CN109736455B - Anti-settlement Construction Method of Curtain Wall Deformation Joints - Google Patents

Anti-settlement Construction Method of Curtain Wall Deformation Joints Download PDF

Info

Publication number
CN109736455B
CN109736455B CN201910011560.XA CN201910011560A CN109736455B CN 109736455 B CN109736455 B CN 109736455B CN 201910011560 A CN201910011560 A CN 201910011560A CN 109736455 B CN109736455 B CN 109736455B
Authority
CN
China
Prior art keywords
deformation joint
cover plate
construction method
curtain wall
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201910011560.XA
Other languages
Chinese (zh)
Other versions
CN109736455A (en
Inventor
贾毅
马冲
司书峰
顾学良
张东健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Goldencity Construction Co ltd
Original Assignee
Shandong Goldencity Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Goldencity Construction Co ltd filed Critical Shandong Goldencity Construction Co ltd
Priority to CN201910011560.XA priority Critical patent/CN109736455B/en
Publication of CN109736455A publication Critical patent/CN109736455A/en
Application granted granted Critical
Publication of CN109736455B publication Critical patent/CN109736455B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

本发明主要应用于建筑技术领域,特别涉及一种幕墙变形缝防沉降施工方法,采用以下步骤:1)浇筑主楼变形缝矮墙及裙房变形缝矮墙,形成错台高差,并在浇筑时分别纵向通长安放木条;2)浇筑完成拆除木条,形成企口槽;3)在两条企口槽内部沿企口槽的长度方向埋设膨胀螺栓;4)在裙房变形缝矮墙的企口槽内安装折弯型下盖板,5)嵌入防水油膏;6)在主楼变形缝矮墙的企口槽内安装折弯型上盖板的;7)安装倒U型倾斜打孔盖板;8)注入发泡填充剂。本发明使上下盖板形成可相对位移的间隙,用以消除主楼裙房的沉降变形差造成的拉力影响,形成抗变形能力。倒U型倾斜打孔盖板的设置,拆卸方便。

Figure 201910011560

The invention is mainly applied to the technical field of construction, and in particular relates to a construction method for anti-settlement of a deformation joint of a curtain wall. 2) After pouring, remove the wood strips to form grooves; 3) Bury expansion bolts along the length of the grooves inside the two grooves; 4) The deformation joints in the podium are short Install the bending type lower cover in the groove and groove of the wall, 5) Embed waterproof grease; 6) Install the bending type upper cover in the groove and groove of the low wall of the deformation joint of the main building; 7) Install the inverted U-shaped inclined perforated cover plate; 8) inject foaming filler. The invention enables the upper and lower cover plates to form a relative displacement gap, so as to eliminate the influence of the pulling force caused by the settlement deformation difference of the podium of the main building, and form the anti-deformation ability. The setting of the inverted U-shaped inclined punching cover plate is convenient for disassembly.

Figure 201910011560

Description

幕墙变形缝防沉降施工方法Anti-settlement Construction Method of Curtain Wall Deformation Joints

技术领域technical field

本发明涉及一种幕墙变形缝防沉降施工方法,属于建筑施工技术领域。The invention relates to an anti-settlement construction method for a deformation joint of a curtain wall, and belongs to the technical field of building construction.

背景技术Background technique

随着高层建筑逐渐增加,幕墙应用逐渐广泛,主楼较多采用幕墙,而在高低建筑连接变形缝处幕墙的防水成为一个重大质量隐患,传统的做法将幕墙结构直接坐落于变形缝之上,并填塞耐候密封胶,两边结构发生不均匀沉降式,会导致防水开裂或幕墙下层整体破裂,造成幕墙节能效果丧失,甚至造成安全隐患,坠落伤人等质量事故。With the gradual increase of high-rise buildings, the application of curtain wall is gradually widespread, and the main building mostly adopts curtain wall, and the waterproofing of the curtain wall at the joint deformation joint of high and low buildings has become a major quality risk. The traditional method is to place the curtain wall structure directly on the deformation joint. Filling with weather-resistant sealant will cause uneven settlement on both sides of the structure, which will lead to waterproof cracking or overall rupture of the lower layer of the curtain wall, resulting in the loss of the energy-saving effect of the curtain wall, and even causing safety hazards, falling and hurting people and other quality accidents.

