CN109747668A - A kind of double crawler belts that train uses laterally quickly transfer the device of car - Google Patents
A kind of double crawler belts that train uses laterally quickly transfer the device of car Download PDFInfo
- Publication number
- CN109747668A CN109747668A CN201811439010.XA CN201811439010A CN109747668A CN 109747668 A CN109747668 A CN 109747668A CN 201811439010 A CN201811439010 A CN 201811439010A CN 109747668 A CN109747668 A CN 109747668A
- Authority
- CN
- China
- Prior art keywords
- car
- crawler belts
- train
- double crawler
- double
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Landscapes
- Train Traffic Observation, Control, And Security (AREA)
Abstract
The invention discloses the devices that double crawler belts that a kind of train uses laterally quickly transfer car, it is a kind of device used on a kind of train for being arranged in and quickly transporting car using high-speed railway network, the main points of its technical scheme are that, it mainly includes power device, transmission shaft, driving wheel, follower, support roller, double crawler belts, bearing block, support plinth, car carrying platform, double crawler belts are two crawler belts being parallel to each other, double crawler belts are arranged on the car carrying platform of train, double crawler belts are by corresponding two groups of driving wheels, passive wheel drive, multiple support rollers are provided between driving wheel and follower at each group, the power device drives transmission shaft, transmission shaft drives driving wheel, car on the double crawler belts of active wheel drive is run to same direction.The device of the invention may be implemented over one hundred car and be completed at the same time within 2~3 minutes time between railway platform and train get on the bus, get off, and has the effect of significantly saving fuel oil, reduces vehicle exhaust, improves the car speed of service.
Description
The present invention relates to the devices that double crawler belts that a kind of train uses laterally quickly transfer car for technical field, more specifically
Say that it is to belong to laterally quickly to transfer sedan-chair using a kind of double crawler belts that the train that high-speed railway network quickly transports car uses in ground
The device of vehicle, using the device can make over one hundred car between railway platform and train within 2~3 minutes time it is complete simultaneously
At getting on the bus, get off.
Background technique currently, both at home and abroad high-speed railway network contribute to passenger traffic, high-speed railway network is not used for sedan-chair
The precedent of vehicle fast transportation.Global high-speed railway is used only for passenger traffic, causes a large amount of capacity of high-speed railway idle, I
The high-speed railway overwhelming majority of state is all in lossing state, especially inter-city high-speed rail, most of inter-city high-speed rail car
Passenger has a full house rate less than 50%.On the other hand, the car on highway is completely trouble, especially the vehicle congestion in big city
It is even more serious.
With the rapid development of economy, the owning amount of private car is constantly soaring, the sedan-chair in big city or megalopolis is caused
Vehicle traffic congestion is got worse;The another aspect of Car Traffic congestion in big city or megalopolis is exactly the row of car tail gas
It puts and causes air pollution, there is expert to point out, in city haze, the contribution rate of car tail gas is not less than 20%.
If the idle capacity of public backbones high-speed railway network, inter-city high-speed rail network can be made full use of, and big
Rapid transit network is created in city or megalopolis, allows national main line high-speed railway network, inter-city high-speed rail net
Network, rapid transit network-efficient quickly transport car, so that it may realize car energy-saving and environmental protection, quickly, efficient operation.
Unquestionably, the energy-saving and environmental protection of car, quick, efficient operating mode will become dazzling world's business card.
Realize above-mentioned target, solution car can be rapidly completed between railway platform and bullet train gets on the bus, gets off
A kind of double crawler belts for using of train laterally quickly the device of transfer car is exactly a crucial sport technique segment.
Summary of the invention is fast using high-speed railway network present invention aim to overcome deficiency in the prior art
The train that speed transports car provides a kind of device of the lateral quickly transfer car of double crawler belts that train uses, to realize that car exists
Two-way quick transfer between railway platform and train.
The device for now laterally quickly transferring car to double crawler belts that a kind of train of the invention uses is described below.
A kind of double crawler belts that train uses laterally quickly transfer the device of car, and the train is primarily used for transporting sedan-chair
The train of vehicle, it includes being provided with chassis system, wheel system, shock mitigation system, trailer system, car body, car carrying platform, institute
One layer of car carrying platform or two layers of car carrying platform or three layers of car carrying platform, skill are provided on the train body stated
The main points of art scheme are to be both provided with multiple double crawler belts on every layer of car carrying platform laterally quickly to transfer car
Device, laterally quickly the device of transfer car includes power device, transmission shaft, driving wheel, follower, support to double crawler belts
Wheel, double crawler belts, bearing block, support plinth, car carrying platform, double crawler belts are two crawler belts being parallel to each other, described
Double crawler belts be provided with corresponding two groups of driving wheels, followers, be additionally provided between driving wheel and follower at each group more
A support roller, the power device receive the instruction of the unlatching of automatic control system sending, closing, and the power device is driven
Dynamic transmission shaft, transmission shaft drive driving wheel, follower, and the car on the double crawler belts of driving wheel, passive wheel drive is to same target side
To operation.
A kind of double crawler belts that train uses laterally quickly transfer the device of car, the main points of its technical scheme are that, it is described
Two driving wheels of double crawler belts are preferably disposed on same root transmission shaft but are not limited to be arranged on same root transmission shaft.Described
Two driving wheels of double crawler belts, which are arranged on same root transmission shaft, to be advantageous in that, the front-wheel and rear-wheel of car can be preferably real
Now synchronous, synchronized transverse shifting.
A kind of double crawler belts that train uses laterally quickly transfer the device of car, the main points of its technical scheme are that, it is described
The both ends of the wheel shaft of two groups of driving wheels, follower or multiple support rollers are arranged on corresponding bearing block, the bearing block
It is arranged on support plinth, the support plinth is arranged on car carrying platform.
A kind of double crawler belts that train uses laterally quickly transfer the device of car, the main points of its technical scheme are that, it is described
The both ends of the wheel shaft of driving wheel are arranged on corresponding bearing block, and the bearing block is arranged on support plinth, institute
The support plinth stated is arranged on car carrying platform, and the both ends of the wheel shaft of the follower or multiple support rollers are arranged on
On corresponding support plinth, the support plinth is arranged on car carrying platform.
A kind of double crawler belts that train uses laterally quickly transfer the device of car, the main points of its technical scheme are that, it is described
The distance between two crawler belts being parallel to each other are greater than or equal to the distance between front-wheel and rear-wheel of car.
A kind of double crawler belts that train uses laterally quickly transfer the device of car, the main points of its technical scheme are that, it is described
The length of double crawler belts is preferably equal but is not limited to the Origin And Destination of equal, described double crawler belts and is preferably in respectively and pair crawler belts
On the perpendicular same straight line of length direction but be not limited to be in respectively on double perpendicular same straight lines in track length directions,
The Origin And Destination of the equal length of double crawler belts and double crawler belts be in respectively with double track length directions it is perpendicular it is same always
Synchronous, synchronized transverse shifting can be better achieved with rear-wheel also for the front-wheel of car in benefit on line.
A kind of double crawler belts that train uses laterally quickly transfer the device of car, the main points of its technical scheme are that, it is described
Further include being provided with raised line on double crawler belts, the width of car wheel is greater than the distance between per adjacent two raised lines, makes car
Wheel can be parked between two raised lines, and the setting of raised line is that car wheel is avoided to skid on double crawler belts.
A kind of double crawler belts that train uses laterally quickly transfer the device of car, the main points of its technical scheme are that, further include
Be provided with car bearing plate, the car bearing plate be arranged in the lower section phases of double crawler belts of carrying car close to position, institute
The both ends for the car bearing plate stated are arranged on car carrying platform, and the setting of car bearing plate both can protect double crawler belts,
It can also ensure that car is more stably run on double crawler belts.
A kind of double crawler belts that train uses laterally quickly transfer the device of car, the main points of its technical scheme are that, further include
It is provided with transition wheel, the transition wheel is arranged in one end of double crawler belts but is not limited to that one end of double crawler belts, transition wheel is arranged in
Setting enters the station area in railway platform and car is waited between area and/or car is waited between area and train and/or train and train
Junction between the outbound area of platform, the both ends of the wheel shaft of transition wheel are arranged on support plinth, the support plinth quilt
Be arranged on car carrying platform, the setting of transition wheel be in order to ensure car railway platform enter the station area and car wait area it
Between and/or double crawler belts of junction for waiting between area and train and/or between train and the outbound area of railway platform of car on nothing
Obstacle is more stably run.
A kind of double crawler belts that train uses laterally quickly transfer the device of car, the main points of its technical scheme are that, utilize height
Fast railway, which quickly transports, is both provided with the laterally quickly transfer of multiple double crawler belts on each layer of car carrying platform of the train of car
The device of car, each stratose station console that car is quickly transported using high-speed railway are respectively arranged with car and entered the station area, car
Wait area, the outbound area of car, the car of railway platform enter the station area, car wait area, the outbound area of car be all respectively arranged with it is multiple
Double crawler belts laterally quickly transfer the device of car;Double crawler belts that a kind of train of the invention uses laterally quickly transfer the dress of car
It sets and gets off outbound program including completing enter the station get on the bus program, car of program, car of waiting of car;The car enters the station journey of waiting
Get on the bus program, car of sequence, car is got off in outbound program in the automatic control system of the train and railway platform
It is completed under unified matching coordinative between automatic control system, the automation of the automatic control system and railway platform of train
Control system receives the automatic control system or this line of the higher level full line that car is quickly transported using high-speed railway
The instruction or control of the automatic control system on road;The each layer of car carrying of the train of car is quickly transported using high-speed railway
Car inventory information on the car carrying platform of car inventory information on platform, unloaded information and each stratose station console,
Unloaded information is respectively by the automatic control system of the automatic control system of train and railway platform and higher level utilization
The automatic control system of automatic control system and this route that high-speed railway quickly transports the full line of car mutually transmits,
Calculation process, feedback are only waited or when car is got on the bus or car is got off demand when car has to enter the station, each layer of sedan-chair of train
Relevant double crawler belts on vehicle carrying platform laterally quickly transfer the car carrying platform of each stratose station console of device of car
