[go: up one dir, main page]

CN109879147A - A kind of replacement mine hoisting head rope turns over the construction technology of rope in the process - Google Patents

A kind of replacement mine hoisting head rope turns over the construction technology of rope in the process Download PDF

Info

Publication number
CN109879147A
CN109879147A CN201910265425.8A CN201910265425A CN109879147A CN 109879147 A CN109879147 A CN 109879147A CN 201910265425 A CN201910265425 A CN 201910265425A CN 109879147 A CN109879147 A CN 109879147A
Authority
CN
China
Prior art keywords
rope
container
elevator
newly
replacement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910265425.8A
Other languages
Chinese (zh)
Inventor
贾福音
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Sansenwei Mining Technology Co Ltd
Original Assignee
Xuzhou Sansenwei Mining Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Sansenwei Mining Technology Co Ltd filed Critical Xuzhou Sansenwei Mining Technology Co Ltd
Priority to CN201910265425.8A priority Critical patent/CN109879147A/en
Publication of CN109879147A publication Critical patent/CN109879147A/en
Pending legal-status Critical Current

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The invention discloses the construction technologies that rope is turned over during a kind of replacement mine hoisting head rope, and step includes: the connection disconnected between the old rope needed replacing and container I, while the old rope needed replacing is disconnected in II side of container;The rope end for the old rope that the rope end newly restricted and II side of container disconnect is connect;Container I is transferred, the rope end newly restricted is run with elevator, and when the rope end newly restricted reaches I side pithead position of container, elevator shuts down;The connection of new rope rope end and old rope is unlocked, and will newly restrict and remove elevator, new rope end of restricting is retained at I side well head of container;The operation of elevator forward direction, container I is above mentioned, and when container I reaches well head level, elevator shuts down;It will newly rope end be connect with container I, while restore the cooperation between new rope and elevator, and turned over rope and complete.The present invention can effectively reduce early-stage preparations item and back work, shorten the time for turning over rope, to improve the whole efficiency for changing rope construction.