发明内容SUMMARY OF THE INVENTION

本发明要解决的技术问题是:提供一种幕墙变形缝防沉降施工方法,抗变形能力强,便于后期维修更换,受冷热变形或其他外力时,不会对幕墙面板造成挤压应力导致幕墙面板被挤压破坏。The technical problem to be solved by the present invention is: to provide an anti-settlement construction method for the deformation joints of the curtain wall, which has strong anti-deformation ability, is convenient for later maintenance and replacement, and will not cause extrusion stress to the curtain wall panels and cause the curtain wall when subjected to cold and heat deformation or other external forces. The panel was crushed and damaged.

本发明所述的幕墙变形缝防沉降施工方法,采用以下步骤:The anti-settlement construction method of the deformation joint of the curtain wall according to the present invention adopts the following steps:

1)浇筑主楼变形缝矮墙及裙房变形缝矮墙,浇筑时使主楼变形缝矮墙高于裙房变形缝矮墙,形成错台高差,并在浇筑时分别在主楼变形缝矮墙、裙房变形缝矮墙外侧预留企口槽;1) Pour the deformation joint low wall of the main building and the podium deformation joint low wall. When pouring, make the deformation joint low wall of the main building higher than the podium deformation joint low wall to form a staggered height difference. , a tongue and groove groove is reserved on the outside of the low wall of the podium deformation joint;

2)在两条企口槽内部沿企口槽的长度方向钻孔,并埋设膨胀螺栓;2) Drill holes along the length of the two grooves and bury expansion bolts;

3)在裙房变形缝矮墙的企口槽内安放预先打孔的折弯型下盖板,并拧紧膨胀螺栓的螺母压紧折弯型下盖板;3) Place the pre-drilled bending lower cover in the groove of the low wall of the deformation joint of the podium, and tighten the nut of the expansion bolt to compress the bending lower cover;

4)在企口槽内嵌入防水油膏,并抹平盖实;4) Embed the waterproof ointment in the groove and trowel and cover it firmly;

5)在主楼变形缝矮墙的企口槽内,重复步骤3)、4),完成折弯型上盖板的安装;5) Repeat steps 3) and 4) in the groove and groove of the low wall of the deformation joint of the main building to complete the installation of the bending type upper cover;

6)依次安装幕墙固定件、幕墙主龙骨、幕墙次龙骨、幕墙面板;6) Install the curtain wall fixing parts, the main keel of the curtain wall, the secondary keel of the curtain wall, and the curtain wall panel in sequence;

7)以主楼变形缝矮墙上边缘为基准,安装倒U型倾斜打孔盖板;7) Based on the edge of the low wall of the main building's deformation joint, install the inverted U-shaped inclined perforated cover;

8)通过倒U型倾斜打孔盖板的孔内,注入发泡填充剂,用刀片切除发泡填充剂溢出幕墙面板及上部倒U型倾斜打孔盖板的多余填充料。8) Inject the foaming filler into the hole of the inverted U-shaped inclined perforated cover plate, and use a blade to cut off the excess filler from the foamed filler overflowing the curtain wall panel and the upper inverted U-shaped inclined perforated cover plate.

所述的步骤1)中错台高差至少为200mm,主楼变形缝矮墙、裙房变形缝矮墙外侧分别为主楼为靠近变形缝侧、裙房为远离变形缝侧。In the step 1), the height difference of the staggered platform is at least 200mm, and the outer sides of the deformation joint low wall of the main building and the podium deformation joint low wall are respectively the side close to the deformation joint for the main building and the side away from the deformation joint for the podium.

所述的步骤1)在浇筑主楼变形缝矮墙、裙房变形缝矮墙时,分别在其外侧纵向通长安放木条;浇筑完成拆除木条,在主楼变形缝矮墙、裙房变形缝矮墙上分别形成企口槽;木条选用30mm*30mm的方木条。Described step 1) when pouring the main building deformation joint low wall and the podium deformation joint low wall, place the wooden strips longitudinally on the outside of the main building respectively; Grooves are formed on the low walls respectively; the wooden strips are square wooden strips of 30mm*30mm.

所述的步骤2)中两条企口槽内部的钻孔间距≤500mm。In the step 2), the drilling distance between the two grooves is ≤500mm.

所述的步骤3)和步骤5)中折弯型下盖板、折弯型上盖板分别为铝制板,其预先打孔的间距均与步骤2)中打孔间距一致。In the steps 3) and 5), the bending type lower cover plate and the bending type upper cover plate are aluminum plates respectively, and the pre-drilled holes are the same as the punched holes in step 2).

所述的步骤6)中幕墙面板选用玻璃幕墙,在幕墙面板内侧下部涂刷银粉漆,涂刷高度为发泡填充剂高度范围。当幕墙面板为透光材料时,玻璃背涂,银粉漆具有反光性能,可以有效阻隔阳光对内部发泡填充剂的紫外线辐射老化。In the described step 6), the glass curtain wall is selected as the curtain wall panel, and the lower part of the inner side of the curtain wall panel is painted with silver powder paint, and the painting height is within the height range of the foaming filler. When the curtain wall panel is a light-transmitting material, the glass back is coated, and the silver powder paint has reflective properties, which can effectively block the ultraviolet radiation aging of the internal foaming filler from sunlight.

所述的步骤7)中倒U型倾斜打孔盖板设置为倒U型斜45度打孔铝制盖板,打孔位置在倒U型倾斜打孔盖板的中部。In the step 7), the inverted U-shaped inclined perforated cover plate is set as an inverted U-shaped inclined 45-degree perforated aluminum cover plate, and the punching position is in the middle of the inverted U-shaped inclined perforated cover plate.

所述的步骤8)中发泡填充剂6注入高度为内部空间1/3,以20分钟后,从注入孔溢出为准。In the described step 8), the injection height of the foaming filler 6 is 1/3 of the inner space, which is based on the overflow from the injection hole after 20 minutes.

所述的折弯型上盖板的上部安装在主楼变形缝矮墙的企口槽内,下部悬空,上部对应企口槽设置为U型,悬空部分为对应错台高差设置的两首尾相接的L型。The upper part of the bending type upper cover plate is installed in the groove and groove of the low wall of the deformation joint of the main building, and the lower part is suspended. connected L type.

所述的折弯型下盖板的下部安装在裙房变形缝矮墙的企口槽内,上部悬空,下部对应企口槽设置为U型,悬空部分为对应错台高差设置的两首尾相接的L型。The lower part of the bending type lower cover plate is installed in the groove and groove of the low wall of the deformation joint of the podium, the upper part is suspended, the corresponding groove and groove of the lower part is set to be U-shaped, and the suspended part is the two head and tail corresponding to the height difference of the staggered platform. Connected L-shape.

本发明的有益效果是:The beneficial effects of the present invention are:

折弯型下盖板、折弯型上盖板的设置使上下盖板形成可相对位移的间隙,用以消除主楼裙房的沉降变形差造成的拉力影响,形成抗变形能力。且便于后期维修更换,倒U型倾斜打孔盖板的设置,拆卸方便,只需拆除倒U型斜45度打孔铝制盖板,简易切割发泡填充剂,更换上盖板、下盖板。斜45度盖板,受冷热变形或其他外力时,不会对幕墙面板造成挤压应力导致幕墙面板被挤压破坏,且使后续发泡填充剂形成密闭空间。幕墙面板涂刷的银粉漆具有反光性能,玻璃背涂,可以有效阻隔阳光对内部发泡填充剂的紫外线辐射老化,当幕墙面板为透光材料时。The setting of the bent lower cover plate and the bent upper cover plate enables the upper and lower cover plates to form a relative displacement gap, which is used to eliminate the influence of the tensile force caused by the poor settlement and deformation of the podium of the main building, and to form the anti-deformation ability. And it is convenient for later maintenance and replacement. The setting of the inverted U-shaped oblique perforated cover plate is easy to disassemble. Just remove the inverted U-shaped oblique 45-degree perforated aluminum cover, simply cut the foaming filler, and replace the upper cover and lower cover. plate. The 45-degree inclined cover plate will not cause extrusion stress to the curtain wall panel when it is deformed by cold and heat or other external forces, causing the curtain wall panel to be crushed and damaged, and the subsequent foaming filler will form a closed space. The silver powder paint painted on the curtain wall panel has reflective properties, and the glass back coating can effectively block the ultraviolet radiation aging of the internal foaming filler from sunlight. When the curtain wall panel is a light-transmitting material.

附图说明Description of drawings

图1是本发明的结构示意图。Figure 1 is a schematic structural diagram of the present invention.

图2是折弯型上盖板的结构示意图。FIG. 2 is a schematic structural diagram of a bending type upper cover plate.

图3是折弯型下盖板的结构示意图。FIG. 3 is a schematic structural diagram of a bent lower cover plate.

图4是倒U型倾斜打孔盖板的结构示意图。FIG. 4 is a schematic structural diagram of an inverted U-shaped oblique perforated cover plate.

图中:1、幕墙主龙骨;2、幕墙固定件;3、幕墙面板;4、银粉漆涂层;5、幕墙次龙骨;6、发泡填充剂;7、折弯型上盖板;8、折弯型下盖板;9、防水油膏;10、膨胀螺栓;11、裙房变形缝矮墙;12、裙房外围框架梁;13、主楼外围框架梁;14、主楼变形缝矮墙;15、主楼框架柱;16、倒U型倾斜打孔盖板。In the figure: 1. Curtain wall main keel; 2. Curtain wall fixings; 3. Curtain wall panel; 4. Silver powder paint coating; 5. Curtain wall secondary keel; 6. Foaming filler; 7. Bending type upper cover; 8 , Bending type lower cover; 9. Waterproof grease; 10. Expansion bolts; 11. Podium deformation joint low wall; 12. Podium peripheral frame beam; 13. Main building peripheral frame beam; 14. Main building deformation joint low wall ; 15. Frame column of the main building; 16. Inverted U-shaped inclined perforated cover plate.

具体实施方式Detailed ways

下面结合附图对本发明做进一步描述:The present invention will be further described below in conjunction with the accompanying drawings:

如图1~图4所示,本发明所述的幕墙变形缝防沉降施工方法:As shown in Figures 1 to 4, the anti-settlement construction method of the curtain wall deformation joint according to the present invention:

1)浇筑主楼框架柱15、主楼外围框架梁13、裙房外围框架梁12完成后,浇筑主楼变形缝矮墙14及裙房变形缝矮墙11,浇筑时使主楼变形缝矮墙14高于裙房变形缝矮墙11,形成错台高差,并在浇筑时分别在主楼变形缝矮墙14、裙房变形缝矮墙11外侧纵向通长安放木条;1) After pouring the main building frame column 15, the main building peripheral frame beam 13, and the podium peripheral frame beam 12, pour the main building deformation joint low wall 14 and the podium deformation joint low wall 11, and make the main building deformation joint low wall 14 higher than The deformation joint low wall 11 of the podium is formed to form a staggered height difference, and during pouring, wooden strips are placed longitudinally on the outside of the main building deformation joint low wall 14 and the podium deformation joint low wall 11 respectively;

2)浇筑完成拆除木条,在主楼变形缝矮墙14、裙房变形缝矮墙11上分别形成企口槽;2) After the pouring is completed, the strips are removed, and grooves and grooves are formed on the main building deformation joint low wall 14 and the podium deformation joint low wall 11 respectively;

3)在两条企口槽内部沿企口槽的长度方向钻孔,并埋设膨胀螺栓10;3) Drill holes along the length of the two grooves inside the grooves, and embed expansion bolts 10;

4)在裙房变形缝矮墙11的企口槽内安放预先打孔的铝制折弯型下盖板8,并拧紧膨胀螺栓10的螺母压紧折弯型下盖板8;4) Place the pre-drilled aluminum bending type lower cover plate 8 in the groove of the podium deformation joint low wall 11, and tighten the nut of the expansion bolt 10 to press the bending type lower cover plate 8;

5)在企口槽内嵌入防水油膏9,并抹平盖实;5) Embed the waterproof ointment 9 in the groove and groove, and smooth and cover;

6)在主楼变形缝矮墙14的企口槽内,重复步骤4)、5),完成折弯型上盖板7的安装;6) In the groove and groove of the deformation joint low wall 14 of the main building, repeat steps 4), 5) to complete the installation of the bending type upper cover plate 7;

