CN109706927A - A kind of prestressed rock-soil bolt and preparation method of free section thereof - Google Patents

A kind of prestressed rock-soil bolt and preparation method of free section thereof Download PDF

Info

Publication number
CN109706927A
CN109706927A CN201910051700.6A CN201910051700A CN109706927A CN 109706927 A CN109706927 A CN 109706927A CN 201910051700 A CN201910051700 A CN 201910051700A CN 109706927 A CN109706927 A CN 109706927A
Authority
CN
China
Prior art keywords
free
anchor
prestressed
hole
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910051700.6A
Other languages
Chinese (zh)
Inventor
孟凡林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jilin Jianzhu University
Original Assignee
Jilin Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jilin Jianzhu University filed Critical Jilin Jianzhu University
Priority to CN201910051700.6A priority Critical patent/CN109706927A/en
Publication of CN109706927A publication Critical patent/CN109706927A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

A kind of preparation method of Prestressed Rock soil anchor bolt and its free segment, belong to Geotechnical Engineering field, the anchor pole includes anchor head and anchor rod body, anchor rod body includes the presstressed reinforcing steel being set in the drilling of foundation pit slope surface or side slope surface drilling, anchoring body and free body, presstressed reinforcing steel is continuous whole reinforcing bar, anchoring body and free body are set on presstressed reinforcing steel, the preparation method of Prestressed Rock soil anchor bolt and its free segment proposed by the present invention is to fill the free segment of rock soil anchor using foamed plastics, form flexible free segment, when anchor pole applies prestressing force, slide mass is compressed, due to the presence of flexible free segment, free segment and corresponding slide mass can be really achieved by anchor pole locking load compression, effective compressive pre-stress can be established in slide mass, sliding surface generates compression, to improve the shear resistance of sliding surface, so that The stabilization of foundation pit or side slope and safety can be guaranteed.

Description

A kind of preparation method of Prestressed Rock soil anchor bolt and its free segment
Technical field
The invention belongs to Geotechnical Engineering fields, are related to foundation pit and slope project, are related specifically to a kind of prestressing force The preparation method of rock soil anchor and its free segment.
Background technique
According to the basic principle and foundation pit of soil mechanics or the designing technique standard requirements of side slope, in the sliding of foundation pit or side slope Anchor bar body should be made into free segment in body section, and anchor bar body should be made into anchoring section in the liptinite section of foundation pit or side slope, pass through The frictional resistance that anchoring section anchor bar body provides prevents the production of sliding surface plus the effect constraint slide mass that is locked of anchor pole outer end It is raw, to realize the purpose to match with calculation model for design, to ensure the stabilization of foundation pit or slope project, guarantee engineering peace Entirely.
The mooring rod technique of existing foundation pit and slope project adds steel to twist using pea gravel concreten or mortar or cement paste The scheme of line or steel tendon or high tensile reinforcement, the practice of free segment and anchoring section for anchor bar body, practical engineering application process In, although having divided free segment and anchoring section in design drawing, there is no distinguish free segment different from the work of anchoring section mostly Method, but anchor bar body one is poured into bottom, or even give the differentiation scheme of free segment and anchoring section, do not reach but The effect of differentiation;Or propose technical solution is of poor quality, low efficiency, at high cost, it is difficult to promote and apply in practical projects.
Application No. is 201410030080.5 Chinese patent, a kind of multistage anchoring type resin anchor and its anchoring are disclosed Method, it includes anchor bar body and aperture preloader, and an anchoring section is equipped at intervals on anchor pole, remaining section is free segment;The point Anchoring section is that dentation cutting ring is machined on the anchor bar body of this section, and dentation cutting ring housing has a two-component resin anchoring cartridge, double groups Part resin anchoring cartridge both ends are cased with spacer ring, so that anchor bar body to be successively divided into the first free segment, the since aperture Some anchoring sections, the second free segment, second point anchoring section, third free segment, thirdly anchoring section, it is desirable that the first free segment is in The relaxation zone of country rock, thirdly anchoring section is in the elastic region of country rock, remaining section is in the plastic zone of country rock.The technical solution point The quantity and each section of length of anchoring section and free segment can be adjusted according to pressure from surrounding rock characteristic distributions, dispersed load, avoided Superpower stress occurs in anchor pole end to concentrate, the body of rod is prevented to be broken or extract anchoring body.The technical solution there are the problem of Be: complicated for operation, work efficiency is low, quality assurance difficulty is big, at high cost etc., especially quality problems, due to resin mobility and Permeability is extremely strong, the local sealing to consolidate and being limited in the region of one section of anticipation with the ground on periphery, in rock mass Has no possibility, resin is inevitable to be overflowed from anchoring section, causes to fail.
Application No. is 201520526632.1 Chinese patents, disclose a kind of water power side slope free section of anchor cable grouting knot Structure, including side slope surface and the anchor cable being set in side slope surface drilling, the anchor cable drilling is divided into anchoring section and free segment, Middle free segment is between anchoring section and side slope surface, including being socketed the anchor cable body being set in the anchor cable drilling, the anchor Grouting Pipe is provided in cable body, the outer rim that anchor cable body is located at the part of free segment is socketed with sealing wrap.The technical solution uses Geotextiles are that anchor bar body makees housing, it is intended to anchor bar body and rock mass be isolated, to achieve the purpose that reduce side friction, due to drilling The roughening and cement slurry of side wall can permeate the characteristic of geotextiles, and practical frictional resistance can be bigger, and free segment function is caused to lose Effect.
Application No. is 201410032446.2 Chinese patent, a kind of multistage anchoring type grouting rock bolt and its anchoring are disclosed Method, it includes anchor bar body and aperture preloader, and anchor pole is also equipped at intervals with free segment, and the free segment is on the anchor bar body It is cased with one section of plastic bushing, the both ends contractibility washer of plastic bushing is blocked or tightened, and the anchor bar body for being cased with plastic bushing is Free segment, the anchor bar body of remaining section are a point anchoring section, so that anchor bar body to be successively divided into the first free segment, the since aperture Some anchoring sections, the second free segment, second point anchoring section, third free segment, thirdly anchoring section, it is desirable that the first free segment is in The relaxation zone of country rock, thirdly anchoring section is in the elastic region of country rock, remaining section is in the plastic zone of country rock.Technical solution examination Figure makes anchor bar body become free segment in its section by plastic bushing, still, due to the frictional resistance between anchor bar body and rock mass Or cohesive force still has, by the transmitting of anchor bar body Compressive Bearing Capacity, the frictional resistance or cohesive force of this section anchor bar body are still Reinforcing bar, steel tendon or steel strand wires can be passed to by the anchor bar body of adjacent anchoring section, the free segment can not play free segment Effect.
Application No. is 201510434626.8 Chinese patents, disclose a kind of anchor cable subregion anchoring segmentation preload rock stratum control Method processed, this method implements subregion anchoring using anchor cable, segmentation pre-tightens.Subregion anchoring is directed to fracture area, plastic zone and elasticity Anchoring section is set separately in area, and anchoring sequence is followed successively by elastic region, plastic zone and fracture area, and elastic region anchoring section uses resin anchoring Agent anchoring, plastic zone and fracture area are anchored using slip casting;Segmentation pre-tightens after i.e. each anchoring is stablized except the anchoring section of aperture, right The free segment in anchoring section outer end to aperture carries out tensioning preload.The technical solution can effectively improve the reliability of cable bolting, Subregion setting anchoring section can effectively avoid whole failure of cable caused by anchor cable is locally broken, and slip casting anchoring has anchoring anchor Rope and the double action for reinforcing crack country rock;Segmentation, which pre-tightens, has anchor cable overall length compared with high pre-stress, and active support effect is obvious It improves, CONTROL OF STRATA MOVEMENT effect can be effectively improved.The technical solution is suitable for permanent anchor pole, for facing for base pit engineering When property anchor pole, this way is complicated for operation, work efficiency is low, long construction period, at high cost.
Realize the Free Transform effect of provisional free section, free segment is allowed for by Free Compression.Existing skill Art is unable to satisfy such requirement, therefore needs the new technical solution of one kind to solve these problems.
Summary of the invention
The technical problems to be solved by the present invention are: providing the preparation side of a kind of Prestressed Rock soil anchor bolt and its free segment Method, so that foundation pit or the anchor pole of side slope become in slide mass section can lock the free segment that load compresses, anchor pole by anchor pole It locks load and effectively generates compression in sliding surface, improve the shear resistance of sliding surface, it is ensured that the stabilization of foundation pit or slope project, Guarantee engineering safety.
The specific present invention adopts the following technical scheme that:
The present invention provides a kind of Prestressed Rock soil anchor bolts, it is characterised in that: the anchor pole includes anchor head and anchor rod body, institute Stating anchor rod body includes presstressed reinforcing steel, anchoring body and the free body being set in the drilling of foundation pit slope surface or side slope surface drilling, institute Stating presstressed reinforcing steel is continuous whole reinforcing bar, is divided into two parts, respectively anchoring section presstressed reinforcing steel and free segment presstressed reinforcing steel, from It is enclosed with outside the aperture side of the drilling of foundation pit slope surface or side slope surface drilling, free segment presstressed reinforcing steel by section presstressed reinforcing steel anti- Rotten separation layer;The anchoring body is arranged outside anchoring section presstressed reinforcing steel, and anchoring body and anchoring section presstressed reinforcing steel constitute anchor pole Anchoring section;The free body is arranged outside free segment presstressed reinforcing steel, free body and free segment presstressed reinforcing steel constitute anchor pole from By section.
The material of the anchoring body uses cement base cementitious mixes.
The material of the free body uses foamed plastics.
The present invention also provides a kind of free phase methods for preparing the Prestressed Rock soil anchor bolt, which is characterized in that should Method includes the following steps,
Step 1: preparing free body
More than two free bodies are prepared using polystyrene foam plastics or polyurethane foam plastics;Free body is cylinder Shape, diameter are less than bore diameter 3mm~50mm for accommodating anchor rod body, segmentation or whole section of preparation;Each free body it is total Length is the freedom length of anchor pole used in free body;The center of free body is arranged elongated perforation circular hole, the circular hole it is straight Diameter is greater than outer diameter 2mm~20mm of anti-corrosion separation layer outside presstressed reinforcing steel;In the position apart from free body outer wall clear distance 5mm~20mm The circular pipe hole that an elongated perforation is set again is set, the diameter of conduit hole is greater than catheter outer diameter 2mm~20mm;
Step 2: Rock And Soil drills
It drills in the slope surface of Rock And Soil foundation pit or side slope by the diameter of design requirement, length and the gradient;Hole depth etc. In anchor rod body length, i.e. the sum of the anchoring section of anchor pole and the length of free segment;
Step 3: material prepares
Presstressed reinforcing steel is prepared by the material of design requirement, quantity, specification and length, and inner end anchor is set by design requirement Head;Anti-corrosion separation layer is arranged in external in free segment presstressed reinforcing steel;In the range of presstressed reinforcing steel free segment, corresponding free body Free body prepared by step 1 is set on the outside of presstressed reinforcing steel by center hole;
Conduit is run through to the conduit hole for being inserted through free body, keeps conduit inner end concordant with the inner end of presstressed reinforcing steel;
Step 4: joint bar is in the milk
The material that step 3 is prepared is sent into the hole of step 2 drilling;It prepares grouting material and passes through conduit to step 2 It is in the milk in the hole of drilling, termination when free body is displaced outwardly or the gap between free body and hole sidewalls has grouting material exudation Grouting.
So far, the preparation method of Prestressed Rock soil anchor bolt free segment is completed.
Through the above design, the present invention can be brought the following benefits: a kind of Prestressed Rock provided by the invention The preparation method of soil anchor bolt and its free segment is to fill the free segment of rock soil anchor using foamed plastics, is formed flexible free Section, when anchor pole applies prestressing force, slide mass is compressed, due to the presence of flexible free segment, free segment and corresponding sliding Body can be really achieved by anchor pole locking load compression, effective compressive pre-stress can be established in slide mass, sliding surface generates Compression, so that the shear resistance of sliding surface is improved, so that the stabilization of foundation pit or side slope and safety can be guaranteed.
Detailed description of the invention
Fig. 1 is Prestressed Rock soil anchor bolt schematic diagram as mentioned in the embodiments of the present invention.
Fig. 2 is the free segment diagrammatic cross-section of Prestressed Rock soil anchor bolt as mentioned in the embodiments of the present invention.
Fig. 3 is the anchoring section diagrammatic cross-section of Prestressed Rock soil anchor bolt as mentioned in the embodiments of the present invention.
It is respectively marked in figure as follows: 1- anchoring section, 2- free segment, 3- Rock And Soil, 4- anchoring body, 5- free body, 6- prestressing force Muscle, 7- conduit.
Specific embodiment
Below with reference to attached drawing of the invention, technical solution in the embodiment of the present invention carries out clear, complete statement, institute Stating embodiment is only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ability Without making creative work, every other embodiment obtained belongs to the present invention to domain those of ordinary skill Protection scope.
Refering to fig. 1~Fig. 3 proposes a kind of Prestressed Rock soil anchor bolt in the present embodiment, which includes anchor head and anchor pole The body of rod, the anchor rod body include being set to the drilling of foundation pit slope surface or presstressed reinforcing steel 6,4 and of anchoring body in side slope surface drilling Free body 5, the presstressed reinforcing steel 6 are continuous whole reinforcing bar, are divided into two parts, respectively anchoring section presstressed reinforcing steel and free segment Presstressed reinforcing steel, free segment presstressed reinforcing steel drills close to foundation pit slope surface or the aperture side of side slope surface drilling, free segment presstressed reinforcing steel Outside is enclosed with anti-corrosion separation layer;The anchoring body 4 is arranged outside anchoring section presstressed reinforcing steel, and anchoring body 4 and anchoring section are answered in advance The anchoring section 1 of power muscle composition anchor pole;The free body 5 is arranged outside free segment presstressed reinforcing steel, and free body 5 and free segment are answered in advance The free segment 2 of power muscle composition anchor pole;
The material of the anchoring body 4 uses cement base cementitious mixes;
The material of the free body 5 uses the foamed plastics of the factorial production.
The invention also provides a kind of free segment preparation methods of Prestressed Rock soil anchor bolt, which is characterized in that this method packet Include following steps,
Step 1: preparing free body 5
More than two free bodies 5 are prepared using polystyrene foam plastics or polyurethane foam plastics;Free body 5 is cylinder Shape, diameter are less than bore diameter 3mm~50mm for accommodating anchor rod body, segmentation or whole section of preparation;Each free body 5 it is total Length is 2 length of free segment of anchor pole used in free body 5;Elongated perforation circular hole is arranged in the center of free body 5, the circular hole Diameter is greater than outer diameter 2mm~20mm of 6 outside anti-corrosion separation layer of presstressed reinforcing steel;Apart from 5 outer wall clear distance 5mm~20mm of free body Position the circular pipe hole of one elongated perforation is set again, the diameter of conduit hole is greater than 7 outer diameter 2mm~20mm of conduit;
Step 2: Rock And Soil 3 drills
It drills in the slope surface of 3 foundation pit of Rock And Soil or side slope by the diameter of design requirement, length and the gradient;Hole depth is just It is the length of anchor rod body, i.e. the sum of the anchoring section 1 of anchor pole and the length of free segment 2;
Step 3: material prepares
Presstressed reinforcing steel 6 is prepared by the material of design requirement, quantity, specification and length, and inner end anchor is set by design requirement Head;Anti-corrosion separation layer is arranged in external in free segment presstressed reinforcing steel;In the range of 6 free segment of presstressed reinforcing steel, corresponding free body 5 Center hole, free body 5 prepared by step 1 is set on the outside of presstressed reinforcing steel 6;
Conduit 7 is run through to the conduit hole for being inserted through free body 5, keeps 7 inner end of conduit concordant with the inner end of presstressed reinforcing steel 6;
Step 4: joint bar is in the milk
The material that step 3 is prepared is sent into the hole of step 2 drilling, is prepared grouting material and is passed through conduit 7 to step It is in the milk in the hole of two drillings, when free body 5 is displaced outwardly or the gap between free body 5 and hole sidewalls has grouting material exudation Terminate grouting.
So far, the preparation method of Prestressed Rock soil anchor bolt free segment is completed.

Claims (4)

1.一种预应力岩土锚杆,该锚杆包括锚头及锚杆杆体,其特征在于:所述锚杆杆体包括设置于基坑坡面钻孔或边坡坡面钻孔内的预应力筋(6)、锚固体(4)和自由体(5),所述预应力筋(6)为连续的整根钢筋,分为两部分,分别为锚固段预应力筋和自由段预应力筋,自由段预应力筋靠近基坑坡面钻孔或边坡坡面钻孔的孔口侧,自由段预应力筋外部包裹有防腐隔离层;所述锚固体(4)设置在锚固段预应力筋外部,锚固体(4)和锚固段预应力筋构成锚杆的锚固段(1);所述自由体(5)设置在自由段预应力筋外部,自由体(5)和自由段预应力筋构成锚杆的自由段(2)。1. a prestressed rock-soil bolt, this bolt comprises an anchor head and a bolt body, it is characterized in that: the described bolt body comprises a prestressed bolt that is arranged in the drilling hole on the slope surface of the foundation pit or the drilling on the slope surface of the side slope. The stress bar (6), the anchor body (4) and the free body (5), the prestressed bar (6) is a continuous whole steel bar and is divided into two parts, which are the prestressed bar of the anchoring section and the prestressed free section. rib, the prestressed rib in the free section is close to the orifice side of the drilling on the slope surface of the foundation pit or the drilling on the slope surface of the slope, and the prestressing rib in the free section is wrapped with an anti-corrosion isolation layer; Outside the stress rib, the anchor body (4) and the anchoring section prestressing tendon constitute the anchoring section (1) of the anchor rod; the free body (5) is arranged outside the free section prestressing tendon, and the free body (5) and the free section prestressing tendon The stress tendons form the free section (2) of the anchor. 2.根据权利要求1所述的预应力岩土锚杆,其特征在于:所述锚固体(4)的材料采用水泥基胶凝混合料。2 . The prestressed rock-soil bolt according to claim 1 , characterized in that: the material of the anchor ( 4 ) is a cement-based cementitious mixture. 3 . 3.根据权利要求1所述的预应力岩土锚杆,其特征在于:所述自由体(5)的材料采用泡沫塑料。3. The prestressed rock-soil bolt according to claim 1, characterized in that: the material of the free body (5) is foamed plastic. 4.一种制备权利要求1所述的预应力岩土锚杆的自由段方法,其特征在于,该方法包括以下步骤,4. A method for preparing the free section of the prestressed rock-soil bolt according to claim 1, characterized in that, the method comprises the following steps: 步骤一、制备自由体(5)Step 1. Preparation of free body (5) 采用聚苯乙烯泡沫塑料或聚氨酯泡沫塑料制备两个以上自由体(5);自由体(5)为圆柱形,直径小于用于容纳锚杆杆体的钻孔直径3mm~50mm,分段或整段制备;每个自由体(5)的总长度为自由体(5)所用于锚杆的自由段(2)长度;自由体(5)的中心设置通长的贯通圆孔,该圆孔的直径大于预应力筋外部防腐隔离层的外径2mm~20mm;在距离自由体(5)外壁净距5mm~20mm的位置再设置一个通长贯通的圆形导管孔洞,导管孔洞的直径大于导管(7)外径2mm~20mm;Using polystyrene foam or polyurethane foam to prepare more than two free bodies (5); the free body (5) is cylindrical, the diameter of which is smaller than the diameter of the drill hole for accommodating the bolt body by 3 mm to 50 mm, and the free body (5) is divided into sections or whole sections. Preparation; the total length of each free body (5) is the length of the free segment (2) of the anchor rod used by the free body (5); the center of the free body (5) is provided with a through hole with a through hole, and the diameter of the hole is 2mm~20mm larger than the outer diameter of the external anti-corrosion isolation layer of the prestressed rib; a circular conduit hole with a through-length through-hole is arranged at a position of 5mm~20mm away from the outer wall of the free body (5), and the diameter of the conduit hole is larger than that of the conduit (7). ) Outer diameter 2mm~20mm; 步骤二、岩土体(3)钻孔Step 2. Drilling of rock and soil mass (3) 按设计要求的直径、长度和坡度在岩土体(3)基坑或边坡的坡面上钻孔;孔洞深度等于锚杆杆体长度,即锚杆的锚固段(1)和自由段(2)的长度之和;Drill holes on the slope surface of the foundation pit or slope of the rock and soil mass (3) according to the diameter, length and slope required by the design; the depth of the hole is equal to the length of the bolt body, that is, the anchoring section (1) and the free section (2) of the bolt. ) sum of the lengths; 步骤三、材料准备Step 3. Material preparation 按设计要求的材质、数量、规格和长度制备预应力筋(6),并按设计要求设置内端锚头;在自由段预应力筋的外部设置防腐隔离层;在预应力筋自由段的范围内,对应自由体(5)的中心孔洞,将步骤一制备的自由体(5)穿套在预应力筋(6)的外部;Prepare the prestressed tendons (6) according to the material, quantity, specification and length required by the design, and set the inner end anchor head according to the design requirements; set the anti-corrosion isolation layer on the outside of the prestressed tendons in the free section; Inside, corresponding to the central hole of the free body (5), the free body (5) prepared in step 1 is sheathed on the outside of the prestressed rib (6); 将导管(7)贯穿插过自由体(5)的导管孔洞,使导管(7)内端与预应力筋(7)的内端平齐;Insert the conduit (7) through the conduit hole of the free body (5), so that the inner end of the conduit (7) is flush with the inner end of the prestressing rib (7); 步骤四、插筋灌浆Step 4: Insert the reinforcement and grouting 将步骤三准备的材料送入步骤二钻孔的孔洞中;制备灌浆料并通过导管(7)向步骤二钻孔的孔洞中灌浆,自由体(5)向外移动或自由体(5)与孔洞侧壁之间的缝隙有灌浆料渗出时终止灌浆。The material prepared in step 3 is sent into the hole drilled in step 2; the grouting material is prepared and grouted into the hole drilled in step 2 through the conduit (7), and the free body (5) moves outward or the free body (5) and the The grouting shall be terminated when the grouting material seeps out of the gap between the side walls of the hole. 至此,预应力岩土锚杆自由段的制备方法完成。So far, the preparation method of the free section of the prestressed rock-soil bolt is completed.
CN201910051700.6A 2019-01-21 2019-01-21 A kind of prestressed rock-soil bolt and preparation method of free section thereof Pending CN109706927A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910051700.6A CN109706927A (en) 2019-01-21 2019-01-21 A kind of prestressed rock-soil bolt and preparation method of free section thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910051700.6A CN109706927A (en) 2019-01-21 2019-01-21 A kind of prestressed rock-soil bolt and preparation method of free section thereof

Publications (1)

Publication Number Publication Date
CN109706927A true CN109706927A (en) 2019-05-03

Family

ID=66262363

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910051700.6A Pending CN109706927A (en) 2019-01-21 2019-01-21 A kind of prestressed rock-soil bolt and preparation method of free section thereof

Country Status (1)

Country Link
CN (1) CN109706927A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258928A (en) * 2019-06-26 2019-09-20 中国长江三峡集团有限公司 A kind of installation method of Nut column deformed bar device
CN110593929A (en) * 2019-10-28 2019-12-20 中冶沈勘秦皇岛工程设计研究总院有限公司 Secondary multi-section anchoring anchor cable and use method thereof
CN116380596A (en) * 2023-05-06 2023-07-04 山东大学 A kind of soil sample preparation device and method for anchoring direct shear test

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200961263Y (en) * 2006-08-29 2007-10-17 湖北中南岩土工程有限公司 Fixed valve locking type reclaimable rockbolt
CN201428135Y (en) * 2009-07-23 2010-03-24 中国科学院水利部成都山地灾害与环境研究所 A pressure-type carbon fiber prestressed anchor cable landslide prevention and control structure
CN103758551A (en) * 2014-01-22 2014-04-30 山东科技大学 Multistage anchoring type resin anchor rod and anchoring method thereof
CN103850696A (en) * 2014-01-22 2014-06-11 山东科技大学 Multi-section anchoring type mortar anchor rod and anchoring method thereof
CN205062860U (en) * 2015-08-12 2016-03-02 河海大学 Side slope model test device is consolidated to stock
CN209652927U (en) * 2019-01-21 2019-11-19 吉林建筑大学 A prestressed rock-soil bolt

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200961263Y (en) * 2006-08-29 2007-10-17 湖北中南岩土工程有限公司 Fixed valve locking type reclaimable rockbolt
CN201428135Y (en) * 2009-07-23 2010-03-24 中国科学院水利部成都山地灾害与环境研究所 A pressure-type carbon fiber prestressed anchor cable landslide prevention and control structure
CN103758551A (en) * 2014-01-22 2014-04-30 山东科技大学 Multistage anchoring type resin anchor rod and anchoring method thereof
CN103850696A (en) * 2014-01-22 2014-06-11 山东科技大学 Multi-section anchoring type mortar anchor rod and anchoring method thereof
CN205062860U (en) * 2015-08-12 2016-03-02 河海大学 Side slope model test device is consolidated to stock
CN209652927U (en) * 2019-01-21 2019-11-19 吉林建筑大学 A prestressed rock-soil bolt

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258928A (en) * 2019-06-26 2019-09-20 中国长江三峡集团有限公司 A kind of installation method of Nut column deformed bar device
CN110593929A (en) * 2019-10-28 2019-12-20 中冶沈勘秦皇岛工程设计研究总院有限公司 Secondary multi-section anchoring anchor cable and use method thereof
CN116380596A (en) * 2023-05-06 2023-07-04 山东大学 A kind of soil sample preparation device and method for anchoring direct shear test

Similar Documents

Publication Publication Date Title
Li et al. Failure mechanism of bolting support and high-strength bolt-grouting technology for deep and soft surrounding rock with high stress
CN104775428B (en) Compound-type pre-stvessed anchor cable structure and construction method thereof
CN1200199C (en) A pin timbering process and sectionalized hollow mud injecting stay bolt thereof
CN101748728B (en) Soil cement expanding uplift pile
CN104790394A (en) Pressure anchor cable structure with prefabricated anchor head and construction method of pressure anchor cable structure
CN109706927A (en) A kind of prestressed rock-soil bolt and preparation method of free section thereof
CN103711507B (en) A Method for Controlling the Deformation of Large Loose Ring Roadway by a Multiple Steel Strand Combined Support Device
CN102330427B (en) Stiffening pile with high uplift resistance
CN102864777A (en) Fast prestress anchor stock structure and construction method
CN203230443U (en) Novel case expanding reverse wedging type slip casting anchor rod
CN105350988A (en) Tunnel base reinforcing method
CN103206233B (en) Anchor rope total length anchoring method for coal mine soft rock roadway
CN206530356U (en) A kind of Novel hollow grouted anchor bar
CN209652927U (en) A prestressed rock-soil bolt
CN2830645Y (en) Pouring anchor arm with anti-corrosion bushing
CN108755677A (en) A kind of prefabricated Inner bolt head anchor cable structure of multiple control slip casting
CN220166898U (en) Grouting pipe anchor rod framework, high-pressure split grouting anchor rod or pile foundation
CN2561935Y (en) Sectional hollow slip anchor rod
CN101649616B (en) Anchor part with controllable anchorage force
CN107747498B (en) A kind of mould bag filled type anchor bolt grouting device and method
CN109653199A (en) The partition method of cement base Prestressed Rock soil anchor bolt and anchor rod anchored section and free segment
CN109183786A (en) A kind of post-tensioned prestressing resistance to plucking small diameter long screw pouring piles and its construction method
CN103938626B (en) A kind of post jacking pressure type anchor rod and its construction method
EA020986B1 (en) Bore injection pile and method for making same
CN111910615A (en) Paste drilling, filling, impact extrusion and enlarged footing anchor rod structure system and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190503

RJ01 Rejection of invention patent application after publication