CN109798140A - Km Deep Soft Rock fracture grouting support reinforcement method - Google Patents

Km Deep Soft Rock fracture grouting support reinforcement method Download PDF

Info

Publication number
CN109798140A
CN109798140A CN201910129143.5A CN201910129143A CN109798140A CN 109798140 A CN109798140 A CN 109798140A CN 201910129143 A CN201910129143 A CN 201910129143A CN 109798140 A CN109798140 A CN 109798140A
Authority
CN
China
Prior art keywords
hole
grouting
sealing
anchor
anchor cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910129143.5A
Other languages
Chinese (zh)
Other versions
CN109798140B (en
Inventor
孙海良
李延河
曹其俭
陈泉建
孟庆妮
孙家锐
赵静雅
王占新
赵朋朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NO.6 MINE, PINGDINGSHAN TIANAN COAL MINING Co.,Ltd.
Pingdingshan Tianan Coal Mining Co Ltd
Original Assignee
Sky Table Mountain Peace Coal Industry Ltd Co Six Ore Deposits
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sky Table Mountain Peace Coal Industry Ltd Co Six Ore Deposits filed Critical Sky Table Mountain Peace Coal Industry Ltd Co Six Ore Deposits
Priority to CN201910129143.5A priority Critical patent/CN109798140B/en
Publication of CN109798140A publication Critical patent/CN109798140A/en
Application granted granted Critical
Publication of CN109798140B publication Critical patent/CN109798140B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention belongs to underground coal mine grouting and reinforcing support technology fields under km deep-well large ground pressure to the km Deep Soft Rock fracture grouting support reinforcement method of tunnel progress support reinforcement, including beating note anchor cable, mortar depositing construction, rising and draw anchor cable step, the configuration of the present invention is simple, it is reinforced by crack of the slip casting to initial fissure and excavation disturbance generation in roadway surrounding rock, improves the engineering mechanics performance of roadway surrounding rock;Grouting serous fluid dilation angle can be increased by fracture grouting again, the soft rock of the opposite softening of deep wall rock intensity is set to be solidified into higher " concrete " structure of intensity, a closed powerful bearing structure is formed with superficial part country rock, to play self and support system enabling capabilities to greatest extent;Slip casting simultaneously provides stable supporting course also for combination of steel rope, and force-bearing of surrounding rock mass state can be changed by carrying out radial pressure provided by tensioning to combination of steel rope, adjoining rock stability creep compliance is improved, so that it is guaranteed that roadway surrounding rock is steady in a long-term.

Description

Km Deep Soft Rock fracture grouting support reinforcement method
Technical field
The invention belongs to underground coal mine grouting and reinforcing support technology field, more particularly to it is a kind of mine, tunnel, building, The engineerings such as waterpower carry out the km of support reinforcement using slip casting corollary equipment under km deep-well large ground pressure to tunnel Deep Soft Rock fracture grouting support reinforcement method.
Background technique
Constantly extend as pit mining is horizontal, strata behaviors are more obvious.Using the method for grouting and reinforcing supporting Effective solution roadway support issues.For km deep-well tunnel, since deep wall rock compression strength is relative to high-ground stress Aobvious is very weak, and bad hydraulic permeability.Slurry injection technique is difficult to reach ideal effect at present.In addition it is influenced by high-ground stress, lane Road driving grouting behind shaft or drift lining can only reinforce superficial part rock stratum, and high-ground stress is not resisted after reinforcing, and crack occurs in deep rock stratum, pine Moving-coil increases with it, surrounding rock structure unstability.
Summary of the invention
It is provided a kind of logical using high-pressure slip-casting technique it is an object of the invention to overcome the deficiencies in the prior art Fracture grouting reinforcement means is crossed, cement or chemical grout etc. are injected into rock stratum, split with improving the km Deep Soft Rock of nature of ground Grouting and reinforcing method for protecting support is split, during slip casting, the slurries of Grouting Pipe outlet are applied with additional compression to surrounding rock mass, make Plastic yielding shearing crack occurs for rock mass, and elder generation is carried out splitting flowing along Weak face by slurries, by the low place of rock mass strength The place high to intensity squeezes, permeates, and as grouting pressure increases, so that the crack in rock mass is widened or generate new crack, splits Enter slurry diffusion, the gelling in rock mass, the soft rock of the opposite softening of intensity is solidified into higher " concrete " structure of intensity, and fill Wall-rock crack makes original Rockmass fractures, hole be filled and be squeezed, and improves rock mass density, improves rock mass physical and mechanics Property and the property infused of rock stratum increase rock mass globality, the purpose of consolidation grouting are played, so as to effectively control rock mass It deforms and stablizes.
The object of the present invention is achieved like this:
A kind of km Deep Soft Rock fracture grouting support reinforcement method, including beat note anchor cable, mortar depositing construction, rise and draw anchor cable step, It is characterized by:
Note anchor cable is played to include the following steps:
Step 1) first is providing to beat in anchor cable section, finishes anchor cable eye according to array pitch position between designing in cable bolting cross-section diagram Position;
First site clearing sundries is answered before step 2, anchor cable construction, it is ensured that the route of retreat is unimpeded;
Step 3), grouting cable anchor hole are drilled using ZDY2300LX coal mine with crawler type hydraulic drilling rig, are punched by design requirement, hole Diameter is 75mm, and hole depth must not be less than 15500mm;
Step 4) installs combination of steel rope in grouting cable anchor hole, and after combination of steel rope installation, hole sealing device can after solidifying 48 hours Slip casting;
2400 × 2400mm of array pitch between step 5), slip casting combination of steel rope;
Mortar depositing construction includes the following steps:
Step 1), high-pressure slip-casting anchor cable line strength have to comply with requirement, and pipeline is intact, cannot reveal;
After step 2, preparation, grouting pump is started, prepared cement mortar is passed through into Grouting Pipe with high-pressure slip-casting pipe The slip casting into drilling blocks gas-guide tube after gas-guide tube plasma discharge;Slip casting is turned out after gas-guide tube plasma discharge in injected hole It fills;The ratio of mud according to weight ratio water's cement mortar is 1:0.8~1:1, and cement uses P.O42.5 grades of fresh portland cements, ACZ-1 additive level is the 8% of cement grout weight;
Grouting pressure controls between 8Mpa-10Mpa;
Step 3) finally continues slip casting to design pressure, as grouting pressure increases, split slurry diffusion in rock mass, gelling, Solidification fills wall-rock crack;
Rise and anchor cable is drawn to include the following steps:
Drawing of rising is carried out by root to combination grouting cable anchor after 10 days, rises and wants the hole in first levelling grouting cable anchor hole when anchor disk is installed before drawing Mouthful, anchorage is installed, jack is then put on and carries out drawing of rising, drawing of rising will recycle drawing of rising by stock group, and single anchor cable rises by tensile strength not It obtains and is less than 100KN.
The combination of steel rope installed in grouting cable anchor hole is a kind of combination of steel rope of at least three sections anchor cable structures, Three sealing of hole corks are at least installed on anchor cable, wherein being provided with blocking iron ring on the anchor cable in the middle part of grouting cable anchor hole, are being hindered It is set with inner sealing of hole cork on the subsequent anchor cable of buting iron circle, is set with inner sealing of hole hard tube on the inner subsequent anchor cable of sealing of hole cork, Slurry outlet is uniformly provided on the anchor cable for stopping iron ring front, the tail portion of inner sealing of hole hard tube has convex edge, at the convex edge It is set with intermediate sealing of hole cork on anchor cable, intermediate sealing of hole hard tube, centre envelope are set on the anchor cable at intermediate sealing of hole cork rear portion The tail portion of hole hard tube is set with outer sealing of hole cork with convex edge on the anchor cable at the convex edge, and outer sealing of hole cork is in slip casting At anchor cable hole aperture, it is set with outer sealing of hole hard tube on the outer subsequent anchor cable of sealing of hole cork, in inner sealing of hole cork and intermediate sealing of hole Slip casting hose, the grouting cable anchor hole between intermediate sealing of hole cork and outer sealing of hole cork are laid in grouting cable anchor hole between cork In be laid with sealing grouting hose, inner sealing of hole cork, inner sealing of hole hard tube, intermediate sealing of hole cork, intermediate sealing of hole hard tube, outer sealing of hole are soft Plug, outer sealing of hole hard tube cover after being shifted on respective position on anchor cable, install anchor cable disk and rigging;Slip casting hose and sealing grouting are soft Pipe is passed through from two slip casting hose ports on anchor cable disk, avoids anchor cable disk that slip casting hose and sealing grouting hose are squeezed flat;Upper It states in operating process, first passes through the bore portions slip casting that sealing grouting hose carries out grouting cable anchor hole, cement grout is in pressure Lower bore portions and the surrounding crack, joint and gap that grouting cable anchor hole is injected by sealing grouting hose of effect, is protected The slip casting plugging strength of card outside and aperture, outer sealing of hole cork, intermediate sealing of hole cork and cement slurry collective effect, drills anchor cable Aperture and aperture and the space of anchor cable block tightly, guarantee that cement grout seals crack, joint, gap around anchor cable drilling orifice It is not in spillage phenomenon when deep hole high-pressure slip-casting after stifled tight;Then pass through slip casting hose again for inner sealing of hole cork and centre The drilling shallow bore hole space of anchor cable carries out slip casting between sealing of hole cork, and Shallow hole grouting pressure is lower, can after Shallow hole grouting blocks tightly Be not in spillage phenomenon to guarantee that deep hole grouting reaches higher pressure, while guaranteeing that deep hole grouting reaches and splitting in rock mass Slurry diffusion, gelling, solidification, fill wall-rock crack;Deep hole grouting is by hollow anchor rope grouting, and by thereon uniformly For the slurry outlet opened up come what is completed, deep hole grouting pressure is higher, and only deep hole grouting, which reaches higher pressure, just can guarantee cement Slurries diffuse to bigger range, and cement grout better filling fracture, compacted country rock, improves reinforcing work at network skeleton Industry, to improve the globality and self-bearing capacity of country rock.
The present invention has following good effect: the configuration of the present invention is simple, by slip casting to the initial fissure in roadway surrounding rock And the crack that excavation disturbance generates is reinforced, and the engineering mechanics performance of roadway surrounding rock is improved;It can be increased again by fracture grouting Grouting serous fluid dilation angle makes the soft rock of the opposite softening of deep wall rock intensity be solidified into higher " concrete " structure of intensity, with superficial part Country rock forms a closed powerful bearing structure, to play self and support system support energy to greatest extent Power;Slip casting simultaneously provides stable supporting course also for combination of steel rope, carries out radial pressure provided by tensioning to combination of steel rope Force-bearing of surrounding rock mass state can be changed, adjoining rock stability creep compliance is improved, so that it is guaranteed that roadway surrounding rock is steady in a long-term.
Detailed description of the invention
Fig. 1 is fracture grouting schematic diagram of the invention.
Fig. 2 is mortar depositing construction structural schematic diagram of the invention.
Fig. 3 is the combination of steel rope structural representation installed in grouting cable anchor hole in the horizontal direction in mortar depositing construction of the invention Figure.
Specific embodiment
As shown in Figure 1, 2, a kind of km Deep Soft Rock fracture grouting support reinforcement method, including beat, infuse anchor cable, slip casting is applied Work rises and draws the processes such as anchor cable, in which:
1, note anchor cable is played to include the following steps:
Step 1) first is providing to beat in anchor cable section, finishes anchor cable eye according to array pitch position between designing in cable bolting cross-section diagram Position;
First site clearing sundries is answered before step 2, anchor cable construction, it is ensured that the route of retreat is unimpeded;
Step 3), grouting cable anchor hole 17 are drilled using ZDY2300LX coal mine with crawler type hydraulic drilling rig, are punched by design requirement, Aperture is 75mm, and hole depth must not be less than 15500mm;
Step 4) installs combination of steel rope 12 in grouting cable anchor hole 16, after combination of steel rope installation, after hole sealing device solidifies 48 hours It can deep hole grouting;
2400 × 2400mm of array pitch between step 5), slip casting combination of steel rope;
2, mortar depositing construction includes the following steps:
Step 1), high-pressure slip-casting anchor cable line strength have to comply with requirement, and pipeline is intact, cannot reveal;
After step 2, preparation, grouting pump 5 is started, with high-pressure slip-casting pipe and high pressure valve 6 by prepared cement mortar The slip casting into deep hole by Grouting Pipe, blocks gas-guide tube after gas-guide tube plasma discharge;Slip casting is turned out after gas-guide tube plasma discharge to infuse It is already filled in slurry deep hole;The ratio of mud according to weight ratio water's cement mortar is 1:0.8~1:1, and cement is new using P.O42.5 grades Fresh portland cement, ACZ-1 additive level are the 8% of cement grout weight;Grouting pressure controls between 8Mpa-10Mpa;
Step 3) finally continues deep hole grouting to design pressure, as grouting pressure increases, split slurry diffusion in rock mass, Gelling, solidification, fill wall-rock crack;
3, rising draws anchor cable to include the following steps:
Drawing of rising is carried out by root to combination grouting cable anchor after 10 days, rises and wants the hole in first levelling grouting cable anchor hole when anchor disk is installed before drawing Mouthful, anchorage is installed, jack is then put on and carries out drawing of rising, drawing of rising will recycle drawing of rising by stock group, and single anchor cable rises by tensile strength not It obtains and is less than 100KN.
Before above-mentioned deep hole grouting, the combination of steel rope installed in grouting cable anchor hole is a kind of at least three sections of anchors The combination of steel rope of Cable Structure is at least equipped with three sealing of hole corks on anchor cable, wherein on the anchor cable in the middle part of grouting cable anchor hole It is provided with blocking iron ring, inner sealing of hole cork is set on stopping the subsequent anchor cable of iron ring, in the inner subsequent anchor cable of sealing of hole cork On be set with inner sealing of hole hard tube, stop iron ring front hollow anchor cable on be uniformly provided with slurry outlet, inner sealing of hole hard tube Tail portion has convex edge, intermediate sealing of hole cork is set on the anchor cable at the convex edge, on the anchor cable at intermediate sealing of hole cork rear portion It is set with intermediate sealing of hole hard tube, the tail portion of intermediate sealing of hole hard tube is set with covering on the anchor cable at the convex edge with convex edge Hole cork, outer sealing of hole cork are at the aperture of grouting cable anchor hole, and it is hard to be set with outer sealing of hole on the outer subsequent anchor cable of sealing of hole cork Pipe, is laid with slip casting hose in the grouting cable anchor hole between inner sealing of hole cork and intermediate sealing of hole cork, intermediate sealing of hole cork with Sealing grouting hose, inner sealing of hole cork, inner sealing of hole hard tube, intermediate sealing of hole are laid in grouting cable anchor hole between outer sealing of hole cork Cork, intermediate sealing of hole hard tube, outer sealing of hole cork, outer sealing of hole hard tube cover after being shifted on respective position on anchor cable, install anchor cable disk And rigging;Slip casting hose and sealing grouting hose are passed through from two slip casting hose ports on anchor cable disk, avoid anchor cable disk slip casting Hose and sealing grouting hose squeeze flat;During aforesaid operations, the hole that sealing grouting hose carries out grouting cable anchor hole is first passed through Oral area dispensing slurry, cement grout pass through under the effect of the pressure sealing grouting hose be injected into grouting cable anchor hole bore portions and Surrounding crack, joint and gap guarantee external and aperture slip casting plugging strength, outer sealing of hole cork, intermediate sealing of hole cork With cement slurry collective effect, anchor cable drilling orifice and aperture and the space of anchor cable are blocked tightly, guarantee cement grout anchor cable Crack around drilling orifice, joint, gap block it is tight after, be not in spillage phenomenon when deep hole high-pressure slip-casting;Then lead to again It crosses slip casting hose and the drilling shallow bore hole space of anchor cable between inner sealing of hole cork and intermediate sealing of hole cork is subjected to slip casting, Shallow hole grouting pressure Power is lower, after Shallow hole grouting blocks tightly, it is ensured that it is not in spillage phenomenon that deep hole grouting, which reaches higher pressure, simultaneously Guarantee that deep hole grouting reaches slurry diffusion, gelling, the solidification split in rock mass, fills wall-rock crack, above-mentioned sealing of hole and shallow bore hole note Slurry is for guaranteeing the splitting of deep hole grouting;Deep hole grouting is by hollow anchor rope grouting, and by uniformly opening thereon If slurry outlet come what is completed, deep hole grouting pressure is higher, and only deep hole grouting, which reaches higher pressure, just can guarantee cement slurry Liquid diffuses to bigger range, and cement grout better filling fracture, compacted country rock, improves reinforcing operation at network skeleton, To improve the globality and self-bearing capacity of country rock.
The fracture grouting reinforcement means of final step uses high-pressure slip-casting technique, and cement or chemical grout etc. are injected rock Layer, to improve nature of ground.During slip casting, the slurries of Grouting Pipe outlet are applied with additional compression to surrounding rock mass, make Plastic yielding shearing crack occurs for rock mass, and elder generation is carried out splitting flowing along Weak face by slurries, by the low place of rock mass strength The place high to intensity squeezes, permeates.As grouting pressure increases, the crack in rock mass is made to widen or generate new crack.It splits Enter slurry diffusion, the gelling in rock mass, the soft rock of the opposite softening of intensity is solidified into higher " concrete " structure of intensity, and fill Wall-rock crack makes original Rockmass fractures, hole be filled and be squeezed, and improves rock mass density, improves rock mass physical and mechanics Property and the property infused of rock stratum increase rock mass globality, the purpose of consolidation grouting are played, so as to effectively control rock mass It deforms and stablizes.
Concrete construction method is as follows:
One, it beats, infuse anchor cable:
(1) first beaten in anchor cable section in regulation, finish anchor cable eye position according to array pitch position between designing in cable bolting cross-section diagram.
(2) first site clearing sundries is answered before anchor cable construction, it is ensured that the route of retreat is unimpeded.
(3) grouting cable anchor hole is drilled using ZDY2300LX coal mine with crawler type hydraulic drilling rig, is punched by design requirement, hole Diameter is 75mm, and hole depth must not be less than 15500mm;
(4) after combination of steel rope installation, hole sealing device can slip casting after solidifying 48 hours.
(5) 2400 × 2400mm of array pitch between slip casting combination of steel rope.
Two, mortar depositing construction (attached drawing 2):
(1) high-pressure slip-casting anchor cable line strength has to comply with requirement, and pipeline is intact, cannot reveal.
(2) after preparation, grouting pump (ZBYSB50/18-7.5) is started with high-pressure slip-casting pipe by prepared water Cement mortar is blocked gas-guide tube after gas-guide tube plasma discharge by Grouting Pipe slip casting into drilling;Note is turned out after gas-guide tube plasma discharge Slurry is already filled in injected hole.
(3) finally continue slip casting to design pressure, as grouting pressure increases, split slurry diffusion in rock mass, gelling, Solidification fills wall-rock crack.
(4) the ratio of mud of cement grout is 1:0.8~1:1(weight ratio), cement uses P.O42.5 grades of fresh silicate cements Mud, ACZ-1 additive level are the 8% of cement grout weight.
(5) grouting pressure control is between 8Mpa-10Mpa.
Three, rise and draw anchor cable: drawing of rising being carried out by root to combination grouting cable anchor after 10 days, rise first levelling when anchor disk is installed before drawing Aperture, installation and anchorage, then put on jack and carry out drawing of rising, and drawing of rising will recycle drawing of rising by stock group, and single anchor cable, which rises, to be drawn by force Degree cannot be less than 100KN.
As shown in Fig. 2, cement 1 and water 2 become cement grout 20, the cement grout 20 of finished product by the stirring of blender 3 It is contained in cement slurry bucket 4, the ratio of mud according to weight ratio water's slurry liquid is 1:0.8~1:1, and cement is new using P.O42.5 grades Fresh portland cement, ACZ-1 additive level are the 8% of cement grout weight;Cement grout 20 passes through grouting pump 5, high pressure valve 6, pressure valve 7 and grout pipe line 8 enter in mixer 9, and mixer 9 passes through mixing feed pipe for mortar 10 and relief valve 11, high pressure valve 6, cement grout is driven into grouting cable anchor hole 16 by pressure gauge 7.The group of 3 diameter 22mm is installed in grouting cable anchor hole 16 Anchor cable 12 is closed, after combination of steel rope installation, hole sealing device 13 can deep hole grouting after solidifying 48 hours;Fracture grouting reinforcement means is adopted With high pressure deep hole grouting technique, cement or chemical grout etc. are injected into rock stratum, to improve nature of ground.During slip casting, note The cement grout 20 of slurry pipe outlet is applied with additional compression to surrounding rock mass, makes rock mass that plastic yielding shearing crack occur, and Elder generation is carried out splitting flowing along Weak face by slurries, and the place low from rock mass strength squeezes to the high place of intensity, permeates, infiltration The slurries 19 of infiltration increase with grouting pressure, and the crack in rock mass is made to widen or generate new crack 18, form splitting surface 17. Slurry diffusion, the gelling in rock mass are split, the soft rock of the opposite softening of intensity is solidified into higher " concrete " structure of intensity, Er Qiechong Wall-rock crack is filled out, original Rockmass fractures, hole is made to be filled and be squeezed, improves rock mass density, improves rock mass physical and power The property infused of property and rock stratum is learned, increases rock mass globality, the purpose of consolidation grouting is played, so as to effectively control rock mass Deformation and stabilization.It starts grouting pump 5 and prepared cement mortar is passed through into mixing feed pipe for mortar 10 to drilling with grout pipe line 8 (grouting cable anchor hole 16) interior slip casting, blocks gas-guide tube after 15 plasma discharge of gas-guide tube;Slip casting is turned out after gas-guide tube plasma discharge to infuse Slurry is already filled in hole.Finally continue slip casting to design pressure, as grouting pressure increases, split slurry diffusion in rock mass, Gelling, solidification, fill wall-rock crack.
The combination of steel rope 12 installed in grouting cable anchor hole 16 is a kind of combination anchor of at least three sections anchor cable structures Rope is at least equipped with three sealing of hole corks 14 on anchor cable, wherein being provided with blocking iron on the anchor cable in the middle part of grouting cable anchor hole Circle is set with inner sealing of hole cork on stopping the subsequent anchor cable of iron ring, is set with inner envelope on the inner subsequent anchor cable of sealing of hole cork Hole hard tube is uniformly provided with slurry outlet on the anchor cable for stopping iron ring front, and the tail portion of inner sealing of hole hard tube has convex edge, convex at this It is set with intermediate sealing of hole cork on anchor cable at, intermediate sealing of hole hard tube is set on the anchor cable at intermediate sealing of hole cork rear portion, The tail portion of intermediate sealing of hole hard tube is set with outer sealing of hole cork with convex edge on the anchor cable at the convex edge, at outer sealing of hole cork At the aperture of grouting cable anchor hole, it is set with outer sealing of hole hard tube on the outer subsequent anchor cable of sealing of hole cork, in inner sealing of hole cork in Between be laid with slip casting hose, the slip casting between intermediate sealing of hole cork and outer sealing of hole cork in grouting cable anchor hole between sealing of hole cork It is laid with sealing grouting hose in anchor cable hole, it is inner sealing of hole cork, inner sealing of hole hard tube, intermediate sealing of hole cork, intermediate sealing of hole hard tube, outer Sealing of hole cork, outer sealing of hole hard tube cover after being shifted on respective position on anchor cable, install anchor cable disk and rigging;Slip casting hose and sealing Slip casting hose is passed through from two slip casting hose ports on anchor cable disk, avoids anchor cable disk that slip casting hose and sealing grouting hose are squeezed It is flat;During aforesaid operations, the bore portions slip casting that sealing grouting hose carries out grouting cable anchor hole is first passed through, cement grout exists Bore portions and the surrounding crack, joint and sky in grouting cable anchor hole are injected under the action of pressure by sealing grouting hose Gap guarantees external and aperture slip casting plugging strength, outer sealing of hole cork, intermediate sealing of hole cork and cement slurry collective effect, anchor Rope drilling orifice and aperture and the space of anchor cable block it is tight, guarantee cement grout crack around anchor cable drilling orifice, joint, Gap block it is tight after, be not in spillage phenomenon when deep hole high-pressure slip-casting;Then pass through slip casting hose again for inner sealing of hole cork The drilling shallow bore hole space of anchor cable carries out slip casting between intermediate sealing of hole cork, and Shallow hole grouting pressure is lower, and Shallow hole grouting blocks tight After close, it is ensured that it is not in spillage phenomenon that deep hole grouting, which reaches higher pressure, while guarantee deep hole grouting reach split into Slurry diffusion, gelling, solidification in rock mass, fill wall-rock crack;Deep hole grouting and is passed through by hollow anchor rope grouting For the slurry outlet uniformly opened up thereon come what is completed, deep hole grouting pressure is higher, and only deep hole grouting reaches higher pressure ability Guarantee that cement grout diffuses to bigger range, cement grout better filling fracture, compacted country rock, is improved and mended network skeleton Strong reinforcement operation, to improve the globality and self-bearing capacity of country rock.
The combination of steel rope is by stopping iron ring to combine three anchor cables, and specific structure is to stop iron ring On side by side direction (horizontal direction) open up there are three installation anchor cable anchor cable fixation hole or stop iron ring on vertical direction (hang down Histogram to) set there are three the anchor cable fixation hole of installation anchor cable or opened up on stopping iron ring on apex angle in equilateral triangle There are three the anchor cable fixation holes of installation anchor cable, and three anchor cables are installed in the anchor cable fixation hole for stopping iron ring.On every anchor cable It is set with sealing of hole hard tube.
As shown in figure 3, horizontal direction is opened up there are three the anchor cable fixation hole of installation anchor cable on stopping iron ring, stopping iron Three anchor cables are installed in the anchor cable fixation hole of circle.The combination of steel rope 12 installed in the hole of grouting cable anchor in the horizontal direction is one The combination of steel rope of at least three sections anchor cable structures of kind, is at least equipped with three sealing of hole corks, wherein in grouting cable anchor hole on anchor cable It is provided on the anchor cable at middle part and stops iron ring 21, inner sealing of hole cork 22 is set on stopping the subsequent anchor cable of iron ring 21, inner It is set with inner sealing of hole hard tube 23 on the subsequent anchor cable of sealing of hole cork 22, is uniformly provided with out on the anchor cable for stopping 21 front of iron ring Hole 24 is starched, the tail portion of inner sealing of hole hard tube 23 has convex edge 25, is set with intermediate sealing of hole cork 26 on the anchor cable at the convex edge 25, Intermediate sealing of hole hard tube 27 is set on the anchor cable at intermediate 26 rear portion of sealing of hole cork, the tail portion of intermediate sealing of hole hard tube 27 is with convex Along 28, outer sealing of hole cork 29 is set on the anchor cable at the convex edge, outer sealing of hole cork is at the aperture of grouting cable anchor hole, outside Outer sealing of hole hard tube 30 is set on the subsequent anchor cable of sealing of hole cork, the note between inner sealing of hole cork 22 and intermediate sealing of hole cork 26 It is laid with slip casting hose 31 in slurry anchor cable hole, is laid in the grouting cable anchor hole between intermediate sealing of hole cork 26 and outer sealing of hole cork 29 There are sealing grouting hose 32, inner sealing of hole cork 22, inner sealing of hole hard tube 23, intermediate sealing of hole cork 26, intermediate sealing of hole hard tube 27, covering After hole cork 29,30 sets of outer sealing of hole hard tube are shifted on anchor cable on respective position, anchor cable disk 33 and rigging 34 are installed;Slip casting hose It is passed through with sealing grouting hose from two slip casting hose ports 35 on anchor cable disk, avoids anchor cable disk slip casting hose and sealing grouting Hose squeezes flat;During aforesaid operations, the bore portions slip casting that sealing grouting hose carries out grouting cable anchor hole, cement are first passed through Slurries pass through bore portions and the surrounding crack, section that sealing grouting hose is injected into grouting cable anchor hole under the effect of the pressure Reason and gap guarantee that external and aperture slip casting plugging strength, outer sealing of hole cork, intermediate sealing of hole cork and cement slurry are made jointly With anchor cable drilling orifice and aperture and the space of anchor cable being blocked tight, guarantee cement grout splitting around anchor cable drilling orifice Gap, joint, gap block it is tight after, be not in spillage phenomenon when deep hole high-pressure slip-casting;Then again by slip casting hose will in The drilling shallow bore hole space of anchor cable carries out slip casting between sealing of hole cork and intermediate sealing of hole cork, and Shallow hole grouting pressure is lower, shallow bore hole note After slurry blocks tightly, it is ensured that it is not in spillage phenomenon that deep hole grouting, which reaches higher pressure, while guaranteeing deep hole grouting Reach slurry diffusion, gelling, the solidification split in rock mass, fills wall-rock crack;Deep hole grouting is by infusing to hollow anchor cable Slurry, and the slurry outlet by uniformly opening up thereon, come what is completed, deep hole grouting pressure is higher, and only deep hole grouting reaches higher Pressure just can guarantee that cement grout diffuses to bigger range, and cement grout better filling fracture, compacted encloses network skeleton Rock improves reinforcing operation, to improve the globality and self-bearing capacity of country rock.

Claims (2)

1. a kind of km Deep Soft Rock fracture grouting support reinforcement method, including beat note anchor cable, mortar depositing construction, rise and anchor cable is drawn to walk Suddenly, it is characterised in that:
Note anchor cable is played to include the following steps:
Step 1) first is providing to beat in anchor cable section, finishes anchor cable eye according to array pitch position between designing in cable bolting cross-section diagram Position;
First site clearing sundries is answered before step 2, anchor cable construction, it is ensured that the route of retreat is unimpeded;
Step 3), grouting cable anchor hole are drilled using ZDY2300LX coal mine with crawler type hydraulic drilling rig, are punched by design requirement, hole Diameter is 75mm, and hole depth must not be less than 15500mm;
Step 4) installs combination of steel rope in grouting cable anchor hole, and after combination of steel rope installation, hole sealing device can after solidifying 48 hours Slip casting;
2400 × 2400mm of array pitch between step 5), slip casting combination of steel rope;
Mortar depositing construction includes the following steps:
Step 1), high-pressure slip-casting anchor cable line strength have to comply with requirement, and pipeline is intact, cannot reveal;
After step 2, preparation, grouting pump is started, prepared cement mortar is passed through into Grouting Pipe with high-pressure slip-casting pipe The slip casting into drilling blocks gas-guide tube after gas-guide tube plasma discharge;Slip casting is turned out after gas-guide tube plasma discharge in injected hole It fills;The ratio of mud according to weight ratio water's cement mortar is 1:0.8~1:1, and cement uses P.O42.5 grades of fresh portland cements, ACZ-1 additive level is the 8% of cement grout weight;Grouting pressure controls between 8Mpa-10Mpa;
Step 3) finally continues slip casting to design pressure, as grouting pressure increases, split slurry diffusion in rock mass, gelling, Solidification fills wall-rock crack;
Rise and anchor cable is drawn to include the following steps:
Drawing of rising is carried out by root to combination grouting cable anchor after 10 days, rises and wants the hole in first levelling grouting cable anchor hole when anchor disk is installed before drawing Mouthful, anchorage is installed, jack is then put on and carries out drawing of rising, drawing of rising will recycle drawing of rising by stock group, and single anchor cable rises by tensile strength not It obtains and is less than 100KN.
2. km Deep Soft Rock fracture grouting support reinforcement method according to claim 1, it is characterised in that: it is described The combination of steel rope installed in grouting cable anchor hole is a kind of combination of steel rope of at least three sections anchor cable structures, is at least equipped on anchor cable Three sealing of hole corks are stopping the subsequent anchor cable of iron ring wherein being provided with blocking iron ring on the anchor cable in the middle part of grouting cable anchor hole On be set with inner sealing of hole cork, on the inner subsequent anchor cable of sealing of hole cork be set with inner sealing of hole hard tube, stopping iron ring front Slurry outlet is uniformly provided on anchor cable, the tail portion of inner sealing of hole hard tube has convex edge, is set with centre on the anchor cable at the convex edge Sealing of hole cork, is set with intermediate sealing of hole hard tube on the anchor cable at intermediate sealing of hole cork rear portion, the tail portion of intermediate sealing of hole hard tube also band There is convex edge, outer sealing of hole cork is set on the anchor cable at the convex edge, outer sealing of hole cork is at the aperture of grouting cable anchor hole, outside Outer sealing of hole hard tube is set on the subsequent anchor cable of sealing of hole cork, the grouting cable anchor between inner sealing of hole cork and intermediate sealing of hole cork Slip casting hose is laid in hole, it is soft to be laid with sealing grouting in the grouting cable anchor hole between intermediate sealing of hole cork and outer sealing of hole cork Pipe, inner sealing of hole cork, inner sealing of hole hard tube, intermediate sealing of hole cork, intermediate sealing of hole hard tube, outer sealing of hole cork, outer sealing of hole hard tube cover After being shifted on respective position on anchor cable, anchor cable disk and rigging are installed;Slip casting hose and sealing grouting hose are from two on anchor cable disk A slip casting hose port passes through, and avoids anchor cable disk that slip casting hose and sealing grouting hose are squeezed flat;During aforesaid operations, first lead to The bore portions slip casting that sealing grouting hose carries out grouting cable anchor hole is crossed, cement grout passes through sealing grouting under the effect of the pressure Hose is injected into bore portions and the surrounding crack, joint and gap in grouting cable anchor hole, guarantees external and aperture slip casting Plugging strength, outer sealing of hole cork, intermediate sealing of hole cork and cement slurry collective effect, anchor cable drilling orifice and aperture and anchor cable Space block it is tight, guarantee cement grout crack around anchor cable drilling orifice, joint, gap block it is tight after, deep hole high pressure It is not in spillage phenomenon when slip casting;Then pass through slip casting hose again for anchor cable between inner sealing of hole cork and intermediate sealing of hole cork Drilling shallow bore hole space carry out slip casting, Shallow hole grouting pressure is lower, Shallow hole grouting block it is tight after, it is ensured that deep hole grouting reaches Be not in spillage phenomenon to higher pressure, while guaranteeing that deep hole grouting reaches the slurry diffusion split in rock mass, is gelled, is solid Change, fills wall-rock crack;Deep hole grouting is by hollow anchor rope grouting, and the slurry outlet by uniformly opening up thereon is come complete At, deep hole grouting pressure is higher, and only deep hole grouting reaches higher pressure just and can guarantee that cement grout diffuses to bigger Range, cement grout better filling fracture, compacted country rock, improve reinforcing operation at network skeleton, to improve country rock Globality and self-bearing capacity.
CN201910129143.5A 2019-02-21 2019-02-21 Splitting grouting reinforcement support method for kilometer deep well soft rock Active CN109798140B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910129143.5A CN109798140B (en) 2019-02-21 2019-02-21 Splitting grouting reinforcement support method for kilometer deep well soft rock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910129143.5A CN109798140B (en) 2019-02-21 2019-02-21 Splitting grouting reinforcement support method for kilometer deep well soft rock

Publications (2)

Publication Number Publication Date
CN109798140A true CN109798140A (en) 2019-05-24
CN109798140B CN109798140B (en) 2020-12-18

Family

ID=66561120

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910129143.5A Active CN109798140B (en) 2019-02-21 2019-02-21 Splitting grouting reinforcement support method for kilometer deep well soft rock

Country Status (1)

Country Link
CN (1) CN109798140B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113137250A (en) * 2021-05-28 2021-07-20 中建隧道建设有限公司 Method for quickly pre-reinforcing and grouting tunnel face excavation of deep-buried high-pressure water-rich tunnel
CN113153396A (en) * 2021-04-19 2021-07-23 华北科技学院 Hole sealing, grouting and water plugging reinforcing method for anchor cable holes in roadway water spraying area
CN114233352A (en) * 2021-12-02 2022-03-25 中煤科工开采研究院有限公司 Multi-section grooving and splitting grouting modified surrounding rock cooperative control method and structure
CN114233393A (en) * 2021-11-12 2022-03-25 中国电建集团华东勘测设计研究院有限公司 Underground engineering surrounding rock-stress double-target mutual feedback combined regulation and control method
CN117108318A (en) * 2023-10-25 2023-11-24 北京科技大学 Surrounding rock reinforcing grouting system for underground coal mine roadway

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102900446A (en) * 2012-10-23 2013-01-30 中国矿业大学 Step-by-step strengthening method by anchoring and forming hole in downward sleeve of cracking medium
CN103758533A (en) * 2014-01-06 2014-04-30 中国矿业大学 High-low pressure integrated roadway grouting reinforcement method
CN205189911U (en) * 2015-10-23 2016-04-27 于守东 Cellular type slip casting anchor rope is proclaimed oneself in antiskid
CN107747498A (en) * 2017-09-06 2018-03-02 中国科学院力学研究所 A kind of mould bag filled type anchor bolt grouting apparatus and method
CN107829767A (en) * 2017-11-30 2018-03-23 安徽理工大学 A kind of block assembly formula, which allows, presses hollow grouting anchor and its construction method
CN108756970A (en) * 2018-07-12 2018-11-06 安徽理工大学 A kind of hollow grouting cable anchor of segmented and application method
CN108868827A (en) * 2018-07-07 2018-11-23 平煤神马建工集团有限公司 Km deep-well high-ground stress combination of steel rope injection hole sealing device and method for sealing
CN108915745A (en) * 2018-08-30 2018-11-30 沈阳建筑大学 The interim anchor cable of Fuse Type of permanent support grouted anchor bar combined support structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102900446A (en) * 2012-10-23 2013-01-30 中国矿业大学 Step-by-step strengthening method by anchoring and forming hole in downward sleeve of cracking medium
CN103758533A (en) * 2014-01-06 2014-04-30 中国矿业大学 High-low pressure integrated roadway grouting reinforcement method
CN205189911U (en) * 2015-10-23 2016-04-27 于守东 Cellular type slip casting anchor rope is proclaimed oneself in antiskid
CN107747498A (en) * 2017-09-06 2018-03-02 中国科学院力学研究所 A kind of mould bag filled type anchor bolt grouting apparatus and method
CN107829767A (en) * 2017-11-30 2018-03-23 安徽理工大学 A kind of block assembly formula, which allows, presses hollow grouting anchor and its construction method
CN108868827A (en) * 2018-07-07 2018-11-23 平煤神马建工集团有限公司 Km deep-well high-ground stress combination of steel rope injection hole sealing device and method for sealing
CN108756970A (en) * 2018-07-12 2018-11-06 安徽理工大学 A kind of hollow grouting cable anchor of segmented and application method
CN108915745A (en) * 2018-08-30 2018-11-30 沈阳建筑大学 The interim anchor cable of Fuse Type of permanent support grouted anchor bar combined support structure

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113153396A (en) * 2021-04-19 2021-07-23 华北科技学院 Hole sealing, grouting and water plugging reinforcing method for anchor cable holes in roadway water spraying area
CN113137250A (en) * 2021-05-28 2021-07-20 中建隧道建设有限公司 Method for quickly pre-reinforcing and grouting tunnel face excavation of deep-buried high-pressure water-rich tunnel
CN113137250B (en) * 2021-05-28 2023-06-30 中建隧道建设有限公司 Rapid pre-reinforcement grouting method for tunnel face excavation of deep-buried high-pressure water-rich tunnel
CN114233393A (en) * 2021-11-12 2022-03-25 中国电建集团华东勘测设计研究院有限公司 Underground engineering surrounding rock-stress double-target mutual feedback combined regulation and control method
CN114233393B (en) * 2021-11-12 2024-05-24 中国电建集团华东勘测设计研究院有限公司 Underground engineering surrounding rock-stress double-target mutual feedback combined regulation and control method
CN114233352A (en) * 2021-12-02 2022-03-25 中煤科工开采研究院有限公司 Multi-section grooving and splitting grouting modified surrounding rock cooperative control method and structure
CN117108318A (en) * 2023-10-25 2023-11-24 北京科技大学 Surrounding rock reinforcing grouting system for underground coal mine roadway
CN117108318B (en) * 2023-10-25 2024-01-02 北京科技大学 Surrounding rock reinforcement grouting system for underground coal mine tunnels

Also Published As

Publication number Publication date
CN109798140B (en) 2020-12-18

Similar Documents

Publication Publication Date Title
CN109798140A (en) Km Deep Soft Rock fracture grouting support reinforcement method
CN104453913B (en) A kind of Shaft Stopes front pre-grouting method
CN103334770B (en) One is grown up reverse-slope tunnel ultra high water pressure rich water zone of fracture construction method
CN112855223B (en) Coal roadway-advanced curtain space integrated grouting method after penetrating goaf wall
CN101748741B (en) Construction method of concrete supporting structure
CN110388223B (en) A segmented grouting hollow grouting anchor cable and using method
CN204703160U (en) Two anchoring section prestressed anchor Cable Structure
CN104481560A (en) Roadway roof aquifer treatment method
CN205025479U (en) Administer bottom plate support system of soft rock tunnel pucking
CN105422128A (en) Method for preventing goaf gas leakage in deep shaft gob-side entry driving
CN103669346A (en) Sleeve valve pipe and application to landslide control
CN104879149A (en) Bolt-grouting support method for roadway in three-soft high-stress region
CN108868827A (en) Km deep-well high-ground stress combination of steel rope injection hole sealing device and method for sealing
CN107339108A (en) The layer of sand location subway pipe shed construction method of underground water enrichment
CN105937221A (en) Manufacturing method for drilled grouting piles
CN109505641A (en) A kind of soft-rock tunnel bottom plate anchor pouring reinforcement method
CN208136918U (en) A kind of tubular type Soil-Nailing Wall Structure
CN107035389B (en) A kind of construction method for grouting reinforcement and earth's surface construction method
CN206110124U (en) Bored concrete pile stake end post grouting device
CN113958324B (en) Method for grouting and reinforcing deep drilling of roadway bottom plate
CN109854281A (en) The method for protecting support of the lower rock compound cross-section stratum jacking construction of upper soil
CN202531098U (en) Broken coal-rock mass grouting system
CN1059012C (en) Technology for quickly resuming normal construction after wellhole submerged by sudden water
CN110778332B (en) Different-diameter adaptive expansion grouting device and reinforcement method at the cracked and damaged part of the tunnel secondary lining
CN112392524A (en) Geotechnical engineering sectional type cavity slip casting anchor rope device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20201130

Address after: 467000 No. 21 miner Road, Henan, Pingdingshan

Applicant after: PINGDINGSHAN TIANAN COAL MINING Co.,Ltd.

Applicant after: NO.6 MINE, PINGDINGSHAN TIANAN COAL MINING Co.,Ltd.

Address before: 467000 Xinxin street, Pinghua coal six, Xinhua District, Pingdingshan, Henan

Applicant before: NO.6 MINE, PINGDINGSHAN TIANAN COAL MINING Co.,Ltd.

GR01 Patent grant
GR01 Patent grant