7)依次安装幕墙固定件2、幕墙主龙骨1、幕墙次龙骨5、幕墙面板3;7) Install the curtain wall fixing parts 2, the main keel of the curtain wall 1, the secondary keel of the curtain wall 5, and the curtain wall panel 3 in sequence;

8)以主楼变形缝矮墙14上边缘为基准,安装倒U型倾斜打孔盖板16;8) Based on the upper edge of the deformation joint low wall 14 of the main building, install the inverted U-shaped inclined punching cover plate 16;

9)通过倒U型倾斜打孔盖板16的孔内,注入发泡填充剂6,用刀片切除发泡填充剂6溢出幕墙面板及上部倒U型倾斜打孔盖板16的多余填充料。9) Inject the foaming filler 6 into the hole of the inverted U-shaped inclined perforated cover plate 16, and use a blade to cut off the excess filling material of the foamed filler 6 overflowing the curtain wall panel and the upper inverted U-shaped inclined perforated cover plate 16.

所述的步骤1)中错台高差至少为200mm,主楼变形缝矮墙14、裙房变形缝矮墙11外侧分别为主楼为靠近变形缝侧、裙房为远离变形缝侧。In the step 1), the height difference of the staggered platform is at least 200mm, and the outer sides of the main building deformation joint low wall 14 and the podium deformation joint low wall 11 are respectively the main building near the deformation joint and the podium far away from the deformation joint.

所述的步骤1)中使用的木条为30mm*30mm的方木条。The wooden strips used in the described step 1) are 30mm*30mm square wooden strips.

所述的步骤3)中两条企口槽内部的钻孔间距≤500mm。In the step 3), the spacing between the holes inside the two grooves is ≤500mm.

所述的步骤4)和步骤6)中折弯型下盖板8、折弯型上盖板7分别为铝制板,其预先打孔的间距均与步骤3)中打孔间距一致。In the steps 4) and 6), the bending type lower cover plate 8 and the bending type upper cover plate 7 are aluminum plates respectively, and the pre-drilled holes are the same as the punched holes in step 3).

所述步骤7)中幕墙面板3选用玻璃幕墙,在幕墙面板3内侧下部涂刷银粉漆,形成银粉漆涂层4,涂刷高度为发泡填充剂6高度范围。In the step 7), the glass curtain wall is selected for the curtain wall panel 3, and silver powder paint is painted on the inner lower part of the curtain wall panel 3 to form the silver powder paint coating 4, and the painting height is the height range of the foaming filler 6.

步骤8)中倒U型倾斜打孔盖板16设置为倒U型斜45度打孔铝制盖板,打孔位置在倒U型倾斜打孔盖板16的中部。In step 8), the inverted U-shaped oblique punching cover plate 16 is set as an inverted U-shaped oblique 45-degree punched aluminum cover plate, and the punching position is in the middle of the inverted U-shaped oblique punching cover plate 16 .

步骤9)中发泡填充剂6注入高度为内部空间1/3,以20分钟后,从注入孔溢出为准。In step 9), the injection height of the foaming filler 6 is 1/3 of the inner space, which is based on the overflow from the injection hole after 20 minutes.

折弯型上盖板7的上部安装在主楼变形缝矮墙14的企口槽内,下部悬空,上部对应企口槽设置为U型,悬空部分为对应错台高差设置的两首尾相接的L型。折弯型下盖板8的下部安装在裙房变形缝矮墙11的企口槽内,上部悬空,下部对应企口槽设置为U型,悬空部分为对应错台高差设置的两首尾相接的L型。The upper part of the bending type upper cover plate 7 is installed in the groove and groove of the deformation joint low wall 14 of the main building. The L shape. The lower part of the bent lower cover plate 8 is installed in the groove and groove of the low wall 11 of the deformation joint of the podium, the upper part is suspended, the corresponding groove and groove of the lower part is set to be U-shaped, and the suspended part is the two end-to-end phase corresponding to the height difference of the staggered platform. connected L type.

