CN109882113A - 一种降水井封堵结构及其施工方法 - Google Patents
一种降水井封堵结构及其施工方法 Download PDFInfo
- Publication number
- CN109882113A CN109882113A CN201910173712.6A CN201910173712A CN109882113A CN 109882113 A CN109882113 A CN 109882113A CN 201910173712 A CN201910173712 A CN 201910173712A CN 109882113 A CN109882113 A CN 109882113A
- Authority
- CN
- China
- Prior art keywords
- dewatering well
- hole
- steel pipe
- steel plate
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
- Piles And Underground Anchors (AREA)
Abstract
一种降水井封堵结构及其施工方法,包括盖板,盖板中心开设有第一通孔,第一通孔的四周开设有若干紧固件固定孔,盖板底部固定装配有套管,所述套管与第一通孔同轴设置,套管内固定装配有上部封堵钢板,上部封堵钢板中心开设有第二通孔,第二通孔内滑动装配有抽水钢管,第二通孔四周开设有若干第三通孔,若干第三通孔内滑动装配有支架,支架底部固定装配有底部封堵钢板,抽水钢管设有阀门,阀门位于上部封堵钢板的上方;本发明的封堵结构和施工方法具有经济实用、简单易行、封堵质量好、防止底板渗漏、整体结构稳固、承载能力高等优点,最高承载力可达800kN。
Description
技术领域
本发明属于岩土工程技术领域,具体涉及一种降水井封堵结构及其施工方法。
背景技术
随着地下空间的开发和利用,地下工程的开挖深度越来越深,在高水位的条件下施工,很容易引起土体滑移、支护结构漏水、基坑失稳等问题。为确保施工安全,需要采取有效措施降低地下水位,通常的方法是在建筑物底板中布置一定数量的降水井进行降水处理。但是对于水压较大、出水量较大的降水井,怎样封堵井口一直是个施工难题,目前尚没有好的解决方案。
发明内容
为了解决现有技术存在的问题,本发明提供一种降水井封堵结构及其施工方法,技术方案如下:
一种降水井封堵结构,包括盖板,盖板中心开设有第一通孔,第一通孔的四周开设有若干紧固件固定孔,盖板底部固定装配有套管,所述套管与第一通孔同轴设置,套管内固定装配有上部封堵钢板,上部封堵钢板中心开设有第二通孔,第二通孔内滑动装配有抽水钢管,第二通孔四周开设有若干第三通孔,若干第三通孔内滑动装配有支架,支架底部固定装配有底部封堵钢板,抽水钢管设有阀门,阀门位于上部封堵钢板的上方。
一种降水井封堵结构的施工方法,采用前述的一种降水井封堵结构,包括以下步骤:
步骤1、用水泵将降水井附近地面上的水抽干;
步骤2、将降水井封堵结构插入至降水井中,使抽水钢管的下端位于降水井井口以下1.5m处,并对抽水钢管的上端和支架上端进行临时固定;
步骤3、利用抽水钢管将降水井内水位抽至降水井井口以下1.5m;
步骤4、在降水井井口四周的混凝土面开设环状凹槽并涂抹硅酮胶,在环状凹槽内安装止水条;
步骤5、定位盖板,使盖板与降水井井口同心,并将盖板粘接在硅酮胶上,然后利用紧固件固定盖板;
步骤6、利用支架提升底部封堵钢板,使抽水钢管的下端位于降水井井口以下1m处,同时使底部封堵钢板上表面与抽水钢管下端挤紧并焊接固定;
步骤7、将抽水钢管与上部封堵钢板焊接在一起,待焊缝冷却后,在抽水钢管与上部封堵钢板的交接处缠绕止水膨胀胶条;
步骤8、在降水井井口以下将支架截断;
步骤9、在降水井井口以下、阀门以上将抽水钢管截断,并向降水井内浇筑灌浆料进行封堵;
步骤10、盖板刷防锈漆保护。
与现有技术相比,本发明的有益效果是:
本发明的封堵结构和施工方法具有经济实用、简单易行、封堵质量好、防止底板渗漏、整体结构稳固、承载能力高等优点,最高承载力可达800kN,本发明主要用于解决水压较大的井口封堵施工问题,同时,对侧孔以及岩壁孔洞的出水问题也具有借鉴意义。
附图说明
图1为本发明降水井封堵结构的示意图;
图2为本发明盖板的俯视示意图;
图3为本发明施工方法的示意图;
图4为图3中A处的局部放大示意图。
其中:盖板1;第一通孔2;紧固件固定孔3;安装孔4;套管5;上部封堵钢板6;第二通孔7;抽水钢管8;第三通孔9;支架10;底部封堵钢板11;阀门12;环状凹槽13;硅酮胶14;止水条15。
具体实施方式
需要说明,本发明实施例中所有方向性指示(诸如上、下、左、右、前、后……)仅用于解释在某一特定姿态(如附图所示)下各部件之间的相对位置关系、运动情况等,如果该特定姿态发生改变时,则该方向性指示也相应地随之改变。
如图1至图4所示,本发明提供了一种降水井封堵结构,包括盖板1,盖板1中心开设有第一通孔2,第一通孔2的四周阵列开设有48个紧固件固定孔3,降水井井口四周的混凝土面设有48个相对应的安装孔4,紧固件穿过紧固件固定孔3后与安装孔4螺接,以实现盖板1的固定,紧固件可以为普通高强螺栓或膨胀螺栓,盖板1底部固定装配有套管5,套管5的外径略小于降水井的内径,所述套管5与第一通孔2同轴设置,套管5内固定装配有上部封堵钢板6,上部封堵钢板6中心开设有第二通孔7,第二通孔7内滑动装配有抽水钢管8,第二通孔7四周阵列开设有12个第三通孔9,若干第三通孔9内滑动装配有支架10,所述支架10由12根钢筋构成,支架10底部固定装配有底部封堵钢板11,抽水钢管8设有阀门12,阀门12位于上部封堵钢板6的上方。