On relevant double crawler belts laterally quickly the devices of transfer cars just operate, it is then inoperative on the contrary;The car, which enters the station, waits
Program, car get on the bus program, car get off train described in outbound program double crawler belts laterally quickly transfer car device
The unlatching of power device, closing motion and railway platform the lateral quick power device of the device of transfer car of double crawler belts
It opens, the finger that the automatic control system for the automatic control system and railway platform that closing motion receives train respectively is issued
It enables and controls;This section is for the succinct convenience of narration, and by double crawler belts, laterally quickly the device of transfer car is referred to as double crawler belts, will
The car of railway platform wait area, the outbound area of car of area, car of entering the station is briefly referred to as enter the station area, the area that waits, outbound area.(1),
Car enters the station program of waiting, and car drives into area of entering the station, then drives into the area that waits from area of entering the station: car along with double track length directions
Perpendicular rectilinear direction is driven on double crawler belts in area of entering the station, and the front and rear wheel of car is parked in respectively on forward and backward crawler belt, and car stops
Steady brake, double crawler belts in area of entering the station and double crawler belts in the area that waits are corresponding is aligned, when car is intended to drive into time from double crawler belts in area of entering the station
When double crawler belts in vehicle area, at this time simultaneously starting enter the station area double crawler belts power device wait area double crawler belts power device,
Power device drives transmission shaft, and transmission shaft drives driving wheel, follower, and driving wheel, passive wheel drive are parked in pair entered the station in area
Car on crawler belt closes power device on target direction laterally operation to double crawler belts in the area that waits at this time, and double crawler belts stop
Operation, car come to a complete stop on double crawler belts in the area that waits and brake.(2), car is got on the bus program, and car drives into train from the area that waits:
The train for being loaded with car enters the area that waits, and double crawler belts on train are corresponding with double crawler belts in the area that waits to be aligned, and train comes to a complete stop, and works as sedan-chair
Che Yucong waits double crawler belts in area when driving into double crawler belts of train, and the wait power device of double crawler belts in area of starting simultaneously at this time arranges
The power device of double crawler belts of vehicle, power device drive transmission shaft, and transmission shaft drives driving wheel, follower, driving wheel, follower
Driving is parked in the car on double crawler belts in the area that waits on target direction laterally operation to double crawler belts of train, closes power at this time
Device, double crawler belts are out of service, and car comes to a complete stop on double crawler belts of train and brakes.(3), car is got off outbound program, car
It is outbound again to drive into outbound area from train: the train for being loaded with car enters outbound area, double shoes of double crawler belts and outbound area on train
The corresponding alignment of band, train come to a complete stop, when car is intended to get off the double crawler belts driven into outbound area from double crawler belts of train, simultaneously at this time
Start the power device of double crawler belts in the outbound area of power device of double crawler belts of train, power device drives transmission shaft, transmission shaft
Driving wheel, follower are driven, driving wheel, passive wheel drive are parked in the car on double crawler belts of train and laterally run to target direction
To outbound area double crawler belts on, close power device at this time, double crawler belts are out of service, car along with double track length directions phase
Vertical rectilinear direction is driven out to outbound area.
Laterally quickly the device of transfer car is realizing car in train station to double crawler belts that a kind of train of the invention uses
Have a characteristic that the length direction of 1, car is equal with the length direction of train when two-way quick transfer between platform and train
Row, car is without turning to;2, it takes time when two-way quick transfer of the car between railway platform and train most short;3, double shoes
With laterally quickly the apparatus structure of transfer car is simple;4, double crawler belts laterally quickly transfer the device manufacturing cost of car relatively
It is low.
Double crawler belts that a kind of train of the invention uses laterally quickly transfer the device of car as fast using high-speed railway
The matching technology that speed transports car is particularly suitable for using in following three kinds of high-speed railway Operation Networks: 1, public backbones high-speed iron
Road network transports car for long-range or very-long-range high-speed railway;2, the intercity high speed between each provincial capital and surrounding cities
Railway network transports car for inter-city high-speed rail;3, rapid transit network is created in big city or super-large city, used
Car is transported in high-speed railway in city.
Laterally quickly the device of transfer car compared with prior art, has double crawler belts that a kind of train of the invention uses
Beneficial effect is:
1, quick convenient, save the time.Double crawler belts that a kind of train of the invention uses laterally quickly transfer the dress of car
Set can enable car in upper and lower bullet train when passenger train upper and lower as passenger operated quickly and conveniently;Usual situation
Under, it opens car and handles affairs from surrounding cities to provincial capital, car, which runs through 100KM highway+40KM or so city section, about needs two
Hour, if change by car take high-speed railway run through same mileage need only be 30 minutes.
2, high-speed rail transport can be made thoroughly to make a profit instead of suffering a loss.Currently, global high-speed railway is used only for passenger traffic, China
For the high-speed railway overwhelming majority all in lossing state, it is idle that reason is that a large amount of capacity of high-speed railway, and is chronically at
The high-speed railway achievement status of lossing state makes the high-speed rail technology in China be difficult to promote in the whole world, a kind of column of the invention
The device that double crawler belts that vehicle uses laterally quickly transfer car, which puts into effect, can sufficiently excavate the idle capacity of high-speed railway, make
High-speed railway is thoroughly made a profit instead of suffering a loss, to greatly facilitate the outlet of the high-speed railway complete set technology of China's independent intellectual property right.
3, energy-efficient, the locomotive engine movement for quickly transporting the bullet train of car is to turn locomotive wheel by power
Dynamic, what is generated between wheel rotation and track is sliding friction, and the wheel of the high-speed train body of fully loaded car is also on track
Rotation is rolling friction between them;It is known that force of sliding friction is than force of rolling friction in the case where identical in quality
It is 40 times to 60 times big, so it is much laborsaving to push object sliding in ground surface object ratio, so quickly transporting the high speed of car
The locomotive engine of train can draw the bullet train advance that tens sections are fully loaded with car;Car on highway when driving, the drive of car
The friction on driving wheel and ground is sliding friction, and the driven wheel of car and the friction on ground are rolling friction, when car falls into miriness
When, the driving wheel rotation of car, which will appear, skids and soil is ground zanjon, and driven wheel is without rotation;If fully loaded by one
The amount and pollutant discharge amount of the energy consumed by the bullet train of 300 cars and 300 cars are simultaneously in highway uplink
The total amount and gross contamination emission for sailing the consumed energy compare, and by most conservative estimation, the former is only the 1/10 of the latter.
4, it is conducive to environmental protection.High-speed railway uses electric energy, and electric energy is clear energy sources, and electric energy can pass through water
The number of ways such as power power generation, wind-power electricity generation, solar power generation, nuclear energy power generation obtain;Car is mostly non-renewable using petroleum etc.
The energy, and a large amount of vehicle exhaust can be discharged, thus, double crawler belts that a kind of train of the invention uses laterally quickly transfer
The device of car or a great environmental protection technology.
5, it can guarantee that car can still go on a journey under the severe weather conditions such as thick fog, heavy rain and ice and snow.Aircraft airport, high speed
Highway must shut off under the severe weather conditions such as thick fog, heavy rain and ice and snow, if high-speed railway is relied on quickly to transport car,
The anti-disaster performance and security performance of car operation can be greatly improved.
6, laterally quickly the device of transfer car puts into effect and can share double crawler belts that a kind of train of the invention uses
The operating pressure of a part of highway, it is possible to reduce the congestion of highway, widen driving between vehicle on expressway away from
From reducing the generation of car accident.
Detailed description of the invention
The bis- crawler belts of Fig. 1 laterally quickly transfer the device top view of car.
The bis- crawler belts of A-A laterally quickly transfer the device sectional view of car in Fig. 2 Fig. 1.
Fig. 3 railway platform laterally quickly transfers the device top view of car with (length) double crawler belts.
Fig. 4 train laterally quickly transfers the device top view of car with (short) double crawler belts.
The bis- crawler belts of Fig. 5 laterally quickly transfer the device rearview of car.
The bis- crawler belts of Fig. 6 laterally quickly transfer the plan view of car bearing plate in the device of car.
The bis- crawler belts of Fig. 7 laterally quickly transfer the device operation schematic diagram (backsight) of car.
The transition wheel sectional view that Fig. 8 is configured between the device that two double crawler belts laterally quickly transfer car.
Fig. 9 car operation schematic diagram (backsight) between the device that two double crawler belts laterally quickly transfer car.
Double crawler belts laterally quickly transfer the device operation schematic diagram (vertical view) of car on Figure 10 railway platform.
Figure 11 car is waited area, train, railway platform in the railway platform for being provided with the lateral transfer car devices of double crawler belts
Top view is run between outbound area.
Figure 12 car is waited in enter the station area, railway platform of the railway platform for being provided with the lateral transfer car devices of double crawler belts
Area, train, railway platform run top view between outbound area.
Figure 13 fills the double-layer high-speed train side view of car.
Front view is arranged on railway platform, train in the driving wheel that the bis- crawler belts of Figure 14 are laterally transferred in car device.
Lateral plan is arranged on railway platform, train in the driving wheel that the bis- crawler belts of Figure 15 are laterally transferred in car device.
In figure: 1. transmission shafts, 2. driving wheels, 3. followers, 4. support rollers, 5. bearing blocks, 6. support plinths, 7. transition wheels,
8. pair crawler belt, 9. pairs of crawler belt raised lines, 10. car bearing plates, 11. cars, 12. car carrying platforms, 13. car carrying platforms
Number, the double-layer high-speed train of 14. carrying cars, 15. high-speed train bodies, 16. bullet train chassis systems, 17. high speeds arrange
Vehicle wheel system, 18. bullet train shock mitigation systems, 19. bullet train trailer systems, 20. cars enter the station area, and 21. cars are waited
Area, the outbound area of 22. cars, 23. rail, 24. concrete columns.
Double crawler belts that specific embodiment is used below with reference to a kind of train of the invention laterally quickly transfer the dress of car
The invention will be further described for the specific embodiment set.
In the present embodiment, the drive system of bullet train, double crawler belts of bullet train laterally quickly transfer the device of car
Power device, railway platform enter the station area, car of car wait the lateral quick transfer car of double crawler belts in area, the outbound area of car
The power device of device be not drawn into.
Double crawler belts that one of the present embodiment train uses laterally quickly transfer the device of car, and the train is main
It is used to transport the train 14 of car 11, it includes being provided with chassis system 16, wheel system 17, shock mitigation system 18, traction system
It unites 19, car body 15, car carrying platform 12, is provided with one layer of car carrying platform or two layers of car on the train body 15
Carrying platform or three layers of car carrying platform, the main points of its technical scheme are that, on every layer of car carrying platform 12 all
Being provided with multiple double crawler belts, laterally quickly the device of transfer car, the device of the lateral quickly transfer car of double crawler belts are main
Including power device, transmission shaft 1, driving wheel 2, follower 3, support roller 4, double crawler belts 8, bearing block 5, support plinth 6, car carrying
Platform 12, double crawler belts 8 are two crawler belts being parallel to each other, and double crawler belts 8 are arranged on car carrying platform 12
On, double crawler belts 8 are driven by corresponding two groups of driving wheels 2, follower 3, each group of driving wheel 2 and follower 3 it
Between be additionally provided with multiple support rollers 4, the power device drives transmission shaft 1, and transmission shaft 1 drives driving wheel 2, follower 3, actively
Wheel 2, follower 3 drive the car 11 on double crawler belts 8 to run to same direction.
A kind of double crawler belts that train uses laterally quickly transfer the device of car, the main points of its technical scheme are that, it is described
Two driving wheels 2 of double crawler belts 8 are preferably disposed on same root transmission shaft 1 but are not limited to be arranged on same root transmission shaft 1.Institute
Two driving wheels 2 of the double crawler belts 8 stated, which are arranged on same root transmission shaft 1, to be advantageous in that, the front-wheel and rear-wheel of car 11 can
Synchronous, synchronized transverse shifting is better achieved.
A kind of double crawler belts that train uses laterally quickly transfer the device of car, the main points of its technical scheme are that, it is described
The both ends of the wheel shaft of two groups of driving wheels 2, follower 3 or multiple support rollers 4 are arranged on corresponding bearing block 5, the axis
It holds seat 5 to be arranged on support plinth 6, the support plinth 6 is arranged on car carrying platform 12.
A kind of double crawler belts that train uses laterally quickly transfer the device of car, the main points of its technical scheme are that, it is described
The both ends of the wheel shaft of driving wheel 2 are arranged on corresponding bearing block 5, and the bearing block 5 is arranged on support plinth 6
On, the support plinth 6 is arranged on car carrying platform 12, and the two of the wheel shaft of the follower 3 or multiple support rollers 4
End is arranged on corresponding support plinth 6, and the support plinth 6 is arranged on car carrying platform 12.
A kind of double crawler belts that train uses laterally quickly transfer the device of car, the main points of its technical scheme are that, it is described
The distance between two crawler belts 8 being parallel to each other are greater than or equal to the distance between front-wheel and rear-wheel of car 11.
A kind of double crawler belts that train uses laterally quickly transfer the device of car, the main points of its technical scheme are that, it is described
The length of double crawler belts 8 is preferably equal but is not limited to the Origin And Destination of equal, described double crawler belts 8 and is preferably in respectively and double shoes
With on the perpendicular same straight line of 8 length directions but be not limited to be in respectively with double 8 length directions of crawler belt it is perpendicular it is same always
On line, the equal length of double crawler belts 8 and the Origin And Destination of double crawler belts 8 are in perpendicular with double track length directions respectively
Synchronous, synchronized transverse shifting can be better achieved with rear-wheel also for the front-wheel of car 11 in benefit on same straight line.
A kind of double crawler belts that train uses laterally quickly transfer the device of car, the main points of its technical scheme are that, it is described
Further include being provided with raised line 9 on double crawler belts 8, the width of 11 wheel of car is greater than the distance between per adjacent two raised lines 9, makes sedan-chair
12 wheel of vehicle can be parked between two raised lines 9, and the setting of raised line 9 is that 11 wheel of car is avoided to skid on double crawler belts.
A kind of double crawler belts that train uses laterally quickly transfer the device of car, the main points of its technical scheme are that, further include
Be provided with car bearing plate 10, the car bearing plate 10 be arranged in the lower section phases of double crawler belts 8 of carrying car 11 close to
The both ends of position, the car bearing plate 10 are arranged on car carrying platform 12, and the setting of car bearing plate 10 both may be used
To protect double crawler belts 8, it can also ensure that car 11 is more stably run on double crawler belts 8.
A kind of double crawler belts that train uses laterally quickly transfer the device of car, the main points of its technical scheme are that, further include
It is provided with transition wheel 7, the transition wheel 7 is arranged in one end of double crawler belts 8 but is not limited to that one end of double crawler belts 8, mistake is arranged in
The setting of ferry boat 7 railway platform enter the station area 20 and car wait between area 21 and/or car wait area 21 and bullet train 14 it
Between and/or the junction between bullet train 14 and the outbound area 22 of railway platform, the both ends of the wheel shaft of transition wheel 7 are arranged on
On support plinth 6, the support plinth 6 is arranged on car carrying platform 12, and the setting of transition wheel 7 is to ensure
Car 11 enters the station area 20 in railway platform and car is waited between area 21 and/or car is waited between area 21 and bullet train 14
And/or it accessible on double crawler belts 8 of the junction between bullet train 14 and the outbound area 22 of railway platform more stably runs.
A kind of double crawler belts that train uses laterally quickly transfer the device of car, the main points of its technical scheme are that, utilize height
Fast railway quickly transports that be both provided with multiple double crawler belts on each layer of car carrying platform 12 of the train 14 of car 11 laterally fast
The device of speed transfer car, each stratose station console that car is quickly transported using high-speed railway are respectively arranged with car and entered the station area
20, car is waited area 21, the outbound area 22 of car, and enter the station area 20, car of the car of railway platform is waited area 21, the outbound area 22 of car
All it is respectively arranged with the device that multiple double crawler belts laterally quickly transfer car;Double crawler belts that a kind of railway platform of the invention uses
Laterally quickly the device of transfer car includes completing enter the station get on the bus program, car of program, car of waiting of car to get off outbound program;
Enter the station get on the bus program, car of program, car of waiting of the car is got off in outbound program in the automation of the train
It is completed under unified matching coordinative between control system and the automatic control system of railway platform, the automation control system of train
The automatic control system of system and railway platform receives the higher level full line that car is quickly transported using high-speed railway
The instruction or control of the automatic control system of automatic control system and/or this route;Sedan-chair is quickly transported using high-speed railway
The sedan-chair of car inventory information, unloaded information and each stratose station console on each layer of car carrying platform 12 of the train 14 of vehicle
Car inventory information, unloaded information on vehicle carrying platform 12 is respectively by oneself of the automatic control system of train and railway platform
The automatic control system of dynamic networked control systems and the higher level full line that car is quickly transported using high-speed railway and/or
The automatic control system of this route mutually transmits, calculation process, feedback, only when car enter the station wait and/or car on
When the demand that vehicle and/or car are got off, relevant double crawler belts on each layer of car carrying platform 12 of train 14 are laterally quick
The relevant double crawler belts transferred on the car carrying platform 12 of each stratose station console of device of car laterally quickly transfer car
Device just operate, it is then inoperative on the contrary;Enter the station get on the bus program, car of program, car of waiting of the car is got off outbound journey
Double crawler belts of train described in sequence laterally quickly transfer unlatching, closing motion and/or the column of the power device of the device of car
The unlatching of the power device of the device of the quick transfer car of double crawler belts transverse direction of station console, closing motion receive oneself of train respectively
The instruction or control that the automatic control system of dynamic networked control systems and railway platform is issued;This section in order to narration succinct side
Just, the lateral quick referred to as double crawler belts of the device of transfer car by double crawler belts wait enter the station area, car of the car of railway platform
Area, the outbound area of car are briefly referred to as enter the station area, the area that waits, outbound area.(1), car enters the station program of waiting, car 14 drive into
Stand area 20, then drive into the area 21 that waits from area 20 of entering the station: car 11 is sailed along the rectilinear direction perpendicular with double track length directions
Enter to enter the station area 20 double crawler belts 8 on, the front and rear wheel of car 11 is parked in respectively on forward and backward crawler belt, and car 11 comes to a complete stop brake, is entered the station
Double crawler belts 8 in area 20 wait that double crawler belts 8 in area 21 are corresponding to be aligned with car, when car 11 is intended to double crawler belts 8 from area 20 of entering the station
When driving into double crawler belts 8 in the area 21 that waits, the enter the station power device of double crawler belts 8 in area 20 of starting simultaneously at this time is waited double shoes in area 21
With 8 power device, power device drives transmission shaft 1, and transmission shaft 1 drives driving wheel 2, follower 3, driving wheel 2, follower 3
Driving is parked in the car 11 on the double crawler belts 8 to enter the station in area 20 on target direction laterally operation to the double crawler belts 8 for waiting area 21,
Power device is closed at this time, and double crawler belts 8 are out of service, and car 11 comes to a complete stop on double crawler belts 8 in the area 21 that waits and brakes.(2), sedan-chair
Vehicle is got on the bus program, and car 11 drives into train 14 from the area 21 that waits: the train 14 for being loaded with car 11 enters the area 21 that waits, on train 14
Double crawler belts 8 it is corresponding with double crawler belts 8 in the area that waits be aligned, train 14 comes to a complete stop, when car 11 is intended to double crawler belts 8 from the area 21 that waits
When driving into double crawler belts 8 of train 14, start double crawler belts 8 of the power device train 14 of double crawler belts 8 in the area 21 that waits simultaneously at this time
Power device, power device drive transmission shaft 1, transmission shaft 1 drive driving wheel 2, follower 3, driving wheel 2, follower 3 drive
The car 11 on double crawler belts 8 in the area 21 that waits is parked in on target direction laterally operation to double crawler belts 8 of train 14, is closed at this time
Power device, double crawler belts 8 are out of service, and car 11 comes to a complete stop on double crawler belts 8 of train 14 and brakes.(3), car is got off outbound
Program, it is outbound again that car 11 from train 14 drives into outbound area 22: the train 14 for being loaded with car 11 enters outbound area 22, on train 14
Double crawler belts 8 it is corresponding with double crawler belts 8 in outbound area be aligned, train 14 comes to a complete stop, when car 11 is intended to get off from double crawler belts 8 of train 14
When driving into double crawler belts 8 in outbound area 22, start double shoes in the outbound area of power device of double crawler belts 8 of train 14 simultaneously at this time
With 8 power device, power device drives transmission shaft 1, and transmission shaft 1 drives driving wheel 2, follower 3, driving wheel 2, follower 3
Driving is parked in the car on double crawler belts 8 of train 14 on target direction laterally operation to double crawler belts 8 in outbound area 22, closes at this time
Power device is closed, double crawler belts 8 are out of service, and car 11 is driven out to out along the rectilinear direction perpendicular with double 8 length directions of crawler belt
It stands area 22.
Claims (1)
1. double crawler belts that a kind of train uses laterally quickly transfer the device of car, the train is the height for transporting car
Fast train, it includes being provided with train body, chassis system, wheel system, shock mitigation system, trailer system, car body, car carrying
Platform, which is characterized in that two layers of car carrying platform is provided on the train body, it is flat in every layer of car carrying
The device that multiple double crawler belts laterally quickly transfer car, the dress of the lateral quickly transfer car of double crawler belts are both provided on platform
It sets including power device, transmission shaft, driving wheel, follower, support roller, double crawler belts, bearing block, support plinth, car carrying platform,
Double crawler belts are two crawler belts being parallel to each other, and double crawler belts are provided with corresponding two groups of driving wheels, followers,
Two groups of driving wheels are arranged on same root transmission shaft, and multiple support rollers are additionally provided between driving wheel and follower at each group,
The driving wheel, follower, support roller the both ends of wheel shaft be arranged on corresponding bearing block, the bearing block is set
It sets on support plinth, the support plinth is arranged on car carrying platform;In the lower section of double crawler belts of carrying car
It further include being provided with car bearing plate, the both ends of car bearing plate are arranged on car carrying platform;The power device
To be driven by electricity, the power device receives the instruction of the unlatching of automatic control system sending, closing, the power dress
Set driving transmission shaft, transmission shaft drives driving wheel, follower, the double crawler belts of driving wheel, passive wheel drive, double crawler belts carry cars to
Same target direction operation;
Alternatively, further including being provided with raised line on double crawler belts;Double crawler belts one end but be not limited to the one of double crawler belts
End further includes being provided with transition wheel, and the both ends of the wheel shaft of transition wheel are arranged on support plinth, and the support plinth is set
It sets on car carrying platform;
Car is quickly transferred using the device, has a characteristic that the bullet train for quickly being transported car using high-speed railway is set
It is equipped with two layers of car carrying platform, it is laterally fast to be both provided with multiple double crawler belts on each layer of car carrying platform of bullet train
The device of speed transfer car, the railway platform that car is quickly transported using high-speed railway is provided with two layers of railway platform, each
It is respectively arranged with enter the station area, car of car on stratose station console to wait area, the outbound area of car, enters the station in the car of railway platform
Wait area, the outbound area of car of area, car is all respectively arranged with multiple double crawler belts laterally quick devices of transfer cars;Car enters the station
Wait program, car get on the bus program, car get off outbound program the automatic control system of train and railway platform from
It is completed under unified matching coordinative between dynamic networked control systems, the automation control of the automatic control system and railway platform of train
System processed receives the automatic control system or this route of the higher level full line that car is quickly transported using high-speed railway
Automatic control system instruction or control;The each layer of car carrying that the train of car is quickly transported using high-speed railway is flat
Car inventory information, sky on the car carrying platform of car inventory information, unloaded information and each stratose station console on platform
Information carrying breath utilizes height by the automatic control system of the automatic control system of train and railway platform and higher level respectively
The automatic control system of automatic control system and this route that fast railway quickly transports the full line of car is mutually transmitted, is transported
Calculation processing, feedback are only waited or when car is got on the bus or car is got off demand when car has to enter the station, each layer of car of train
Relevant double crawler belts on carrying platform are laterally quickly transferred on the car carrying platform of each stratose station console of device of car
Relevant double crawler belts laterally quickly the devices of transfer cars just operate, it is then inoperative on the contrary;Car enters the station the program, car of waiting
Get on the bus program, car gets off that laterally quickly the power device of the device of transfer car is opened for double crawler belts of train in outbound program
It opens, double crawler belts laterally quickly unlatching of the power device of the device of transfer car, closing motion of closing motion and railway platform
The instruction and control that the automatic control system of the automatic control system and railway platform that receive train respectively is issued.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811439010.XA CN109747668A (en) | 2015-07-26 | 2015-07-26 | A kind of double crawler belts that train uses laterally quickly transfer the device of car |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510470615.5A CN105035111B (en) | 2015-07-26 | 2015-07-26 | A kind of device and method that double crawler belts that train uses laterally quickly transfer car |
