CN109854245A - A kind of erosion control safety method of Coal Face Passing Through connection roadway - Google Patents
A kind of erosion control safety method of Coal Face Passing Through connection roadway Download PDFInfo
- Publication number
- CN109854245A CN109854245A CN201811596961.8A CN201811596961A CN109854245A CN 109854245 A CN109854245 A CN 109854245A CN 201811596961 A CN201811596961 A CN 201811596961A CN 109854245 A CN109854245 A CN 109854245A
- Authority
- CN
- China
- Prior art keywords
- connection roadway
- face
- coal face
- passing
- crossheading
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000003245 coal Substances 0.000 title claims abstract description 31
- 230000003628 erosive effect Effects 0.000 title claims abstract description 16
- 238000000034 method Methods 0.000 title claims abstract description 12
- 238000012544 monitoring process Methods 0.000 claims abstract description 20
- 238000007726 management method Methods 0.000 claims abstract description 5
- 238000005065 mining Methods 0.000 claims abstract description 5
- 238000003672 processing method Methods 0.000 claims abstract description 4
- 238000010276 construction Methods 0.000 claims description 9
- 230000008901 benefit Effects 0.000 claims description 6
- 238000004140 cleaning Methods 0.000 claims description 4
- 239000002390 adhesive tape Substances 0.000 claims description 3
- 230000002547 anomalous effect Effects 0.000 claims description 3
- 238000005422 blasting Methods 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 description 5
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000000295 complement effect Effects 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- GOLXNESZZPUPJE-UHFFFAOYSA-N spiromesifen Chemical compound CC1=CC(C)=CC(C)=C1C(C(O1)=O)=C(OC(=O)CC(C)(C)C)C11CCCC1 GOLXNESZZPUPJE-UHFFFAOYSA-N 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
- Road Paving Structures (AREA)
Abstract
The present invention relates to a kind of erosion control safety methods of Coal Face Passing Through connection roadway, comprising the following steps: (1) the erosion control release of Coal Face Passing Through connection roadway;(2) working face cuts a pressure relief method;(3) monitoring and warning processing method during Coal Face Passing Through connection roadway;(4) implement limit person's access management method during Coal Face Passing Through connection roadway;(5) reinforce face timbering intensity, it is ensured that the setting load of fully mechanized mining supporter and two crossheading advance timberings reaches requirement.The present invention can preferably guarantee the erosion control safety of Coal Face Passing Through connection roadway, increase economic efficiency to greatest extent.
Description
Technical field
The present invention relates to a kind of erosion control safety methods of Coal Face Passing Through connection roadway.
Background technique
The erosion control of working face and connection roadway safety, is always the most important thing in colliery industry coal mining trouble free service, work
There is many unsafe factors in face and connection roadway, the erosion control of Coal Face Passing Through connection roadway is never obtained safely well
It solves.
Summary of the invention
To overcome the shortcomings of existing technologies, the present invention provides a kind of erosion control safety method of Coal Face Passing Through connection roadway, this hair
Bright technical solution is:
The following steps are included:
(1) the erosion control release of Coal Face Passing Through connection roadway: A helps benefit before and after the two crossheading connection roadway of working face in tunnel within the scope of 150m
Implement portion, side unloading pressure by blasting, spacing 10m, hole depth 15m with pressure relief vent;During B Coal Face Passing Through connection roadway, help in track crossheading two and
First advance 300m range is helped to implement large diameter borehole release, hole depth 25m, bore diameter 125mm, pitch of holes in adhesive tape crossheading
No more than 1m;Construction hole depth 35m, side portion's pressure relief vent of spacing 2m are helped outside C face belt crossheading;During crossing connection roadway, in advance
Working face 300m one hole depth 25m of complement, pressure relief vent of aperture 125mm among former pressure relief vent;
(2) working face cuts a pressure relief method: working face slipping tail away from connection roadway 30m at, construct towards connection roadway direction in work
Pressure relief vent, hole depth 25m, spacing 2m, sequence of construction are constructed from work towards a direction is slipped;
(3) monitoring and warning processing method during Coal Face Passing Through connection roadway: A reinforces working face and connection roadway stress monitoring, tunnel are received
Deformation monitoring is held back, monitoring data are regularly published, when there is early warning or monitoring data anomalous variation, controls face propulsion speed,
Advance of the face degree is controlled in 3 knives/day, to connection roadway construction pressure relief vent in working face;There is stress in two crossheading of B working face
When early warning, cleaning bottom of hole release, pitch of holes 2m, hole depth 25m are carried out before and after the prewarning area at 15M;There is big face in two crossheading of working face
When product stress early warning, face propulsion speed is controlled, by the control of advance of the face degree in 3 knives/day, is carried out in two crossheading of working face
Cleaning bottom of hole release;During C Coal Face Passing Through connection roadway, micro seismic monitoring data are handled in time;Working face day, which releases energy, reaches 5*104J
When, limited production processing is carried out to working face, notice working face slows down coal cutting speed, must not exceed 2 knives according to split run production, whole day is not
Be more than the production of 4 knife tissues, working face day releases energy when reaching 7*104J, carries out halt production processing, off-time to working face
It must not be lower than 2 hours, stablize until stope energy discharges, advanced stress variation without exception;
(4) implement limit person's access management method during Coal Face Passing Through connection roadway;When working face is apart from connection roadway 200m, to connection roadway
Closed management is carried out, anyone entrance is forbidden;During Coal Face Passing Through connection roadway, two crossheading of working face is super during working surface production
Forbid anyone entrance within the scope of preceding 300m;
(5) reinforce face timbering intensity, it is ensured that the setting load of fully mechanized mining supporter and two crossheading advance timberings reaches requirement.
The invention has the advantages that can preferably guarantee the erosion control safety of Coal Face Passing Through connection roadway by the release that drills;It is logical
It crosses monitoring and warning and reinforces face timbering intensity, can find the problem in time, carry out erosion control and prepare safely, mention to greatest extent
High economic benefit.
Specific embodiment
The invention will now be further described with reference to specific embodiments, the advantages and features of the present invention will be with description and
It is apparent.But examples are merely exemplary for these, and it is not intended to limit the scope of the present invention in any way.Those skilled in the art
Member it should be understood that without departing from the spirit and scope of the invention can details to technical solution of the present invention and form into
Row modifications or substitutions, but these modifications and replacement are fallen within the protection scope of the present invention.
The present invention relates to a kind of erosion control safety methods of Coal Face Passing Through connection roadway, comprising the following steps:
(1) the erosion control release of Coal Face Passing Through connection roadway: A helps benefit before and after the two crossheading connection roadway of working face in tunnel within the scope of 150m
Implement portion, side unloading pressure by blasting, spacing 10m, hole depth 15m with pressure relief vent;During B Coal Face Passing Through connection roadway, help in track crossheading two and
First advance 300m range is helped to implement large diameter borehole release, hole depth 25m, bore diameter 125mm, pitch of holes in adhesive tape crossheading
No more than 1m;Construction hole depth 35m, side portion's pressure relief vent of spacing 2m are helped outside C face belt crossheading;
(2) working face cuts a pressure relief method: working face slipping tail away from connection roadway 30m at, construct towards connection roadway direction in work
Pressure relief vent, hole depth 25m, spacing 2m, sequence of construction are constructed from work towards a direction is slipped;
(3) monitoring and warning processing method during Coal Face Passing Through connection roadway: A reinforces working face and connection roadway stress monitoring, tunnel are received
Deformation monitoring is held back, monitoring data are regularly published, when there is early warning or monitoring data anomalous variation, controls face propulsion speed,
To connection roadway construction pressure relief vent in working face;When stress early warning occurs in two crossheading of B working face, before and after the prewarning area at 15M
Carry out cleaning bottom of hole release, pitch of holes 2m, hole depth 25m;During C Coal Face Passing Through connection roadway, micro seismic monitoring data are handled in time;
(4) implement limit person's access management method during Coal Face Passing Through connection roadway;
(5) reinforce face timbering intensity, it is ensured that the setting load of fully mechanized mining supporter and two crossheading advance timberings reaches requirement.
Claims (1)
1. a kind of erosion control safety method of Coal Face Passing Through connection roadway, it is characterised in that: the following steps are included:
(1) the erosion control release of Coal Face Passing Through connection roadway: A helps benefit before and after the two crossheading connection roadway of working face in tunnel within the scope of 150m
Implement portion, side unloading pressure by blasting, spacing 10m, hole depth 15m with pressure relief vent;During B Coal Face Passing Through connection roadway, help in track crossheading two and
First advance 300m range is helped to implement large diameter borehole release, hole depth 25m, bore diameter 125mm, pitch of holes in adhesive tape crossheading
No more than 1m;Construction hole depth 35m, side portion's pressure relief vent of spacing 2m are helped outside C face belt crossheading;
(2) working face cuts a pressure relief method: working face slipping tail away from connection roadway 30m at, construct towards connection roadway direction in work
Pressure relief vent, hole depth 25m, spacing 2m, sequence of construction are constructed from work towards a direction is slipped;
(3) monitoring and warning processing method during Coal Face Passing Through connection roadway: A reinforces working face and connection roadway stress monitoring, tunnel are received
Deformation monitoring is held back, monitoring data are regularly published, when there is early warning or monitoring data anomalous variation, controls face propulsion speed,
To connection roadway construction pressure relief vent in working face;When stress early warning occurs in two crossheading of B working face, before and after the prewarning area at 15M
Carry out cleaning bottom of hole release, pitch of holes 2m, hole depth 25m;During C Coal Face Passing Through connection roadway, micro seismic monitoring data are handled in time;
(4) implement limit person's access management method during Coal Face Passing Through connection roadway;
(5) reinforce face timbering intensity, it is ensured that the setting load of fully mechanized mining supporter and two crossheading advance timberings reaches requirement.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811596961.8A CN109854245B (en) | 2018-12-26 | 2018-12-26 | Anti-impact safety method for working face passing through contact lane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811596961.8A CN109854245B (en) | 2018-12-26 | 2018-12-26 | Anti-impact safety method for working face passing through contact lane |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109854245A true CN109854245A (en) | 2019-06-07 |
CN109854245B CN109854245B (en) | 2021-01-05 |
Family
ID=66892389
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811596961.8A Expired - Fee Related CN109854245B (en) | 2018-12-26 | 2018-12-26 | Anti-impact safety method for working face passing through contact lane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109854245B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110529113A (en) * | 2019-08-29 | 2019-12-03 | 龙口矿业集团有限公司 | A kind of deep-well high seam complex geological condition various factors coupling region of high stress crosses the anti-punching method of connection roadway |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1710746A1 (en) * | 1990-04-02 | 1992-02-07 | Донецкий политехнический институт | Method of working protection |
CN1664310A (en) * | 2005-02-28 | 2005-09-07 | 清华大学 | Control Method of Rock Burst in Coal Mine Island Coal Pillar |
CN101713290A (en) * | 2009-12-10 | 2010-05-26 | 天地科技股份有限公司 | Method for clearing rock burst of full-mine laneway deep in mine |
CN102322262A (en) * | 2011-09-12 | 2012-01-18 | 山东科技大学 | Colliery isolated island coal column crossheading bump control method |
CN105715291A (en) * | 2016-04-03 | 2016-06-29 | 河南理工大学 | High-level roadway communicated drill hole circulating water type mine cooling system and method |
CN106437711A (en) * | 2016-10-20 | 2017-02-22 | 山东科技大学 | Coal seam impact type mine earthquake prevention and control method |
CN107013216A (en) * | 2017-05-16 | 2017-08-04 | 中国科学院武汉岩土力学研究所 | A kind of colliery deep mining impulsion pressure prevention and controls |
CN107060760A (en) * | 2017-06-13 | 2017-08-18 | 中国矿业大学 | A kind of method that colliery withdraws tunnel presplit blasting caving release |
CN108756881A (en) * | 2018-05-24 | 2018-11-06 | 淮海工学院 | A kind of bump preventing control method in solid coal column pressure coal region |
-
2018
- 2018-12-26 CN CN201811596961.8A patent/CN109854245B/en not_active Expired - Fee Related
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1710746A1 (en) * | 1990-04-02 | 1992-02-07 | Донецкий политехнический институт | Method of working protection |