Description

A kind of replacement mine hoisting head rope turns over the construction technology of rope in the process
Technical field
The present invention relates to mine hoisting technical fields, and in particular to applying for rope is turned over during a kind of replacement mine hoisting head rope Work technique.
Background technique
Important form of the friction winding as vertical shaft hoisting, is applied more and more.To guarantee friction winding safety Reliably, replacement hoisting rope is the important process for guaranteeing to be promoted safety.In the construction technology that replacement promotes head rope, turning over rope is wherein An important link, i.e., the rope end newly restricted is crossed into elevator, head sheave etc. to other side container from the traction of side container, and with Side container connection.At present, it is common to use rope technique of turning over to be to maintain elevator static, pulling winch is set in well head, is utilized Traction rope on pulling winch crosses new rope rope end to other side container from the traction of side container.The technique early-stage preparations item More with back work, the time of construction is long, low efficiency.
In this context, it improves and turns over the construction technology of rope during changing rope, it is very necessary that the construction time of rope is turned in reduction , the whole efficiency for changing rope construction can be improved in the improvement for turning over rope technique.
Summary of the invention
The present invention provides a kind of replacement mine hoisting head rope mistake in order to overcome at least one of the drawbacks of the prior art described above The construction technology of rope is turned in journey, to improve the working efficiency for turning over rope.
In order to solve the above technical problems, present invention offer technical solution is as follows:
A kind of replacement mine hoisting head rope turns over the construction technology of rope in the process, comprising:
Step S1: the connection between the old rope needed replacing and container I is disconnected, while disconnecting the needs in II side of container The old rope of replacement;
Step S2: the rope end for the old rope that the rope end newly restricted and II side of container disconnect is connect;
Step S3: elevator inverted running transfers the container I, and the new rope is continuously broadcasted into well head, will need Replacement old rope from I lateral well external traction of container, the rope end newly restricted is run with elevator, from container II rollover get over elevator to I side of container, when the rope end newly restricted reaches I side pithead position of container, elevator shuts down;
Step S4: unlocking the connection of new rope rope end and old rope, and will newly restrict and remove elevator, makes newly to restrict no longer with elevator Operation, new rope end of restricting are retained at I side well head of container;
Step S5: the operation of elevator forward direction above mentions the container I, and when container I reaches well head level, elevator stops Only operate;
Step S6: will newly rope end connect with container I, while restore the cooperation between new rope and elevator, make new restrict can It is run with elevator, turns over rope and complete.
Further, the rope closing, put rope movement by rope changer completion.By rope changer complete rope closing, Rope movement is put, the labor intensity of worker is further mitigated, shortens and changes the rope time, improve and change rope efficiency.
Further, sheave is equipped at the well head of II side of container, the sheave is arranged in the rope that changes and fills The front set.
Further, the new rope is released from rope winch is put, and described put is equipped with the cheese newly restricted on rope winch.Put rope Winch cooperates rope changer work, makes to change rope process and carries out more in an orderly manner.
Further, before turning over rope, the old rope needed replacing has been recycled to outer wellhead, and container II is located at the platform of shaft bottom, Other side container I is located at wellhead platform.
Further, using it is described turn over rope technique when, changed at one in rope circulation, the hoisting rope quantity of replacement is one Or more, but the hoisting rope quantity replaced is less than the quantity of whole hoisting ropes.
Further, when the hoisting rope quantity of replacement is more, the hoisting rope of the replacement is symmetrically chosen.Symmetrical choosing The hoisting rope for taking replacement is conducive to the stable operation of whole device.
Compared with prior art, the present invention having the following beneficial effects:
By using the above-mentioned construction technology for turning over rope, original old rope in the power and lifting system of elevator itself is utilized Elevator, head sheave are crossed into the traction of new rope end, be not required to it is additional add pulling winch and traction rope, can effectively reduce early period The time for turning over rope is shortened in preparatory items and back work, to improve the whole efficiency for changing rope construction.
Detailed description of the invention
It, below will be to the required attached drawing of specific embodiment in order to illustrate more clearly of technical solution of the present invention It is briefly described, it should be apparent that, it is certain specific embodiments of the invention described in the following drawings, should not serve to Limitation to technical solution of the present invention.
Fig. 1 is the schematic diagram for turning over preceding each equipment state of restricting;
Fig. 2 is the schematic diagram of new rope rope end and old rope connection;
Fig. 3 is the schematic diagram after new rope rope end is crossed;
Fig. 4 is the schematic diagram for turning over rope and completing.
Marked in the figure: 1- elevator, 2- head sheave, 3- sheave, 4- change rope equipment, 5- puts rope winch, 6- container I, and 7- holds Device II, 8- tail rope, the old rope of 9-, 10- newly restrict.
Specific embodiment
The embodiment of the present invention is described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning to end Same or similar label indicates same or similar element or element with the same or similar functions.Below with reference to attached The embodiment of figure description is exemplary, it is intended to is used to explain the present invention, and is not considered as limiting the invention.
In the description of the present invention, it is to be understood that, term " center ", " longitudinal direction ", " transverse direction ", " length ", " width ", " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside", " up time The orientation or positional relationship of the instructions such as needle ", " counterclockwise ", " axial direction ", " radial direction ", " circumferential direction " be orientation based on the figure or Positional relationship is merely for convenience of description of the present invention and simplification of the description, rather than the device or element of indication or suggestion meaning must There must be specific orientation, be constructed and operated in a specific orientation, therefore be not considered as limiting the invention.
In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicitly include at least one this feature.In the description of the present invention, the meaning of " plurality " is at least two, such as two, three It is a etc., unless otherwise specifically defined.
Embodiment one
A kind of replacement mine hoisting head rope turns over the construction technology of rope in the process, comprising:
Step S1: the connection between the old rope needed replacing and container I is disconnected, while disconnecting the needs in II side of container The old rope of replacement;
Step S2: the rope end for the old rope that the rope end newly restricted and II side of container disconnect is connect;
Step S3: elevator inverted running transfers the container I, and the new rope is continuously broadcasted into well head, will need Replacement old rope from I lateral well external traction of container, the rope end newly restricted is run with elevator, from container II rollover get over elevator to I side of container, when the rope end newly restricted reaches I side pithead position of container, elevator shuts down;
Step S4: unlocking the connection of new rope rope end and old rope, and will newly restrict and remove elevator, makes newly to restrict no longer with elevator Operation, new rope end of restricting are retained at I side well head of container;
Step S5: the operation of elevator forward direction above mentions the container I, and when container I reaches well head level, elevator stops Only operate;
Step S6: will newly rope end connect with container I, while restore the cooperation between new rope and elevator, make new restrict can It is run with elevator, turns over rope and complete.
In the present embodiment, turning over rope technique is entirely to change intermediate steps of rope construction technology, is needed replacing before turning over rope Old rope 9 has been recycled to outer wellhead, and container II 7 is located at the platform of shaft bottom, and other side container I 6 is located at wellhead platform.
It in the present embodiment, is changed at one in rope circulation, the hoisting rope quantity of replacement is one or more (" more " herein The case where including 2), but the hoisting rope quantity replaced is less than the quantity of whole hoisting ropes.Corresponding thereto new when turning over rope Rope is one or more.
In the present embodiment, when the hoisting rope quantity of replacement is more, the hoisting rope of the replacement is preferably symmetrically chosen.It is right Claim the hoisting rope for choosing replacement, is conducive to the stable operation of whole device.
Using the construction technology for turning over rope during the replacement mine hoisting head rope of the present embodiment, the dynamic of elevator itself is utilized The traction of new rope end is crossed elevator, head sheave by original old rope in power and lifting system, be not required to it is additional add pulling winch and Traction rope can effectively reduce early-stage preparations item and back work, shorten the time for turning over rope, apply to improve entirety and change rope The efficiency of work.
Embodiment two
In the present embodiment, turns over the equipment that the technique of rope is related to and mainly includes sheave 3, rope changer 4 and put rope winch 5, Putting on rope winch 5 has the new cheese for putting new rope 10.
As shown in Figure 1, Figure 2 and Fig. 3, a kind of construction technology replaced mine hoisting head rope and turn over rope in the process shown in Fig. 4, including Following steps:
Step 1: the connection between the old rope 9 needed replacing and container I 6 is disconnected, while before the rope changer 4 The old rope 9 needed replacing described in portion's disconnection, the rope changer 4 exit back all old ropes 9;
Step 2: the new rope 10 put on rope winch 5 is passed through into rope changer 4, new 10 rope ends and the container II 7 of restricting from back to front 9 rope end of the old rope connection that side disconnects;
Step 3: elevator 1 is transferred the container I 6 with low speed continuous operation, and the rope changer 4 is run simultaneously, The new rope 10 is continuously broadcasted into well head, the old rope 9 needed replacing described is put from I 6 lateral well external traction of container Rope winch 5 is continuously run, and the new rope 10 is discharged from cheese, the rope end of new rope 10 is run with elevator 1, from container II 7 Elevator 1, head sheave 2 to I 6 side of container are got in rollover, and when the rope end of new rope 10 reaches I 6 side pithead position of container, each equipment stops Operating;
Step 4: unlocking the connection of 10 rope ends of new rope and old rope 9, and the 10 removing elevators 1 that will newly restrict, and makes newly to restrict 10 no longer It is run with elevator 1, new 10 rope ends of restricting are retained at I 6 side well head of container;
Step 5: elevator 1 is above mentioned the container I 6 with low speed continuous operation, when container I 6 reaches well head level, Elevator 1 shuts down;
Step 6: 10 rope ends that will newly restrict are connect with container I 6, while restoring the cooperation between new rope 10 and elevator 1, are made New rope 10 can be run with elevator 1, turned over rope and completed.
In the present embodiment, turning over rope step is entirely to change intermediate steps of rope construction technology, is needed replacing before turning over rope Old rope 9 has passed through rope changer 4 and has been recycled to outer wellhead, and the container II 7 close to 4 side of rope changer is located at the platform of shaft bottom, separately Side container I 6 is located at wellhead platform.The rope changer 4 is arranged in well head, and the sheave 3 is described close to promotion head rope It puts rope winch 5 and is installed on 4 rear of rope changer, and in described put the cheese of new rope 10 is installed on rope winch 5.
In the present embodiment, in addition to the specific withdrawing rope equipment of use, the structure of other parts is the same as example 1, this Place repeats no more.
Using the construction technology for turning over rope during a kind of replacement mine hoisting head rope of the present embodiment, further improves and change The degree of automation of rope construction is crossed the traction of new rope end using old rope original in the power and lifting system of elevator itself Elevator, head sheave, be not required to it is additional add pulling winch and traction rope, can effectively reduce early-stage preparations item and backman Make, shorten the time for turning over rope, to improve the whole efficiency for changing rope construction.
Finally it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Pipe present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: its according to So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into Row equivalent replacement;And these are modified or replaceed, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution The range of scheme.

Claims (7)

1. turning over the construction technology of rope during a kind of replacement mine hoisting head rope characterized by comprising
Step S1: disconnecting the connection between the old rope needed replacing and container I, while needing replacing described in disconnecting in II side of container Old rope;
Step S2: the rope end for the old rope that the rope end newly restricted and II side of container disconnect is connect;
Step S3: elevator inverted running transfers the container I, and the new rope is continuously broadcasted into well head, will need replacing Old rope from I lateral well external traction of container, the rope end newly restricted is run with elevator, gets over elevator to container from the rollover of container II I side, when the rope end newly restricted reaches I side pithead position of container, elevator shuts down;
Step S4: unlocking the connection of new rope rope end and old rope, and will newly restrict and remove elevator, makes newly to restrict and no longer transport with elevator Row, new rope end of restricting are retained at I side well head of container;
Step S5: the operation of elevator forward direction above mentions the container I, and when container I reaches well head level, elevator stops fortune Turn;
Step S6: will newly rope end connect with container I, while restore the cooperation between new rope and elevator, and making newly to restrict can be with mentioning The operation of the machine of liter is turned over rope and is completed.
2. turning over the construction technology of rope during a kind of replacement mine hoisting head rope according to claim 1, which is characterized in that The rope closing puts rope movement by rope changer completion.
3. turning over the construction technology of rope during a kind of replacement mine hoisting head rope according to claim 2, which is characterized in that Sheave is equipped at the well head of II side of container, the sheave is arranged in the front of the rope changer.
4. turning over the construction technology of rope during a kind of replacement mine hoisting head rope according to claim 2, which is characterized in that The new rope is released from rope winch is put, and described put is equipped with the cheese newly restricted on rope winch.
5. turning over the construction technology of rope during a kind of replacement mine hoisting head rope according to claim 1, which is characterized in that Before turning over rope, the old rope needed replacing has been recycled to outer wellhead, and container II is located at the platform of shaft bottom, and other side container I is located at well head At platform.
6. turning over the construction technology of rope during a kind of replacement mine hoisting head rope according to claim 1, which is characterized in that Using it is described turn over rope technique when, changed at one in rope circulation, the hoisting rope quantity of replacement is one or more, but the promotion replaced Quantity of restricting is less than the quantity of whole hoisting ropes.
7. turning over the construction technology of rope during a kind of replacement mine hoisting head rope according to claim 6, which is characterized in that When the hoisting rope quantity of replacement is more, the hoisting rope of the replacement is symmetrically chosen.
CN201910265425.8A 2019-04-03 2019-04-03 A kind of replacement mine hoisting head rope turns over the construction technology of rope in the process Pending CN109879147A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910265425.8A CN109879147A (en) 2019-04-03 2019-04-03 A kind of replacement mine hoisting head rope turns over the construction technology of rope in the process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910265425.8A CN109879147A (en) 2019-04-03 2019-04-03 A kind of replacement mine hoisting head rope turns over the construction technology of rope in the process

Publications (1)

Publication Number Publication Date
CN109879147A true CN109879147A (en) 2019-06-14

Family

ID=66935918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910265425.8A Pending CN109879147A (en) 2019-04-03 2019-04-03 A kind of replacement mine hoisting head rope turns over the construction technology of rope in the process

Country Status (1)

Country Link
CN (1) CN109879147A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112607568A (en) * 2020-12-30 2021-04-06 武汉万进达电梯有限公司 Elevator steel wire rope replacing method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2556329B1 (en) * 1983-12-07 1989-08-25 Maschf Augsburg Nuernberg Ag METHOD AND DEVICE FOR STEP-BY-STEP DRAWING OF EXTRACTION CABLES FROM A MINE WELL EXTRACTION INSTALLATION
PL189043B1 (en) * 1998-10-10 2005-06-30 Wincenty Magnowski Method of replacing hoisting ropes of mine shaft hoists
CN107651546A (en) * 2017-11-06 2018-02-02 淮南矿业(集团)有限责任公司 The main replacing lifting ropes of multi-rope technique of vertical
CN109019278A (en) * 2018-08-31 2018-12-18 中信重工机械股份有限公司 A kind of deep-well multi-rope friction hoisting machine steel rope replacing method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2556329B1 (en) * 1983-12-07 1989-08-25 Maschf Augsburg Nuernberg Ag METHOD AND DEVICE FOR STEP-BY-STEP DRAWING OF EXTRACTION CABLES FROM A MINE WELL EXTRACTION INSTALLATION
PL189043B1 (en) * 1998-10-10 2005-06-30 Wincenty Magnowski Method of replacing hoisting ropes of mine shaft hoists
CN107651546A (en) * 2017-11-06 2018-02-02 淮南矿业(集团)有限责任公司 The main replacing lifting ropes of multi-rope technique of vertical
CN109019278A (en) * 2018-08-31 2018-12-18 中信重工机械股份有限公司 A kind of deep-well multi-rope friction hoisting machine steel rope replacing method

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
刘德凯等: "立井多绳摩擦式提升机钢丝绳更换新工艺的研究和应用", 《内蒙古煤炭经济》 *
王红强: "提高摩擦提升机钢丝绳更换效率的施工工艺的研究", 《煤矿机械》 *
田渝飞: "无卡式预拉伸自动换绳法在东庞矿的应用", 《中国新技术新产品》 *
黄定国主编;张彦斌,许胜军副主编: "《煤矿安全生产管理人员安全培训教材(复训)》", 31 March 2016, 中国矿业大学出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112607568A (en) * 2020-12-30 2021-04-06 武汉万进达电梯有限公司 Elevator steel wire rope replacing method

Similar Documents

Publication Publication Date Title
CN109911748A (en) A kind of construction technology for replacing mine hoisting head rope
CN103380070B (en) Prop up support component
CN205422552U (en) Novel rig that tertiary hydraulic cylinder rises to rise
CN102425435A (en) Ultra-large whole-circle needle beam type hydraulic steel mould trolley and demoulding method thereof
CN109879147A (en) A kind of replacement mine hoisting head rope turns over the construction technology of rope in the process
US11358835B2 (en) Method for roping an elevator
CN206617175U (en) A kind of automatic liquid pressure type inverted arch trestle
CN205034589U (en) System for container is locked automatic dismounting device soon and is included it
CN105129271A (en) Automatic disassembling device for container rotating lock, system comprising same and disassembling method
CN102979465A (en) Multifunctional maritime workover rig and operation method thereof
CN107420050A (en) The full-automatic workover rig of mast lift
CN101963046B (en) Top driving slippery insert type folding guide rail plate
CN102022718B (en) Exchanging method of exhaust-heat boiler low temperature economizer
CN105712200A (en) Lifting hook pulley with function of rapidly regulating rope reeling rate
CN206663609U (en) A kind of mould turning device
CN110654973B (en) Automatic unhooking lifting appliance
CN104963999B (en) The double lock of set three knots and knotting method
CN208948697U (en) A kind of transmission mechanism and plating driving
CN109835801A (en) It is a kind of replacement mine hoisting head rope during messenger construction technology
CN217599902U (en) Replacing device for lifting belt of self-unloading ship
CN114852846A (en) Stable spreader for warehousing and logistics
CN105621175B (en) The control method and elevator system of elevator system
CN110422759A (en) Monkey, tackling system and hoisting method
CN106013001A (en) Method for operating multi-hole diversion tunnel sealing and blocking gate through trolley
CN102390640A (en) Full-automatic bottom lock used on container

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 221116 Yicheng Village, Street Office, Tongshan District, Xuzhou High-tech Industrial Development Zone, Xuzhou City, Jiangsu Province

Applicant after: XUZHOU SANSEN WEIER MINE TECHNOLOGY Co.,Ltd.

Address before: 221116 Yicheng Village, Street Office, Tongshan District, Xuzhou High-tech Industrial Development Zone, Changzhou City, Jiangsu Province

Applicant before: XUZHOU SANSEN WEIER MINE TECHNOLOGY Co.,Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190614