CN109656589A - A kind of secondary equipment of intelligent converting station software harnesses method and system - Google Patents
A kind of secondary equipment of intelligent converting station software harnesses method and system Download PDFInfo
- Publication number
- CN109656589A CN109656589A CN201811429251.6A CN201811429251A CN109656589A CN 109656589 A CN109656589 A CN 109656589A CN 201811429251 A CN201811429251 A CN 201811429251A CN 109656589 A CN109656589 A CN 109656589A
- Authority
- CN
- China
- Prior art keywords
- version
- software
- converting station
- secondary equipment
- intelligent converting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F8/00—Arrangements for software engineering
- G06F8/60—Software deployment
- G06F8/65—Updates
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Business, Economics & Management (AREA)
- Economics (AREA)
- Software Systems (AREA)
- General Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Public Health (AREA)
- Computer Security & Cryptography (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Stored Programmes (AREA)
Abstract
The present invention provides a kind of secondary equipment of intelligent converting station software harnesses method and system, the target software release of secondary equipment of intelligent converting station is created first, and the target software release version information current with secondary equipment of intelligent converting station is compared, when comparing result is inconsistent, target software release is sent to secondary equipment of intelligent converting station, the present invention online to progress in the software set of substation secondary device can manage and control, it is easy to operate, maloperation is avoided, to ensure the safe and stable operation of substation secondary device;Production efficiency is improved, provides technical support to the workload of secondary device software management to reduce, optimizing.
Description
Technical field
The invention belongs to computer software and power system automation technology field, in particular to a kind of intelligent substation two
Secondary device software harnesses method and system.
Background technique
With the fast development of power system automation technology, transformer substation end information remote transmitting technology is mature, is dispatching
End can grasp more and more transforming plant primary equipment real time data information, can satisfy scheduling system substantially to power grid
The demand of operational management.The automation of transformation substations is promoted from power equipment management demand is met for secondary equipment of intelligent converting station
Equipment code and intelligentized angle, study automation equipment on-line monitoring technique, realize automation of transformation substations equipment
Line monitoring, abnormity early warning, state evaluation and centralized management realize automation equipment operational management from off-line mode to on-line analysis
Transformation, has been increasingly becoming development trend.
For the safe and stable operation for guaranteeing secondary equipment of intelligent converting station, the software of secondary device is frequently necessary to update or rise
Grade needs to upgrade driver etc. as needed to update network profile when network environment change to improve safety.
At present when the software of secondary device, which needs to inquire, to be updated, operation maintenance personnel is needed to connect secondary device, to check
Software version, updates software at verification.Artificial nucleus need long time to all information under normal circumstances, if not smoothly, when
Between can be longer, putting into operation on time for station may be will affect, due to using artificial nucleus couple, data information amount is big and dull always repeats
Work, inevitably because human negligence generate mistakes and omissions, also to station long-term safety operation has buried hidden danger;And intelligent substation two
Include many devices in secondary device, different devices is needed to carry out using different software connection single devices different
Operation, interface is complicated, and cumbersome, there are the risks of maloperation.
Summary of the invention
The purpose of the present invention is to provide a kind of secondary equipment of intelligent converting station software harnesses method and system, for solving
Secondary equipment of intelligent converting station software management operation is complicated in the prior art and there are problems that operational risk.
To achieve the above object, the present invention provides a kind of secondary equipment of intelligent converting station software harnesses methods, including such as
Lower step:
1) check-in operation is carried out to secondary equipment of intelligent converting station software version or checks out operation, create intelligent substation two
The target software release of secondary device, and obtain the current version information of secondary equipment of intelligent converting station;
2) target software release version information current with secondary equipment of intelligent converting station is compared, judges institute
It states target software release and whether the current version of secondary equipment of intelligent converting station is consistent, if inconsistent, issue warning information, and
The target software release is sent to secondary equipment of intelligent converting station.
The present invention creates the target software release of secondary equipment of intelligent converting station first, and by target software release and intelligence
The current version information of substation secondary device compares, and when comparing result is inconsistent, target software release is sent to
Secondary equipment of intelligent converting station, the present invention online to progress in the software set of substation secondary device can manage and control,
It is easy to operate, maloperation is avoided, to ensure the safe and stable operation of substation secondary device;Production efficiency is improved, to reduce,
Optimize and provides technical support to the workload of secondary device software management.
In order to which the version information for reminding related personnel's target software release and secondary equipment of intelligent converting station current is inconsistent,
When the target software release and the current version of secondary equipment of intelligent converting station are inconsistent, warning information is issued, is shown simultaneously
Show version comparative information.
Include in order to keep the performance of the software of updated intelligent substation more perfect, in the target software release with
The corresponding driver of secondary device, function program and network profile.
In order to which the software version to secondary equipment of intelligent converting station preferably manages, when soft to secondary equipment of intelligent converting station
When part version is checked in or checks out operation, for the document creation version for checking in or checking out, and updated software version is set
Set file path name, file type, version number and check code.
The present invention also provides a kind of secondary equipment of intelligent converting station software harnesses system, including memory, processor with
And the computer program that can be run in the memory and on a processor is stored, the processor executes real when described program
Existing following steps:
1) check-in operation is carried out to secondary equipment of intelligent converting station software version or checks out operation, create intelligent substation two
The target software release of secondary device, and obtain the current version information of secondary equipment of intelligent converting station;
2) target software release version information current with secondary equipment of intelligent converting station is compared, judges institute
It states target software release and whether the current version of secondary equipment of intelligent converting station is consistent, if inconsistent and the target is soft
Part version is sent to secondary equipment of intelligent converting station.
The present invention creates the target software release of secondary equipment of intelligent converting station first, and by target software release and intelligence
The current version information of substation secondary device compares, and when comparing result is inconsistent, target software release is sent to
Secondary equipment of intelligent converting station, the present invention online to progress in the software set of substation secondary device can manage and control,
It is easy to operate, maloperation is avoided, to ensure the safe and stable operation of substation secondary device;Production efficiency is improved, to reduce,
Optimize and provides technical support to the workload of secondary device software management.
In order to remind related personnel to check in real time, target software release is believed with the current version of secondary equipment of intelligent converting station
Cease whether inconsistent, active or version progress periodically current to the target software release and secondary equipment of intelligent converting station
Comparison issues warning information, together when the target software release and the current version of secondary equipment of intelligent converting station are inconsistent
When version of display comparative information.
Include in order to keep the performance of the software of updated intelligent substation more perfect, in the target software release with
The corresponding driver of secondary device, function program and network profile.
It is preferably managed to obtain software version to secondary equipment of intelligent converting station, when soft to secondary equipment of intelligent converting station
When part version is checked in or checks out operation, for the document creation version of check-in, and file is arranged to updated software version
Pathname, file type, version number and check code.
Detailed description of the invention
Fig. 1 is the online management-control method flow chart of secondary equipment of intelligent converting station software of the invention;
Fig. 2 is the structural block diagram of the online managing and control system of secondary equipment of intelligent converting station software of the invention;
Fig. 3 is that the device of the invention software checks in/check out dialogue block diagram.
Specific embodiment
A specific embodiment of the invention is further described with reference to the accompanying drawing:
Secondary equipment of intelligent converting station software harnesses system embodiment:
The present invention provides a kind of secondary equipment of intelligent converting station software harnesses system, which includes software version
It checks in/checks out module, version management module and version and check module online, these modules are software process or program, wherein soft
Part version checks in/checks out module for carrying out check-in operation to secondary equipment of intelligent converting station software version or checking out operation, and
Create the target software release of secondary equipment of intelligent converting station;Version management module is worked as obtaining secondary equipment of intelligent converting station
Preceding version information;Version is checked module online and is used for target software release and the current version of secondary equipment of intelligent converting station
Information compares, and judges whether target software release and the current version of secondary equipment of intelligent converting station are consistent, if inconsistent,
And target software release is sent to secondary equipment of intelligent converting station.
Above-mentioned secondary equipment of intelligent converting station software harnesses system, including memory, processor and it is stored in storage
In device and the computer program that can run on a processor, and has network interface, which is connected to station level net
PC or computer equipment on network.
The control object of online software involved in the present embodiment refers to the secondary of the access station control layer network in the area substation safety I
Equipment, including measure and control device, PMU collector and protective device etc., further, the secondary equipment of intelligent converting station of the present embodiment
Software harnesses system can add corresponding voltage class/interval/device of substation etc..To avoid repeating configuring, power transformation herein
After the completion of station arrangement model can be configured by unified collocation tool, directly read.
Secondary equipment of intelligent converting station software harnesses embodiment of the method:
Specifically, as shown in Figure 1, the secondary equipment of intelligent converting station software harnesses method of the present embodiment, including it is as follows
Step:
1) check-in operation is carried out to secondary equipment of intelligent converting station software version, creates the mesh of secondary equipment of intelligent converting station
Software version is marked, and obtains the current version information of secondary equipment of intelligent converting station;
2) version of the secondary equipment of intelligent converting station software in repository is updated;
3) actively or periodically the current version information of target software release and secondary equipment of intelligent converting station is carried out
Comparison, judges whether target software release and the current version of secondary equipment of intelligent converting station are consistent, if inconsistent, issues alarm
Information, and target software release is sent to secondary equipment of intelligent converting station, check the process of comparison are as follows: the online school of software version
Core services readable device program/file cyclic redundancy check, and is compared with the target software release of version management module, when
When comparison result is inconsistent, control interface issues the inconsistent warning information of version, while also version of display comparative information.
4) pass through station level network to corresponding secondary equipment of intelligent converting station network loading target software release, intelligent power transformation
Secondary device software upgrading of standing success;The realization process of network loading function therein are as follows: device powers on automatic startup file and connects
Business is conquered, agreement port numbers are listened to;When network loading, software harnesses system on engineer work station, by proprietary protocol or
61850 agreements directly establish TCP connection with device file reception service, complete to fill under file;It is that target is soft that lower loading sheet, which is arranged,
Part version, software harnesses system actively disconnects TCP connection after filling under file.
5) operation note is stored to history library.
As shown in Fig. 2, station level network is connect with device 1, device 2, device 3, device 1, device 2, device 3 are to survey respectively
Control device, PMU collector and protective device.Software upgrading module control software type include and measure and control device, PMU collector
And protective device driver, function program and network profile etc..The main interface of software upgrading module is as shown in figure 3, boundary
Face mainly shows table and version by menu bar, the list of transforming plant apparatus tree, device target software release and old version information
Check inconsistent Real-time Alarm window composition.Wherein, the list of transforming plant apparatus tree is soft by substation-voltage class-interval-device-
The hierarchical structure tissue of part type (driver/function program/network profile).
Secondary equipment of intelligent converting station software harnesses module has check-in function, and check-in function can be realized software upgrading mould
Driver, function program and the network profile check-in that block is completed check in software harnesses module and arrive software harnesses module
In after, need the document creation version for check-in, establish association connection, and save the file path name of newly-built version, files classes
Type, version number and check code etc..Specifically, as shown in figure 3, selection is set certain device node in list and is clicked when software checks in
After checking in menu, dialog box as shown in Figure 3 is popped up, is submitted to being determined after device software list checking box.Text will be chosen
Part is copied to software harnesses system, creates a new software version, establishes the incidence relation with device;Version is read from file
This number, and calculation document cyclic redundancy check, save file path name, the file type, version number, check code, device of newly-built version
The information such as title refresh the version information of the currently checked device of main interface into repository software version information table.
Secondary equipment of intelligent converting station software harnesses system is also equipped with network loading function, in secondary equipment of intelligent converting station
Each device power on automatic startup file and receive service, listen to agreement port numbers;It is soft on engineer work station when network loading
Part managing and control system directly establishes TCP connection by proprietary protocol or 61850 agreements with device file reception service, completes file
Lower dress;It is target software release that lower loading sheet, which is arranged, and software harnesses system actively disconnects TCP connection after filling under file.
Secondary equipment of intelligent converting station software harnesses system, which has, checks out function, selects current goal software version or any
The file of old version, checks out in software management module, and software management module completes modification based on checking out version.For
File of the same name during checking out, directly with the file in the file covering software editing module in software harnesses module.Specifically
, when software checks out, the file of current goal software version or any old version is selected from software harnesses system, is checked out
In version management module, version management module completes modification based on checking out version;Then current goal modification completed
The file of software version or any old version is checked in into repository, and the process then carried out is consistent with above-mentioned process,
Here it just repeats no more.