CN201811439010.XA CN109747668A (en) | 2015-07-26 | 2015-07-26 | A kind of double crawler belts that train uses laterally quickly transfer the device of car |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510470615.5A Division CN105035111B (en) | 2015-07-26 | 2015-07-26 | A kind of device and method that double crawler belts that train uses laterally quickly transfer car |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109747668A true CN109747668A (en) | 2019-05-14 |
Family
ID=54442229
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811439010.XA Withdrawn CN109747668A (en) | 2015-07-26 | 2015-07-26 | A kind of double crawler belts that train uses laterally quickly transfer the device of car |
CN201510470615.5A Expired - Fee Related CN105035111B (en) | 2015-07-26 | 2015-07-26 | A kind of device and method that double crawler belts that train uses laterally quickly transfer car |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510470615.5A Expired - Fee Related CN105035111B (en) | 2015-07-26 | 2015-07-26 | A kind of device and method that double crawler belts that train uses laterally quickly transfer car |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN109747668A (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109747669A (en) * | 2015-07-26 | 2019-05-14 | 郭卫康 | A kind of double crawler belts that railway platform uses laterally quickly transfer the device of car |
CN105416301A (en) * | 2015-11-23 | 2016-03-23 | 郭卫康 | Method for saving investment and increasing number of cars loaded on high-speed rail train exponentially |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3037031A1 (en) * | 1980-10-01 | 1982-05-06 | Hans-Jürgen 5250 Engelskirchen Jung | Moving cars on and off railway wagon deck - involves transfer units moving cars transversely to rail track onto platform level with deck |
DE69808054D1 (en) * | 1997-03-06 | 2002-10-24 | Harry Nijenhuis Man B V | HANDLING DEVICE FOR CONTAINERS AND A RAILWAY TROLLEY |
ATE207429T1 (en) * | 1997-06-22 | 2001-11-15 | Daimler Chrysler Ag | ENVELOPE SYSTEM |
KR100285792B1 (en) * | 1999-01-30 | 2001-03-15 | 조시대 | The sending construction for vehicle |
KR101319810B1 (en) * | 2008-12-30 | 2013-10-17 | 백윤강 | Multilayer type garrage system |
DE102010019002A1 (en) * | 2010-05-03 | 2011-11-03 | RLI - Rail Logistik Innovation GbR mbH (vertretungsberechtigte Gesellschafter: Hans-Wilhelm Peters, 79837 St. Blasien; Bruno Lichtnow, 26759 Hinte) | Method and device for loading freight transport by rail |
US9511943B2 (en) * | 2013-04-26 | 2016-12-06 | J. Schmalz Gmbh | Conveyor device for loading or unloading piece goods which can be singulated |
CN104015732B (en) * | 2014-06-02 | 2018-12-07 | 郭卫康 | A kind of car high-speed rail fast freight system cracking urban traffic blocking world-famous puzzle |
-
2015
- 2015-07-26 CN CN201811439010.XA patent/CN109747668A/en not_active Withdrawn
- 2015-07-26 CN CN201510470615.5A patent/CN105035111B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN105035111B (en) | 2019-06-11 |
CN105035111A (en) | 2015-11-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107933571B (en) | A kind of car high-speed rail fast freight proprietary information is integrated and control system | |
KR200468591Y1 (en) | Smart mass transit rail system | |
CN103171563A (en) | Trail type rapid traffic delivery system and delivery method thereof | |
CN100406282C (en) | Automobile railroad | |
US20070028798A1 (en) | Dual mode vehicle and system for high speed surface transportation | |
CN109421748A (en) | A kind of guide wheel rail vehicle and track | |
CN105059290B (en) | A kind of method that double crawler belts laterally quickly transfer car | |
CN104828033A (en) | Motor vehicle in-situ steering device and method for train platform | |
CN107914725B (en) | A kind of method that the automatic locking that train uses fastens car | |
CN105035111B (en) | A kind of device and method that double crawler belts that train uses laterally quickly transfer car | |
CN103935368B (en) | A kind of car industrial railway platform of quick transport car | |
CN109747669A (en) | A kind of double crawler belts that railway platform uses laterally quickly transfer the device of car | |
CN109927737A (en) | A kind of wide compartment bullet train of quick transport car | |
CN104002819A (en) | Simple high-speed rail station capable of quickly loading and unloading cars | |
CN104002826A (en) | Train with wide carriages | |
CN204801781U (en) | Device of car is transversely transferred fast to two tracks that train used | |
CN205169546U (en) | Device of car is transversely transferred fast to two tracks that train platform used | |
CN204801780U (en) | Device of car is transversely transferred fast to two tracks | |
CN104044597A (en) | High-speed train provided with driver and passenger rest rooms for rapidly transporting cars | |
CN103935287A (en) | Device and method for locking car on automobile or train fast | |
CN103953214A (en) | Device and method for quickly locking saloon car on fixed parking stall of electric vehicle or train | |
CN110053635A (en) | Quick lock in quickly transports the wide compartment bullet train of car | |
CN104828101A (en) | Motor vehicle in-situ steering device and method for train | |
CN108116296B (en) | Electric vehicle-carrying shortcut transport system | |
CN104074107A (en) | Wide-gauge railway |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190514 |