitable for Sulphuric Acid Enterprises installation.
[Detailed description of the invention]
The present invention is further illustrated in conjunction with the embodiments with reference to the accompanying drawings.
Fig. 1 be the embodiment of the present invention sulfur furnace furnace drying method based on system schematic.
Fig. 2 is the sulfur furnace oven drying temperature and the curve graph of time of the embodiment of the present invention.
[specific embodiment]
Referring to Fig.1-2, below in conjunction with specific embodiment, the present invention is further illustrated.
Fujian Shen Yuan new material Co., Ltd sulfuric acid apparatus sulfur furnace furnace drying method, the sulfur furnace furnace drying method based on be System is as shown in Figure 1, in Fig. 1, and 1 is diesel oil slot, and 2 be diesel pump, and 3 be baker blower, and 4 be sulfur furnace;
Sulfur furnace main technologic parameters and characteristic are as follows:
The specific operation method is as follows for sulfur furnace baker:
Step 1: starting heating blower, is sent into air into sulfur furnace sulfur furnace;
Step 2: starting diesel pump, diesel oil is sent into sulfur furnace;
Step 3: starting burner, lights diesel oil, start baker;
Step 4: being controlled by adjusting heating fan outlet valve into sulfur furnace air capacity, by adjusting diesel oil ejiction opening Valve is controlled into sulfur furnace diesel oil amount, and the heating rate of sulfur furnace is controlled with air capacity and diesel oil amount.
Sulfur furnace baker rate is as follows:
1, the 15 DEG C/h in room temperature → 120 DEG C, in 120 DEG C of constant temperature 72h;
2,120 DEG C → 250 DEG C 10 DEG C/h, in 250 DEG C of constant temperature 60h;
3,250 DEG C → 350 DEG C 10 DEG C/h, in 350 DEG C of constant temperature 10h;
4,350 DEG C → 650 DEG C 10 DEG C/h, 650 DEG C of constant temperature for 24 hours;
5,650 DEG C → 950 DEG C 30 DEG C/h, in 950 DEG C of constant temperature 8h;
6, after 950 DEG C of bakers, sulfur furnace manhole is sealed, cold stoking cooling, general 144h are carried out to sulfur furnace;
When sulfur furnace temperature is down to 200 DEG C, openable sulfur furnace manhole carries out Temperature fall to sulfur furnace, is down to room temperature General 120h.
The 1 sulfur furnace exit gas moisture of detection in every 2 hours before sulfur furnace baker terminates, moisture are baker lower than 2.5% Qualification terminates baker work, and sulfur furnace oven drying temperature and the curve graph of time are as shown in Figure 2.
Points for attention:
1. debugging heating blower, main air blower and diesel pump before combustion furnace ignition, debugging diesel oil gun sprayer atomization does not have It is fitted into combustion furnace after problem.
2. sulfur furnace builds completion and gravity-flow ventilation 15 days or more can baker.
3. before baker, opening the hole 30~40mm of φ not less than 8 in sulfur furnace steel shell upper surface, making water vapour during baker It is excessive, it should be welded after baker.
4. during baker, sulfur furnace stokehold temperature and the sulfur furnace heater outlet temperature temperature difference are no more than 150 DEG C;If the temperature difference is more than It 150 DEG C, then should increase into sulfur furnace air quantity.
5. must first blow in machine in sulfur furnace ignition process, then slightly open grease gun igniting.Blowing-out machine after truce Shi Xianting oil gun, It must not reverse operating.Less cooking fume is allowed to be gathered in system, such as misfire must to blown down in system it is clean again again Igniting, prevents cooking fume detonation.
6. arranging special messenger to see fire when diesel oil burns in combustion furnace, once fire extinguishes, stops oil gun rapidly, restart a little Fire.
7. the crystallization water is discharged when temperature reaches 350 DEG C, and temperature reaches when oven drying temperature reaches 100 DEG C or more free water discharges Remnants combination water is discharged when to 650 DEG C, 120 DEG C, 350 DEG C and 650 DEG C this 3 humidity provinces it is noted that constant temperature.
8. all records will be arranged and be bound into book form after sulfur furnace baker, retain for a long time as archives.
In July, 2017, Fujian Shen Yuan new material Co., Ltd creates 400,000 tons of sulfuric acid apparatus, using the method to sulfur furnace Baker is carried out, so far sulfur furnace operational excellence, has provided safety guarantee for the operation of sulfuric acid apparatus.
Although specific embodiments of the present invention have been described above, those familiar with the art should be managed Solution, we are merely exemplary described specific embodiment, rather than for the restriction to the scope of the present invention, it is familiar with this The technical staff in field should be covered of the invention according to modification and variation equivalent made by spirit of the invention In scope of the claimed protection.

Claims (1)

1. a kind of sulfur furnace furnace drying method, it is characterised in that:
Preparation before baker: sulfur furnace, which is built, to be completed and can carry out baker in gravity-flow ventilation 15 days or more;Before baker, burning It opens sulphur furnace steel shell upper surfaceHole is not less than 8, is welded after baker;
Steps are as follows for the furnace drying method:
Step 1: starting heating blower, is sent into air into sulfur furnace sulfur furnace;
Step 2: starting diesel pump, diesel oil is sent into sulfur furnace;
Step 3: starting burner, lights diesel oil, start baker;
Step 4: being controlled by adjusting heating fan outlet valve into sulfur furnace air capacity, by adjusting diesel oil ejiction opening valve It controls into sulfur furnace diesel oil amount, the heating rate of sulfur furnace is controlled with air capacity and diesel oil amount;
Sulfur furnace baker rate is as follows:
1, room temperature is to 120 DEG C, 15 DEG C/h of heating rate, and in 120 DEG C of constant temperature 72h;
2,120 DEG C to 250 DEG C, 10 DEG C/h of heating rate, and in 250 DEG C of constant temperature 60h;
3,250 DEG C to 350 DEG C, 10 DEG C/h of heating rate, and in 350 DEG C of constant temperature 10h;
4,350 DEG C to 650 DEG C, 10 DEG C/h of heating rate, and 650 DEG C of constant temperature for 24 hours;
5,650 DEG C to 950 DEG C, 30 DEG C/h of heating rate, and in 950 DEG C of constant temperature 8h;
After 950 DEG C of bakers, sulfur furnace manhole is sealed, cold stoking cooling is carried out to sulfur furnace, when sulfur furnace temperature is down to 200 DEG C, Openable sulfur furnace manhole carries out Temperature fall to sulfur furnace, is down to room temperature;
The 1 sulfur furnace exit gas moisture of detection in every 2 hours before sulfur furnace baker terminates, moisture is qualified for baker lower than 2.5%, Terminate baker work.
CN201910119919.5A 2019-02-18 2019-02-18 A kind of sulfur furnace furnace drying method Pending CN109882869A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910119919.5A CN109882869A (en) 2019-02-18 2019-02-18 A kind of sulfur furnace furnace drying method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910119919.5A CN109882869A (en) 2019-02-18 2019-02-18 A kind of sulfur furnace furnace drying method

Publications (1)

Publication Number Publication Date
CN109882869A true CN109882869A (en) 2019-06-14

Family

ID=66928256

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910119919.5A Pending CN109882869A (en) 2019-02-18 2019-02-18 A kind of sulfur furnace furnace drying method

Country Status (1)

Country Link
CN (1) CN109882869A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110397934A (en) * 2019-08-12 2019-11-01 苏伊士水务工程有限责任公司 Automatic temperature rise control method and device for incinerator
CN114076320A (en) * 2020-08-20 2022-02-22 中石化南京化工研究院有限公司 Control method and device for sulfur-containing waste treatment system and readable storage medium

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4324112C1 (en) * 1993-07-20 1995-02-02 Basf Ag Process for recycling plastics in a steam cracker
CN103320603A (en) * 2013-06-14 2013-09-25 中冶南方(武汉)威仕工业炉有限公司 Furnace drying method of bright annealing furnace
CN103642529A (en) * 2013-12-11 2014-03-19 中国化学工程第四建设有限公司 Coal gasifier local baking method
CN104019446A (en) * 2014-06-19 2014-09-03 宜兴瑞泰耐火材料工程有限公司 Energy-saving environmentally-friendly boiler baking method for CFB boiler wear-resisting lining engineering
CN104728831A (en) * 2015-04-02 2015-06-24 天津征鑫热能设备制造有限公司 Burner for baking oven
CN108278854A (en) * 2018-01-17 2018-07-13 山东钢铁集团日照有限公司 A kind of diesel oil furnace drying method
CN108315520A (en) * 2018-05-09 2018-07-24 秦皇岛秦冶重工有限公司 Hot-blast stove baking oven system, blast oven system and furnace drying method
CN208419615U (en) * 2018-04-26 2019-01-22 中石化第五建设有限公司 A kind of internal combustion method furnace drying device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4324112C1 (en) * 1993-07-20 1995-02-02 Basf Ag Process for recycling plastics in a steam cracker
CN103320603A (en) * 2013-06-14 2013-09-25 中冶南方(武汉)威仕工业炉有限公司 Furnace drying method of bright annealing furnace
CN103642529A (en) * 2013-12-11 2014-03-19 中国化学工程第四建设有限公司 Coal gasifier local baking method
CN104019446A (en) * 2014-06-19 2014-09-03 宜兴瑞泰耐火材料工程有限公司 Energy-saving environmentally-friendly boiler baking method for CFB boiler wear-resisting lining engineering
CN104728831A (en) * 2015-04-02 2015-06-24 天津征鑫热能设备制造有限公司 Burner for baking oven
CN108278854A (en) * 2018-01-17 2018-07-13 山东钢铁集团日照有限公司 A kind of diesel oil furnace drying method
CN208419615U (en) * 2018-04-26 2019-01-22 中石化第五建设有限公司 A kind of internal combustion method furnace drying device
CN108315520A (en) * 2018-05-09 2018-07-24 秦皇岛秦冶重工有限公司 Hot-blast stove baking oven system, blast oven system and furnace drying method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
B.H.热列宾: "《炼铁生产与管理》", 31 March 1984, 冶金工业出版社 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110397934A (en) * 2019-08-12 2019-11-01 苏伊士水务工程有限责任公司 Automatic temperature rise control method and device for incinerator
CN114076320A (en) * 2020-08-20 2022-02-22 中石化南京化工研究院有限公司 Control method and device for sulfur-containing waste treatment system and readable storage medium

Similar Documents

Publication Publication Date Title
CN103555880B (en) Method for preventing electric precipitation explosion venting during blowing igniting of semi-steel steelmaking
CN106247353B (en) A kind of blast furnace gas diffusing ignition system
CN106967448B (en) A kind of oven method after large area replacement of refractory material in CDQ system
CN107419052A (en) The furnace drying method after fire proof material of furnace lining is changed in 120t converters
CN109882869A (en) A kind of sulfur furnace furnace drying method
CN107267709A (en) A kind of use converter gas all can heat the heater and heating means of steel scrap
CN101353579A (en) 7.63m coke oven negative pressure in-furnace furnace drying method
CN109357268A (en) The process of waste and old paint kettle is handled using the oxygen-enriched natural gas shaft furnace of hot wind
CN106379866B (en) A kind of fluidized bed furnace for pyrite-based sulphuric acid ignition method of energy-saving and environmental protection
CN110617710A (en) Furnace drying method of walking beam furnace
CN112066736A (en) A kind of double hearth tubular heating furnace drying method
CN206973570U (en) A kind of incinerator
CN112280927A (en) Operation method for baking scrap steel in converter
CN106091004A (en) A kind of gas combusting limestone kiln ignition process and special purpose device
CN105647563A (en) Dry heat treatment type waste rubber recycling device
CN103343964B (en) Combustion method for greatly improving thermal efficiency of industrial furnace by alcohol-based clean fuel
CN208536608U (en) A kind of converter furnace lining attemperator
CN203454183U (en) Burner assembly for converter waste heat recovery boiler
CN103588401B (en) Coal gas of converter dries calcining furnace and the furnace drying method of desulfurated plaster
CN114737048A (en) Opening method of roasting furnace
CN209065935U (en) Blast furnace gas combustion apparatus for baking
CN101693936A (en) Explosion suppression device of combustible gas for flues
CN218842287U (en) Production equipment for energy conservation and emission reduction of secondary aluminum industry
CN116479201B (en) A method for heat preservation and back-blowing of hot blast stove in blast furnace
CN215824193U (en) Ceramic shell roasting furnace

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190614