[go: up one dir, main page]

CN109849324A - Make the tool component and method of composite double layer insulating tube - Google Patents

Make the tool component and method of composite double layer insulating tube Download PDF

Info

Publication number
CN109849324A
CN109849324A CN201811520924.9A CN201811520924A CN109849324A CN 109849324 A CN109849324 A CN 109849324A CN 201811520924 A CN201811520924 A CN 201811520924A CN 109849324 A CN109849324 A CN 109849324A
Authority
CN
China
Prior art keywords
pipe
pressure
core
pressure chamber
rubber plastic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811520924.9A
Other languages
Chinese (zh)
Inventor
方靖
王立民
李富永
张路涵
赵江浩
刘志涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TANGSHAN CITY HEATING POWER INDUSTRY DEVELOPMENT Co Ltd
Original Assignee
TANGSHAN CITY HEATING POWER INDUSTRY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TANGSHAN CITY HEATING POWER INDUSTRY DEVELOPMENT Co Ltd filed Critical TANGSHAN CITY HEATING POWER INDUSTRY DEVELOPMENT Co Ltd
Priority to CN201811520924.9A priority Critical patent/CN109849324A/en
Publication of CN109849324A publication Critical patent/CN109849324A/en
Pending legal-status Critical Current

Links

Landscapes

  • Thermal Insulation (AREA)

Abstract

The present invention relates to utilidor production technical field, the tool component and method of specifically a kind of production composite double layer insulating tube.Roller bed device, core pipe pressure chamber, protection pipe pressure chamber, traction device are positioned including pipe fitting; it includes bottom plate, collateral seat, support roller that pipe fitting, which positions roller bed device; core pipe pressure chamber includes first pressure pipe; protection pipe pressure chamber includes second pressure pipe, and traction device includes drawing head, third pressure pipe, sealing drum, hoist engine;Production method is to be set with rubber plastic pipe outside core pipe first, and protection pipe is then set with outside rubber plastic pipe.Invention tool structure is simple, easily fabricated, improves production efficiency and product quality, time saving and energy saving, reduces production cost, practical, and the insulating tube surface strength produced is high, and smoothly fold, heat insulation effect be not good for appearance.

Description

Make the tool component and method of composite double layer insulating tube
Technical field
The present invention relates to utilidor production technical field, the tool component of specifically a kind of production composite double layer insulating tube And method.
Background technique
Utilidor structure in the prior art is on the outside of feedwater piping with one circle rubber and plastic foam thermal insulation of glue bonding Then cotton is bonded on the outside of rubber and plastic foam thermal insulation cotton with aluminium foil or adhesive tape and is fixed, but in use, rubber and plastic foam Heat-preservation cotton is easy to breakage, causes feedwater piping exposed outside, not can guarantee heat insulation effect, the weather resistance of insulating tube is poor, Service life is short, in order to solve this problem, by being set with insulating tube outside rubber and plastic foam thermal insulation cotton, to prevent rubber and plastic foam from protecting Warm cotton is damaged, guarantees heat insulation effect, but structure is complicated for this utilidor, and process is tedious for production method, and needs to put into More production equipments, cost of manufacture are high.
Summary of the invention
Present invention seek to address that the above problem, so that providing one kind can be improved production efficiency and product quality, time saving province Power, the tool component and method for reducing production cost, practical production composite double layer insulating tube.
The present invention solves described problem, the technical solution adopted is that:
A kind of tool component making composite double layer insulating tube, including pipe fitting position roller bed device, core pipe pressure chamber, protection pipe pressure Power cabin, traction device;
Pipe fitting positioning roller bed device includes bottom plate, collateral seat, support roller, and collateral seat setting is in bottom plate one end, and support roller is in side by side Interval shape is arranged on bottom plate, and the step spindle nose for installing core pipe is provided on collateral seat;
Core pipe pressure chamber includes first pressure pipe, and one end of first pressure pipe is provided with end cover, is provided on end cover The other end of valve cock, first pressure pipe is provided with connecting flange;
Protection pipe pressure chamber includes second pressure pipe, and the both ends of second pressure pipe are respectively arranged with connecting flange;
Traction device includes drawing head, third pressure pipe, sealing drum, hoist engine, and one end of drawing head is tube expansion, setting in tube expansion There is dormant bolt, dormant bolt and tube expanding joint constitute expansion bolt structure, and the other end of drawing head is outward in contraction-like Conehead is provided with the hanging ring for connecting steel wire ropes on conehead, and one end of third pressure pipe is provided with connecting flange, third pressure The other end of pipe is connect with sealing drum, and the roller of hoist engine is arranged in sealing drum, and the motor reducer of hoist engine is arranged close Outside sealed tube.
Preferably, third pressure pipe is welded as a whole with sealing drum.
A method of composite double layer insulating tube is made, the tooling group of production composite double layer insulating tube as described above is used Part includes the following steps:
(1) one end of core pipe is sleeved on the tube expansion of drawing head, makes tube expansion expansion locking core by rotating dormant bolt Pipe, and then one end of core pipe is fixed on drawing head;
(2) other end of core pipe is sleeved on the step spindle nose of pipe fitting positioning roller bed device;
(3) rubber plastic pipe is inserted in from conehead one end of drawing head, is sleeved on core pipe at step spindle nose, and then by rubber plastic pipe On;
(4) it after core pipe and rubber plastic pipe assembly reach requirement, is packed into core pipe pressure chamber together;
(5) protection pipe is packed into protection pipe pressure chamber;
(6) wirerope on elevator machine cylinder is sequentially passed through into third pressure pipe and second pressure pipe, then and on drawing head Hanging ring connection;
(7) first pressure pipe is passed through connecting flange and be bolted with second pressure pipe and be sealed, by second pressure Guan Yu Three pressure pipes, which pass through connecting flange and are bolted, to be sealed;
(8) using air compressor machine to injection air at the valve cock in core pipe pressure chamber, so that air pressure reaches 03 Mpa in cabin For -0.8Mpa. so that the outer diameter of rubber plastic pipe shrinks 50%, air is injected in stopping;
(9) roller is driven by the motor reducer of hoist engine, the core pipe and rubber plastic pipe that assemble is introduced by wirerope by guarantor In pillar;
(10) it after core pipe and rubber plastic pipe reach distracted position, that is, is formed outside core pipe to be set with outside rubber plastic pipe, rubber plastic pipe and is set with The structure of protection pipe opens valve cock and deflates, unclamps the connection bolt between first pressure pipe and second pressure, finally putting on Workpiece take out.
The present invention by adopting the above technical scheme, compared with prior art, the feature protruded is:
Tool structure of the present invention is simple, easily fabricated, improves production efficiency and product quality, time saving and energy saving, reduces production Cost, practical, the insulating tube surface strength produced is high, and smoothly fold, heat insulation effect be not good for appearance.
Detailed description of the invention
Fig. 1 is the schematic view of the front view of pipe fitting of embodiment of the present invention positioning roller bed device;
Fig. 2 is the overlooking structure diagram of pipe fitting of embodiment of the present invention positioning roller bed device;
Fig. 3 is the schematic view of the front view of core pipe pressure chamber of the embodiment of the present invention;
Fig. 4 is the side structure schematic view of core pipe pressure chamber of the embodiment of the present invention;
Fig. 5 is the schematic view of the front view of protection pipe pressure chamber of the embodiment of the present invention;
Fig. 6 is the side structure schematic view of protection pipe pressure chamber of the embodiment of the present invention;
Fig. 7 is the schematic view of the front view of drawing head of the embodiment of the present invention;
Fig. 8 is the overlooking structure diagram of drawing head of the embodiment of the present invention;
Fig. 9 is the schematic view of the front view of traction device of the embodiment of the present invention;
Figure 10 is the overlooking structure diagram of traction device of the embodiment of the present invention;
Figure 11 is the structural schematic diagram that the embodiment of the present invention is set with rubber plastic pipe in core pipe;
Figure 12 is the structural schematic diagram that drawing head of the embodiment of the present invention is connect with the wirerope of elevator machine cylinder;
Figure 13 is the structure when embodiment of the present invention is introduced into the core pipe and rubber plastic pipe that assemble in protection pipe by wirerope Schematic diagram;
In figure: bottom plate 1;Collateral seat 2;Support roller 3;Step spindle nose 4;Valve cock 5;End cover 6;First pressure pipe 7;Connection method Orchid 8;Second pressure pipe 9;Dormant bolt 10;Tube expansion 11;Conehead 12;Hanging ring 13;Wirerope 14;Third pressure pipe 15;Sealing drum 16;Roller 17;Rubber plastic pipe 18;Core pipe 19;Drawing head 20;Protection pipe 21;Bolt 22;Motor reducer 23.
Specific embodiment:
Below with reference to embodiment, the invention will be further described, and purpose, which is only that, more fully understands the content of present invention, therefore, institute The example of act is not intended to limit protection scope of the present invention.
Referring to Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, Fig. 8, Fig. 9, Figure 10, Figure 11, Figure 12, Figure 13, a kind of production The tool component of composite double layer insulating tube, including pipe fitting positioning roller bed device, core pipe pressure chamber, protection pipe pressure chamber, traction dress It sets.
Pipe fitting positioning roller bed device includes bottom plate 1, collateral seat 2, support roller 3, and the collateral setting of seat 2 is in 1 one end of bottom plate, support Roller 3 is arranged on bottom plate 1 in spacing side by side shape, and the step spindle nose 4 for installing core pipe 19 is provided on collateral seat 2.
Core pipe pressure chamber includes first pressure pipe 7, and one end of first pressure pipe 7 is provided with end cover 6, end cover 6 On be provided with valve cock 5, the other end of first pressure pipe 7 is provided with connecting flange 8.
Protection pipe pressure chamber includes second pressure pipe 9, and the both ends of second pressure pipe 9 are respectively arranged with connecting flange 8.
Traction device includes drawing head 20, third pressure pipe 15, sealing drum 16, hoist engine, and one end of drawing head 20 is swollen Pipe 11, dormant bolt 10 is provided in tube expansion 11, and dormant bolt 10 and tube expansion 11 connect and compose expansion bolt structure, drawing head 20 The other end be outward be in contraction-like conehead 12, the hanging ring 13 for connecting steel wire ropes 14, third pressure are provided on conehead 12 One end of solenoid 15 is provided with connecting flange 8, and the other end of third pressure pipe 15 is connect with sealing drum 16, the roller 17 of hoist engine It is arranged in sealing drum 16, the motor reducer 23 of hoist engine is arranged outside sealing drum 16.
Third pressure pipe 15 is welded as a whole with sealing drum 16.
A method of composite double layer insulating tube is made, the tooling group of production composite double layer insulating tube as described above is used Part includes the following steps:
(1) one end of core pipe 19 is sleeved on the tube expansion 11 of drawing head 20, makes tube expansion 11 swollen by rotating dormant bolt 10 Swollen locking core pipe 19, and then one end of core pipe 19 is fixed on drawing head 20.
(2) other end of core pipe 19 is sleeved on the step spindle nose 4 of pipe fitting positioning roller bed device.
(3) rubber plastic pipe 18 is inserted in from 12 one end of conehead of drawing head 20, at step spindle nose 4, and then by rubber plastic pipe 18 are sleeved in core pipe 19.
(4) it after core pipe 19 and the assembly of rubber plastic pipe 18 reach requirement, is packed into core pipe pressure chamber together.
(5) protection pipe 21 is packed into protection pipe pressure chamber.
(6) wirerope 14 on elevator machine cylinder 17 is sequentially passed through into third pressure pipe 15 and second pressure pipe 9, then It is connect with the hanging ring 13 on drawing head 20.
(7) first pressure pipe 7 is connect and is sealed by connecting flange 8 and bolt 22 with second pressure pipe 9, by second Pressure pipe 9 is connect and is sealed by connecting flange 8 and bolt 22 with third pressure pipe 15.
(8) using air compressor machine to air is injected at the valve cock 5 of core pipe pressure chamber, so that air pressure reaches in cabin For 03 Mpa -0.8Mpa. so that the outer diameter of rubber plastic pipe 18 shrinks 50%, air is injected in stopping.
(9) roller 17, the core pipe 19 assembled by 14, wirerope and rubber are driven by the motor reducer of hoist engine 23 Modeling pipe 18 is introduced into protection pipe 21.
(10) it after core pipe 19 and rubber plastic pipe 18 reach distracted position, that is, is formed outside core pipe 19 and is set with rubber plastic pipe 18, rubber It is set with the structure of protection pipe 21 outside modeling pipe 18, opens valve cock 5 and deflates, unclamp between first pressure pipe 7 and second pressure pipe 9 Bolt 22, finally the workpiece put on is taken out.
In the present embodiment, core pipe 19 is coating steel pipe, and protection pipe 21 is made of PVC pipe, ensure that the outer of insulating tube While table intensity, the smooth beauty of pipe fitting monnolithic case is also ensured, while also having fire-retardant, secondary reinforcement heat insulation effect, rubber Modeling pipe 18, which has, independently closes bubble structure, inside distribution countless tiny bubbles, relatively independent, is not connected to mutually.To make its guarantee every Thermal energy power reduces thermal coefficient, while waterproof and dampproof, also plays the role of corrosion-resistant to insulation pipeline.
Tool structure of the present invention is simple, easily fabricated, improves production efficiency and product quality, time saving and energy saving, reduces Production cost, practical, the insulating tube surface strength produced is high, and smoothly fold, heat insulation effect be not good for appearance.
The foregoing is merely preferably feasible embodiment of the invention, not thereby limiting the scope of the invention, It is all to use equivalence changes made by description of the invention and its accompanying drawing content, it is intended to be included within the scope of the present invention.

Claims (3)

1. a kind of tool component for making composite double layer insulating tube, including pipe fitting position roller bed device, core pipe pressure chamber, protection pipe Pressure chamber, traction device;It is characterized by:
Pipe fitting positioning roller bed device includes bottom plate, collateral seat, support roller, and collateral seat setting is in bottom plate one end, and support roller is in side by side Interval shape is arranged on bottom plate, and the step spindle nose for installing core pipe is provided on collateral seat;
Core pipe pressure chamber includes first pressure pipe, and one end of first pressure pipe is provided with end cover, is provided on end cover The other end of valve cock, first pressure pipe is provided with connecting flange;
Protection pipe pressure chamber includes second pressure pipe, and the both ends of second pressure pipe are respectively arranged with connecting flange;
Traction device includes drawing head, third pressure pipe, sealing drum, hoist engine, and one end of drawing head is tube expansion, setting in tube expansion There is dormant bolt, dormant bolt and tube expanding joint constitute expansion bolt structure, and the other end of drawing head is outward in contraction-like Conehead is provided with the hanging ring for connecting steel wire ropes on conehead, and one end of third pressure pipe is provided with connecting flange, third pressure The other end of pipe is connect with sealing drum, and the roller of hoist engine is arranged in sealing drum, and the motor reducer of hoist engine is arranged close Outside sealed tube.
2. it is according to claim 1 production composite double layer insulating tube tool component, it is characterised in that: third pressure pipe with Sealing drum is welded as a whole.
3. a kind of method for making composite double layer insulating tube uses the described in any item production composite double layers of such as claim 1-2 The tool component of insulating tube, which comprises the steps of:
(1) one end of core pipe is sleeved on the tube expansion of drawing head, makes tube expansion expansion locking core by rotating dormant bolt Pipe, and then one end of core pipe is fixed on drawing head;
(2) other end of core pipe is sleeved on the step spindle nose of pipe fitting positioning roller bed device;
(3) rubber plastic pipe is inserted in from conehead one end of drawing head, is sleeved on core pipe at step spindle nose, and then by rubber plastic pipe On;
(4) it after core pipe and rubber plastic pipe assembly reach requirement, is packed into core pipe pressure chamber together;
(5) protection pipe is packed into protection pipe pressure chamber;
(6) wirerope on elevator machine cylinder is sequentially passed through into third pressure pipe and second pressure pipe, then and on drawing head Hanging ring connection;
(7) first pressure pipe is passed through connecting flange and be bolted with second pressure pipe and be sealed, by second pressure Guan Yu Three pressure pipes, which pass through connecting flange and are bolted, to be sealed;
(8) using air compressor machine to injection air at the valve cock in core pipe pressure chamber, so that air pressure reaches 03 Mpa in cabin For -0.8Mpa. so that the outer diameter of rubber plastic pipe shrinks 50%, air is injected in stopping;
(9) roller is driven by the motor reducer of hoist engine, the core pipe and rubber plastic pipe that assemble is introduced by wirerope by guarantor In pillar;
(10) it after core pipe and rubber plastic pipe reach distracted position, that is, is formed outside core pipe to be set with outside rubber plastic pipe, rubber plastic pipe and is set with The structure of protection pipe opens valve cock and deflates, unclamps the connection bolt between first pressure pipe and second pressure, finally putting on Workpiece take out.
CN201811520924.9A 2018-12-12 2018-12-12 Make the tool component and method of composite double layer insulating tube Pending CN109849324A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811520924.9A CN109849324A (en) 2018-12-12 2018-12-12 Make the tool component and method of composite double layer insulating tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811520924.9A CN109849324A (en) 2018-12-12 2018-12-12 Make the tool component and method of composite double layer insulating tube

