[go: up one dir, main page]

CN109631018A - A kind of gradual-enlargement type Anti-slagging burner for industrial coal powder boiler - Google Patents

A kind of gradual-enlargement type Anti-slagging burner for industrial coal powder boiler Download PDF

Info

Publication number
CN109631018A
CN109631018A CN201811548346.XA CN201811548346A CN109631018A CN 109631018 A CN109631018 A CN 109631018A CN 201811548346 A CN201811548346 A CN 201811548346A CN 109631018 A CN109631018 A CN 109631018A
Authority
CN
China
Prior art keywords
air duct
flue gas
burner
combustion chamber
precombustion chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811548346.XA
Other languages
Chinese (zh)
Inventor
陈智超
严蓉
王家全
曾令艳
李争起
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Institute of Technology Shenzhen
Original Assignee
Harbin Institute of Technology Shenzhen
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Institute of Technology Shenzhen filed Critical Harbin Institute of Technology Shenzhen
Priority to CN201811548346.XA priority Critical patent/CN109631018A/en
Publication of CN109631018A publication Critical patent/CN109631018A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23CMETHODS OR APPARATUS FOR COMBUSTION USING FLUID FUEL OR SOLID FUEL SUSPENDED IN  A CARRIER GAS OR AIR 
    • F23C5/00Disposition of burners with respect to the combustion chamber or to one another; Mounting of burners in combustion apparatus
    • F23C5/08Disposition of burners
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23CMETHODS OR APPARATUS FOR COMBUSTION USING FLUID FUEL OR SOLID FUEL SUSPENDED IN  A CARRIER GAS OR AIR 
    • F23C7/00Combustion apparatus characterised by arrangements for air supply
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23CMETHODS OR APPARATUS FOR COMBUSTION USING FLUID FUEL OR SOLID FUEL SUSPENDED IN  A CARRIER GAS OR AIR 
    • F23C9/00Combustion apparatus characterised by arrangements for returning combustion products or flue gases to the combustion chamber
    • F23C9/003Combustion apparatus characterised by arrangements for returning combustion products or flue gases to the combustion chamber for pulverulent fuel
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23DBURNERS
    • F23D1/00Burners for combustion of pulverulent fuel
    • F23D1/02Vortex burners, e.g. for cyclone-type combustion apparatus

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)

Abstract

A kind of gradual-enlargement type Anti-slagging burner for industrial coal powder boiler, it is related to boiler technology field, to solve the problems, such as that small and medium-sized industrial coal powder boilers slagging is serious under the prior art.The present invention includes that primary air piping, inner second air pipe, outer second air pipe, inward eddy burner, contour stealth burner, precombustion chamber, flue gas recycled pipeline valve, recycling high pressure blower, supervisor, multiple flue gas recycled jet pipes and multiple are in charge of;Primary air piping, inner second air pipe and outer second air pipe are successively set in together with one heart from inside to outside, and it is adjacent between the two with gap formation air duct, primary air piping, inner second air pipe and the respective air outlet of outer second air pipe are connected to the entrance of precombustion chamber respectively, primary air piping, inner second air pipe and the respective axis of outer second air pipe are vertical with the end face of pre-burning chamber inlet, the outlet of precombustion chamber is connected to the burner hearth of boiler, and precombustion chamber is the big conically shaped in the small outlet of entrance.The present invention is suitable for industrial coal powder boiler.

Description

A kind of gradual-enlargement type Anti-slagging burner for industrial coal powder boiler
Technical field
The present invention relates to boiler technology fields, and in particular to a kind of gradual-enlargement type Anti-slagging burning for industrial coal powder boiler Device.
Background technique
Industrial Boiler plays the role of essential in China's economic development and resident living, and coal-burned industrial boiler is Main in addition to station boiler is equipped with coal.In recent years, with coal dust processing, transport and the development of storing technology, Yi Jimei The continuous maturation of powder combustion technology, the mediumand smallscale industrial boilers of coal dust burning are continued to develop, by the development of more than ten years, coal Powder Industrial Boiler industry has preliminarily formed.In China, for coal-burned industrial boiler sum close to 600,000, year consumes coal nearly 6.4 hundred million Ton.Precombustion chamber is the important component of Industrial Boiler, and fuel supply device injects fuel into precombustion chamber, and fuel is filled through igniting It sets and furnace chamber inner combustion is blown by Secondary Air after lighting, precombustion chamber plays the role of lighting fuel and organizes burning.Breeze airflow into After entering precombustion chamber, high temperature recirculation zone is formed under the action of turbulent burner, guarantees that breeze airflow stablizes burning.Due to precombustion chamber The case where interior temperature is high, and space is small, is easy to appear slagging and dust stratification, especially when using the lower colm of ash fusion point, in advance It is serious to fire indoor slagging.Slagging and dust stratification destroy the aerodynamic field of precombustion chamber in precombustion chamber, influence the stabilization of coal dust firing Property, it will cause safety accident when serious, increase the maintenance workload of operations staff.Slagging is that influence precombustion chamber is normal with dust stratification The main reason for operation.It prevents precombustion chamber dust stratification and slagging from guaranteeing that precombustion chamber is run steadily in the long term, and then guarantees industrial coal powder pot The stable operation of furnace superintendent phase.
China has developed a variety of coal powder burners suitable for industrial coal powder boiler at present.Utility model patent " one The colm pre-combustion chamber burner of kind of Anti-slagging " China Patent No. is ZL201320145975.4, authorized announcement date is 2014 3 Month 26 days, application publication number CN203501168U, call " file one " in the following text, precombustion chamber barrel are divided into four sections, first segment is gradually Expansion type, latter three sections are straight barrel type, and Secondary Air sprays into for three sections from the gap between barrel point, preceding two sections of adherent penetratings, and third section is oblique To penetrating.(China Patent No. ZL201520406222.3, authorized announcement date are utility model patent " combustion powder Industrial Boiler " September in 2015 30 days, application publication number CN204678328U, call " file two " in the following text) input end of the precombustion chamber ontology is in Tapered form and for installing main burner, the outlet end of the precombustion chamber ontology is in the form of flaring.
Although a variety of combustion technologies of domestic-developed, there are still the easy slagging of precombustion chamber to ask existing industrial coal powder boiler Topic, if not can solve this problem, it may be difficult to guarantee the safe operation steady in a long-term of industrial coal powder boiler.
Summary of the invention
The present invention provides a kind of use to solve the problems, such as that small and medium-sized industrial coal powder boilers slagging is serious under the prior art In the gradual-enlargement type Anti-slagging burner of industrial coal powder boiler.
The technical solution adopted by the present invention to solve the above technical problem is:
A kind of gradual-enlargement type Anti-slagging burner for industrial coal powder boiler includes primary air piping, inner second air pipe, outer two Secondary air hose, inward eddy burner, contour stealth burner, precombustion chamber, flue gas recycled pipeline valve, recycling high pressure blower, master Pipe, multiple flue gas recycled jet pipes and multiple are in charge of;
Primary air piping, inner second air pipe and outer second air pipe are successively set in together with one heart from inside to outside, and both adjacent Between have gap formed air duct, primary air piping, inner second air pipe and the respective air outlet of outer second air pipe respectively with precombustion chamber Entrance connection, primary air piping, inner second air pipe and the respective axis of outer second air pipe are vertical with the end face of pre-burning chamber inlet, in advance The outlet of combustion room is connected to the burner hearth of boiler, and precombustion chamber is the big conically shaped in the small outlet of entrance, primary air piping and inner second air pipe Between be equipped with inward eddy burner, between primary air piping and inner second air pipe be equipped with contour stealth burner, precombustion chamber be equipped with it is more A flue gas recycled jet pipe, each flue gas recycled jet pipe is in charge of with each to be connected to, and is in charge of for multiple and is connected to respectively with supervisor, It is responsible for and is connected to the air outlet of recycling high pressure blower, the branch, which is in charge of, is equipped with flue gas recycled pipeline valve, each follows again Ring flue gas jet pipe is arranged at an angle with precombustion chamber entrance face, two neighboring to cross flue gas recycled nozzle axis and and in advance The angle for firing the vertical plane in chamber inlet end face is equal, and the center line of precombustion chamber to each mistake flue gas recycled nozzle axis and The plane vertical with precombustion chamber entrance face is equidistant.
Compared with the prior art, the invention has the following beneficial effects:
One, precombustion chamber of the invention is set as taper, and from the inlet to the outlet, sectional area constantly increases, Thermal load of cross-section by A possibility that gradually reducing, effectively reducing precombustion chamber slagging.
Two, flue gas recycled of the present invention is sprayed by the flue gas recycled jet pipe on precombustion chamber entrance face with certain speed Enter, forms one layer " air film " in pre-burning chamber interior walls, high temperature, the flue gas of high lime-ash concentration and precombustion chamber internal wall separates are opened, are kept away Exempt from the lime-ash of high temperature and the contact of pre-burning chamber interior walls;Meanwhile flue gas recycled temperature is lower than furnace high-temperature flue gas, so that high temperature cigarette Gas has cooled down before touching pre-burning chamber interior walls, and the lime-ash for reaching pre-burning chamber interior walls can be recycled flue gas stream band at once It walks, reduces pre-burning chamber interior walls slagging.Therefore, flue gas recycled is avoided that coal in the case where not influencing pre-burning Indoor Combustion Powder and ash deposition achieve the purpose that prevent precombustion chamber dust stratification and slagging in precombustion chamber wall surface.
Three, the angle in the present invention between the axis of flue gas recycled jet pipe and the vertical line of precombustion chamber entrance face can basis Coal quality fire behaviour and the difference of boiler load are adjusted, and avoid coal dust and ash deposition in precombustion chamber wall surface, reaching prevents The purpose of precombustion chamber dust stratification and slagging.
Four, the present invention is two neighboring crosses flue gas recycled nozzle axis and vertical with precombustion chamber entrance face two are put down The angle in face is equal, and the center line of precombustion chamber hangs down to each flue gas recycled nozzle axis excessively and with precombustion chamber entrance face Straight plane is equidistant, and so that flue gas recycled is formed rotating jet by flue gas recycled jet pipe, rotating jet is in pre-burning The strong disturbance that chamber interior walls are formed purges pre-burning chamber interior walls, plays the role of deashing, reduce dust stratification in precombustion chamber, can The ash of wall surface, slag are effectively blown out into precombustion chamber, avoided because of slagging caused by wall surface dust stratification is excessive.
Detailed description of the invention
Fig. 1 is the schematic diagram that the present invention is applied to horizontal pulverized-coal fired boiler;
Fig. 2 is left view of the invention;
Fig. 3 is the schematic diagram that the present invention is applied to vertical pulverized-coal fired boiler;
Wherein the single arrow direction in Fig. 1 and Fig. 3 is the conveying direction of First air coal dust.
Specific embodiment
Specific embodiment 1: illustrate present embodiment in conjunction with Fig. 1 and Fig. 2, present embodiment include primary air piping 1, Inner second air pipe 2, outer second air pipe 3, inward eddy burner 4, contour stealth burner 5, precombustion chamber 6, flue gas recycled pipeline valve Door 7, recycling high pressure blower 9, supervisor 10, multiple flue gas recycled jet pipes 8 and multiple are in charge of 12;
Primary air piping 1, inner second air pipe 2 and outer second air pipe 3 are successively set in together with one heart from inside to outside, and adjacent two There is gap to form air duct, primary air piping 1, inner second air pipe 2 and the respective air outlet of outer second air pipe 3 are respectively and in advance between person Fire the entrance connection of room 6, the end of primary air piping 1, inner second air pipe 2 and the respective axis of outer second air pipe 3 and 6 entrance of precombustion chamber Face is vertical, and the outlet of precombustion chamber 6 is connected to the burner hearth 11 of boiler, and precombustion chamber 6 is the big conically shaped in the small outlet of entrance, primary air piping It is equipped with inward eddy burner 4 between 1 and inner second air pipe 2, contour stealth is equipped between primary air piping 1 and inner second air pipe 2 and is burnt Device 5, precombustion chamber 6 are equipped with multiple flue gas recycled jet pipes 8, and each flue gas recycled jet pipe 8 is in charge of 12 with each and is connected to, more A branch is in charge of 12 and is connected to respectively with supervisor 10, and supervisor 10 is connected to the air outlet of recycling high pressure blower 9, and the branch is in charge of on 12 Equipped with flue gas recycled pipeline valve 7, each flue gas recycled jet pipe 8 is arranged at an angle with 6 entrance face of precombustion chamber, phase Adjacent two are crossed 8 axis of flue gas recycled jet pipe and equal with the vertical angle of plane of 6 entrance face of precombustion chamber, and precombustion chamber 6 center line crosses 8 axis of flue gas recycled jet pipe and the phase at a distance from vertical plane with 6 entrance face of precombustion chamber to each Deng.
The wind speed that the present invention recycles the offer of high pressure blower 9 40m/s or more can will recycle cigarette by the conversion of valve 7 Gas terminates, and the indoor lime-ash of pre-burning can effectively be cleared up by being sent into high-speed flow using recycling high pressure blower 9, plays protection precombustion chamber 6 effect.
Specific embodiment 2: illustrating present embodiment in conjunction with Fig. 1, the cone angle of precombustion chamber 6 described in present embodiment is 0-45°。
Other compositions and connection relationship are same as the specific embodiment one.
Specific embodiment 3: illustrate present embodiment in conjunction with Fig. 1, the entrance of precombustion chamber 6 described in present embodiment Diameter is 1.5-3 times of 3 outer diameter of outer second air pipe, and the length L1 of precombustion chamber 6 is the 0.8- of 3 outer diameter of outer second air pipe 2 times.
So set, being conducive to coal dust flue gas stream in precombustion chamber blows out precombustion chamber.
Other compositions and connection relationship are the same as one or two specific embodiments.
Specific embodiment 4: illustrating present embodiment in conjunction with Fig. 1, the material of precombustion chamber 6 described in present embodiment is High strength refractory material.
Other compositions and connection relationship are identical as specific embodiment one, two or three.
Specific embodiment 5: illustrate present embodiment in conjunction with Fig. 1, flue gas recycled jet pipe 8 described in present embodiment Axis and the angle of the 6 entrance face vertical line of precombustion chamber be 0-60 °.
Angle β between the 6 entrance face vertical line of axis and precombustion chamber of flue gas recycled jet pipe 8 is adjustable, by adjusting β Size can realize the targeted elimination to lime-ash in precombustion chamber.
So set, avoiding coal dust and ash deposition in precombustion chamber wall surface, precombustion chamber dust stratification and slagging are prevented.
Other compositions and connection relationship and specific embodiment one, two, three or four are identical.
Specific embodiment 6: illustrate present embodiment in conjunction with Fig. 1, flue gas recycled jet pipe 8 described in present embodiment The entrance inner wall distance of the center of outlet to the precombustion chamber 6 is 10-30mm.
So set, the rotating jet that flue gas recycled jet pipe 8 projects generates effective disturbance to inner wall.
Other compositions and connection relationship and specific embodiment one, two, three, four or five are identical.
As shown in figure 3, it is can also be applied to vertical boiler, precombustion chamber 6 of the invention in vertical pulverized-coal fired boiler Top connection, primary air piping 1 of the invention, inner second air pipe 2 and outer second air pipe 3 be vertically arranged, other component relationships with it is upper It is identical to state embodiment.

Claims (6)

1.一种用于工业煤粉锅炉的渐扩式防结渣燃烧器,包括一次风管(1)、内二次风管(2)、外二次风管(3)、内旋流燃烧器(4)、外旋流燃烧器(5)和预燃室(6),其特征在于:它还包括再循环烟气管道阀门(7)、再循环高压风机(9)、主管(10)、多个再循环烟气喷管(8)和多个支分管(12);1. A progressive expansion type anti-slagging burner for an industrial pulverized coal boiler, comprising a primary air duct (1), an inner secondary air duct (2), an outer secondary air duct (3), an inner swirl combustion (4), external swirl burner (5) and pre-combustion chamber (6), characterized in that: it also includes a recirculation flue gas pipeline valve (7), a recirculation high-pressure fan (9), a main pipe (10) , a plurality of recirculating flue gas nozzles (8) and a plurality of branch pipes (12); 一次风管(1)、内二次风管(2)和外二次风管(3)由内向外依次同心套装在一起,且相邻两者之间具有间隙形成风道,一次风管(1)、内二次风管(2)和外二次风管(3)各自的出风口分别与预燃室(6)的入口连通,一次风管(1)、内二次风管(2)和外二次风管(3)各自的轴线与预燃室(6)入口的端面垂直,预燃室(6)的出口与锅炉的炉膛(11)连通,预燃室(6)为入口小出口大的锥形筒,一次风管(1)和内二次风管(2)之间设有内旋流燃烧器(4),一次风管(1)和内二次风管(2)之间设有外旋流燃烧器(5),预燃室(6)上设有多个再循环烟气喷管(8),每个再循环烟气喷管(8)与每个支分管(12)连通,多个支分管(12)分别与主管(10)连通,主管(10)与再循环高压风机(9)的出风口连通,所述支分管(12)上设有再循环烟气管道阀门(7),每个再循环烟气喷管(8)与预燃室(6)入口端面呈一定角度设置,相邻两个过再循环烟气喷管(8)轴线且均与预燃室(6)入口端面垂直的平面的夹角相等,且预燃室(6)的中心线到每个过再循环烟气喷管(8)轴线且均与预燃室(6)入口端面垂直的平面的距离相等。The primary air duct (1), the inner secondary air duct (2) and the outer secondary air duct (3) are assembled concentrically from the inside to the outside in turn, and there is a gap between the adjacent two to form an air duct, and the primary air duct ( 1) The respective air outlets of the inner secondary air duct (2) and the outer secondary air duct (3) are respectively connected with the inlet of the pre-combustion chamber (6), the primary air duct (1), the inner secondary air duct (2) ) and the respective axes of the outer secondary air duct (3) are perpendicular to the end face of the inlet of the pre-chamber (6), the outlet of the pre-chamber (6) is communicated with the furnace (11) of the boiler, and the pre-chamber (6) is the inlet A conical tube with a small outlet and a large outlet is provided with an inner swirl burner (4) between the primary air duct (1) and the inner secondary air duct (2), the primary air duct (1) and the inner secondary air duct (2) ) is provided with an external swirling burner (5), a plurality of recirculating flue gas nozzles (8) are arranged on the pre-combustion chamber (6), each recirculating flue gas nozzle (8) is connected with each branch The branch pipes (12) are communicated, and the plurality of branch and branch pipes (12) are respectively communicated with the main pipe (10), the main pipe (10) is communicated with the air outlet of the recirculating high-pressure fan (9), and the branch pipes (12) are provided with a recirculation The flue gas pipeline valve (7), each recirculating flue gas nozzle (8) is arranged at a certain angle with the inlet end face of the pre-combustion chamber (6), and the axes of the adjacent two recirculating flue gas nozzles (8) are The included angle of the plane perpendicular to the inlet end face of the pre-combustion chamber (6) is equal, and the centerline of the pre-combustion chamber (6) to the axis of each over-recirculation flue gas nozzle (8) and the pre-combustion chamber (6) The distance between the vertical planes of the inlet end face is equal. 2.根据权利要求1所述的一种用于工业煤粉锅炉的渐扩式防结渣燃烧器,其特征在于:所述预燃室(6)的锥角(α)为0-45°。2. A progressively expanding type anti-slagging burner for an industrial pulverized coal boiler according to claim 1, characterized in that: the cone angle (α) of the pre-combustion chamber (6) is 0-45° . 3.根据权利要求2所述的一种用于工业煤粉锅炉的渐扩式防结渣燃烧器,其特征在于:所述预燃室(6)的入口的外径是所述外二次风管(3)外径的1.5-3倍,预燃室(6)的长度(L1)是所述外二次风管(3)外径的0.8-2倍。3. A progressively expanding anti-slagging burner for an industrial pulverized coal boiler according to claim 2, characterized in that: the outer diameter of the inlet of the pre-combustion chamber (6) is the outer diameter of the outer secondary The outer diameter of the air duct (3) is 1.5-3 times, and the length (L1) of the pre-combustion chamber (6) is 0.8-2 times the outer diameter of the outer secondary air duct (3). 4.根据权利要求3所述的一种用于工业煤粉锅炉的渐扩式防结渣燃烧器,其特征在于:所述预燃室(6)的材质为高强度耐火材料。4 . The progressively expanding type anti-slagging burner for an industrial pulverized coal boiler according to claim 3 , wherein the pre-combustion chamber ( 6 ) is made of high-strength refractory material. 5 . 5.根据权利要求4所述的一种用于工业煤粉锅炉的渐扩式防结渣燃烧器,其特征在于:所述再循环烟气喷管(8)的轴线与所述预燃室(6)入口端面垂线的夹角为0-60°。5. A progressively expanding anti-slagging burner for an industrial pulverized coal boiler according to claim 4, characterized in that: the axis of the recirculating flue gas nozzle (8) is connected to the pre-combustion chamber (6) The included angle of the vertical line of the inlet end face is 0-60°. 6.根据权利要求5所述的一种用于工业煤粉锅炉的渐扩式防结渣燃烧器,其特征在于:所述再循环烟气喷管(8)出口的中心到所述预燃室(6)的入口内壁距离为10-30mm。6. A progressively expanding anti-slagging burner for an industrial pulverized coal boiler according to claim 5, characterized in that: the center of the outlet of the recirculating flue gas nozzle (8) reaches the point of the pre-combustion The distance to the inner wall of the inlet of the chamber (6) is 10-30 mm.
CN201811548346.XA 2018-12-18 2018-12-18 A kind of gradual-enlargement type Anti-slagging burner for industrial coal powder boiler Pending CN109631018A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811548346.XA CN109631018A (en) 2018-12-18 2018-12-18 A kind of gradual-enlargement type Anti-slagging burner for industrial coal powder boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811548346.XA CN109631018A (en) 2018-12-18 2018-12-18 A kind of gradual-enlargement type Anti-slagging burner for industrial coal powder boiler

Publications (1)

Publication Number Publication Date
CN109631018A true CN109631018A (en) 2019-04-16

Family

ID=66074972

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811548346.XA Pending CN109631018A (en) 2018-12-18 2018-12-18 A kind of gradual-enlargement type Anti-slagging burner for industrial coal powder boiler

Country Status (1)

Country Link
CN (1) CN109631018A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111895410A (en) * 2020-06-29 2020-11-06 欧保(中国)环境工程股份有限公司 Vector control gas low-nitrogen burner

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0171788A1 (en) * 1984-08-16 1986-02-19 STEIN INDUSTRIE Société Anonyme dite: Ignition and support burner for solid fossil pulverized fuel, and combustion chamber comprising such a burner
EP0639742A2 (en) * 1993-08-20 1995-02-22 Saacke GmbH & Co. KG Method and device for low emission combustion of fluid and or gaseous fuels with internal recirculation of fluegas
CN107559819A (en) * 2017-09-21 2018-01-09 哈尔滨工业大学 A kind of spiral-flow powdered coal burning mechanism that gradually expanded form precombustion chamber is carried for Industrial Boiler
CN107559820A (en) * 2017-09-21 2018-01-09 哈尔滨工业大学 A kind of precombustion chamber with surrounding air suitable for vortex burner
CN107606606A (en) * 2017-09-21 2018-01-19 哈尔滨工业大学 Powder " Ω " shape industrial coal powder boiler is given at a kind of center using flue gas recirculation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0171788A1 (en) * 1984-08-16 1986-02-19 STEIN INDUSTRIE Société Anonyme dite: Ignition and support burner for solid fossil pulverized fuel, and combustion chamber comprising such a burner
EP0639742A2 (en) * 1993-08-20 1995-02-22 Saacke GmbH & Co. KG Method and device for low emission combustion of fluid and or gaseous fuels with internal recirculation of fluegas
CN107559819A (en) * 2017-09-21 2018-01-09 哈尔滨工业大学 A kind of spiral-flow powdered coal burning mechanism that gradually expanded form precombustion chamber is carried for Industrial Boiler
CN107559820A (en) * 2017-09-21 2018-01-09 哈尔滨工业大学 A kind of precombustion chamber with surrounding air suitable for vortex burner
CN107606606A (en) * 2017-09-21 2018-01-19 哈尔滨工业大学 Powder " Ω " shape industrial coal powder boiler is given at a kind of center using flue gas recirculation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111895410A (en) * 2020-06-29 2020-11-06 欧保(中国)环境工程股份有限公司 Vector control gas low-nitrogen burner
CN111895410B (en) * 2020-06-29 2022-02-01 欧保(中国)环境工程股份有限公司 Vector control gas low-nitrogen burner

Similar Documents

Publication Publication Date Title
CN103615717B (en) A kind of novel oxygen-enriched tiny-oil ignition and steady burning burner in ultra low load
CN103791495B (en) Oxygen-enriched low-NOx pulverized coal burner and application thereof
CN107559817B (en) A swirl pulverized coal combustion device and method using flue gas recirculation
CN107559818A (en) Using precombustion chamber and the center feeding rotational flow coal dust burner of double-deck jet separation Secondary Air
CN107559819A (en) A kind of spiral-flow powdered coal burning mechanism that gradually expanded form precombustion chamber is carried for Industrial Boiler
CN107327850A (en) A kind of Two-way Cycle turbulent bed incinerator of the grey device of band spray
CN109973994A (en) A kind of low NO
CN106989411A (en) A kind of boiler water wall air film protection device
CN205119061U (en) Gas fractional combustion ware
CN108870383A (en) A kind of pulverized-coal fired boiler low NOx combustion system
CN206786717U (en) A kind of two-chamber combustion gas low nitrogen burning machine
CN206145669U (en) Swirling flow pulverized coal burner
CN109631018A (en) A kind of gradual-enlargement type Anti-slagging burner for industrial coal powder boiler
CN208901372U (en) A kind of pulverized-coal fired boiler low NOx combustion system
CN106838895A (en) A kind of low-load combustion-stabilizing once-through type burner
CN109631022A (en) A kind of coal powder burner with flue gas recirculation for industrial coal powder boiler
CN105910115A (en) Waste liquid incineration device
CN211694854U (en) W flame boiler low-nitrogen combustion and slagging-proof flue gas recirculation system
CN109175339A (en) A kind of double combustion-supporting channel flue gas internal-circulation type ladle baking facilities
CN109631025A (en) A kind of Anti-slagging swirling pulverized coal combustion device suitable for industrial coal powder boiler
CN205119046U (en) Swirl pulverized coal burner
CN107504480A (en) A kind of industrial coal powder boiler with center feeding rotational flow coal dust burner
CN107022379A (en) A kind of dry coal powder airflow bed gasification furnace burner with aqueous cold plate protection of pipe
CN206637650U (en) A kind of boiler water wall air film protection device
CN107559820A (en) A kind of precombustion chamber with surrounding air suitable for vortex burner

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190416