一种降水井封堵结构的施工方法,采用前述的一种降水井封堵结构,包括以下步骤:
步骤1、用水泵将降水井附近地面上的水抽干;
步骤2、将降水井封堵结构插入至降水井中,使抽水钢管8的下端位于降水井井口以下1.5m处,并对抽水钢管8的上端和支架10上端进行临时固定;
步骤3、利用抽水钢管8将降水井内水位抽至降水井井口以下1.5m;
步骤4、在降水井井口四周的混凝土面开设环状凹槽13并涂抹硅酮胶14,在环状凹槽13内安装止水条15,具体的,环状凹槽13靠近降水井井口一侧设置;
步骤5、定位盖板1,使盖板1与降水井井口同心,并将盖板1粘接在硅酮胶14上,然后利用紧固件固定盖板1;
步骤6、利用支架10提升底部封堵钢板11,使抽水钢管8的下端位于降水井井口以下1m处,同时使底部封堵钢板11上表面与抽水钢管8下端挤紧并焊接固定;
步骤7、将抽水钢管8与上部封堵钢板6焊接在一起,待焊缝冷却后,在抽水钢管8与上部封堵钢板6的交接处缠绕止水膨胀胶条;
步骤8、在降水井井口以下将支架10截断;
步骤9、在降水井井口以下、阀门12以上将抽水钢管8截断,并向降水井内浇筑灌浆料进行封堵;
步骤10、盖板1刷防锈漆保护。
以上实施例仅用以说明本发明的技术方案而非对其限制,尽管参照上述实施例对本发明进行了详细说明,领域的普通技术人员应当理解:依然可以对本发明的具体实施方式进行修改或者等同替换,而未脱离本发明精神和范围的任何修改或者等同替换,其均应涵盖在本权利要求范围当中。
Claims (2)
1.一种降水井封堵结构,其特征在于,包括盖板,盖板中心开设有第一通孔,第一通孔的四周开设有若干紧固件固定孔,盖板底部固定装配有套管,所述套管与第一通孔同轴设置,套管内固定装配有上部封堵钢板,上部封堵钢板中心开设有第二通孔,第二通孔内滑动装配有抽水钢管,第二通孔四周开设有若干第三通孔,若干第三通孔内滑动装配有支架,支架底部固定装配有底部封堵钢板,抽水钢管设有阀门,阀门位于上部封堵钢板的上方。
2.一种降水井封堵结构的施工方法,采用如权利要求1所述的一种降水井封堵结构,其特征在于,包括以下步骤:
步骤1、用水泵将降水井附近地面上的水抽干;
步骤2、将降水井封堵结构插入至降水井中,使抽水钢管的下端位于降水井井口以下1.5m处,并对抽水钢管的上端和支架上端进行临时固定;
步骤3、利用抽水钢管将降水井内水位抽至降水井井口以下1.5m;
步骤4、在降水井井口四周的混凝土面开设环状凹槽并涂抹硅酮胶,在环状凹槽内安装止水条;
步骤5、定位盖板,使盖板与降水井井口同心,并将盖板粘接在硅酮胶上,然后利用紧固件固定盖板;
步骤6、利用支架提升底部封堵钢板,使抽水钢管的下端位于降水井井口以下1m处,同时使底部封堵钢板上表面与抽水钢管下端挤紧并焊接固定;
步骤7、将抽水钢管与上部封堵钢板焊接在一起,待焊缝冷却后,在抽水钢管与上部封堵钢板的交接处缠绕止水膨胀胶条;
步骤8、在降水井井口以下将支架截断;
步骤9、在降水井井口以下、阀门以上将抽水钢管截断,并向降水井内浇筑灌浆料进行封堵;
步骤10、盖板刷防锈漆保护。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910173712.6A CN109882113B (zh) | 2019-03-07 | 2019-03-07 | 一种降水井封堵结构的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910173712.6A CN109882113B (zh) | 2019-03-07 | 2019-03-07 | 一种降水井封堵结构的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109882113A true CN109882113A (zh) | 2019-06-14 |
CN109882113B CN109882113B (zh) | 2020-12-01 |
Family
ID=66931274
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910173712.6A Active CN109882113B (zh) | 2019-03-07 | 2019-03-07 | 一种降水井封堵结构的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109882113B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113897991A (zh) * | 2021-11-08 | 2022-01-07 | 安徽水利开发有限公司 | 降水井钢盖板封堵装置及其施工方法 |
CN118854956A (zh) * | 2024-08-12 | 2024-10-29 | 北京中岩大地科技股份有限公司 | 一种降水井结构及降水井封井方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3543851A (en) * | 1968-10-21 | 1970-12-01 | Tenneco Oil Co | Apparatus for producing water from a well |
CN103334444A (zh) * | 2013-07-09 | 2013-10-02 | 中国一冶集团有限公司 | 一种基坑降水井泄压式的封堵方法 |
CN103343543A (zh) * | 2013-07-09 | 2013-10-09 | 中国一冶集团有限公司 | 一种基坑降水井减压式封堵方法 |
CN103911988A (zh) * | 2014-04-03 | 2014-07-09 | 大连理工大学 | 一种用于基坑支护的新型护壁桩 |
CN203768926U (zh) * | 2014-04-08 | 2014-08-13 | 江苏扬州建工建设集团有限公司 | 一种地下室深井封堵装置 |
CN203768925U (zh) * | 2014-04-02 | 2014-08-13 | 于航 | 一种基坑内降水井的封堵装置 |
-
2019
- 2019-03-07 CN CN201910173712.6A patent/CN109882113B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3543851A (en) * | 1968-10-21 | 1970-12-01 | Tenneco Oil Co | Apparatus for producing water from a well |
CN103334444A (zh) * | 2013-07-09 | 2013-10-02 | 中国一冶集团有限公司 | 一种基坑降水井泄压式的封堵方法 |
CN103343543A (zh) * | 2013-07-09 | 2013-10-09 | 中国一冶集团有限公司 | 一种基坑降水井减压式封堵方法 |
CN203768925U (zh) * | 2014-04-02 | 2014-08-13 | 于航 | 一种基坑内降水井的封堵装置 |
CN103911988A (zh) * | 2014-04-03 | 2014-07-09 | 大连理工大学 | 一种用于基坑支护的新型护壁桩 |
CN203768926U (zh) * | 2014-04-08 | 2014-08-13 | 江苏扬州建工建设集团有限公司 | 一种地下室深井封堵装置 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113897991A (zh) * | 2021-11-08 | 2022-01-07 | 安徽水利开发有限公司 | 降水井钢盖板封堵装置及其施工方法 |
CN118854956A (zh) * | 2024-08-12 | 2024-10-29 | 北京中岩大地科技股份有限公司 | 一种降水井结构及降水井封井方法 |
Also Published As
Publication number | Publication date |
---|---|
CN109882113B (zh) | 2020-12-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107299643B (zh) | 一种基坑内钢格构柱复合式塔吊基础结构及施工方法 | |
CN103510528A (zh) | 用于地下结构抗浮的盲沟排水结构 | |
CN109594578A (zh) | 一种塔柜的5g小微通信基站桩基机构 | |
CN109882113A (zh) | 一种降水井封堵结构及其施工方法 | |
CN106088120B (zh) | 一种围堰下放施工方法 | |
CN108086344A (zh) | 一种格构式塔吊基础结构及施工方法 | |
CN203654309U (zh) | 一种桩箱水工结构物 | |
CN103572770B (zh) | 一种桩箱水工结构物及其建造方法 | |
CN205369277U (zh) | 一种围堰内支撑整体下放系统 | |
CN205062858U (zh) | 一种地下连续墙与混凝土结构底板整体抗浮结构 | |
CN209523214U (zh) | 一种组装式楔形桩基机构 | |
CN208981334U (zh) | 地下围护加固结构 | |
CN208933993U (zh) | 一种海上风电嵌岩单桩及其施工系统 | |
CN208441083U (zh) | 半预制地下连续墙结构 | |
CN208309592U (zh) | 一种基坑支护结构 | |
CN207143965U (zh) | 钢板混凝土组合式抗浮止水结构 | |
CN216194845U (zh) | 卵石覆盖层钢板桩围堰系统 | |
CN108301409A (zh) | 一种内护筒安装工艺 | |
CN112681351B (zh) | 一种富水地区基坑电渗防水墙及其施工方法 | |
CN108547286A (zh) | 一种混凝土防渗墙预制导向槽结构及导向槽安装方法 | |
CN211340818U (zh) | 深水钢围堰混凝土封底 | |
CN211231961U (zh) | 一种密封性好的钢筋砼管 | |
CN211256953U (zh) | 一种改善地基应力的增强桩结构 | |
CN114592517A (zh) | 带扩大桩靴桩身自重锤击施工工艺 | |
CN103397650B (zh) | 一种大型钢圆筒围堰结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |