CN109797779A
CN109797779A CN201910152197.3A CN201910152197A CN109797779A CN 109797779 A CN109797779 A CN 109797779A CN 201910152197 A CN201910152197 A CN 201910152197A CN 109797779 A CN109797779 A CN 109797779A
Authority
CN
China
Prior art keywords
film piece
hdpe film
plate
hdpe
membrane cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910152197.3A
Other languages
Chinese (zh)
Inventor
徐方才
孙亮
江志安
苗志斌
胡微
白晓光
杨建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Foundation Engineering Co Ltd
Original Assignee
Sinohydro Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Foundation Engineering Co Ltd filed Critical Sinohydro Foundation Engineering Co Ltd
Priority to CN201910152197.3A priority Critical patent/CN109797779A/en
Publication of CN109797779A publication Critical patent/CN109797779A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention discloses the joint connection and its method of a kind of compound HDPE film piece of self-hardening slurry diaphragm wall, the joint connection includes: the first Membrane cover of the first HDPE film piece;Second Membrane cover of the 2nd NDPE diaphragm;For connecting the HDPE film piece connector of first Membrane cover and second Membrane cover, so that the first HDPE film piece and the 2nd HDPE are linked together.Present invention dramatically increases the use depth of HDPE film piece being vertically laid with.

Description

A kind of joint connection and its method of the compound HDPE film piece of self-hardening slurry diaphragm wall
Technical field
The present invention relates to continuous for engineering fields, in particular to a kind of self-hardening slurries such as building, mine, water conservancy and environment The joint connection and its method of the compound HDPE film piece of wall.
Background technique
The antiseepage that self-hardening slurry diaphram wall has been widely used in above-mentioned field, which is cut, seeps control engineering, is particularly suitable for ground Lower water level height, the givey Special section of the soft appearance in stratum or the biggish salt lake of underground water specific gravity or again chemical environment area Seepage prevention system building.
The general infiltration coefficient of self-hardening slurry diaphragm wall is unable to satisfy pollutant isolation etc. in 10-8m/s and requires higher ring Border, and self-hardening slurry wall, since intensity is in 1MPa or so, the lower ability for resisting chemical erosion of intensity is poor, individual self-solidifying The durability of mortar diaphram wall is sometimes difficult to meet the requirement under specified conditions.
HDPE film piece is now widely used for the engineering fields such as domestic building, mine, water conservancy and environment, as antiseepage or Buffer action has extraordinary corrosion resistance and ductility, and mature production thickness reaches 3mm at home, and breadth is more than 6 meters HDPE antiseepage film, be widely used in the engineering fields such as outdoor refuse landfill.
It is current external more and more using HDPE film and self-hardening slurry building composite anti-penetrating diaphram wall, for permanent The underground water of engineering fields and the seepage control engineering of pollutant such as building, mine, water conservancy and environment, meet 10-11m/s or less more Small permeability and better life requirement.
The building key of HDPE film and self-hardening slurry building composite anti-penetrating diaphram wall is HDPE film piece to be realized certainly Vertical continuous in solidifying mortar slot is laid with, and is had the following problems:
(1) the external more satisfactory connection type of is using the connection lock of multimachine coextrusion process production HDPE film, but technique Equipment and product are expensive, such as United States Patent (USP) US005497097A,.
(2) country, which generallys use increase diaphragm and is laid with, has a common boundary length, that is, increases the mode of penetration route to realize HDPE film The connection of piece, there is laying depth can only be confined within the scope of smaller depth, and due to not constraining and contacting between diaphragm, Existing interval increases, and durability and Reliability Assurance degree are poor.
(3) the overlap joint diaphragm waste of the domestic usually construction method of is more, and then affects higher in some standard requirements The application of field such as environment protection field.
Summary of the invention
The object of the present invention is to provide a kind of joint connection of compound HDPE film of self-hardening slurry diaphragm wall and its sides Method.
A kind of joint connection of the compound HDPE film piece of self-hardening slurry diaphragm wall of the invention includes:
First Membrane cover of the first HDPE film piece;
Second Membrane cover of the 2nd NDPE diaphragm;
The HDPE film piece connector of first Membrane cover and second Membrane cover is connected, so as to by the first HDPE film piece and Two HDPE link together.
Preferably, the HDPE connector includes: made of steel plate by upper junction plate 1a, lower connecting plate 1c and positioned at upper The I-shaped frame body 1 that riser 1b between connecting plate and lower connecting plate is constituted;
It is welded on first side plate in lower connecting plate side (such as Fig. 1 a and the left side Fig. 1 b);
The first deep floor being welded on the outside of the first side plate, first deep floor are connect with lower connecting plate;
It is welded on second side plate on the lower connecting plate other side (such as Fig. 1 a and the right side Fig. 1 b);
The second deep floor being welded on the outside of the second side plate, second deep floor are connect with lower connecting plate.
Preferably, the joint connection of the compound HDPE film piece of self-hardening slurry diaphragm wall according to claim 1, In, the HDPE connector includes:
It is made of made of steel plate upper junction plate, lower connecting plate and the riser between upper junction plate and lower connecting plate I-shaped frame body 1;
It is welded on first side plate in lower connecting plate side (such as Fig. 1 a and the left side Fig. 1 b);
The first deep floor being welded on the outside of the first side plate, first deep floor are connect with lower connecting plate;
It is welded on the second side plate (being located on the right side of Fig. 1 b) of the side upper junction plate 1a, first side plate and described second side Plate is symmetrically distributed in the riser two sides;
The second deep floor being welded on the outside of the second side plate, second deep floor are connect with upper junction plate.
Preferably, first Membrane cover and the second Membrane cover, which are thermally welded, connects in the first end HDP E and the 2nd end HDPE.
Preferably, the first Membrane cover of the first HDPE film piece is mounted to surrounded by first side plate and riser In one space;Second Membrane cover of the second HDPE film piece is mounted to the second space surrounded by second side plate and riser In.
In one embodiment, the first Membrane cover is mounted in the first space surrounded by first side plate and riser Afterwards, the first HDPE film piece is parallel to the upper junction plate, and does not overlap the upper junction plate;Second Membrane cover 7b is mounted to After in the second space surrounded by second side plate and riser, the second HDPE film piece is parallel to the upper junction plate, and The upper junction plate is not overlapped.
In another embodiment, the first Membrane cover is mounted in the first space surrounded by first side plate and riser Afterwards, the first HDPE film piece forms the overlap joint with the upper junction plate from the top in the first space;Second Membrane cover is mounted to After in the second space surrounded by second side plate and riser, the second HDPE film piece from the lower part of second space formed with The overlap joint of the lower connecting plate.
In yet another embodiment, the first Membrane cover is mounted in the first space surrounded by first side plate and riser Afterwards, the first HDPE film piece forms the overlap joint with upper junction plate from the top in the first space;Second Membrane cover is mounted to by institute After stating in the second space that the second side plate and riser surround, the second HDPE film piece is formed and lower company from the top of second space The overlap joint of fishplate bar.
The joint connection of the compound HDPE film of self-hardening slurry diaphragm wall of the invention further includes being separately mounted to described Membrane cover supporting element in one Membrane cover and the second Membrane cover.
Compared with the existing technology, advantageous effects of the invention include:
(1) existing hot melt is used only with common fashioned iron and steel plate processing jointing and its attachment, HDPE film piece Welding, cost do not obviously increase;
(2) be applicable in Depth Expansion can be implemented to the range using crane crane capacity, greatly increases HDPE film and vertically spreads If use depth, expand application field;
(3) by the preservative treatment or layout appropriate to workpiece, the height of self-hardening slurry and HDPE film piece system is durable Property and reliability are guaranteed;
(4) be external HDPE film piece interlocking product ideal alternative, and joint seepage paths is longer, but provides higher Anti-seepage standard.
Structure of the invention, principle and effect are described in detail with specific embodiment with reference to the accompanying drawing.
Detailed description of the invention
Fig. 1 a is the schematic diagram of the connector first embodiment of HDPE film strip terminal attachment device of the invention;
Fig. 1 b is the schematic diagram of the connector second embodiment of HDPE film strip terminal attachment device of the invention;
Fig. 2 is the schematic diagram for showing HDPE film piece Membrane cover of the invention;
Fig. 3 a is the schematic diagram of the first embodiment of HDPE film strip terminal attachment device of the invention;
Fig. 3 b is the schematic diagram of the second embodiment of HDPE film strip terminal attachment device of the invention;
Fig. 4 a is the schematic diagram of the 3rd embodiment of HDPE film strip terminal attachment device of the invention;
Fig. 4 b is the schematic diagram of the fourth embodiment of HDPE film strip terminal attachment device of the invention;
Fig. 5 a is the schematic diagram of the 5th embodiment of HDPE film strip terminal attachment device of the invention;
Fig. 5 b is the schematic diagram of the sixth embodiment of HDPE film strip terminal attachment device of the invention.
Description of symbols: 1-HDPE connecting member for membrane;1a- upper junction plate;1b- riser;The second connecting plate of 1c-;The side 2- Plate;3- reinforces floor;4- Membrane cover supporting element;5-HDPE diaphragm plate;6-HDPE welding;The first Membrane cover of 7a-, the second Membrane cover of 7b-.
Specific embodiment
The compound HDPE film technology of self-hardening slurry diaphragm wall is a kind of opening using cement bentonite slurry as underground tank section It digs and stablizes mud in the process, HDPE film piece is vertically divided into after the completion of excavating clear bottom, passes through specifically tiling or mutual between diaphragm The lap connection of lock forms the Complex subsurface diaphragm wall technique of self-hardening slurry and HDPE film piece after the mud solidification in slotted hole.
As Figure 1-Figure 2, the joint connection of the compound HDPE film piece of a kind of self-hardening slurry diaphragm wall of the invention, packet It includes: the first Membrane cover 7a of the first HDPE film piece;Second Membrane cover 7b of the 2nd NDPE diaphragm;For connecting first Membrane cover and institute The HDPE film piece connector of the second Membrane cover is stated, so that the first HDPE film piece and the 2nd HDPE link together.
As shown in Figure 1, in one embodiment, HDPE connector of the invention includes: made of steel plate by upper connection The I-shaped frame body 1 that plate 1a, lower connecting plate 1c and the riser 1b between upper junction plate 1a and lower connecting plate 1c are constituted;Welding The first side plate (side plate as being located at figure 1A left side) in lower connecting plate side;The first ribs being welded on the outside of the first side plate Plate 3, first deep floor are connect with lower connecting plate 1c;The second side plate for being welded on the other side lower connecting plate 1c (is such as located at Side plate on the right side of Fig. 1 a);The second deep floor being welded on the outside of the second side plate, second deep floor and lower connecting plate connect It connects.
As shown in Fig. 2, in another embodiment, the HDPE connector includes: made of steel plate by upper junction plate The I-shaped frame body 1 that 1a, lower connecting plate 1c and the riser 1b between upper junction plate 1a and lower connecting plate 1c are constituted;It is welded on The first side plate of the side lower connecting plate 1c (as being located at the side plate on the left of Fig. 1 b);The first ribs being welded on the outside of the first side plate Plate 3, first deep floor are connect with lower connecting plate 1c;The second side plate of the side upper junction plate 1a is welded on (as being located at figure Side plate on the right side of 1b), first side plate and second side plate are symmetrically distributed in the riser two sides;It is welded on the second side plate Second deep floor 3 in outside, second deep floor are connect with upper junction plate.
A HDPE template shown in Fig. 2, the both ends that Fig. 2 diagrammatically illustrates HDPE template be welded with the first Membrane cover 7a and Second Membrane cover 7b.It should be understood that the first Membrane cover 7a and the second Membrane cover 7b described in the application actually refers to two Membrane cover in HDPE template is just able to achieve the connection of two templates in this way.Institute is connected by sweat soldering 6 in HDPE template end State Membrane cover.
Referring to an example described in Fig. 3 a and Fig. 3 b, the first Membrane cover 7a of the first HDPE film piece is mounted to by the first side In the first space that plate and riser surround;Second Membrane cover 7b of the second HDPE film piece be mounted to by second side plate and In the second space that riser surrounds.The joint connection of the compound HDPE film of self-hardening slurry diaphragm wall of the invention further includes difference It is mounted on Membrane cover supporting element 4 in the first Membrane cover 7a and the second Membrane cover 7b.
The difference of Fig. 3 a and Fig. 3 b are, in 3a, Membrane cover supporting element 4 is hollow square tube;In fig 3b, Membrane cover supporting element For hollow circular-tube.
In Fig. 3 a and Fig. 3 b, the first Membrane cover 7a is mounted in the first space surrounded by first side plate and riser Afterwards, the first HDPE film piece is parallel to the upper junction plate, and does not overlap the upper junction plate;Second Membrane cover 7b is mounted to After in the second space surrounded by second side plate and riser, the second HDPE film piece is parallel to the upper junction plate, and The upper junction plate is not overlapped.
Referring to fig. 4 in another embodiment shown in a and Fig. 4 b, the first Membrane cover 7a be mounted to by first side plate and After in the first space that riser surrounds, the first HDPE film piece is formed from the top in the first space with the upper junction plate 1a's Overlap joint;After second Membrane cover 7b is mounted in the second space surrounded by second side plate and riser, second HDPE film Piece forms the overlap joint with the lower connecting plate 1c from the lower part of second space.
Referring to another example shown in Fig. 5 a and Fig. 5 b, the first Membrane cover 7a is mounted to by first side plate and riser After in the first space surrounded, the first HDPE film piece forms the overlap joint with upper junction plate 1a from the top in the first space;The After two Membrane cover 7b are mounted in the second space surrounded by second side plate and riser, the second HDPE film piece is from second Overlap joint with lower connecting plate 1b is formed at the top in space.
Above content is described further below.
Referring to Fig. 1 a and Fig. 1 b, HDPE film strip terminal interlocks bridging arrangement, including one uses work steel steel, steel plate and steel plate The piecing devices that the structure of supporting element secondary operation is connected as HDPE film blade unit, the both ends hot melt processing one of HDPE film piece HDPE covers, and is packed on the hollow square tube of a corresponding size or round tube in HDPE set.
1) attachment device of steel construction
Being processed into band as shown in the figure using forming I-steel and steel plate, there are two vertical or centrosymmetric indent frameworks Structure is considered as the scope that the present invention protects if concave inward structure deformation processing is triangle, circular configuration.
In order to guarantee the rigidity of frame structure, framework closes steel plate and the wing plate of I-steel welds, and is spaced setting branch Triangular stall board is supportted, in order to avoid scratching diaphragm, above structure takes edging to handle.
In order to guarantee the corrosion resistance of above-mentioned steel construction, surface treatment and anti-corrosion measure can be increased.
2) HDPE film blade unit is processed
Referring to fig. 2, HDPE film piece maximum breadth has reached 7m, and thickness reaches 3mm, generallys use sweat soldering, HDPE film piece list Member is welded on workbench, and end diaphragm is fixed by size overlapping, using double slit sweat soldering, forms Membrane cover.It is double Seam weld is detected by HDPE welding standard, it is ensured that welding quality.
3) square tube or round tube that auxiliary is divided into
HDPE film piece needs to assemble the square tube or round tube of corresponding size in the Membrane cover of end before dividing into, material using steel, HDPE or PVC, it is important to which the connection of length direction will have office to reach intensity.Assist the square tube divided into or round tube in self-hardening slurry Cleaning can slowly be extracted before solidification out to reuse, referring to Fig. 3 a- Fig. 5 b.
HDPE film blade unit can be formed a variety of interlocking connection layouts, be had their own advantages by the attachment device of steel construction:
HDPE film blade unit interlocking layout I type, referring to Fig. 3 a and Fig. 3 b, HDPE film piece is straight at external one of interlock On line, letter connects clear, but HDPE film piece is not carried out overlap joint in structure, and steel construction interlock preferably needs to do preservative treatment, It is smaller by HDPE film piece infiltration lane.
HDPE film blade unit interlocking layout II type, a and Fig. 4 b, HDPE film set are matched referring to fig. 4 with interlock central symmetry Set, HDPE film piece junction not point-blank, it is simple and clear, but HDPE film piece realizes overlap joint in structure, even if steel Structural interlock device does not do preservative treatment, and HDPE film piece itself overlaps, by HDPE film piece infiltration lane longest.
HDPE film blade unit interlocking layout type III, referring to Fig. 5 a and Fig. 5 b, HDPE film set is matched so that interlock is asymmetric Set, HDPE film piece junction not point-blank, but HDPE film piece realizes overlap joint in structure, even if steel construction interlocking dress It sets and does not do preservative treatment, HDPE film piece itself overlaps, longer by HDPE film piece infiltration lane.
Apparatus of the present invention realize that using installation is divided under the technique of self-hardening slurry, it is continuous to construct the compound underground HDPE for HDPE film Wall does not need additional special installation, has stronger operability, can satisfy very high anti-seepage standard.
In conclusion the invention has the following advantages that
(1) existing hot melt is used only with common fashioned iron and steel plate processing jointing and its attachment, HDPE film piece Welding, cost do not obviously increase;
(2) be applicable in Depth Expansion can be implemented to the range using crane crane capacity, greatly increases HDPE film and vertically spreads If use depth, expand application field;
(3) by the preservative treatment or layout appropriate to workpiece, the height of self-hardening slurry and HDPE film piece system is durable Property and reliability are guaranteed;
(4) be external HDPE film piece interlocking product ideal alternative, and joint seepage paths is longer, but provides higher Anti-seepage standard.
Although describing the invention in detail above, but the invention is not restricted to this, those skilled in the art of the present technique It can be carry out various modifications with principle according to the present invention.Therefore, all to be modified according to made by the principle of the invention, all it should be understood as Fall into protection scope of the present invention.

Claims (9)

1. a kind of joint connection of the compound HDPE film piece of self-hardening slurry diaphragm wall, comprising:
The first Membrane cover positioned at the first HDPE film piece end;
Positioned at the second Membrane cover of the 2nd NDPE membrane ends;
The HDPE film piece connector of first Membrane cover and second Membrane cover is connected, so as to by the first HDPE film piece and second HDPE links together;
Wherein, the HDPE is high density polyethylene (HDPE).
2. the joint connection of the compound HDPE film piece of self-hardening slurry diaphragm wall according to claim 1, wherein described HDPE connector includes:
The work being made of made of steel plate upper junction plate, lower connecting plate and the riser between upper junction plate and lower connecting plate Font frame body;
It is welded on the first side plate of lower connecting plate side;
The first deep floor being welded on the outside of the first side plate, first deep floor are connect with lower connecting plate;
It is welded on the second side plate of the lower connecting plate other side;
The second deep floor being welded on the outside of the second side plate, second deep floor are connect with lower connecting plate.
3. the joint connection of the compound HDPE film piece of self-hardening slurry diaphragm wall according to claim 1, wherein described HDPE connector includes:
The work being made of made of steel plate upper junction plate, lower connecting plate and the riser between upper junction plate and lower connecting plate Font frame body;
It is welded on the first side plate of lower connecting plate side;
The first deep floor being welded on the outside of the first side plate, first deep floor are connect with lower connecting plate;
It is welded on the second side plate of upper junction plate side, first side plate and second side plate are symmetrically distributed in the riser Two sides;
The second deep floor being welded on the outside of the second side plate, second deep floor are connect with upper junction plate.
4. the joint connection of the compound HDPE film piece of self-hardening slurry diaphragm wall according to claim 1, wherein described One Membrane cover and the second Membrane cover, which are thermally welded, to be connect in the first end HDP E and the 2nd end HDPE.
5. according to the joint connection of the compound HDPE film piece of self-hardening slurry diaphragm wall described in claim 2 and 3, wherein institute The first Membrane cover for stating the first HDPE film piece is mounted in the first space surrounded by first side plate and riser;Described second Second Membrane cover of HDPE film piece is mounted in the second space surrounded by second side plate and riser.
6. the joint connection of the compound HDPE film piece of self-hardening slurry diaphragm wall according to claim 5, wherein the first film After set is mounted in the first space surrounded by first side plate and riser, the first HDPE film piece is parallel on described Connecting plate, and the upper junction plate is not overlapped;Second Membrane cover 7b is mounted to second surrounded by second side plate and riser After in space, the second HDPE film piece is parallel to the upper junction plate, and does not overlap the upper junction plate.
7. the joint connection of the compound HDPE film piece of self-hardening slurry diaphragm wall according to claim 5, wherein the first film After set is mounted in the first space surrounded by first side plate and riser, the first HDPE film piece is from the first space Overlap joint with the upper junction plate is formed at top;Second Membrane cover is mounted to the second sky surrounded by second side plate and riser Between in after, the second HDPE film piece is formed and the overlap joint of the lower connecting plate from the lower part of second space.
8. the joint connection of the compound HDPE film piece of self-hardening slurry diaphragm wall according to claim 5, wherein the first film After set is mounted in the first space surrounded by first side plate and riser, the first HDPE film piece is from the first space Overlap joint with upper junction plate is formed at top;Second Membrane cover 7b is mounted to the second space surrounded by second side plate and riser In after, the second HDPE film piece is formed and the overlap joint of lower connecting plate from the top of second space.
9. according to the joint connection of the compound HDPE film piece of the described in any item self-hardening slurry diaphragm walls of claim 5-8, also Including being separately mounted to Membrane cover supporting element in first Membrane cover and the second Membrane cover.
CN201910152197.3A 2019-02-28 2019-02-28 A kind of joint connection and its method of the compound HDPE film piece of self-hardening slurry diaphragm wall Pending CN109797779A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910152197.3A CN109797779A (en) 2019-02-28 2019-02-28 A kind of joint connection and its method of the compound HDPE film piece of self-hardening slurry diaphragm wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910152197.3A CN109797779A (en) 2019-02-28 2019-02-28 A kind of joint connection and its method of the compound HDPE film piece of self-hardening slurry diaphragm wall

Publications (1)

Publication Number Publication Date
CN109797779A true CN109797779A (en) 2019-05-24

Family

ID=66562373

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910152197.3A Pending CN109797779A (en) 2019-02-28 2019-02-28 A kind of joint connection and its method of the compound HDPE film piece of self-hardening slurry diaphragm wall

Country Status (1)

Country Link
CN (1) CN109797779A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112609676A (en) * 2020-12-16 2021-04-06 天津大学 HDPE (high-density polyethylene) film composite underground diaphragm wall structure and construction method
CN113152530A (en) * 2021-03-26 2021-07-23 中船第九设计研究院工程有限公司 HDPE (high-density polyethylene) film discharging machine and film discharging process
CN115847829A (en) * 2022-10-27 2023-03-28 中国水电基础局有限公司 Automatic equipment that sets up of ultra-deep wall section HDPE membrane of mortar of congealing certainly

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2620149A1 (en) * 1987-09-04 1989-03-10 Solvay Continuous membrane for hermetic isolation of unpleasant or marshy ground
US5497097A (en) * 1994-05-02 1996-03-05 Gse Lining Technology, Inc. Apparatus for detecting a connection between adjacent panels of a curtain wall
JPH11140866A (en) * 1997-11-05 1999-05-25 Tone Geo Tech Co Ltd Underground cutoff wall, method for constructing the same, and cutoff plate made of steel
CN102367672A (en) * 2011-09-13 2012-03-07 北京高能时代环境技术股份有限公司 Method for installing vertical soft barrier system based on soil-stone foundation
CN202559379U (en) * 2012-05-24 2012-11-28 北京高能时代环境技术股份有限公司 Vertical flexible barrier mounting structure with debris foundation conditions
CN104652458A (en) * 2014-12-31 2015-05-27 上海远方基础工程有限公司 Construction method for isolating underground pollution
CN204570751U (en) * 2014-12-31 2015-08-19 上海远方基础工程有限公司 Underground anti-seepage jointing and underground anti-seepage device
CN104912057A (en) * 2015-04-13 2015-09-16 上海远方基础工程有限公司 Novel underground diaphragm wall construction method
CN204691255U (en) * 2015-04-13 2015-10-07 上海远方基础工程有限公司 Diaphragm wall
CN205189015U (en) * 2015-11-27 2016-04-27 上海长凯岩土工程有限公司 A connect sealing device for prevent osmosis membrane perpendicularly
CN106368172A (en) * 2016-10-14 2017-02-01 中石化胜利建设工程有限公司 Building foundation impermeable membrane connecting device and building foundation impermeable membrane connecting method
CN107023017A (en) * 2016-02-02 2017-08-08 上海城地建设股份有限公司 UH goes along with sb. to guard him water sealing structure and its construction method
CN109024703A (en) * 2018-07-26 2018-12-18 上海远方基础工程有限公司 Underground anti-seepage film connector and its construction method
CN109339031A (en) * 2018-11-20 2019-02-15 南昌工程学院 A kind of anti-seepage device for underground concrete diaphragm wall joint

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2620149A1 (en) * 1987-09-04 1989-03-10 Solvay Continuous membrane for hermetic isolation of unpleasant or marshy ground
US5497097A (en) * 1994-05-02 1996-03-05 Gse Lining Technology, Inc. Apparatus for detecting a connection between adjacent panels of a curtain wall
JPH11140866A (en) * 1997-11-05 1999-05-25 Tone Geo Tech Co Ltd Underground cutoff wall, method for constructing the same, and cutoff plate made of steel
CN102367672A (en) * 2011-09-13 2012-03-07 北京高能时代环境技术股份有限公司 Method for installing vertical soft barrier system based on soil-stone foundation
CN202559379U (en) * 2012-05-24 2012-11-28 北京高能时代环境技术股份有限公司 Vertical flexible barrier mounting structure with debris foundation conditions
CN204570751U (en) * 2014-12-31 2015-08-19 上海远方基础工程有限公司 Underground anti-seepage jointing and underground anti-seepage device
CN104652458A (en) * 2014-12-31 2015-05-27 上海远方基础工程有限公司 Construction method for isolating underground pollution
CN104912057A (en) * 2015-04-13 2015-09-16 上海远方基础工程有限公司 Novel underground diaphragm wall construction method
CN204691255U (en) * 2015-04-13 2015-10-07 上海远方基础工程有限公司 Diaphragm wall
CN205189015U (en) * 2015-11-27 2016-04-27 上海长凯岩土工程有限公司 A connect sealing device for prevent osmosis membrane perpendicularly
CN107023017A (en) * 2016-02-02 2017-08-08 上海城地建设股份有限公司 UH goes along with sb. to guard him water sealing structure and its construction method
CN106368172A (en) * 2016-10-14 2017-02-01 中石化胜利建设工程有限公司 Building foundation impermeable membrane connecting device and building foundation impermeable membrane connecting method
CN109024703A (en) * 2018-07-26 2018-12-18 上海远方基础工程有限公司 Underground anti-seepage film connector and its construction method
CN109339031A (en) * 2018-11-20 2019-02-15 南昌工程学院 A kind of anti-seepage device for underground concrete diaphragm wall joint

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《水利水电工程施工实用手册》编委会: "《混凝土防渗墙工程施工》", 中国环境出版社, pages: 43 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112609676A (en) * 2020-12-16 2021-04-06 天津大学 HDPE (high-density polyethylene) film composite underground diaphragm wall structure and construction method
CN112609676B (en) * 2020-12-16 2022-05-17 天津大学 HDPE (high-density polyethylene) film composite underground diaphragm wall structure and construction method
CN113152530A (en) * 2021-03-26 2021-07-23 中船第九设计研究院工程有限公司 HDPE (high-density polyethylene) film discharging machine and film discharging process
CN115847829A (en) * 2022-10-27 2023-03-28 中国水电基础局有限公司 Automatic equipment that sets up of ultra-deep wall section HDPE membrane of mortar of congealing certainly
CN115847829B (en) * 2022-10-27 2025-06-24 中国水电基础局有限公司 An automatic installation device for HDPE membrane in ultra-deep wall sections using self-setting mortar

Similar Documents

Publication Publication Date Title
CN104018436B (en) Prefabricated box culvert system and its installation method
CN109797779A (en) A kind of joint connection and its method of the compound HDPE film piece of self-hardening slurry diaphragm wall
CN104088295B (en) The embedded connecting structure of enclosure wall and middle plate and construction method thereof in covered back-digging
CN1307348C (en) Construction method for underground structure through half reverse course of action of inverting connection
CN111441375A (en) Flexible continuous wall for underground pollution blocking and construction method thereof
CN104963364A (en) Disposing method for topdown structural slab lower side wall construction joint
CN110424988A (en) Tunnel waterproofing construction and tunnel waterproofing method
CN105735323B (en) The inverse deep footing groove enclosing structure for making to combine with Percussion Piles of spray anchor and its construction method
CN103132465B (en) Underground box culvert constructing method closely attached to pile foundation bearing platform
CN117513363A (en) Fluid solidified soil backfill system and construction method for narrow fertilizer trough in pit
CN106759365B (en) A kind of counterfort wing wall waterproof curtain construction method of foundation pit enclosure wall
CN206829147U (en) A kind of combined type shaped steel, slip casting steel pipe bearing diagonal foundation pit enclosure structure
CN105113513B (en) Anti-seepage foundation pit supporting structure and construction method
CN112145207B (en) HDPE (high-density polyethylene) diaphragm coupling interlocking connection device and application method thereof
CN104594358B (en) Sequential construction and reversed construction Clockwise and counter-clockwise combined construction method of irregular planar deep foundation pit
CN101024955B (en) Sheet pile
CN105804090B (en) A kind of indoor piling wall supporting construction and its construction method
CN107268675A (en) Laying method and structure of combined multi-bin underground comprehensive pipe gallery
CN107299649A (en) A kind of post-cast strip advance water stop construction method for plentiful level of ground water
CN110468862A (en) A kind of plugging structure for subway station precipitation well head
CN106013256A (en) Tenon type connector water-proof structure for side wall of concrete waist beam embedded structure
CN111139863A (en) Waterproof construction method for open cut semi-reverse construction method tunnel purlin enclosing node
CN210104805U (en) Joint connecting device for self-setting mortar continuous wall composite HDPE (high-density polyethylene) membrane
CN212316963U (en) Connection structure of concrete impervious wall and composite geomembrane of water retaining building
CN203960813U (en) Anchorage part for earth work membrane

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190524