CN1664310A (en) * | 2005-02-28 | 2005-09-07 | 清华大学 | Control Method of Rock Burst in Coal Mine Island Coal Pillar |
CN101713290A (en) * | 2009-12-10 | 2010-05-26 | 天地科技股份有限公司 | Method for clearing rock burst of full-mine laneway deep in mine |
CN102322262A (en) * | 2011-09-12 | 2012-01-18 | 山东科技大学 | Colliery isolated island coal column crossheading bump control method |
CN105715291A (en) * | 2016-04-03 | 2016-06-29 | 河南理工大学 | High-level roadway communicated drill hole circulating water type mine cooling system and method |
CN106437711A (en) * | 2016-10-20 | 2017-02-22 | 山东科技大学 | Coal seam impact type mine earthquake prevention and control method |
CN107013216A (en) * | 2017-05-16 | 2017-08-04 | 中国科学院武汉岩土力学研究所 | A kind of colliery deep mining impulsion pressure prevention and controls |
CN107060760A (en) * | 2017-06-13 | 2017-08-18 | 中国矿业大学 | A kind of method that colliery withdraws tunnel presplit blasting caving release |
CN108756881A (en) * | 2018-05-24 | 2018-11-06 | 淮海工学院 | A kind of bump preventing control method in solid coal column pressure coal region |
Non-Patent Citations (2)
Title |
---|
张子学等: "深埋煤层采煤面冲击地压危险区域划分与卸压技术", 《陕西煤炭》 * |
牟宗龙: "《深部矿井冲击地压灾害防治研究》", 30 September 2016, 中国矿业大学出版社 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110529113A (en) * | 2019-08-29 | 2019-12-03 | 龙口矿业集团有限公司 | A kind of deep-well high seam complex geological condition various factors coupling region of high stress crosses the anti-punching method of connection roadway |
Also Published As
Publication number | Publication date |
---|---|
CN109854245B (en) | 2021-01-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA3044307C (en) | Stress-transfer method in tunnel with high ground pressure based on fracturing ring | |
WO2019148788A1 (en) | Method for preventing rock bursts by means of active support reinforcement and active pressure relief | |
CN104100266B (en) | The method of preventing and treating gob side entry bump | |
CN106194200A (en) | A kind of efficient construction of hard rock tunnel | |
CN109854245A (en) | A kind of erosion control safety method of Coal Face Passing Through connection roadway | |
CN110529113B (en) | Anti-impact method for deep well thick coal seam complex geological condition multi-factor coupling high stress area crossing contact roadway | |
EA201890135A1 (en) | ANTI-SCALE CONSTRUCTION FOR ROLLING OUT ON METHOD 110 UNDERGROUND DEVELOPMENT WITH DESTRUCTION OF ROOF | |
CN107013216A (en) | A kind of colliery deep mining impulsion pressure prevention and controls | |
CN110924945A (en) | Safe working method under condition of lateral suspended roof rock burst | |
CN102418525B (en) | Soft coal seam long-wall high-mining-height comprehensive mechanized coal mining end mining method | |
CN106285676A (en) | Metallurgical underground mine mesopore is without well Cut Blasting system | |
CN110359910B (en) | Fully mechanized caving high-level filling mining method for thick coal seam strips under coal mine railway | |
CN213510672U (en) | Reusable constant-resistance suspension top beam | |
CN108252651B (en) | Method for fully mechanized mining face multipoint dispersion parallel type blast hole presplitting roof | |
CN111005740A (en) | Method for controlling surrounding rock of upper and lower walls of stope by medium-length hole pre-grouting | |
CN210178355U (en) | Cutter head of small-section shield tunneling machine for coal mine | |
CN211977724U (en) | Fan-shaped stoping medium-length hole for treating suspended top of cutting groove | |
CN108708721B (en) | Mechanized upward segmented stoping method | |
CN102913244B (en) | Underground mining method for kaolin mine | |
SU901567A1 (en) | Method for mechanized extraction of mineral | |
CN106285777A (en) | The method that flood mine mineral building discharges water in advance | |
CN109236306B (en) | Safety redundancy mechanism for preventing replaceable cutter under normal pressure from falling off and installation method thereof | |
Solov'ev et al. | Development of New Mining and Engineering Construction Works for the Development of Remote Northern Regions and the Far East | |
CN212130513U (en) | Colliery tunnelling working face advance support protector | |
CN109377907A (en) | Underground escape system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: An anti scour safety method for working face passing through connecting roadway Effective date of registration: 20211126 Granted publication date: 20210105 Pledgee: Longkou Mining Group Thermal Power Co.,Ltd. Pledgor: LONGKOU MINING GROUP Co.,Ltd. Registration number: Y2021980013319 |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210105 |