Publications (1)

Publication Number Publication Date
CN109849324A true CN109849324A (en) 2019-06-07

Family

ID=66891194

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811520924.9A Pending CN109849324A (en) 2018-12-12 2018-12-12 Make the tool component and method of composite double layer insulating tube

Country Status (1)

Country Link
CN (1) CN109849324A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112936836A (en) * 2021-01-26 2021-06-11 河南省众邦伟业科技有限公司 Forming machine for light wallboard core pipe

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020066490A1 (en) * 2000-12-04 2002-06-06 Roderick Charles Brewis Pipe end fittings
CN203330979U (en) * 2013-07-01 2013-12-11 新疆塔里木油田建设工程有限责任公司 Sieve tube outer sheath assembling tool
CN108139016A (en) * 2015-09-11 2018-06-08 沃茨水技术有限公司 Manufacture the method and system and Preadiabetic tube of Preadiabetic tube
CN209224555U (en) * 2018-12-12 2019-08-09 唐山市热力实业开发公司 Make the tool component of composite double layer insulating tube

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020066490A1 (en) * 2000-12-04 2002-06-06 Roderick Charles Brewis Pipe end fittings
CN203330979U (en) * 2013-07-01 2013-12-11 新疆塔里木油田建设工程有限责任公司 Sieve tube outer sheath assembling tool
CN108139016A (en) * 2015-09-11 2018-06-08 沃茨水技术有限公司 Manufacture the method and system and Preadiabetic tube of Preadiabetic tube
CN209224555U (en) * 2018-12-12 2019-08-09 唐山市热力实业开发公司 Make the tool component of composite double layer insulating tube

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112936836A (en) * 2021-01-26 2021-06-11 河南省众邦伟业科技有限公司 Forming machine for light wallboard core pipe

Similar Documents

Publication Publication Date Title
CN102797916A (en) Multilayer structure glass fiber reinforced plastic tube
CN204785177U (en) Novel board -like flat welding method is blue
CN106586036B (en) Launch vehicle composite material storage tank with reinforcing beam and processing method thereof
WO2019056510A1 (en) Bell and spigot-type metal pipe having end reinforcing ring and plastic liner pipe, and manufacturing method
CN109849324A (en) Make the tool component and method of composite double layer insulating tube
CN205226691U (en) On --spot flange joint lining plastic steel pipe's of engineering plastics bush structure
CN209224555U (en) Make the tool component of composite double layer insulating tube
CN109681345A (en) Ultra-large type solid propellant rocket segmented composite material casing and its manufacturing method
CN103498985B (en) A kind of steel wire composite net pipe quick connection method
CN105082661B (en) A kind of overall forming method of carbon panel aluminum honeycomb sandwich structure
CN113619132B (en) Common-base adhesive bonding method suitable for panel foam sandwich heat-insulation storage tank and heat-insulation storage tank
CN208331536U (en) A kind of jointing of fiber reinforced thermoplastics composite coiled tubing
CN117231854B (en) Heat-preserving and energy-saving device for heat pipeline and heat-preserving and energy-saving method for heat pipeline
CN206320464U (en) Repairing applied to PCCP pipe fittings connects section
CN203797184U (en) Pipe connecting component structure
CN216843238U (en) Split type solenoid valve with temperature sensor
CN113266713B (en) A processing method for pressure-viscous composite plastic connection of dissimilar metal thin-walled tubes
CN202088536U (en) Special honeycomb composite material for minitype unmanned verticraft
CN204456975U (en) Digitlization compound operation room module system
CN205463827U (en) Bloated device that takes shape bimetal composite tube of elastic material liquid
CN221075685U (en) Composite sleeve
CN204477577U (en) A kind of compound mesohigh electric-melting flange structure
CN203036146U (en) Quick connector for connecting oil pipelines
CN208721509U (en) A kind of anti-internal pressure of full-scale aluminium drill pipe and package seal checker
CN207514421U (en) A kind of flexible chamber internal feed pipe for assembled finishing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190607