CN109847557A - Gas barrier arrangement structure and barrier method for landfill - Google Patents

Gas barrier arrangement structure and barrier method for landfill Download PDF

Info

Publication number
CN109847557A
CN109847557A CN201811547689.4A CN201811547689A CN109847557A CN 109847557 A CN109847557 A CN 109847557A CN 201811547689 A CN201811547689 A CN 201811547689A CN 109847557 A CN109847557 A CN 109847557A
Authority
CN
China
Prior art keywords
gas
straight line
wells
well
gas injection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811547689.4A
Other languages
Chinese (zh)
Inventor
刘磊
薛强
魏明俐
魏建明
田宇
李琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Institute of Rock and Soil Mechanics of CAS
Original Assignee
Wuhan Institute of Rock and Soil Mechanics of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Institute of Rock and Soil Mechanics of CAS filed Critical Wuhan Institute of Rock and Soil Mechanics of CAS
Priority to CN201811547689.4A priority Critical patent/CN109847557A/en
Publication of CN109847557A publication Critical patent/CN109847557A/en
Pending legal-status Critical Current

Links

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

本发明属于环境岩土工程领域,尤其涉及一种垃圾填埋场用气体阻隔布置结构以及阻隔方法。该阻隔布置结构包括抽气井以及注气井,抽气井设置有多个,多个抽气井处于第一直线上,注气井也设置有多个,多个注气井处于第二直线上,第一直线和第一直线依次远离清理区域设置。该阻隔方法包括:在清理区域外侧的垃圾堆体上布置抽气井以及注气井。利用注气井向垃圾堆体中注入空气,注入的空气以及清理区域内甲烷通过抽气井吸取至抽气井,空气中的氧气与甲烷发生化学反应,以降低清理区域内的甲烷。本发明具有施工工艺简单、耗时短、成本低和易维护的特点。

The invention belongs to the field of environmental geotechnical engineering, and in particular relates to a gas barrier arrangement structure and a barrier method for landfills. The barrier arrangement structure includes gas extraction wells and gas injection wells. There are a plurality of gas extraction wells, the plurality of gas extraction wells are on a first straight line, and there are also a plurality of gas injection wells, and the plurality of gas injection wells are on a second straight line. The line and the first straight line in turn are set away from the cleanup area. The blocking method includes: arranging a gas extraction well and a gas injection well on the garbage dump body outside the cleaning area. The gas injection well is used to inject air into the garbage dump, and the injected air and the methane in the cleaning area are sucked into the extraction well through the gas extraction well, and the oxygen in the air reacts with the methane to reduce the methane in the cleaning area. The invention has the characteristics of simple construction process, short time-consuming, low cost and easy maintenance.

Description

Refuse landfill gas barrier arragement construction and blocking method
Technical field
The invention belongs to environmental geotechnical field more particularly to a kind of refuse landfill with gas barrier arragement construction with And blocking method.
Background technique
With the continuous quickening of Urbanization in China, domestic waste yield rises year by year, the clothes of refuse landfill The labour time limit is also gradually shortened.Rubbish generates two kinds of main pollutants after landfill --- biogas and Leachate site.Biogas be methane, The mixture of the gases such as carbon dioxide, hydrogen sulfide, Leachate site are the waste liquids of the high concentration generated by degradation, contain a huge sum of money Belong to, organic and high salt.Since Design of Waste Landfill Site plans the contradiction with operation, landfill yard is caused to go out during longtime running Show different degrees of contamination accident and operation new demand therefore to repair the junk-heap body partially filled, change The cleaning works such as build or remove.
During cleaning work carries out, the methane concentration of working face requires to be lower than 5%, otherwise easily cause fire and The safety accidents such as explosion.When the rubbish of landfill in cleaning area still has degradation capability, main component of the methane as biogas It will persistently generate, and be migrated to low pressure regions or atmospheric pressure direction.It, must in order to ensure the safety and efficient operation of cleaning work Gas in junk-heap body other than non-cleaning area must be collected or be handled, avoided the methane of non-cleaning area from penetrating into and open Dig area and place cleaning.
Since good Zoning landfill is not carried out in China's overwhelming majority refuse landfill, and often cleaning work mainly collects In a part or sub-fraction region in.Good barrier is not built between the region and non-cleaning area being cleaned to set Under conditions of applying, the gas between two regions is easy to interpenetrate, easily the initiation safety accidents such as fire or explosion.
In addition, since junk-heap body has the characteristics that hole is larger, be unevenly distributed and cohesive strength is lower, traditional ground The more difficult implementation of the methods of slip casting, solidification in engineering.When the heap body of cleaning is deeper, using vertical seepage control film not only construction cost High and low efficiency, while the stability of excavation face is also difficult to ensure.
Therefore, design it is a kind of with simple process, excellent effect and low-cost new gas blocking method, for The smooth cleaning of junk-heap body has important practical significance.
Summary of the invention
In view of the above existing problems in the prior art, the present invention provides a kind of refuse landfill gas barrier arragement constructions And method, with simple and effective, safe and inexpensive clear up junk-heap body.
The present invention through the following technical solutions to achieve the above objectives:
On the one hand, the invention discloses a kind of refuse landfill gas barrier arragement construction, the barrier arragement constructions Including extraction well and gas injection well, in which:
The extraction well is provided with multiple, and multiple extraction wells are in first straight line;
The gas injection well is also equipped with multiple, and multiple gas injection wells are in second straight line;
The first straight line and the first straight line are successively arranged far from cleaning area.
Further, it is straight to be equal to or less than described first for the distance between the first straight line and the cleaning area boundary The distance between line and the second straight line.
Further, the distance between the first straight line and the cleaning area boundary, the first straight line and described The distance between second straight line is no more than 10m.
Further, the gas injection well interlaced arrangement on the extraction well and the second straight line in the first straight line.
Further, in an extraction well in the first straight line and the second straight line with one extraction well Two adjacent gas injection wells, arrangement in equilateral triangle, such extraction well are best to the extraction effect of methane and air.
Further, there are three monitoring wells for spaced set between two extraction wells adjacent in the first straight line, often It is provided with gas concentration detector in a monitoring well, with real-time detection extraction well treated gas concentration.
It further, further include multiple first branch pipes and first general pipeline, first branch pipe and the extraction well pair Should be arranged, the upper end of one end of first branch pipe and the corresponding extraction well is connected to, multiple first branch pipes it is another On first general pipeline, first general pipeline is connected to the first blower for end connection.
It further, further include multiple second branch pipes and second general pipeline, second branch pipe and the gas injection well pair Should be arranged, the upper end of one end of second branch pipe and the corresponding gas injection well is connected to, multiple second branch pipes it is another On second general pipeline, second general pipeline is connected to the second blower for end connection.
On the other hand, the invention also discloses another refuse landfill gas barrier arragement construction, the barrier cloth Setting structure includes extraction well and gas injection well, in which:
The extraction well is provided with multiple, and multiple extraction wells are on first lap;
The gas injection well be also equipped with it is multiple, multiple gas injection wells be in second circle on;
The first lap setting is between second circle and cleaning area.
In addition, the method is to utilize above-mentioned resistance the invention also discloses a kind of refuse landfill gas barrier method It is carried out every arragement construction, which comprises
Extraction well and gas injection well are arranged on the junk-heap body on the outside of cleaning area;
Air is injected into junk-heap body using gas injection well, methane passes through extraction well in the air and cleaning area of injection It draws the oxygen to extraction well, in air to chemically react with methane, to reduce the methane in cleaning area.
The beneficial effects of the present invention are:
A kind of refuse landfill gas barrier arragement construction and blocking method provided by the present invention utilize gas injection Well injects air into junk-heap body, and the oxygen in air is chemically reacted with methane, to reduce the methane in cleaning area , the gases such as remaining oxygen, methane and nitrogen flow into extraction well under the negative pressure of extraction well, and are discharged by extraction well, To ensure that carrying out the gases such as the methane in work progress other than cleaning area in cleaning area does not flow into cleaning area, improves clear Manage the safety that regional work carries out, since gas injection well and extraction well can carry out flexible design according to the landform of landfill yard, not by The influence of orographic condition, and gas injection well and extraction well are reusable, will not cause secondary pollution to landfill yard place, have The feature that construction technology is simple, time-consuming is short, at low cost and easy to maintain.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings other Attached drawing.
Fig. 1 is a kind of schematic diagram of refuse landfill gas barrier arragement construction of the embodiment of the present invention;
Fig. 2 is the schematic top plan view of Fig. 1;
Fig. 3 is the arrangement schematic diagram of monitoring well;
Fig. 4 is the pipeline arrangement schematic diagram of extraction well in the embodiment of the present invention;
Fig. 5 is the pipeline arrangement schematic diagram of gas injection well in the embodiment of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Fig. 1 is a kind of schematic diagram of refuse landfill gas barrier arragement construction of the embodiment of the present invention, Fig. 2 Fig. 1 Schematic top plan view, in conjunction with Fig. 1 and Fig. 2, which includes extraction well 2 and gas injection well 3, wherein extraction well 2 is set It is equipped with multiple, multiple extraction wells 2 are in first straight line;Gas injection well 3 is also equipped with multiple, and it is straight that multiple gas injection wells 3 are in second On line, first straight line and first straight line are successively arranged far from cleaning area 1.
The setting of extraction well 2, can be by the portion of methane in cleaning area 1 and close to cleaning area 1 in 1 periphery of cleaning area Interior methane is collected and controls, so that the methane of non-cleaning area collects to greatest extent, prevents methane from flowing into clear Manage region.
The setting of gas injection well 3 is in 2 periphery of extraction well, the methane hair after injecting air, around the oxygen and gas injection well 3 in air Biochemical reaction achievees the purpose that reduce methane, while the methane for being also possible to prevent higher concentration flows into extraction well 2, prevents The methane and oxygen collected in extraction well 2 are mixed explosion accident.
In the embodiment of the present invention, the distance between 1 boundary of first straight line and cleaning area be equal to or less than first straight line and The distance between second straight line, and the distance is usually no more than 10m, can reduce the operation intensity of blower in this way, saves operation Cost.
Further, in the embodiment of the present invention, the extraction well 2 in first straight line and the gas injection well in second straight line 3 are best Interlaced arrangement, it is preferable that two gas injections adjacent with the extraction well 2 on the extraction well 2 and second straight line in first straight line Well 3, arrangement in equilateral triangle, the gas that this distribution method can be controlled to greatest extent in 2 near zone of extraction well pass through pumping Gas well is collected, and is reduced gas injection well 3 and flowed into cleaning area with the methane of exterior domain.
In the embodiment of the present invention, the aperture of extraction well 2 and gas injection well 3 generally in 110mm-200mm, drills on the ground Afterwards, the high density polyethylene pipe of punching is vertically put into hole, rubble is inserted around pipe.The upper end of pipe shaft should be higher than that ground surface 1m Left and right.
Fig. 3 is the arrangement schematic diagram of monitoring well, and the intermediate region of two adjacent extraction wells 2 is the weaker area of Extracting Ability Domain, therefore, in conjunction with Fig. 5, between two extraction wells 2 adjacent in first straight line of the embodiment of the present invention there are three spaced sets Monitoring well 8, is provided with gas concentration detector in each monitoring well 8, during fan operation, needs to the gas in monitoring well 8 Bulk concentration is monitored, and when the methane concentration in monitoring well is higher than 5%, should suitably increase pumping intensity, until in monitoring well Methane concentration be lower than 5%.
In the embodiment of the present invention, gas concentration detector generally selects online gas concentration analyzer (sucking rate 0.8- 1L/min, model: TY-6020P).Certainly, gas concentration detector can also be selected as other models, the embodiment of the present invention pair This is with no restriction.
Fig. 4 is the pipeline arrangement schematic diagram of extraction well in the embodiment of the present invention, in conjunction with Fig. 4, the embodiment of the invention also includes Multiple first branch pipes 4 and first general pipeline 5, the first branch pipe 4 and extraction well 2 are correspondingly arranged, one end of the first branch pipe 4 with it is corresponding Extraction well 2 upper end connection, the other ends of multiple first branch pipes 4 is connected to first general pipeline 5 and the first wind on the first general pipeline 5 Machine connection is discharged by the gas that the first blower is extracted extraction well 2.
Fig. 5 is the pipeline arrangement schematic diagram of gas injection well in the embodiment of the present invention, in conjunction with Fig. 5, the embodiment of the invention also includes Multiple second branch pipes 6 and second general pipeline 7, the second branch pipe 6 and gas injection well 3 are correspondingly arranged, one end of the second branch pipe 6 with it is corresponding Gas injection well 3 upper end connection, the other ends of multiple second branch pipes 6 is connected to second general pipeline 7 and the second wind on the second general pipeline 7 Machine connection, is injected air into the junk-heap body near cleaning area by the second blower.
In the embodiment of the present invention, the pipeline that extraction well 2 and gas injection well 3 are connected to various blowers is total more using one The arrangement of branch can optimize pipeline arrangement, and save connection pipeline used.
In the embodiment of the present invention, extraction well 2 can be connected with the branch pipe connected to it of gas injection well 3 by way of hot melt, It is of course also possible to by other means, such as bump joint etc., the embodiment of the present invention to this with no restriction.
In the embodiment of the present invention, the flow proportional of the first blower and the second blower is arranged according to 1.5:1~1.2:1, flow Value can be designed according to field condition, and flow increases with the increase of the distance between extraction well and gas injection well.
Further, in the embodiment of the present invention, sample tap can be set on the first general pipeline 5, gas concentration is supervised It surveys, to obtain gas concentration.Due to the mixed gas that the gas collected in extraction well is methane and oxygen, the first fan operation phase Between, the methane concentration in the first general pipeline should be kept to be maintained at 10% hereinafter, can avoid explosion accident.
When the sample tap on the first general pipeline 5 detects methane concentration lower than 5%, can construct to cleaning area, when When detecting that methane concentration continues 3 days lower than 2%, the operation intensity of gas injection blower can be suitably reduced, saves operating cost.
After the completion of the rubbish cleaning in extraction well and gas injection well cleaning area, the gas injection well and extraction well can be successively closed Corresponding control valve dismantles corresponding pipeline, and can continue drilling well-digging excavating neighboring area along route, and will disassembly Pipeline move to new perforated area and installed, use can be re-started after installation.It dismantles the quantity of gas well and reinstalls Quantity can be adjusted according to construction speed.
As a kind of deformation of above-described embodiment, the embodiment of the present invention is also provided with another refuse landfill and is hindered with gas It is every the difference of arragement construction, the barrier structure and above-described embodiment, multiple extraction wells are on first lap, multiple gas injection wells On the second circle, i.e., first lap setting is between the second circle and cleaning area.Making this change is based on cleaning area institute Construction environment setting, i.e., the embodiment of the present invention can be based on above-mentioned design philosophy, and according to specific construction environment into Row flexible setting, is not influenced by orographic condition.
Based on above-mentioned thought, the embodiment of the invention also provides a kind of refuse landfill gas barrier method, the sides Method is carried out using above-mentioned barrier arragement construction, this method comprises:
Extraction well and gas injection well are arranged on the junk-heap body on the outside of cleaning area;
Air is injected into junk-heap body using gas injection well, methane passes through extraction well in the air and cleaning area of injection It draws the oxygen to extraction well, in air to chemically react with methane, to reduce the methane in cleaning area.
In the embodiment of the present invention, since gas injection well and extraction well can carry out flexible design according to the landform of landfill yard, not by The influence of orographic condition, and gas injection well and extraction well are reusable, will not cause secondary pollution to landfill yard place, because This, has the characteristics that construction technology is simple, time-consuming short, at low cost and easy to maintain.
Following illustrated embodiment is better embodiment of the invention, only is used to facilitate to illustrate the present invention, not to this hair The bright limitation made under any form has usually intellectual in any technical field, if not departing from the proposed skill of the present invention In the range of art feature, using the equivalent embodiment for locally changing or modifying made by disclosed technology contents, and Without departing from technical feature content of the invention, in the range of still falling within the technology of the present invention feature.

Claims (10)

1.一种垃圾填埋场用气体阻隔布置结构,其特征在于,所述阻隔布置结构包括抽气井以及注气井,其中:1. A gas barrier arrangement structure for a landfill, wherein the barrier arrangement structure comprises a gas extraction well and a gas injection well, wherein: 所述抽气井设置有多个,多个所述抽气井处于第一直线上;A plurality of the gas extraction wells are provided, and the plurality of the gas extraction wells are located on a first straight line; 所述注气井也设置有多个,多个所述注气井处于第二直线上;There are also a plurality of gas injection wells, and the plurality of gas injection wells are located on the second straight line; 所述第一直线和所述第一直线依次远离清理区域设置。The first straight line and the first straight line are disposed away from the cleaning area in sequence. 2.根据权利要求1所述的垃圾填埋场用气体阻隔布置结构,其特征在于,所述第一直线和所述清理区域边界之间的距离等于或小于所述第一直线和所述第二直线之间的距离。2. The gas barrier arrangement structure for landfills according to claim 1, wherein the distance between the first straight line and the boundary of the cleaning area is equal to or smaller than the first straight line and the the distance between the second straight lines. 3.根据权利要求2所述的垃圾填埋场用气体阻隔布置结构,其特征在于,所述第一直线和所述清理区域边界之间的距离、所述第一直线和所述第二直线之间的距离不超过10m。3 . The gas barrier arrangement structure for landfills according to claim 2 , wherein the distance between the first straight line and the boundary of the cleaning area, the first straight line and the first straight line and the The distance between the two straight lines shall not exceed 10m. 4.根据权利要求2所述的垃圾填埋场用气体阻隔布置结构,其特征在于,所述第一直线上的抽气井和所述第二直线上的注气井交错布置。4 . The gas barrier arrangement structure for a landfill according to claim 2 , wherein the gas extraction wells on the first straight line and the gas injection wells on the second straight line are staggered. 5 . 5.根据权利要求4所述的垃圾填埋场用气体阻隔布置结构,其特征在于,所述第一直线上的一个抽气井和所述第二直线上与所述一个抽气井相邻的两个所述注气井,呈等边三角形布置。5 . The gas barrier arrangement structure for a landfill according to claim 4 , wherein one gas extraction well on the first straight line and a gas extraction well adjacent to the one gas extraction well on the second straight line. 6 . The two gas injection wells are arranged in an equilateral triangle. 6.根据权利要求5所述的垃圾填埋场用气体阻隔布置结构,其特征在于,所述第一直线上相邻的两个抽气井之间等间距设置有三个监测井,每个所述监测井上均设置有气体浓度检测器。6 . The gas barrier arrangement structure for a landfill according to claim 5 , wherein three monitoring wells are arranged at equal intervals between two adjacent gas extraction wells on the first straight line, each of which is equidistant. 7 . The monitoring wells are all provided with gas concentration detectors. 7.根据权利要求1所述的垃圾填埋场用气体阻隔布置结构,其特征在于,还包括多个第一支管和一个第一总管,所述第一支管和所述抽气井对应设置,所述第一支管的一端与对应的所述抽气井的上端连通,多个所述第一支管的另一端连通在所述第一总管上,所述第一总管与第一风机连通。7 . The gas barrier arrangement structure for a landfill according to claim 1 , further comprising a plurality of first branch pipes and a first header pipe, wherein the first branch pipes are correspondingly arranged with the gas extraction wells, so that the One end of the first branch pipe is communicated with the upper end of the corresponding gas extraction well, and the other ends of the plurality of first branch pipes are communicated with the first header pipe, and the first header pipe is communicated with the first fan. 8.根据权利要求1所述的垃圾填埋场用气体阻隔布置结构,其特征在于,还包括多个第二支管和一个第二总管,所述第二支管和所述注气井对应设置,所述第二支管的一端与对应的所述注气井的上端连通,多个所述第二支管的另一端连通在所述第二总管上,所述第二总管与第二风机连通。8 . The gas barrier arrangement structure for a landfill according to claim 1 , further comprising a plurality of second branch pipes and a second header pipe, wherein the second branch pipes are correspondingly arranged with the gas injection wells, so that the One end of the second branch pipe is communicated with the upper end of the corresponding gas injection well, and the other ends of the plurality of second branch pipes are communicated with the second header pipe, and the second header pipe is communicated with the second fan. 9.一种垃圾填埋场用气体阻隔布置结构,其特征在于,所述阻隔布置结构包括抽气井以及注气井,其中:9. A gas barrier arrangement structure for a landfill, wherein the barrier arrangement structure comprises a gas extraction well and a gas injection well, wherein: 所述抽气井设置有多个,多个所述抽气井处于第一圈上;A plurality of the gas extraction wells are provided, and the plurality of the gas extraction wells are located on the first circle; 所述注气井也设置有多个,多个所述注气井处于第二圈上;There are also a plurality of the gas injection wells, and the plurality of the gas injection wells are located on the second circle; 所述第一圈设置在所述第二圈和清理区域之间。The first ring is disposed between the second ring and the cleaning area. 10.一种垃圾填埋场用气体阻隔方法,其特征在于,所述方法是利用权利要求1-9任一项所述的阻隔布置结构进行的,所述方法包括:10. A gas barrier method for a landfill, characterized in that the method is performed using the barrier arrangement according to any one of claims 1-9, the method comprising: 在清理区域外侧的垃圾堆体上布置抽气井以及注气井;Arrange gas extraction wells and gas injection wells on the garbage dump outside the cleaning area; 利用注气井向垃圾堆体中注入空气,注入的空气以及清理区域内甲烷通过抽气井吸取至抽气井,空气中的氧气与甲烷发生化学反应,以降低清理区域内的甲烷。The gas injection well is used to inject air into the garbage dump, and the injected air and the methane in the cleaning area are sucked to the extraction well through the gas extraction well, and the oxygen in the air reacts with the methane to reduce the methane in the cleaning area.
CN201811547689.4A 2018-12-18 2018-12-18 Gas barrier arrangement structure and barrier method for landfill Pending CN109847557A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811547689.4A CN109847557A (en) 2018-12-18 2018-12-18 Gas barrier arrangement structure and barrier method for landfill

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811547689.4A CN109847557A (en) 2018-12-18 2018-12-18 Gas barrier arrangement structure and barrier method for landfill

Publications (1)

Publication Number Publication Date
CN109847557A true CN109847557A (en) 2019-06-07

Family

ID=66891488

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811547689.4A Pending CN109847557A (en) 2018-12-18 2018-12-18 Gas barrier arrangement structure and barrier method for landfill

Country Status (1)

Country Link
CN (1) CN109847557A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110441208A (en) * 2019-08-09 2019-11-12 陈芬娜 A kind of landfill site seepage prevention system tracking and monitoring well and its method for arranging

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6481929B1 (en) * 1998-04-27 2002-11-19 Arcadis Geraghty & Miller Aerobic bioreduction of municipal solid waste landfill mass
CN1644255A (en) * 2005-01-12 2005-07-27 北京煜立晟科技有限公司 Method for rapid degradating solid refuse
CN201644483U (en) * 2010-05-14 2010-11-24 北京紫光泰和通环保技术有限公司 A well layout system for aerobic treatment of landfill
CN103506369A (en) * 2013-09-12 2014-01-15 上海市政工程设计研究总院(集团)有限公司 Landfill gas collection and exhaust guide system of landfill
CN104281124A (en) * 2014-09-09 2015-01-14 武汉凯信达智能科技有限公司 Refuse aerobic degradation monitoring and controlling system and refuse aerobic degradation controlling method for refuse landfill
CN107876539A (en) * 2017-10-17 2018-04-06 南京中电环保工程有限公司 The aerobic Ecosystem restoration system of refuse landfill and method
CN209451626U (en) * 2018-12-18 2019-10-01 中国科学院武汉岩土力学研究所 Gas Barrier Arrangements for Landfills

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6481929B1 (en) * 1998-04-27 2002-11-19 Arcadis Geraghty & Miller Aerobic bioreduction of municipal solid waste landfill mass
CN1644255A (en) * 2005-01-12 2005-07-27 北京煜立晟科技有限公司 Method for rapid degradating solid refuse
CN201644483U (en) * 2010-05-14 2010-11-24 北京紫光泰和通环保技术有限公司 A well layout system for aerobic treatment of landfill
CN103506369A (en) * 2013-09-12 2014-01-15 上海市政工程设计研究总院(集团)有限公司 Landfill gas collection and exhaust guide system of landfill
CN104281124A (en) * 2014-09-09 2015-01-14 武汉凯信达智能科技有限公司 Refuse aerobic degradation monitoring and controlling system and refuse aerobic degradation controlling method for refuse landfill
CN107876539A (en) * 2017-10-17 2018-04-06 南京中电环保工程有限公司 The aerobic Ecosystem restoration system of refuse landfill and method
CN209451626U (en) * 2018-12-18 2019-10-01 中国科学院武汉岩土力学研究所 Gas Barrier Arrangements for Landfills

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110441208A (en) * 2019-08-09 2019-11-12 陈芬娜 A kind of landfill site seepage prevention system tracking and monitoring well and its method for arranging
CN110441208B (en) * 2019-08-09 2020-06-26 乐清市钜派企业管理咨询有限公司 Tracking monitoring well of landfill seepage-proofing system and arrangement method thereof

Similar Documents

Publication Publication Date Title
US10787865B2 (en) In-situ injection of soil and groundwater—high pressure rotary jet grouting in-situ remediation system and method
CN106734167A (en) Strengthen repair system and technique in a kind of organic contamination place
CN104174643B (en) A kind of organic polluted soil and underground water in-situ repairing device and restorative procedure
CN107876539A (en) The aerobic Ecosystem restoration system of refuse landfill and method
CN206382324U (en) Strengthen repair system in a kind of organic contamination place
CN203991656U (en) A kind of organic polluted soil and underground water in-situ repairing device
CN206373157U (en) A kind of showering equipment of organic material contaminated soil
CN106807737A (en) Contaminated soil and underground water biliquid shallow-layer stirring in situ chemical oxidation restorative procedure
US12077459B2 (en) Device and method for mud solidification based on electro-osmosis well points cooperating with well-points dewatering
CN205762951U (en) Soil and subsoil water inject high-pressure rotary-spray injection in-situ remediation system in situ
CN107983761A (en) The method for repairing and constructing of heavy metal and VOCs combined contamination soils
CN106734178A (en) Comprehensive restoration system and method for polluted site
CN102536250A (en) Construction method for tunnels with karst and gas simultaneously
CN114733895B (en) Contaminated soil gas normal position thermal desorption restoration equipment
CN204769817U (en) Simple and easy good oxygen bioreactor processing system of landfill yard
CN109847557A (en) Gas barrier arrangement structure and barrier method for landfill
CN114101278A (en) Intelligent processing method and pretreatment method for excavating stale garbage
CN212349864U (en) Novel permeable reaction wall capable of maintaining underground water in-situ remediation
CN209451626U (en) Gas Barrier Arrangements for Landfills
CN111530911B (en) Novel maintainable groundwater in-situ repair permeable reactive barrier
CN209716043U (en) It is a kind of for underground water and the horizontal reverse Ying Jing of soil remediation
CN108862693A (en) A kind of construction method based on ecology fragility mining area mine water underground purified in situ pond
CN117985891A (en) System and method for treating acidic wastewater source of waste pyrite mountain footrill
CN116677393A (en) Construction method for improving middle partition CD of large-span highway tunnel
CN114232634A (en) Closed garbage excavation system and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190607

RJ01 Rejection of invention patent application after publication