CN109656752B - Data backup storage device for smart campus management system and installation method thereof - Google Patents
Data backup storage device for smart campus management system and installation method thereof Download PDFInfo
- Publication number
- CN109656752B CN109656752B CN201910043329.9A CN201910043329A CN109656752B CN 109656752 B CN109656752 B CN 109656752B CN 201910043329 A CN201910043329 A CN 201910043329A CN 109656752 B CN109656752 B CN 109656752B
- Authority
- CN
- China
- Prior art keywords
- mounting plate
- data backup
- backup storage
- installation
- storage cabinet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/07—Responding to the occurrence of a fault, e.g. fault tolerance
- G06F11/16—Error detection or correction of the data by redundancy in hardware
- G06F11/1608—Error detection by comparing the output signals of redundant hardware
- G06F11/1612—Error detection by comparing the output signals of redundant hardware where the redundant component is persistent storage
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F1/00—Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
- G06F1/16—Constructional details or arrangements
- G06F1/20—Cooling means
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F1/00—Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
- G06F1/26—Power supply means, e.g. regulation thereof
- G06F1/30—Means for acting in the event of power-supply failure or interruption, e.g. power-supply fluctuations
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Quality & Reliability (AREA)
- Human Computer Interaction (AREA)
- Cooling Or The Like Of Electrical Apparatus (AREA)
Abstract
Description
技术领域technical field
本发明属于智慧校园管理系统技术领域,具体涉及用于智慧校园管理系统的数据备份存储装置及其安装方法。The invention belongs to the technical field of smart campus management systems, and in particular relates to a data backup storage device and an installation method thereof for the smart campus management system.
背景技术Background technique
当前,高等教育信息化建设不断发展,教育信息化应用水平不断提升,为了更好的整合信息化原有硬件设备资源,建设先进、全面、深入、稳定、安全的数字校园移动平台,加强无线终端的实际应用,在日常教学、办公管理、交流互动、资源共享、远程教育等多个方面进行移动应用整合与完善,满足学校管理应用的持续发展,提升学校教学质量,提高学校核心竞争力就显得尤为迫切。At present, the construction of higher education informatization continues to develop, and the application level of education informatization continues to improve. In order to better integrate the original hardware equipment resources of informatization, build an advanced, comprehensive, in-depth, stable and safe digital campus mobile platform, and strengthen wireless terminal It is necessary to integrate and improve mobile applications in daily teaching, office management, communication and interaction, resource sharing, distance education, etc., to meet the continuous development of school management applications, improve the quality of school teaching, and improve the core competitiveness of schools. especially urgent.
随着信息技术的发展,数字化校园的不断推进,移动智能终端的普及以及高校无线网覆盖区域的不断扩大。智慧校园管理系统是结合移动互联和大数据分析手段,其为学校打造的高效、实时的管理系统。在智慧校园管理系统中,数据备份是很重要的一个环节,平台管理员通过web管理界面建立磁盘备份任务,设置相应的备份策略和计划,将关键业务数据集中备份到数据备份存储柜上。如何让数据备份存储柜在断电情况下还能持续工作,且不降低散热效果为本领域技术人员需要解决的技术问题。With the development of information technology, the continuous advancement of digital campuses, the popularization of mobile smart terminals and the continuous expansion of wireless network coverage areas in colleges and universities. The smart campus management system is an efficient and real-time management system for schools that combines mobile internet and big data analysis methods. In the smart campus management system, data backup is a very important link. The platform administrator establishes disk backup tasks through the web management interface, sets corresponding backup strategies and plans, and centrally backs up key business data to the data backup storage cabinet. How to make the data backup storage cabinet continue to work in the case of power failure without reducing the heat dissipation effect is a technical problem to be solved by those skilled in the art.
发明内容Contents of the invention
本发明目的在于解决现有技术中存在的上述不足,提供用于智慧校园管理系统的数据备份存储装置及其安装方法,能使数据备份存储柜在断电情况下还能持续工作,当数据备份存储柜的存储空间放满时,可将部分数据传输到备用磁盘中,保证数据备份存储柜处于备份状态,而且箱体中间位置的风扇能对四周的数据备份存储柜、备用电源和备用磁盘同时进行散热,通过第一散热孔实现空气对流,保证箱体内部整体的散热效果;在安装方法中,先安装数据备份存储柜、备用电源和备用磁盘,再安装第一安装板、第二安装板、第三安装板和第四安装板,然后将数据备份存储柜与备用电源连接,使得数据备份存储柜与备用电源之间的线路预留长度保证第一安装板和第二安装板在滑槽中向外移动,再将数据备份存储柜与备用磁盘连接,使得数据备份存储柜与备用磁盘之间的线路预留长度保证第一安装板和第四安装板在滑槽中向外移动。The purpose of the present invention is to solve the above-mentioned deficiencies in the prior art, and provide a data backup storage device and an installation method thereof for a smart campus management system, so that the data backup storage cabinet can continue to work when the power is cut off. When the storage space of the storage cabinet is full, part of the data can be transferred to the spare disk to ensure that the data backup storage cabinet is in the backup state, and the fan in the middle of the cabinet can simultaneously control the surrounding data backup storage cabinets, backup power supply and backup disk. To dissipate heat, realize air convection through the first heat dissipation hole, and ensure the overall heat dissipation effect inside the box; in the installation method, first install the data backup storage cabinet, backup power supply and backup disk, and then install the first installation board and the second installation board , the third installation board and the fourth installation board, and then connect the data backup storage cabinet with the backup power supply, so that the reserved length of the line between the data backup storage cabinet and the backup power supply ensures that the first installation board and the second installation board are in the chute Move outward in the center, and then connect the data backup storage cabinet with the spare disk, so that the reserved length of the line between the data backup storage cabinet and the backup disk ensures that the first mounting plate and the fourth mounting plate move outward in the chute.
为了解决上述技术问题,本发明采用如下技术方案:In order to solve the above technical problems, the present invention adopts the following technical solutions:
用于智慧校园管理系统的数据备份存储装置,其特征在于:包括底板、箱体、数据备份存储柜、备用电源和备用磁盘,底板的四个角处均设有安装区域,数据备份存储柜、备用电源和备用磁盘分别单独设于各个安装区域中,数据备份存储柜与备用电源连接,数据备份存储柜与备用磁盘连接,数据备份存储柜的接口向外设置,箱体固定连接于底板的上方,箱体的中间位置设有风扇,风扇设于底板的上方,底板设有第一散热孔。本发明能使数据备份存储柜在断电情况下还能持续工作,当数据备份存储柜的存储空间放满时,可将部分数据传输到备用磁盘中,保证数据备份存储柜处于备份状态,而且箱体中间位置的风扇能对四周的数据备份存储柜、备用电源和备用磁盘同时进行散热,通过第一散热孔实现空气对流,保证箱体内部整体的散热效果。The data backup storage device used in the smart campus management system is characterized in that it includes a base plate, a box body, a data backup storage cabinet, a backup power supply and a backup disk, and there are installation areas at the four corners of the base plate, and the data backup storage cabinet, The backup power supply and the backup disk are separately installed in each installation area, the data backup storage cabinet is connected to the backup power supply, the data backup storage cabinet is connected to the backup disk, the interface of the data backup storage cabinet is set outward, and the cabinet is fixedly connected to the top of the bottom plate A fan is arranged in the middle of the box, and the fan is arranged above the base plate, and the base plate is provided with a first cooling hole. The invention can make the data backup storage cabinet continue to work when the power is cut off, and when the storage space of the data backup storage cabinet is full, part of the data can be transferred to the spare disk to ensure that the data backup storage cabinet is in a backup state, and The fan in the middle of the box can simultaneously dissipate heat from the surrounding data backup storage cabinets, backup power supply and backup disk, and realize air convection through the first cooling hole to ensure the overall cooling effect inside the box.
进一步,底板的四个角处滑动连接有第一安装板、第二安装板、第三安装板和第四安装板,第一安装板、第二安装板、第三安装板和第四安装板均设于安装区域中,数据备份存储柜安装于第一安装板上,备用电源安装于第二安装板上,备用磁盘安装于第四安装板上,第三安装板作为预留安装区,用于研发部件安装。可将第一安装板、第二安装板、第三安装板和第四安装板分别从底板上拉出一定空间,便于后期对数据备份存储柜、备用电源和备用磁盘进行除尘,且数据备份存储柜、备用电源和备用磁盘设置在设定区域中,对数据备份存储柜、备用电源和备用磁盘进行功能性存放,便于后续维修。Further, the four corners of the base plate are slidingly connected with a first mounting plate, a second mounting plate, a third mounting plate and a fourth mounting plate, and the first mounting plate, the second mounting plate, the third mounting plate and the fourth mounting plate They are all located in the installation area. The data backup storage cabinet is installed on the first installation board, the backup power supply is installed on the second installation board, the spare disk is installed on the fourth installation board, and the third installation board is used as a reserved installation area. Installed on R&D components. The first mounting plate, the second mounting plate, the third mounting plate and the fourth mounting plate can be pulled out of a certain space from the bottom plate, which is convenient for dust removal of the data backup storage cabinet, backup power supply and backup disk, and data backup storage The cabinet, backup power supply and spare disk are set in the setting area, and the data backup storage cabinet, backup power supply and backup disk are functionally stored, which is convenient for subsequent maintenance.
进一步,底板设有四个滑槽,滑槽与底板的中线呈45度夹角,第一安装板的底部、第二安装板的底部、第三安装板的底部和第四安装板的底部均设有滑动凸起,滑动凸起设于滑槽中,滑动凸起与滑槽之间设有弹簧。当对第一安装板、第二安装板、第三安装板和第四安装板进行施力时,滑动凸起在滑槽中滑动,可将第一安装板、第二安装板、第三安装板和第四安装板分别从底板上拉出一定空间,当对数据备份存储柜、备用电源和备用磁盘除尘完成后,对第一安装板、第二安装板、第三安装板和第四安装板松开,在弹簧的回复作用下,第一安装板、第二安装板、第三安装板和第四安装板回复到起始位置处。由于底板的四个滑槽与底板的中线呈45度夹角,使得第一安装板、第二安装板、第三安装板和第四安装板从底板上拉出时相互之间不受影响。Further, the base plate is provided with four chute, the chute and the center line of the base plate form an angle of 45 degrees, the bottom of the first mounting plate, the bottom of the second mounting plate, the bottom of the third mounting plate and the bottom of the fourth mounting plate are all A sliding protrusion is provided, the sliding protrusion is arranged in the chute, and a spring is arranged between the sliding protrusion and the chute. When applying force to the first mounting plate, the second mounting plate, the third mounting plate and the fourth mounting plate, the sliding protrusion slides in the chute, and the first mounting plate, the second mounting plate, the third mounting plate can be board and the fourth installation board respectively pull out a certain space from the base plate, after the dust removal of the data backup storage cabinet, backup power supply and The plates are released, and under the return action of the spring, the first mounting plate, the second mounting plate, the third mounting plate and the fourth mounting plate return to their original positions. Since the four slide grooves of the base plate form an included angle of 45 degrees with the center line of the base plate, the first mounting plate, the second mounting plate, the third mounting plate and the fourth mounting plate are not affected by each other when they are pulled out from the base plate.
进一步,第一安装板的一个外侧、第二安装板的两个外侧、第三安装板的两个外侧和第四安装板的两个外侧均设有挡板,挡板设于底板和箱体之间,挡板的外部包裹有限位卡套,挡板的外侧均设有限位凸起,限位卡套支撑于限位凸起上。通过限位卡套包裹在挡板的外部,使得第一安装板、第二安装板、第三安装板和第四安装板整体限位在底板上,此时弹簧处于小幅度压缩状态,使得第一安装板、第二安装板、第三安装板和第四安装板不出现滑动现象,提高数据备份存储柜、备用电源和备用磁盘安装的稳定性。Further, one outer side of the first installation plate, two outer sides of the second installation plate, two outer sides of the third installation plate and two outer sides of the fourth installation plate are provided with baffles, and the baffles are arranged on the bottom plate and the box body Between, the outside of the baffle is wrapped with a limit ferrule, and the outside of the baffle is provided with a limit protrusion, and the limit ferrule is supported on the limit protrusion. Wrapping the outside of the baffle through the limit ferrule, the first mounting plate, the second mounting plate, the third mounting plate and the fourth mounting plate are limited on the bottom plate as a whole. At this time, the spring is in a slightly compressed state, so that the first mounting plate The first installation board, the second installation board, the third installation board and the fourth installation board do not appear to slide, which improves the stability of the data backup storage cabinet, backup power supply and backup disk installation.
进一步,第一安装板设有两根导向条,数据备份存储柜设于两根导向条之间,第一安装板上的挡板水平设有两个调整孔,数据备份存储柜的侧部弹性连接有按压柱,按压柱与调整孔相匹配。数据备份存储柜在两根导向条之间定向移动,当对按压柱进行按压时,可按压柱转换到不同位置处的调整孔,可转换数据备份存储柜的工作状态。当按压柱设置在远离数据备份存储柜的接口的调整孔中时,数据备份存储柜处于不工作状态;当按压柱设置在靠近数据备份存储柜的接口的调整孔中时,数据备份存储柜处于工作状态,可将数据线连入数据备份存储柜的接口中。Further, the first mounting plate is provided with two guide strips, the data backup storage cabinet is arranged between the two guide strips, the baffle plate on the first installation plate is provided with two adjustment holes horizontally, the side of the data backup storage cabinet is elastically A pressing column is connected, and the pressing column matches the adjustment hole. The data backup storage cabinet moves directionally between the two guide bars. When the pressing column is pressed, the pressing column can be switched to the adjustment holes at different positions, and the working state of the data backup storage cabinet can be converted. When the pressing column is arranged in the adjustment hole far away from the interface of the data backup storage cabinet, the data backup storage cabinet is in a non-working state; when the pressing column is arranged in the adjustment hole near the interface of the data backup storage cabinet, the data backup storage cabinet is in the In the working state, the data cable can be connected to the interface of the data backup storage cabinet.
进一步,数据备份存储柜的侧部设有安装口,安装口中安装有固定板,数据备份存储柜与固定板之间设有第一固定螺钉,固定板之间设有接口保护架,接口保护架设于数据备份存储柜的接口的外侧。接口保护架对数据备份存储柜的接口起到外部冲击保护作用;且便于在数据备份存储柜的侧部拆装接口保护架。Further, the side of the data backup storage cabinet is provided with an installation opening, and a fixing plate is installed in the installation opening, a first fixing screw is provided between the data backup storage cabinet and the fixing plate, an interface protection frame is provided between the fixing plates, and the interface protection erection on the outside of the interface of the data backup storage cabinet. The interface protection frame protects the interface of the data backup storage cabinet from external impact; and it is convenient to disassemble and assemble the interface protection frame at the side of the data backup storage cabinet.
进一步,接口保护架的外侧安装有盖板,盖板与接口保护架之间设有第二固定螺钉,便于在接口保护架上拆装盖板。当按压柱设置在远离数据备份存储柜的接口的调整孔中时,数据备份存储柜处于不工作状态,此时盖板起到一个封闭作用。Further, a cover plate is installed on the outside of the interface protection frame, and a second fixing screw is provided between the cover plate and the interface protection frame to facilitate the disassembly and assembly of the cover plate on the interface protection frame. When the pressing column is arranged in the adjustment hole away from the interface of the data backup storage cabinet, the data backup storage cabinet is in a non-working state, and the cover plate plays a sealing role at this time.
进一步,箱体的底部设有插接板,底板设有通孔,插接板设于通孔中,底板与插接板之间设有第三固定螺钉,实现箱体固定连接于底板的上方,而且使得箱体与底板之间预留一定空间,便于数据备份存储柜、备用电源和备用磁盘的安装。Further, the bottom of the box body is provided with a plug-in board, the bottom board is provided with a through hole, the plug-in board is arranged in the through-hole, and a third fixing screw is provided between the bottom board and the plug-in board, so that the box body is fixedly connected to the top of the bottom board , and a certain space is reserved between the box body and the bottom plate, which is convenient for the installation of the data backup storage cabinet, the backup power supply and the backup disk.
进一步,插接板设有第二散热孔,提高散热效果。Furthermore, the plug board is provided with a second cooling hole to improve the cooling effect.
用于智慧校园管理系统的数据备份存储装置的安装方法,其特征在于包括如下步骤:The method for installing a data backup storage device for a smart campus management system is characterized in that it includes the following steps:
a、数据备份存储柜、备用电源和备用磁盘安装:采用螺钉将数据备份存储柜安装于第一安装板上,将备用电源安装于第二安装板上,同时将备用磁盘安装于第四安装板上;a. Data backup storage cabinet, backup power supply and backup disk installation: use screws to install the data backup storage cabinet on the first installation board, install the backup power supply on the second installation board, and install the backup disk on the fourth installation board superior;
b、第一安装板、第二安装板、第三安装板和第四安装板安装:根据第一安装板、第二安装板、第三安装板和第四安装板的安装位置,在底板上做上标记,再在第一安装板的底部、第二安装板的底部、第三安装板的底部和第四安装板的底部的滑动凸起处接入弹簧,将弹簧一端的钩子设置到滑动凸起的第一垫片上,然后将第一安装板、第二安装板、第三安装板和第四安装板分别安装在标记的安装位置处,将弹簧另一端的钩子设置到滑槽的第二垫片上,再逐个将第一安装板、第二安装板、第三安装板和第四安装板在滑槽中向外移动,测试弹簧的性能,然后在第一安装板外侧的挡块、第二安装板外侧的挡块、第三安装板外侧的挡块和第四安装板外侧的挡块之间卡入限位卡套;b. Installation of the first installation board, the second installation board, the third installation board and the fourth installation board: according to the installation positions of the first installation board, the second installation board, the third installation board and the fourth installation board, on the base plate Make a mark, and then connect the springs to the sliding protrusions at the bottom of the first mounting plate, the bottom of the second mounting plate, the bottom of the third mounting plate and the bottom of the fourth mounting plate, and set the hook at one end of the spring to slide Then install the first mounting plate, the second mounting plate, the third mounting plate and the fourth mounting plate at the marked installation positions respectively, and set the hook at the other end of the spring to the chute On the second gasket, move the first mounting plate, the second mounting plate, the third mounting plate and the fourth mounting plate outward in the chute one by one to test the performance of the spring, and then place the stopper on the outside of the first mounting plate Block, the stopper on the outside of the second mounting plate, the stopper on the outside of the third mounting plate and the stopper on the outside of the fourth mounting plate are snapped into the limit ferrule;
c、将数据备份存储柜与备用电源连接,数据备份存储柜与备用电源之间的线路预留长度保证第一安装板和第二安装板在滑槽中向外移动,再将数据备份存储柜与备用磁盘连接,数据备份存储柜与备用磁盘之间的线路预留长度保证第一安装板和第四安装板在滑槽中向外移动;c. Connect the data backup storage cabinet to the backup power supply. The reserved length of the line between the data backup storage cabinet and the backup power supply ensures that the first installation board and the second installation board move outward in the chute, and then the data backup storage cabinet Connected with the spare disk, the reserved length of the line between the data backup storage cabinet and the spare disk ensures that the first mounting plate and the fourth mounting plate move outward in the chute;
d、风扇安装:采用螺钉将风扇固定在箱体的中间位置中;d. Fan installation: Use screws to fix the fan in the middle of the box;
e、箱体安装:将箱体的底部的插接板插入到底板的通孔中,再采用第三固定螺钉将底板与插接板之间固定连接。e. Cabinet installation: insert the plug-in board at the bottom of the cabinet into the through hole of the bottom plate, and then use the third fixing screw to fix the connection between the bottom board and the plug-in board.
本发明由于采用了上述技术方案,具有以下有益效果:The present invention has the following beneficial effects due to the adoption of the above technical solution:
1、本发明中数据备份存储柜与备用电源连接,在断电情况下,备用电源能给数据备份存储柜供电,使数据备份存储柜能持续工作。本发明中数据备份存储柜与备用磁盘连接,当数据备份存储柜的存储空间放满时,可将部分数据传输到备用磁盘中,保证数据备份存储柜处于备份状态。而且数据备份存储柜、备用电源和备用磁盘分别单独设于底板的四个角处,箱体中间位置的风扇能对四周的数据备份存储柜、备用电源和备用磁盘同时进行散热,通过第一散热孔实现空气对流,保证箱体内部整体的散热效果。1. In the present invention, the data backup storage cabinet is connected to the backup power supply. In case of power failure, the backup power supply can supply power to the data backup storage cabinet, so that the data backup storage cabinet can continue to work. In the present invention, the data backup storage cabinet is connected with the backup disk, and when the storage space of the data backup storage cabinet is full, part of the data can be transferred to the backup disk to ensure that the data backup storage cabinet is in a backup state. Moreover, the data backup storage cabinet, backup power supply and backup disk are separately installed at the four corners of the bottom plate, and the fan in the middle of the cabinet can simultaneously dissipate heat from the surrounding data backup storage cabinet, backup power supply and backup disk. The holes realize air convection and ensure the overall cooling effect inside the box.
2、本发明可将第一安装板、第二安装板、第三安装板和第四安装板分别从底板上拉出一定空间,便于后期对数据备份存储柜、备用电源和备用磁盘进行除尘,且数据备份存储柜、备用电源和备用磁盘设置在设定区域中,对数据备份存储柜、备用电源和备用磁盘进行功能性存放,便于后续维修。第三安装板作为预留安装区,用于研发部件安装。2. In the present invention, the first mounting plate, the second mounting plate, the third mounting plate and the fourth mounting plate can be pulled out of a certain space from the bottom plate, so as to facilitate the dust removal of the data backup storage cabinet, backup power supply and backup disk in the later stage. And the data backup storage cabinet, the backup power supply and the backup disk are arranged in the setting area, and the data backup storage cabinet, the backup power supply and the backup disk are functionally stored to facilitate subsequent maintenance. The third installation board is used as a reserved installation area for the installation of R&D components.
3、在安装方法中,先安装数据备份存储柜、备用电源和备用磁盘,再安装第一安装板、第二安装板、第三安装板和第四安装板,然后将数据备份存储柜与备用电源连接,使得数据备份存储柜与备用电源之间的线路预留长度保证第一安装板和第二安装板在滑槽中向外移动,再将数据备份存储柜与备用磁盘连接,使得数据备份存储柜与备用磁盘之间的线路预留长度保证第一安装板和第四安装板在滑槽中向外移动,可将第一安装板、第二安装板、第三安装板和第四安装板分别从底板上拉出一定空间,便于后期对数据备份存储柜、备用电源和备用磁盘进行除尘。3. In the installation method, install the data backup storage cabinet, backup power supply and backup disk first, then install the first installation board, the second installation board, the third installation board and the fourth installation board, and then install the data backup storage cabinet with the backup Power connection, so that the reserved length of the line between the data backup storage cabinet and the backup power supply ensures that the first installation board and the second installation board move outward in the chute, and then connect the data backup storage cabinet with the backup disk, so that the data backup The reserved length of the line between the storage cabinet and the spare disk ensures that the first installation board and the fourth installation board can move outward in the chute, and the first installation board, the second installation board, the third installation board and the fourth installation board can be installed The boards are pulled out from the bottom plate to a certain space, which is convenient for dust removal of the data backup storage cabinet, backup power supply and backup disk later.
附图说明Description of drawings
下面结合附图对本发明作进一步说明:The present invention will be further described below in conjunction with accompanying drawing:
图1为本发明中用于智慧校园管理系统的数据备份存储装置的结构示意图;Fig. 1 is the structural representation of the data backup storage device that is used in the wisdom campus management system among the present invention;
图2为本发明中用于智慧校园管理系统的数据备份存储装置用于数据备份时的结构示意图;Fig. 2 is the structure diagram when the data backup storage device used in the smart campus management system is used for data backup in the present invention;
图3为本发明中用于智慧校园管理系统的数据备份存储装置的内部结构示意图;Fig. 3 is a schematic diagram of the internal structure of the data backup storage device used in the smart campus management system in the present invention;
图4为本发明中底板的结构示意图;Fig. 4 is a schematic structural view of the bottom plate of the present invention;
图5为本发明中第一安装板的结构示意图;Fig. 5 is a schematic structural view of the first mounting plate in the present invention;
图6为本发明中数据备份存储柜与接口保护架连接的结构示意图;Fig. 6 is a schematic structural diagram of the connection between the data backup storage cabinet and the interface protection frame in the present invention;
图7为本发明中数据备份存储柜的结构示意图;Fig. 7 is the structural representation of data backup storage cabinet among the present invention;
图8为本发明中接口保护架和盖板连接的结构示意图;Fig. 8 is a schematic structural diagram of the connection between the interface protection frame and the cover plate in the present invention;
图9为本发明中风扇在箱体的中间位置安装的结构示意图。Fig. 9 is a structural schematic view of the fan installed in the middle of the box in the present invention.
图中,1-底板;2-箱体;3-数据备份存储柜;4-备用电源;5-备用磁盘;6-风扇;7-第一安装板;8-第二安装板;9-第三安装板;10-第四安装板;11-滑槽;12-弹簧;13-挡板;14-限位卡套;15-限位凸起;16-导向条;17-调整孔;18-按压柱;19-安装口;20-固定板;21-第一固定螺钉;22-接口保护架;23-盖板;24-第二固定螺钉;25-插接板;26-第二散热孔;27-通孔;28-第一散热孔。In the figure, 1-base plate; 2-cabinet; 3-data backup storage cabinet; 4-backup power supply; 5-backup disk; 6-fan; 7-first installation board; 8-second installation board; Three mounting plates; 10-fourth mounting plate; 11-chute; 12-spring; 13-baffle; 14-limit ferrule; 15-limit protrusion; 16-guide bar; -press column; 19-installation opening; 20-fixing plate; 21-first fixing screw; 22-interface protection frame; 23-cover plate; 24-second fixing screw; 25-plug board; 26-second heat dissipation hole; 27-through hole; 28-the first cooling hole.
具体实施方式Detailed ways
如图1至图9所示,为本发明中用于智慧校园管理系统的数据备份存储装置,包括底板1、箱体2、数据备份存储柜3、备用电源4和备用磁盘5。底板1的四个角处均设有安装区域,数据备份存储柜3、备用电源4和备用磁盘5分别单独设于各个安装区域中。数据备份存储柜3与备用电源4连接,数据备份存储柜3与备用磁盘5连接,数据备份存储柜3的接口向外设置。箱体2固定连接于底板1的上方,箱体2的中间位置设有风扇6,风扇6设于底板1的上方,底板1设有第一散热孔28。As shown in Figures 1 to 9, it is a data backup storage device used in the smart campus management system in the present invention, including a
底板1的四个角处滑动连接有第一安装板7、第二安装板8、第三安装板9和第四安装板10,第一安装板7、第二安装板8、第三安装板9和第四安装板10均设于安装区域中,数据备份存储柜3安装于第一安装板7上,备用电源4安装于第二安装板8上,备用磁盘5安装于第四安装板10上,第三安装板9作为预留安装区,用于研发部件安装。可将第一安装板7、第二安装板8、第三安装板9和第四安装板10分别从底板1上拉出一定空间,便于后期对数据备份存储柜3、备用电源4和备用磁盘5进行除尘,且数据备份存储柜3、备用电源4和备用磁盘5设置在设定区域中,对数据备份存储柜3、备用电源4和备用磁盘5进行功能性存放,便于后续维修。The four corners of the
底板1设有四个滑槽11,滑槽11与底板1的中线呈45度夹角。第一安装板7的底部、第二安装板8的底部、第三安装板9的底部和第四安装板10的底部均设有滑动凸起,滑动凸起设于滑槽11中,滑动凸起与滑槽11之间设有弹簧12。当对第一安装板7、第二安装板8、第三安装板9和第四安装板10进行施力时,滑动凸起在滑槽11中滑动,可将第一安装板7、第二安装板8、第三安装板9和第四安装板10分别从底板1上拉出一定空间,当对数据备份存储柜3、备用电源4和备用磁盘5除尘完成后,对第一安装板7、第二安装板8、第三安装板9和第四安装板10松开,在弹簧12的回复作用下,第一安装板7、第二安装板8、第三安装板9和第四安装板10回复到起始位置处。由于底板1的四个滑槽11与底板1的中线呈45度夹角,使得第一安装板7、第二安装板8、第三安装板9和第四安装板10从底板1上拉出时相互之间不受影响。The
第一安装板7的一个外侧、第二安装板8的两个外侧、第三安装板9的两个外侧和第四安装板10的两个外侧均设有挡板13,挡板13设于底板1和箱体2之间,挡板13的外部包裹有限位卡套14,挡板13的外侧均设有限位凸起15,限位卡套14支撑于限位凸起15上。通过限位卡套14包裹在挡板13的外部,使得第一安装板7、第二安装板8、第三安装板9和第四安装板10整体限位在底板1上,此时弹簧12处于小幅度压缩状态,使得第一安装板7、第二安装板8、第三安装板9和第四安装板10不出现滑动现象,提高数据备份存储柜3、备用电源4和备用磁盘5安装的稳定性。One outer side of the first mounting
第一安装板7设有两根导向条16,数据备份存储柜3设于两根导向条16之间,第一安装板7上的挡板13水平设有两个调整孔17,数据备份存储柜3的侧部弹性连接有按压柱18,按压柱18与调整孔17相匹配。数据备份存储柜3在两根导向条16之间定向移动,当对按压柱18进行按压时,可按压柱18转换到不同位置处的调整孔17,可转换数据备份存储柜3的工作状态。当按压柱18设置在远离数据备份存储柜3的接口的调整孔17中时,数据备份存储柜3处于不工作状态;当按压柱18设置在靠近数据备份存储柜3的接口的调整孔17中时,数据备份存储柜3处于工作状态,可将数据线连入数据备份存储柜3的接口中。The
数据备份存储柜3的侧部设有安装口19,安装口19中安装有固定板20,数据备份存储柜3与固定板20之间设有第一固定螺钉21,固定板20之间设有接口保护架22,接口保护架22设于数据备份存储柜3的接口的外侧。接口保护架22对数据备份存储柜3的接口起到外部冲击保护作用;且便于在数据备份存储柜3的侧部拆装接口保护架22。The side portion of the data
接口保护架22的外侧安装有盖板23,盖板23与接口保护架22之间设有第二固定螺钉24,便于在接口保护架22上拆装盖板23。当按压柱18设置在远离数据备份存储柜3的接口的调整孔17中时,数据备份存储柜3处于不工作状态,此时盖板23起到一个封闭作用。A
箱体2的底部设有插接板25,底板1设有通孔27,插接板25设于通孔27中,底板1与插接板25之间设有第三固定螺钉,实现箱体2固定连接于底板1的上方,而且使得箱体2与底板1之间预留一定空间,便于数据备份存储柜3、备用电源4和备用磁盘5的安装。插接板25设有第二散热孔26,提高散热效果。The bottom of the
用于智慧校园管理系统的数据备份存储装置的安装方法,包括如下步骤:A method for installing a data backup storage device for a smart campus management system includes the following steps:
a、数据备份存储柜3、备用电源4和备用磁盘5安装:采用螺钉将数据备份存储柜3安装于第一安装板7上,将备用电源4安装于第二安装板8上,同时将备用磁盘5安装于第四安装板10上。a, data
b、第一安装板7、第二安装板8、第三安装板9和第四安装板10安装:根据第一安装板7、第二安装板8、第三安装板9和第四安装板10的安装位置,在底板1上做上标记,一般采用铅笔在底板1上标记数字。再在第一安装板7的底部、第二安装板8的底部、第三安装板9的底部和第四安装板10的底部的滑动凸起处接入弹簧12,将弹簧12一端的钩子设置到滑动凸起的第一垫片上,然后将第一安装板7、第二安装板8、第三安装板9和第四安装板10分别安装在标记的安装位置处,将弹簧12另一端的钩子设置到滑槽11的第二垫片上。再逐个将第一安装板7、第二安装板8、第三安装板9和第四安装板10在滑槽11中向外移动,测试弹簧12的性能。然后在第一安装板7外侧的挡块、第二安装板8外侧的挡块、第三安装板9外侧的挡块和第四安装板10外侧的挡块之间卡入限位卡套14。b. Installation of the first mounting
c、将数据备份存储柜3与备用电源4连接,数据备份存储柜3与备用电源4之间的线路预留长度保证第一安装板7和第二安装板8在滑槽11中向外移动。再将数据备份存储柜3与备用磁盘5连接,数据备份存储柜3与备用磁盘5之间的线路预留长度保证第一安装板7和第四安装板10在滑槽11中向外移动。c. Connect the data
d、风扇6安装:采用螺钉将风扇6固定在箱体2的中间位置中。d.
e、箱体2安装:将箱体2的底部的插接板25插入到底板1的通孔27中,再采用第三固定螺钉将底板1与插接板25之间固定连接。e. Installation of box body 2: insert the plug-in
本发明能使数据备份存储柜3在断电情况下还能持续工作,当数据备份存储柜3的存储空间放满时,可将部分数据传输到备用磁盘5中,保证数据备份存储柜3处于备份状态,而且箱体2中间位置的风扇6能对四周的数据备份存储柜3、备用电源4和备用磁盘5同时进行散热,通过第一散热孔28实现空气对流,保证箱体2内部整体的散热效果;在安装方法中,先安装数据备份存储柜3、备用电源4和备用磁盘5,再安装第一安装板7、第二安装板8、第三安装板9和第四安装板10,然后将数据备份存储柜3与备用电源4连接,使得数据备份存储柜3与备用电源4之间的线路预留长度保证第一安装板7和第二安装板8在滑槽11中向外移动,再将数据备份存储柜3与备用磁盘5连接,使得数据备份存储柜3与备用磁盘5之间的线路预留长度保证第一安装板7和第四安装板10在滑槽11中向外移动。The present invention can make the data
以上仅为本发明的具体实施例,但本发明的技术特征并不局限于此。任何以本发明为基础,为解决基本相同的技术问题,实现基本相同的技术效果,所作出的简单变化、等同替换或者修饰等,皆涵盖于本发明的保护范围之中。The above are only specific embodiments of the present invention, but the technical features of the present invention are not limited thereto. Any simple changes, equivalent replacements or modifications based on the present invention to solve basically the same technical problems and achieve basically the same technical effects are covered by the protection scope of the present invention.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910043329.9A CN109656752B (en) | 2019-01-17 | 2019-01-17 | Data backup storage device for smart campus management system and installation method thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910043329.9A CN109656752B (en) | 2019-01-17 | 2019-01-17 | Data backup storage device for smart campus management system and installation method thereof |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN109656752A CN109656752A (en) | 2019-04-19 |
| CN109656752B true CN109656752B (en) | 2023-04-18 |
Family
ID=66118894
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910043329.9A Active CN109656752B (en) | 2019-01-17 | 2019-01-17 | Data backup storage device for smart campus management system and installation method thereof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN109656752B (en) |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH02266599A (en) * | 1989-04-07 | 1990-10-31 | Fujitsu Ltd | Centralized disk storage device |
| CN1487389A (en) * | 2002-10-03 | 2004-04-07 | ������������ʽ���� | Disk array device and method for supplying power to disk array device |
| CN106355350A (en) * | 2016-09-23 | 2017-01-25 | 重庆多创电子技术有限公司 | Intelligent campus system |
| CN108538324A (en) * | 2018-05-26 | 2018-09-14 | 黄春梅 | It is a kind of to facilitate buckle and waterproof and dampproof optical disk storage apparatus |
| CN109165948A (en) * | 2018-08-02 | 2019-01-08 | 贵州中信宏业科技股份有限公司 | intelligent campus management system |
| CN210072593U (en) * | 2019-01-17 | 2020-02-14 | 浙江建设职业技术学院 | Data backup storage device for smart campus management system |
-
2019
- 2019-01-17 CN CN201910043329.9A patent/CN109656752B/en active Active
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH02266599A (en) * | 1989-04-07 | 1990-10-31 | Fujitsu Ltd | Centralized disk storage device |
| CN1487389A (en) * | 2002-10-03 | 2004-04-07 | ������������ʽ���� | Disk array device and method for supplying power to disk array device |
| CN106355350A (en) * | 2016-09-23 | 2017-01-25 | 重庆多创电子技术有限公司 | Intelligent campus system |
| CN108538324A (en) * | 2018-05-26 | 2018-09-14 | 黄春梅 | It is a kind of to facilitate buckle and waterproof and dampproof optical disk storage apparatus |
| CN109165948A (en) * | 2018-08-02 | 2019-01-08 | 贵州中信宏业科技股份有限公司 | intelligent campus management system |
| CN210072593U (en) * | 2019-01-17 | 2020-02-14 | 浙江建设职业技术学院 | Data backup storage device for smart campus management system |
Non-Patent Citations (1)
| Title |
|---|
| 戴馨 ; 唐继勇 ; .光盘自动存储柜及相关媒体资产管理系统的研究与实现.西部广播电视.2006,(第02期),第12-14页. * |
Also Published As
| Publication number | Publication date |
|---|---|
| CN109656752A (en) | 2019-04-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110557460A (en) | Monitoring system for infrastructure equipment of data center | |
| CN101409723B (en) | Method for designing synthesis network management system based on ForCES protocol | |
| CN109656752B (en) | Data backup storage device for smart campus management system and installation method thereof | |
| CN202196363U (en) | Plug-in type host | |
| CN210072593U (en) | Data backup storage device for smart campus management system | |
| CN203787802U (en) | Distribution automation integrated DTU (Data Transfer Unit) case | |
| CN115334815A (en) | Ultrahigh-density MPO/MTP case applied to data center | |
| CN222814132U (en) | A reliable power supply device for data center | |
| CN219555084U (en) | Network switch convenient to equipment | |
| CN220106027U (en) | Wireless cloud storage device | |
| CN216414478U (en) | A new energy photovoltaic gateway power supply | |
| CN216673036U (en) | a test equipment | |
| CN215895607U (en) | Modularization intelligence equipment of making out an invoice | |
| CN222927016U (en) | Communication service device | |
| CN221748414U (en) | Vehicle-mounted data communication terminal | |
| CN223320771U (en) | Domain control device and control system for controlling autonomous driving test bench equipment | |
| CN220543264U (en) | Intelligent simulation system box body of movable energy station | |
| CN223364150U (en) | Photovoltaic power plant intelligent gateway | |
| CN106022661B (en) | An electronic sand table for distribution network | |
| CN223912496U (en) | POE switch capable of arranging wires | |
| CN204732911U (en) | A kind of portable power source box | |
| CN223024841U (en) | 5G mobile phone signal control equipment | |
| CN209765322U (en) | A dynamic ring monitoring host | |
| CN204156050U (en) | Distributed power source on-line maintenance device | |
| CN203759626U (en) | High-density server chassis |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| EE01 | Entry into force of recordation of patent licensing contract | ||
| EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20190419 Assignee: Hangzhou Longfa Construction Engineering Tendering Agency Co.,Ltd. Assignor: ZHEJIANG College OF CONSTRUCTION Contract record no.: X2024980044385 Denomination of invention: Data backup storage device and installation method for smart campus management system Granted publication date: 20230418 License type: Common License Record date: 20250103 Application publication date: 20190419 Assignee: HANGZHOU FENGSE PHOTOCOPY TECHNOLOGY Co.,Ltd. Assignor: ZHEJIANG College OF CONSTRUCTION Contract record no.: X2024980044330 Denomination of invention: Data backup storage device and installation method for smart campus management system Granted publication date: 20230418 License type: Common License Record date: 20250103 Application publication date: 20190419 Assignee: Fubon Holdings Development Group Co.,Ltd. Assignor: ZHEJIANG College OF CONSTRUCTION Contract record no.: X2024980044329 Denomination of invention: Data backup storage device and installation method for smart campus management system Granted publication date: 20230418 License type: Common License Record date: 20250103 Application publication date: 20190419 Assignee: Hangzhou Juneng Trading Co.,Ltd. Assignor: ZHEJIANG College OF CONSTRUCTION Contract record no.: X2024980044328 Denomination of invention: Data backup storage device and installation method for smart campus management system Granted publication date: 20230418 License type: Common License Record date: 20250103 Application publication date: 20190419 Assignee: Shanghai Shengma Import and Export Co.,Ltd. Assignor: ZHEJIANG College OF CONSTRUCTION Contract record no.: X2024980044323 Denomination of invention: Data backup storage device and installation method for smart campus management system Granted publication date: 20230418 License type: Common License Record date: 20250103 Application publication date: 20190419 Assignee: Shanghai Xidao Digital Technology Co.,Ltd. Assignor: ZHEJIANG College OF CONSTRUCTION Contract record no.: X2024980044320 Denomination of invention: Data backup storage device and installation method for smart campus management system Granted publication date: 20230418 License type: Common License Record date: 20250103 |