Claims (10)

1. A curtain wall deformation joint anti-settlement construction method is characterized by comprising the following steps:
1) pouring a main building deformation joint low wall (14) and a skirt room deformation joint low wall (11), wherein the main building deformation joint low wall (14) is higher than the skirt room deformation joint low wall (11) during pouring to form a staggered platform height difference, and tongue-and-groove grooves are reserved on the outer sides of the main building deformation joint low wall (14) and the skirt room deformation joint low wall (11) respectively during pouring;
2) drilling holes in the two tongue-and-groove grooves along the length direction of the tongue-and-groove grooves, and embedding expansion bolts (10);
3) a pre-punched bent lower cover plate (8) is placed in a rabbet groove of the skirt house deformation joint low wall (11), and a nut of an expansion bolt (10) is screwed to compress the bent lower cover plate (8);
4) embedding waterproof factice (9) in the groove and tongue groove, and trowelling and covering firmly;
5) repeating the steps 3) and 4) in the tongue-and-groove of the main building deformation joint low wall (14), and finishing the installation of the bent upper cover plate (7);
6) sequentially installing a curtain wall fixing piece (2), a curtain wall main keel (1), a curtain wall secondary keel (5) and a curtain wall panel (3);
7) an inverted U-shaped inclined punching cover plate (16) is installed by taking the upper edge of the main building deformation joint low wall (14) as a reference;
8) the foaming filler (6) is injected into the holes of the inverted U-shaped inclined perforated cover plate (16), and the excessive filling material overflowing from the curtain wall panel (3) and the upper inverted U-shaped inclined perforated cover plate (16) of the foaming filler (6) is cut off by a blade.
2. The anti-settling construction method for the deformation joint of the curtain wall as claimed in claim 1, wherein the anti-settling construction method comprises the following steps: in the step 1), the height difference of the staggered platforms is at least 200mm, the outer sides of the main building deformation joint low wall (14) and the skirt room deformation joint low wall (11) are respectively the main building side close to the deformation joint and the skirt room side far away from the deformation joint.
3. The anti-settling construction method for the deformation joint of the curtain wall as claimed in claim 1, wherein the anti-settling construction method comprises the following steps: step 1) when a main building deformation joint low wall and a skirt house deformation joint low wall are poured, battens are longitudinally and completely arranged on the outer sides of the main building deformation joint low wall and the skirt house deformation joint low wall; after pouring, removing battens, and respectively forming tongue-and-groove grooves on the main building deformation joint low wall and the skirt house deformation joint low wall; the battens are square battens with the thickness of 30mm by 30 mm.
4. The anti-settling construction method for the deformation joint of the curtain wall as claimed in claim 1, wherein the anti-settling construction method comprises the following steps: the distance between the drill holes in the two tongue-and-groove grooves in the step 2) is less than or equal to 500 mm.
5. The anti-settling construction method for the deformation joint of the curtain wall as claimed in claim 1, wherein the anti-settling construction method comprises the following steps: the bending type lower cover plate (8) and the bending type upper cover plate (7) in the steps 3) and 5) are respectively made of aluminum plates, and the pre-punching intervals of the bending type lower cover plate and the bending type upper cover plate are consistent with the punching intervals in the step 2).
6. The anti-settling construction method for the deformation joint of the curtain wall as claimed in claim 1, wherein the anti-settling construction method comprises the following steps: and 6), selecting a glass curtain wall as the curtain wall panel (3), and coating silver paint on the lower part of the inner side of the curtain wall panel (3) before installation, wherein the coating height is within the height range of the foaming filler (6).
7. The anti-settling construction method for the deformation joint of the curtain wall as claimed in claim 1, wherein the anti-settling construction method comprises the following steps: and 7), arranging the inverted U-shaped inclined punching cover plate (16) into an inverted U-shaped inclined 45-degree punching aluminum cover plate, and punching the hole at the middle part of the inverted U-shaped inclined punching cover plate (16).
8. The anti-settling construction method for the deformation joint of the curtain wall as claimed in claim 1, wherein the anti-settling construction method comprises the following steps: in step 8), the foaming filler (6) is injected into the inner space 1/3 at a height of 20 minutes before overflowing from the injection hole.
9. The anti-settling construction method for the deformation joint of the curtain wall as claimed in claim 1, wherein the anti-settling construction method comprises the following steps: and 5), the upper part of the bending type upper cover plate (7) is arranged in a rabbet groove of the main building deformation joint low wall (14), the lower part of the bending type upper cover plate is suspended, the upper part of the bending type upper cover plate is arranged in a U shape corresponding to the rabbet groove, and the suspended part of the bending type upper cover plate is an L shape with two ends connected with each other and arranged corresponding to the height difference of the staggered floor.
10. The anti-settling construction method for the deformation joint of the curtain wall as claimed in claim 1, wherein the anti-settling construction method comprises the following steps: and 3) the lower part of the bent lower cover plate (8) is arranged in a rabbet groove of the skirt house deformation joint low wall (11), the upper part is suspended, the lower part corresponding to the rabbet groove is set to be U-shaped, and the suspended part is L-shaped with two ends connected with each other and corresponding to the staggered platform height difference.
CN201910011560.XA 2019-01-07 2019-01-07 Anti-settlement Construction Method of Curtain Wall Deformation Joints Expired - Fee Related CN109736455B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910011560.XA CN109736455B (en) 2019-01-07 2019-01-07 Anti-settlement Construction Method of Curtain Wall Deformation Joints

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910011560.XA CN109736455B (en) 2019-01-07 2019-01-07 Anti-settlement Construction Method of Curtain Wall Deformation Joints

Publications (2)

Publication Number Publication Date
CN109736455A CN109736455A (en) 2019-05-10
CN109736455B true CN109736455B (en) 2020-12-11

Family

ID=66363606

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910011560.XA Expired - Fee Related CN109736455B (en) 2019-01-07 2019-01-07 Anti-settlement Construction Method of Curtain Wall Deformation Joints

Country Status (1)

Country Link
CN (1) CN109736455B (en)

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5611181A (en) * 1994-11-14 1997-03-18 Construction Specialties, Inc. Seismic expansion joint cover
CN202530656U (en) * 2012-03-31 2012-11-14 叶香菲 High and low roof expansion joint structure
CN207110085U (en) * 2017-08-30 2018-03-16 浙江中邦建设工程有限公司 A kind of antiseep processing structure at expansion joint high-low bay

Also Published As

Publication number Publication date
CN109736455A (en) 2019-05-10

Similar Documents

Publication Publication Date Title
US9624666B2 (en) Structural insulated panel framing system
US7984594B1 (en) Composite building and panel systems
CN110792203B (en) Aerated concrete composite thermal insulation wall panel system and construction method thereof
US9068350B2 (en) Building module, a method for making same, and a method for using same to construct a building
CN102051923A (en) Fireproofing retardant cement calcium silicate board insulating wall body and construction method thereof
CN111188454A (en) Assembled profiled steel sheet combination light foaming cement wallboard
CN104631650B (en) Screen plate outer wall with heat insulation layer and construction method
CN116044106A (en) Integrated construction method for assembled phase-change heat-preservation decorative plate
CN208718203U (en) Monoblock type autoclaved lightweight concrete plate and autoclaved lightweight concrete plate module
CN109736455B (en) Anti-settlement Construction Method of Curtain Wall Deformation Joints
CN203603309U (en) Mesh plate outer wall with mesh joints mutually staggered
CN201991102U (en) Fire-proof fire retardation cement calcium silicate board thermal-insulation wall
CN112459307A (en) Construction method of prefabricated heat-preservation-structure integrated wall external formwork
KR102050941B1 (en) Composite art panel combined structure with waterproof function
CN211949184U (en) Assembled profiled steel sheet combination light foaming cement wallboard
CN206477517U (en) A unitized glass railing system
CN116104224A (en) A kind of external wall thermal insulation integrated gap assembly structure node and construction method
EP3015620B1 (en) Panel for the enclosure and external thermal insulation of façades and roofs, and the installation procedure
CN102877580B (en) Back fastening locking type close seam mounting stone curtain wall dry hanging structure
JP4063831B2 (en) Exterior insulation prestressed building structure
CN221001522U (en) Light steel joist modularization wall body
CN219548267U (en) Outer wall moulding shaping structure
CN216587232U (en) Plate type concrete curtain wall
CN108915211B (en) Prefabricated heat-preservation decorative column with built-in pipeline and installation and construction method thereof
CN219158079U (en) Aluminum plate curtain wall mounting structure with fusiform decorative strip

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201211