Claims (8)
1. a kind of secondary equipment of intelligent converting station software harnesses method, which comprises the steps of:
1) check-in operation is carried out to secondary equipment of intelligent converting station software version or checks out operation, creation intelligent substation secondary is set
Standby target software release, and obtain the current version information of secondary equipment of intelligent converting station;
2) target software release version information current with secondary equipment of intelligent converting station is compared, judges the mesh
It marks software version and whether the current version of secondary equipment of intelligent converting station is consistent, if it is inconsistent, and by the target software version
Originally it is sent to secondary equipment of intelligent converting station.
2. secondary equipment of intelligent converting station software harnesses method according to claim 1, which is characterized in that when the target
When software version and the current version of secondary equipment of intelligent converting station are inconsistent, warning information is issued, while version of display compares
Information.
3. secondary equipment of intelligent converting station software harnesses method according to claim 1 or 2, which is characterized in that the mesh
Marking in software version includes driver corresponding with secondary device, function program and network profile.
4. secondary equipment of intelligent converting station software harnesses method according to claim 3, which is characterized in that when to intelligent change
Power station secondary device software version carries out check-in operation or when checking out operation, for the document creation version for checking in or checking out, and it is right
Updated software version setting file path name, file type, version number and check code.
5. a kind of secondary equipment of intelligent converting station software harnesses system, including memory, processor and it is stored in the storage
In device and the computer program that can run on a processor, which is characterized in that the processor realized when executing described program with
Lower step:
1) check-in operation is carried out to secondary equipment of intelligent converting station software version or checks out operation, creation intelligent substation secondary is set
Standby target software release, and obtain the current version information of secondary equipment of intelligent converting station;
2) target software release version information current with secondary equipment of intelligent converting station is compared, judges the mesh
It marks software version and whether the current version of secondary equipment of intelligent converting station is consistent, if it is inconsistent, and by the target software version
Originally it is sent to secondary equipment of intelligent converting station.
6. secondary equipment of intelligent converting station software harnesses system according to claim 5, which is characterized in that active or period
The property version current with secondary equipment of intelligent converting station to the target software release compares, when the target software release
When current version is inconsistent with secondary equipment of intelligent converting station, warning information, while version of display comparative information are issued.
7. secondary equipment of intelligent converting station software harnesses system according to claim 5 or 6, which is characterized in that the mesh
Marking in software version includes driver corresponding with secondary device, function program and network profile.
8. secondary equipment of intelligent converting station software harnesses system according to claim 7, which is characterized in that set when to secondary
When standby software version carries out check-in operation or checks out operation, for the document creation version for checking in or checking out, and to updated soft
File path name, file type, version number and check code is arranged in part version.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201811429251.6A CN109656589B (en) | 2018-11-27 | 2018-11-27 | Intelligent substation secondary equipment software management and control method and system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201811429251.6A CN109656589B (en) | 2018-11-27 | 2018-11-27 | Intelligent substation secondary equipment software management and control method and system |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN109656589A true CN109656589A (en) | 2019-04-19 |
| CN109656589B CN109656589B (en) | 2022-04-05 |
Family
ID=66111646
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201811429251.6A Active CN109656589B (en) | 2018-11-27 | 2018-11-27 | Intelligent substation secondary equipment software management and control method and system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN109656589B (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111090441A (en) * | 2019-11-09 | 2020-05-01 | 国网上海市电力公司 | A management method and system for power secondary equipment software |
| CN112269590A (en) * | 2020-09-16 | 2021-01-26 | 许继集团有限公司 | Operation and maintenance master station on-site protection device software version management method and system |
| CN118377509A (en) * | 2024-06-21 | 2024-07-23 | 广东电网有限责任公司中山供电局 | Remote upgrading method and system for self-installed device, program product and storage medium |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101325513A (en) * | 2007-11-26 | 2008-12-17 | 华为技术有限公司 | Method, device and system for software upgrade |
| CN106326450A (en) * | 2016-08-26 | 2017-01-11 | 山东电力工程咨询院有限公司 | Interaction method for realizing SCD (system configuration description) file sign-in and sign-off based on data integration |
| WO2018126379A1 (en) * | 2017-01-05 | 2018-07-12 | 深圳市前海中康汇融信息技术有限公司 | Database management method for smart terminal application software |
| CN108733767A (en) * | 2018-04-18 | 2018-11-02 | 北京四方继保自动化股份有限公司 | A kind of intelligent substation configuration file management-control method based on decoupling technology |
-
2018
- 2018-11-27 CN CN201811429251.6A patent/CN109656589B/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101325513A (en) * | 2007-11-26 | 2008-12-17 | 华为技术有限公司 | Method, device and system for software upgrade |
| CN106326450A (en) * | 2016-08-26 | 2017-01-11 | 山东电力工程咨询院有限公司 | Interaction method for realizing SCD (system configuration description) file sign-in and sign-off based on data integration |
| WO2018126379A1 (en) * | 2017-01-05 | 2018-07-12 | 深圳市前海中康汇融信息技术有限公司 | Database management method for smart terminal application software |
| CN108733767A (en) * | 2018-04-18 | 2018-11-02 | 北京四方继保自动化股份有限公司 | A kind of intelligent substation configuration file management-control method based on decoupling technology |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111090441A (en) * | 2019-11-09 | 2020-05-01 | 国网上海市电力公司 | A management method and system for power secondary equipment software |
| CN112269590A (en) * | 2020-09-16 | 2021-01-26 | 许继集团有限公司 | Operation and maintenance master station on-site protection device software version management method and system |
| CN112269590B (en) * | 2020-09-16 | 2024-05-10 | 许继集团有限公司 | Method and system for managing software version of operation and maintenance master station on-site protection device |
| CN118377509A (en) * | 2024-06-21 | 2024-07-23 | 广东电网有限责任公司中山供电局 | Remote upgrading method and system for self-installed device, program product and storage medium |
| CN118377509B (en) * | 2024-06-21 | 2024-09-10 | 广东电网有限责任公司中山供电局 | Remote upgrading method and system for self-installed device, program product and storage medium |
Also Published As
| Publication number | Publication date |
|---|---|
| CN109656589B (en) | 2022-04-05 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103295163B (en) | Chart-model integrated transformer substation and dispatch master station cooperation modeling method | |
| CN102722764B (en) | Integration network optimization computer-aided decision support System | |
| CN104600840A (en) | Intelligent dispatching and mis-operation preventing management system and method | |
| CN103761624A (en) | Implementing method of integrated power grid dispatching operation intelligent mistaken-early-warning preventing system | |
| CN101436790A (en) | On-line splicing and coalition method for electric network model containing complex T connection line | |
| CN109146253A (en) | A kind of intelligent automatic interactive operating system for making out an invoice and protecting locking | |
| CN102957205A (en) | Method and system for establishing distribution network model | |
| CN104933535A (en) | An intelligent monitoring operation ticket management method and a system thereof | |
| CN104993589B (en) | A kind of method of model sharing between distribution main website and terminal | |
| CN102593954A (en) | Power grid model constructing and updating method and device based on distribution network automation system | |
| CN109656589A (en) | A kind of secondary equipment of intelligent converting station software harnesses method and system | |
| CN111967740A (en) | Operation ticket safety checking system and method thereof | |
| CN110188898A (en) | A kind of power distribution network Dispatching intelligent tickets system and method based on line chart | |
| CN103679557A (en) | Power grid operating mode data managing system based on C/S framework and achieving method for power grid operating mode data managing system | |
| CN116843284A (en) | Method, device and equipment for generating operation tickets for distribution network operations | |
| CN105868410A (en) | Model-driven intelligent SCD (substation configuration description) file and CIM/E (common information model/efficiency) file conversion tool and method | |
| CN108038332A (en) | A kind of online artwork rapid generation for the state power grid that faces the future | |
| CN104915794A (en) | Multi-time-state full-service unified modeling method based on model center | |
| CN117808312A (en) | A method for intelligently generating new device startup plans | |
| CN111524031B (en) | An implementation method and system for intelligently generating operation steps based on analytical operation tasks | |
| CN113592226A (en) | One-key control method and platform for cascade power station group | |
| CN113515298A (en) | System and method for upgrading and managing power distribution terminal program | |
| CN103488726A (en) | Method for establishing unified grid data platform based on WEB-SERVICE | |
| CN106059073A (en) | Programmed control method based on cooperative misoperation prevention of master station and substation | |
| CN107766949A (en) | Failure rapid rush-repair commander's business information exchange method based on meta-model |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |