CN109656589A - A kind of secondary equipment of intelligent converting station software harnesses method and system - Google Patents

A kind of secondary equipment of intelligent converting station software harnesses method and system Download PDF

Info

Publication number
CN109656589A
CN109656589A CN201811429251.6A CN201811429251A CN109656589A CN 109656589 A CN109656589 A CN 109656589A CN 201811429251 A CN201811429251 A CN 201811429251A CN 109656589 A CN109656589 A CN 109656589A
Authority
CN
China
Prior art keywords
version
software
converting station
secondary equipment
intelligent converting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811429251.6A
Other languages
Chinese (zh)
Other versions
CN109656589B (en
Inventor
张兵
卫星
郭利军
胡斌
李红
慕宗君
王广民
袁方方
李宝潭
李永照
陈哲
张海庭
吴正青
车帅
庞涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuji Group Co Ltd
XJ Electric Co Ltd
Xuchang XJ Software Technology Co Ltd
Original Assignee
Xuji Group Co Ltd
XJ Electric Co Ltd
Xuchang XJ Software Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuji Group Co Ltd, XJ Electric Co Ltd, Xuchang XJ Software Technology Co Ltd filed Critical Xuji Group Co Ltd
Priority to CN201811429251.6A priority Critical patent/CN109656589B/en
Publication of CN109656589A publication Critical patent/CN109656589A/en
Application granted granted Critical
Publication of CN109656589B publication Critical patent/CN109656589B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/60Software deployment
    • G06F8/65Updates
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Economics (AREA)
  • Software Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Computer Security & Cryptography (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Stored Programmes (AREA)

Abstract

The present invention provides a kind of secondary equipment of intelligent converting station software harnesses method and system, the target software release of secondary equipment of intelligent converting station is created first, and the target software release version information current with secondary equipment of intelligent converting station is compared, when comparing result is inconsistent, target software release is sent to secondary equipment of intelligent converting station, the present invention online to progress in the software set of substation secondary device can manage and control, it is easy to operate, maloperation is avoided, to ensure the safe and stable operation of substation secondary device;Production efficiency is improved, provides technical support to the workload of secondary device software management to reduce, optimizing.

Description

A kind of secondary equipment of intelligent converting station software harnesses method and system
Technical field
The invention belongs to computer software and power system automation technology field, in particular to a kind of intelligent substation two Secondary device software harnesses method and system.
Background technique
With the fast development of power system automation technology, transformer substation end information remote transmitting technology is mature, is dispatching End can grasp more and more transforming plant primary equipment real time data information, can satisfy scheduling system substantially to power grid The demand of operational management.The automation of transformation substations is promoted from power equipment management demand is met for secondary equipment of intelligent converting station Equipment code and intelligentized angle, study automation equipment on-line monitoring technique, realize automation of transformation substations equipment Line monitoring, abnormity early warning, state evaluation and centralized management realize automation equipment operational management from off-line mode to on-line analysis Transformation, has been increasingly becoming development trend.
For the safe and stable operation for guaranteeing secondary equipment of intelligent converting station, the software of secondary device is frequently necessary to update or rise Grade needs to upgrade driver etc. as needed to update network profile when network environment change to improve safety.
At present when the software of secondary device, which needs to inquire, to be updated, operation maintenance personnel is needed to connect secondary device, to check Software version, updates software at verification.Artificial nucleus need long time to all information under normal circumstances, if not smoothly, when Between can be longer, putting into operation on time for station may be will affect, due to using artificial nucleus couple, data information amount is big and dull always repeats Work, inevitably because human negligence generate mistakes and omissions, also to station long-term safety operation has buried hidden danger;And intelligent substation two Include many devices in secondary device, different devices is needed to carry out using different software connection single devices different Operation, interface is complicated, and cumbersome, there are the risks of maloperation.
Summary of the invention
The purpose of the present invention is to provide a kind of secondary equipment of intelligent converting station software harnesses method and system, for solving Secondary equipment of intelligent converting station software management operation is complicated in the prior art and there are problems that operational risk.
To achieve the above object, the present invention provides a kind of secondary equipment of intelligent converting station software harnesses methods, including such as Lower step:
1) check-in operation is carried out to secondary equipment of intelligent converting station software version or checks out operation, create intelligent substation two The target software release of secondary device, and obtain the current version information of secondary equipment of intelligent converting station;
2) target software release version information current with secondary equipment of intelligent converting station is compared, judges institute It states target software release and whether the current version of secondary equipment of intelligent converting station is consistent, if inconsistent, issue warning information, and The target software release is sent to secondary equipment of intelligent converting station.
The present invention creates the target software release of secondary equipment of intelligent converting station first, and by target software release and intelligence The current version information of substation secondary device compares, and when comparing result is inconsistent, target software release is sent to Secondary equipment of intelligent converting station, the present invention online to progress in the software set of substation secondary device can manage and control, It is easy to operate, maloperation is avoided, to ensure the safe and stable operation of substation secondary device;Production efficiency is improved, to reduce, Optimize and provides technical support to the workload of secondary device software management.
In order to which the version information for reminding related personnel's target software release and secondary equipment of intelligent converting station current is inconsistent, When the target software release and the current version of secondary equipment of intelligent converting station are inconsistent, warning information is issued, is shown simultaneously Show version comparative information.
Include in order to keep the performance of the software of updated intelligent substation more perfect, in the target software release with The corresponding driver of secondary device, function program and network profile.
In order to which the software version to secondary equipment of intelligent converting station preferably manages, when soft to secondary equipment of intelligent converting station When part version is checked in or checks out operation, for the document creation version for checking in or checking out, and updated software version is set Set file path name, file type, version number and check code.
The present invention also provides a kind of secondary equipment of intelligent converting station software harnesses system, including memory, processor with And the computer program that can be run in the memory and on a processor is stored, the processor executes real when described program Existing following steps:
1) check-in operation is carried out to secondary equipment of intelligent converting station software version or checks out operation, create intelligent substation two The target software release of secondary device, and obtain the current version information of secondary equipment of intelligent converting station;
2) target software release version information current with secondary equipment of intelligent converting station is compared, judges institute It states target software release and whether the current version of secondary equipment of intelligent converting station is consistent, if inconsistent and the target is soft Part version is sent to secondary equipment of intelligent converting station.
The present invention creates the target software release of secondary equipment of intelligent converting station first, and by target software release and intelligence The current version information of substation secondary device compares, and when comparing result is inconsistent, target software release is sent to Secondary equipment of intelligent converting station, the present invention online to progress in the software set of substation secondary device can manage and control, It is easy to operate, maloperation is avoided, to ensure the safe and stable operation of substation secondary device;Production efficiency is improved, to reduce, Optimize and provides technical support to the workload of secondary device software management.
In order to remind related personnel to check in real time, target software release is believed with the current version of secondary equipment of intelligent converting station Cease whether inconsistent, active or version progress periodically current to the target software release and secondary equipment of intelligent converting station Comparison issues warning information, together when the target software release and the current version of secondary equipment of intelligent converting station are inconsistent When version of display comparative information.
Include in order to keep the performance of the software of updated intelligent substation more perfect, in the target software release with The corresponding driver of secondary device, function program and network profile.
It is preferably managed to obtain software version to secondary equipment of intelligent converting station, when soft to secondary equipment of intelligent converting station When part version is checked in or checks out operation, for the document creation version of check-in, and file is arranged to updated software version Pathname, file type, version number and check code.
Detailed description of the invention
Fig. 1 is the online management-control method flow chart of secondary equipment of intelligent converting station software of the invention;
Fig. 2 is the structural block diagram of the online managing and control system of secondary equipment of intelligent converting station software of the invention;
Fig. 3 is that the device of the invention software checks in/check out dialogue block diagram.
Specific embodiment
A specific embodiment of the invention is further described with reference to the accompanying drawing:
Secondary equipment of intelligent converting station software harnesses system embodiment:
The present invention provides a kind of secondary equipment of intelligent converting station software harnesses system, which includes software version It checks in/checks out module, version management module and version and check module online, these modules are software process or program, wherein soft Part version checks in/checks out module for carrying out check-in operation to secondary equipment of intelligent converting station software version or checking out operation, and Create the target software release of secondary equipment of intelligent converting station;Version management module is worked as obtaining secondary equipment of intelligent converting station Preceding version information;Version is checked module online and is used for target software release and the current version of secondary equipment of intelligent converting station Information compares, and judges whether target software release and the current version of secondary equipment of intelligent converting station are consistent, if inconsistent, And target software release is sent to secondary equipment of intelligent converting station.
Above-mentioned secondary equipment of intelligent converting station software harnesses system, including memory, processor and it is stored in storage In device and the computer program that can run on a processor, and has network interface, which is connected to station level net PC or computer equipment on network.
The control object of online software involved in the present embodiment refers to the secondary of the access station control layer network in the area substation safety I Equipment, including measure and control device, PMU collector and protective device etc., further, the secondary equipment of intelligent converting station of the present embodiment Software harnesses system can add corresponding voltage class/interval/device of substation etc..To avoid repeating configuring, power transformation herein After the completion of station arrangement model can be configured by unified collocation tool, directly read.
Secondary equipment of intelligent converting station software harnesses embodiment of the method:
Specifically, as shown in Figure 1, the secondary equipment of intelligent converting station software harnesses method of the present embodiment, including it is as follows Step:
1) check-in operation is carried out to secondary equipment of intelligent converting station software version, creates the mesh of secondary equipment of intelligent converting station Software version is marked, and obtains the current version information of secondary equipment of intelligent converting station;
2) version of the secondary equipment of intelligent converting station software in repository is updated;
3) actively or periodically the current version information of target software release and secondary equipment of intelligent converting station is carried out Comparison, judges whether target software release and the current version of secondary equipment of intelligent converting station are consistent, if inconsistent, issues alarm Information, and target software release is sent to secondary equipment of intelligent converting station, check the process of comparison are as follows: the online school of software version Core services readable device program/file cyclic redundancy check, and is compared with the target software release of version management module, when When comparison result is inconsistent, control interface issues the inconsistent warning information of version, while also version of display comparative information.
4) pass through station level network to corresponding secondary equipment of intelligent converting station network loading target software release, intelligent power transformation Secondary device software upgrading of standing success;The realization process of network loading function therein are as follows: device powers on automatic startup file and connects Business is conquered, agreement port numbers are listened to;When network loading, software harnesses system on engineer work station, by proprietary protocol or 61850 agreements directly establish TCP connection with device file reception service, complete to fill under file;It is that target is soft that lower loading sheet, which is arranged, Part version, software harnesses system actively disconnects TCP connection after filling under file.
5) operation note is stored to history library.
As shown in Fig. 2, station level network is connect with device 1, device 2, device 3, device 1, device 2, device 3 are to survey respectively Control device, PMU collector and protective device.Software upgrading module control software type include and measure and control device, PMU collector And protective device driver, function program and network profile etc..The main interface of software upgrading module is as shown in figure 3, boundary Face mainly shows table and version by menu bar, the list of transforming plant apparatus tree, device target software release and old version information Check inconsistent Real-time Alarm window composition.Wherein, the list of transforming plant apparatus tree is soft by substation-voltage class-interval-device- The hierarchical structure tissue of part type (driver/function program/network profile).
Secondary equipment of intelligent converting station software harnesses module has check-in function, and check-in function can be realized software upgrading mould Driver, function program and the network profile check-in that block is completed check in software harnesses module and arrive software harnesses module In after, need the document creation version for check-in, establish association connection, and save the file path name of newly-built version, files classes Type, version number and check code etc..Specifically, as shown in figure 3, selection is set certain device node in list and is clicked when software checks in After checking in menu, dialog box as shown in Figure 3 is popped up, is submitted to being determined after device software list checking box.Text will be chosen Part is copied to software harnesses system, creates a new software version, establishes the incidence relation with device;Version is read from file This number, and calculation document cyclic redundancy check, save file path name, the file type, version number, check code, device of newly-built version The information such as title refresh the version information of the currently checked device of main interface into repository software version information table.
Secondary equipment of intelligent converting station software harnesses system is also equipped with network loading function, in secondary equipment of intelligent converting station Each device power on automatic startup file and receive service, listen to agreement port numbers;It is soft on engineer work station when network loading Part managing and control system directly establishes TCP connection by proprietary protocol or 61850 agreements with device file reception service, completes file Lower dress;It is target software release that lower loading sheet, which is arranged, and software harnesses system actively disconnects TCP connection after filling under file.
Secondary equipment of intelligent converting station software harnesses system, which has, checks out function, selects current goal software version or any The file of old version, checks out in software management module, and software management module completes modification based on checking out version.For File of the same name during checking out, directly with the file in the file covering software editing module in software harnesses module.Specifically , when software checks out, the file of current goal software version or any old version is selected from software harnesses system, is checked out In version management module, version management module completes modification based on checking out version;Then current goal modification completed The file of software version or any old version is checked in into repository, and the process then carried out is consistent with above-mentioned process, Here it just repeats no more.

Claims (8)

1. a kind of secondary equipment of intelligent converting station software harnesses method, which comprises the steps of:
1) check-in operation is carried out to secondary equipment of intelligent converting station software version or checks out operation, creation intelligent substation secondary is set Standby target software release, and obtain the current version information of secondary equipment of intelligent converting station;
2) target software release version information current with secondary equipment of intelligent converting station is compared, judges the mesh It marks software version and whether the current version of secondary equipment of intelligent converting station is consistent, if it is inconsistent, and by the target software version Originally it is sent to secondary equipment of intelligent converting station.
2. secondary equipment of intelligent converting station software harnesses method according to claim 1, which is characterized in that when the target When software version and the current version of secondary equipment of intelligent converting station are inconsistent, warning information is issued, while version of display compares Information.
3. secondary equipment of intelligent converting station software harnesses method according to claim 1 or 2, which is characterized in that the mesh Marking in software version includes driver corresponding with secondary device, function program and network profile.
4. secondary equipment of intelligent converting station software harnesses method according to claim 3, which is characterized in that when to intelligent change Power station secondary device software version carries out check-in operation or when checking out operation, for the document creation version for checking in or checking out, and it is right Updated software version setting file path name, file type, version number and check code.
5. a kind of secondary equipment of intelligent converting station software harnesses system, including memory, processor and it is stored in the storage In device and the computer program that can run on a processor, which is characterized in that the processor realized when executing described program with Lower step:
1) check-in operation is carried out to secondary equipment of intelligent converting station software version or checks out operation, creation intelligent substation secondary is set Standby target software release, and obtain the current version information of secondary equipment of intelligent converting station;
2) target software release version information current with secondary equipment of intelligent converting station is compared, judges the mesh It marks software version and whether the current version of secondary equipment of intelligent converting station is consistent, if it is inconsistent, and by the target software version Originally it is sent to secondary equipment of intelligent converting station.
6. secondary equipment of intelligent converting station software harnesses system according to claim 5, which is characterized in that active or period The property version current with secondary equipment of intelligent converting station to the target software release compares, when the target software release When current version is inconsistent with secondary equipment of intelligent converting station, warning information, while version of display comparative information are issued.
7. secondary equipment of intelligent converting station software harnesses system according to claim 5 or 6, which is characterized in that the mesh Marking in software version includes driver corresponding with secondary device, function program and network profile.
8. secondary equipment of intelligent converting station software harnesses system according to claim 7, which is characterized in that set when to secondary When standby software version carries out check-in operation or checks out operation, for the document creation version for checking in or checking out, and to updated soft File path name, file type, version number and check code is arranged in part version.
CN201811429251.6A 2018-11-27 2018-11-27 Intelligent substation secondary equipment software management and control method and system Active CN109656589B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811429251.6A CN109656589B (en) 2018-11-27 2018-11-27 Intelligent substation secondary equipment software management and control method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811429251.6A CN109656589B (en) 2018-11-27 2018-11-27 Intelligent substation secondary equipment software management and control method and system

Publications (2)

Publication Number Publication Date
CN109656589A true CN109656589A (en) 2019-04-19
CN109656589B CN109656589B (en) 2022-04-05

Family

ID=66111646

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811429251.6A Active CN109656589B (en) 2018-11-27 2018-11-27 Intelligent substation secondary equipment software management and control method and system

Country Status (1)

Country Link
CN (1) CN109656589B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111090441A (en) * 2019-11-09 2020-05-01 国网上海市电力公司 A management method and system for power secondary equipment software
CN112269590A (en) * 2020-09-16 2021-01-26 许继集团有限公司 Operation and maintenance master station on-site protection device software version management method and system
CN118377509A (en) * 2024-06-21 2024-07-23 广东电网有限责任公司中山供电局 Remote upgrading method and system for self-installed device, program product and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101325513A (en) * 2007-11-26 2008-12-17 华为技术有限公司 Method, device and system for software upgrade
CN106326450A (en) * 2016-08-26 2017-01-11 山东电力工程咨询院有限公司 Interaction method for realizing SCD (system configuration description) file sign-in and sign-off based on data integration
WO2018126379A1 (en) * 2017-01-05 2018-07-12 深圳市前海中康汇融信息技术有限公司 Database management method for smart terminal application software
CN108733767A (en) * 2018-04-18 2018-11-02 北京四方继保自动化股份有限公司 A kind of intelligent substation configuration file management-control method based on decoupling technology

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101325513A (en) * 2007-11-26 2008-12-17 华为技术有限公司 Method, device and system for software upgrade
CN106326450A (en) * 2016-08-26 2017-01-11 山东电力工程咨询院有限公司 Interaction method for realizing SCD (system configuration description) file sign-in and sign-off based on data integration
WO2018126379A1 (en) * 2017-01-05 2018-07-12 深圳市前海中康汇融信息技术有限公司 Database management method for smart terminal application software
CN108733767A (en) * 2018-04-18 2018-11-02 北京四方继保自动化股份有限公司 A kind of intelligent substation configuration file management-control method based on decoupling technology

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111090441A (en) * 2019-11-09 2020-05-01 国网上海市电力公司 A management method and system for power secondary equipment software
CN112269590A (en) * 2020-09-16 2021-01-26 许继集团有限公司 Operation and maintenance master station on-site protection device software version management method and system
CN112269590B (en) * 2020-09-16 2024-05-10 许继集团有限公司 Method and system for managing software version of operation and maintenance master station on-site protection device
CN118377509A (en) * 2024-06-21 2024-07-23 广东电网有限责任公司中山供电局 Remote upgrading method and system for self-installed device, program product and storage medium
CN118377509B (en) * 2024-06-21 2024-09-10 广东电网有限责任公司中山供电局 Remote upgrading method and system for self-installed device, program product and storage medium

Also Published As

Publication number Publication date
CN109656589B (en) 2022-04-05

Similar Documents

Publication Publication Date Title
CN103295163B (en) Chart-model integrated transformer substation and dispatch master station cooperation modeling method
CN102722764B (en) Integration network optimization computer-aided decision support System
CN104600840A (en) Intelligent dispatching and mis-operation preventing management system and method
CN103761624A (en) Implementing method of integrated power grid dispatching operation intelligent mistaken-early-warning preventing system
CN101436790A (en) On-line splicing and coalition method for electric network model containing complex T connection line
CN109146253A (en) A kind of intelligent automatic interactive operating system for making out an invoice and protecting locking
CN102957205A (en) Method and system for establishing distribution network model
CN104933535A (en) An intelligent monitoring operation ticket management method and a system thereof
CN104993589B (en) A kind of method of model sharing between distribution main website and terminal
CN102593954A (en) Power grid model constructing and updating method and device based on distribution network automation system
CN109656589A (en) A kind of secondary equipment of intelligent converting station software harnesses method and system
CN111967740A (en) Operation ticket safety checking system and method thereof
CN110188898A (en) A kind of power distribution network Dispatching intelligent tickets system and method based on line chart
CN103679557A (en) Power grid operating mode data managing system based on C/S framework and achieving method for power grid operating mode data managing system
CN116843284A (en) Method, device and equipment for generating operation tickets for distribution network operations
CN105868410A (en) Model-driven intelligent SCD (substation configuration description) file and CIM/E (common information model/efficiency) file conversion tool and method
CN108038332A (en) A kind of online artwork rapid generation for the state power grid that faces the future
CN104915794A (en) Multi-time-state full-service unified modeling method based on model center
CN117808312A (en) A method for intelligently generating new device startup plans
CN111524031B (en) An implementation method and system for intelligently generating operation steps based on analytical operation tasks
CN113592226A (en) One-key control method and platform for cascade power station group
CN113515298A (en) System and method for upgrading and managing power distribution terminal program
CN103488726A (en) Method for establishing unified grid data platform based on WEB-SERVICE
CN106059073A (en) Programmed control method based on cooperative misoperation prevention of master station and substation
CN107766949A (en) Failure rapid rush-repair commander's business information exchange method based on meta-model

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant