[go: up one dir, main page]

CN109854245A - A kind of erosion control safety method of Coal Face Passing Through connection roadway - Google Patents

A kind of erosion control safety method of Coal Face Passing Through connection roadway Download PDF

Info

Publication number
CN109854245A
CN109854245A CN201811596961.8A CN201811596961A CN109854245A CN 109854245 A CN109854245 A CN 109854245A CN 201811596961 A CN201811596961 A CN 201811596961A CN 109854245 A CN109854245 A CN 109854245A
Authority
CN
China
Prior art keywords
connection roadway
face
coal face
passing
crossheading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811596961.8A
Other languages
Chinese (zh)
Other versions
CN109854245B (en
Inventor
解士安
慕鹏飞
刘伟波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Longkou Mining Group Co Ltd
Original Assignee
Longkou Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Longkou Mining Group Co Ltd filed Critical Longkou Mining Group Co Ltd
Priority to CN201811596961.8A priority Critical patent/CN109854245B/en
Publication of CN109854245A publication Critical patent/CN109854245A/en
Application granted granted Critical
Publication of CN109854245B publication Critical patent/CN109854245B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention relates to a kind of erosion control safety methods of Coal Face Passing Through connection roadway, comprising the following steps: (1) the erosion control release of Coal Face Passing Through connection roadway;(2) working face cuts a pressure relief method;(3) monitoring and warning processing method during Coal Face Passing Through connection roadway;(4) implement limit person's access management method during Coal Face Passing Through connection roadway;(5) reinforce face timbering intensity, it is ensured that the setting load of fully mechanized mining supporter and two crossheading advance timberings reaches requirement.The present invention can preferably guarantee the erosion control safety of Coal Face Passing Through connection roadway, increase economic efficiency to greatest extent.

Description

A kind of erosion control safety method of Coal Face Passing Through connection roadway
Technical field
The present invention relates to a kind of erosion control safety methods of Coal Face Passing Through connection roadway.
Background technique
The erosion control of working face and connection roadway safety, is always the most important thing in colliery industry coal mining trouble free service, work There is many unsafe factors in face and connection roadway, the erosion control of Coal Face Passing Through connection roadway is never obtained safely well It solves.
Summary of the invention
To overcome the shortcomings of existing technologies, the present invention provides a kind of erosion control safety method of Coal Face Passing Through connection roadway, this hair Bright technical solution is:
The following steps are included:
(1) the erosion control release of Coal Face Passing Through connection roadway: A helps benefit before and after the two crossheading connection roadway of working face in tunnel within the scope of 150m Implement portion, side unloading pressure by blasting, spacing 10m, hole depth 15m with pressure relief vent;During B Coal Face Passing Through connection roadway, help in track crossheading two and First advance 300m range is helped to implement large diameter borehole release, hole depth 25m, bore diameter 125mm, pitch of holes in adhesive tape crossheading No more than 1m;Construction hole depth 35m, side portion's pressure relief vent of spacing 2m are helped outside C face belt crossheading;During crossing connection roadway, in advance Working face 300m one hole depth 25m of complement, pressure relief vent of aperture 125mm among former pressure relief vent;
(2) working face cuts a pressure relief method: working face slipping tail away from connection roadway 30m at, construct towards connection roadway direction in work Pressure relief vent, hole depth 25m, spacing 2m, sequence of construction are constructed from work towards a direction is slipped;
(3) monitoring and warning processing method during Coal Face Passing Through connection roadway: A reinforces working face and connection roadway stress monitoring, tunnel are received Deformation monitoring is held back, monitoring data are regularly published, when there is early warning or monitoring data anomalous variation, controls face propulsion speed, Advance of the face degree is controlled in 3 knives/day, to connection roadway construction pressure relief vent in working face;There is stress in two crossheading of B working face When early warning, cleaning bottom of hole release, pitch of holes 2m, hole depth 25m are carried out before and after the prewarning area at 15M;There is big face in two crossheading of working face When product stress early warning, face propulsion speed is controlled, by the control of advance of the face degree in 3 knives/day, is carried out in two crossheading of working face Cleaning bottom of hole release;During C Coal Face Passing Through connection roadway, micro seismic monitoring data are handled in time;Working face day, which releases energy, reaches 5*104J When, limited production processing is carried out to working face, notice working face slows down coal cutting speed, must not exceed 2 knives according to split run production, whole day is not Be more than the production of 4 knife tissues, working face day releases energy when reaching 7*104J, carries out halt production processing, off-time to working face It must not be lower than 2 hours, stablize until stope energy discharges, advanced stress variation without exception;
(4) implement limit person's access management method during Coal Face Passing Through connection roadway;When working face is apart from connection roadway 200m, to connection roadway Closed management is carried out, anyone entrance is forbidden;During Coal Face Passing Through connection roadway, two crossheading of working face is super during working surface production Forbid anyone entrance within the scope of preceding 300m;
(5) reinforce face timbering intensity, it is ensured that the setting load of fully mechanized mining supporter and two crossheading advance timberings reaches requirement.
The invention has the advantages that can preferably guarantee the erosion control safety of Coal Face Passing Through connection roadway by the release that drills;It is logical It crosses monitoring and warning and reinforces face timbering intensity, can find the problem in time, carry out erosion control and prepare safely, mention to greatest extent High economic benefit.
Specific embodiment
The invention will now be further described with reference to specific embodiments, the advantages and features of the present invention will be with description and It is apparent.But examples are merely exemplary for these, and it is not intended to limit the scope of the present invention in any way.Those skilled in the art Member it should be understood that without departing from the spirit and scope of the invention can details to technical solution of the present invention and form into Row modifications or substitutions, but these modifications and replacement are fallen within the protection scope of the present invention.
The present invention relates to a kind of erosion control safety methods of Coal Face Passing Through connection roadway, comprising the following steps:
(1) the erosion control release of Coal Face Passing Through connection roadway: A helps benefit before and after the two crossheading connection roadway of working face in tunnel within the scope of 150m Implement portion, side unloading pressure by blasting, spacing 10m, hole depth 15m with pressure relief vent;During B Coal Face Passing Through connection roadway, help in track crossheading two and First advance 300m range is helped to implement large diameter borehole release, hole depth 25m, bore diameter 125mm, pitch of holes in adhesive tape crossheading No more than 1m;Construction hole depth 35m, side portion's pressure relief vent of spacing 2m are helped outside C face belt crossheading;
(2) working face cuts a pressure relief method: working face slipping tail away from connection roadway 30m at, construct towards connection roadway direction in work Pressure relief vent, hole depth 25m, spacing 2m, sequence of construction are constructed from work towards a direction is slipped;
(3) monitoring and warning processing method during Coal Face Passing Through connection roadway: A reinforces working face and connection roadway stress monitoring, tunnel are received Deformation monitoring is held back, monitoring data are regularly published, when there is early warning or monitoring data anomalous variation, controls face propulsion speed, To connection roadway construction pressure relief vent in working face;When stress early warning occurs in two crossheading of B working face, before and after the prewarning area at 15M Carry out cleaning bottom of hole release, pitch of holes 2m, hole depth 25m;During C Coal Face Passing Through connection roadway, micro seismic monitoring data are handled in time;
(4) implement limit person's access management method during Coal Face Passing Through connection roadway;
(5) reinforce face timbering intensity, it is ensured that the setting load of fully mechanized mining supporter and two crossheading advance timberings reaches requirement.

Claims (1)

1. a kind of erosion control safety method of Coal Face Passing Through connection roadway, it is characterised in that: the following steps are included:
(1) the erosion control release of Coal Face Passing Through connection roadway: A helps benefit before and after the two crossheading connection roadway of working face in tunnel within the scope of 150m Implement portion, side unloading pressure by blasting, spacing 10m, hole depth 15m with pressure relief vent;During B Coal Face Passing Through connection roadway, help in track crossheading two and First advance 300m range is helped to implement large diameter borehole release, hole depth 25m, bore diameter 125mm, pitch of holes in adhesive tape crossheading No more than 1m;Construction hole depth 35m, side portion's pressure relief vent of spacing 2m are helped outside C face belt crossheading;
(2) working face cuts a pressure relief method: working face slipping tail away from connection roadway 30m at, construct towards connection roadway direction in work Pressure relief vent, hole depth 25m, spacing 2m, sequence of construction are constructed from work towards a direction is slipped;
(3) monitoring and warning processing method during Coal Face Passing Through connection roadway: A reinforces working face and connection roadway stress monitoring, tunnel are received Deformation monitoring is held back, monitoring data are regularly published, when there is early warning or monitoring data anomalous variation, controls face propulsion speed, To connection roadway construction pressure relief vent in working face;When stress early warning occurs in two crossheading of B working face, before and after the prewarning area at 15M Carry out cleaning bottom of hole release, pitch of holes 2m, hole depth 25m;During C Coal Face Passing Through connection roadway, micro seismic monitoring data are handled in time;
(4) implement limit person's access management method during Coal Face Passing Through connection roadway;
(5) reinforce face timbering intensity, it is ensured that the setting load of fully mechanized mining supporter and two crossheading advance timberings reaches requirement.
CN201811596961.8A 2018-12-26 2018-12-26 Anti-impact safety method for working face passing through contact lane Expired - Fee Related CN109854245B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811596961.8A CN109854245B (en) 2018-12-26 2018-12-26 Anti-impact safety method for working face passing through contact lane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811596961.8A CN109854245B (en) 2018-12-26 2018-12-26 Anti-impact safety method for working face passing through contact lane

Publications (2)

Publication Number Publication Date
CN109854245A true CN109854245A (en) 2019-06-07
CN109854245B CN109854245B (en) 2021-01-05

Family

ID=66892389

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811596961.8A Expired - Fee Related CN109854245B (en) 2018-12-26 2018-12-26 Anti-impact safety method for working face passing through contact lane

Country Status (1)

Country Link
CN (1) CN109854245B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110529113A (en) * 2019-08-29 2019-12-03 龙口矿业集团有限公司 A kind of deep-well high seam complex geological condition various factors coupling region of high stress crosses the anti-punching method of connection roadway

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1710746A1 (en) * 1990-04-02 1992-02-07 Донецкий политехнический институт Method of working protection
CN1664310A (en) * 2005-02-28 2005-09-07 清华大学 Control Method of Rock Burst in Coal Mine Island Coal Pillar
CN101713290A (en) * 2009-12-10 2010-05-26 天地科技股份有限公司 Method for clearing rock burst of full-mine laneway deep in mine
CN102322262A (en) * 2011-09-12 2012-01-18 山东科技大学 Colliery isolated island coal column crossheading bump control method
CN105715291A (en) * 2016-04-03 2016-06-29 河南理工大学 High-level roadway communicated drill hole circulating water type mine cooling system and method
CN106437711A (en) * 2016-10-20 2017-02-22 山东科技大学 Coal seam impact type mine earthquake prevention and control method
CN107013216A (en) * 2017-05-16 2017-08-04 中国科学院武汉岩土力学研究所 A kind of colliery deep mining impulsion pressure prevention and controls
CN107060760A (en) * 2017-06-13 2017-08-18 中国矿业大学 A kind of method that colliery withdraws tunnel presplit blasting caving release
CN108756881A (en) * 2018-05-24 2018-11-06 淮海工学院 A kind of bump preventing control method in solid coal column pressure coal region

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1710746A1 (en) * 1990-04-02 1992-02-07 Донецкий политехнический институт Method of working protection
CN1664310A (en) * 2005-02-28 2005-09-07 清华大学 Control Method of Rock Burst in Coal Mine Island Coal Pillar
CN101713290A (en) * 2009-12-10 2010-05-26 天地科技股份有限公司 Method for clearing rock burst of full-mine laneway deep in mine
CN102322262A (en) * 2011-09-12 2012-01-18 山东科技大学 Colliery isolated island coal column crossheading bump control method
CN105715291A (en) * 2016-04-03 2016-06-29 河南理工大学 High-level roadway communicated drill hole circulating water type mine cooling system and method
CN106437711A (en) * 2016-10-20 2017-02-22 山东科技大学 Coal seam impact type mine earthquake prevention and control method
CN107013216A (en) * 2017-05-16 2017-08-04 中国科学院武汉岩土力学研究所 A kind of colliery deep mining impulsion pressure prevention and controls
CN107060760A (en) * 2017-06-13 2017-08-18 中国矿业大学 A kind of method that colliery withdraws tunnel presplit blasting caving release
CN108756881A (en) * 2018-05-24 2018-11-06 淮海工学院 A kind of bump preventing control method in solid coal column pressure coal region

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张子学等: "深埋煤层采煤面冲击地压危险区域划分与卸压技术", 《陕西煤炭》 *
牟宗龙: "《深部矿井冲击地压灾害防治研究》", 30 September 2016, 中国矿业大学出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110529113A (en) * 2019-08-29 2019-12-03 龙口矿业集团有限公司 A kind of deep-well high seam complex geological condition various factors coupling region of high stress crosses the anti-punching method of connection roadway

Also Published As

Publication number Publication date
CN109854245B (en) 2021-01-05

Similar Documents

Publication Publication Date Title
CA3044307C (en) Stress-transfer method in tunnel with high ground pressure based on fracturing ring
WO2019148788A1 (en) Method for preventing rock bursts by means of active support reinforcement and active pressure relief
CN104100266B (en) The method of preventing and treating gob side entry bump
CN106194200A (en) A kind of efficient construction of hard rock tunnel
CN109854245A (en) A kind of erosion control safety method of Coal Face Passing Through connection roadway
CN110529113B (en) Anti-impact method for deep well thick coal seam complex geological condition multi-factor coupling high stress area crossing contact roadway
EA201890135A1 (en) ANTI-SCALE CONSTRUCTION FOR ROLLING OUT ON METHOD 110 UNDERGROUND DEVELOPMENT WITH DESTRUCTION OF ROOF
CN107013216A (en) A kind of colliery deep mining impulsion pressure prevention and controls
CN110924945A (en) Safe working method under condition of lateral suspended roof rock burst
CN102418525B (en) Soft coal seam long-wall high-mining-height comprehensive mechanized coal mining end mining method
CN106285676A (en) Metallurgical underground mine mesopore is without well Cut Blasting system
CN110359910B (en) Fully mechanized caving high-level filling mining method for thick coal seam strips under coal mine railway
CN213510672U (en) Reusable constant-resistance suspension top beam
CN108252651B (en) Method for fully mechanized mining face multipoint dispersion parallel type blast hole presplitting roof
CN111005740A (en) Method for controlling surrounding rock of upper and lower walls of stope by medium-length hole pre-grouting
CN210178355U (en) Cutter head of small-section shield tunneling machine for coal mine
CN211977724U (en) Fan-shaped stoping medium-length hole for treating suspended top of cutting groove
CN108708721B (en) Mechanized upward segmented stoping method
CN102913244B (en) Underground mining method for kaolin mine
SU901567A1 (en) Method for mechanized extraction of mineral
CN106285777A (en) The method that flood mine mineral building discharges water in advance
CN109236306B (en) Safety redundancy mechanism for preventing replaceable cutter under normal pressure from falling off and installation method thereof
Solov'ev et al. Development of New Mining and Engineering Construction Works for the Development of Remote Northern Regions and the Far East
CN212130513U (en) Colliery tunnelling working face advance support protector
CN109377907A (en) Underground escape system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: An anti scour safety method for working face passing through connecting roadway

Effective date of registration: 20211126

Granted publication date: 20210105

Pledgee: Longkou Mining Group Thermal Power Co.,Ltd.

Pledgor: LONGKOU MINING GROUP Co.,Ltd.

Registration number: Y2021980013319

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210105