[go: up one dir, main page]

CN109630063A - Method for tripping partition of gel solid slug - Google Patents

Method for tripping partition of gel solid slug Download PDF

Info

Publication number
CN109630063A
CN109630063A CN201811286593.7A CN201811286593A CN109630063A CN 109630063 A CN109630063 A CN 109630063A CN 201811286593 A CN201811286593 A CN 201811286593A CN 109630063 A CN109630063 A CN 109630063A
Authority
CN
China
Prior art keywords
gel
slug
drilling
pressure
well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811286593.7A
Other languages
Chinese (zh)
Inventor
李枝林
梁玉林
杨玻
韩烈祥
陆灯云
肖润德
李赛
聂捷
高如军
左星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
China National Petroleum Corp
CNPC Chuanqing Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, CNPC Chuanqing Drilling Engineering Co Ltd filed Critical China National Petroleum Corp
Priority to CN201811286593.7A priority Critical patent/CN109630063A/en
Publication of CN109630063A publication Critical patent/CN109630063A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • E21B33/134Bridging plugs

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a method for tripping a gel solid slug partition, which relates to the field of drilling operation of sulfur-containing oil and gas wells and comprises the following steps: the first step is as follows: taking out the drill under pressure to the designed well depth, pumping the gel with the designed amount, and taking out the drill to the upper part of the gel slug; the second step is that: circulating for n hours, and triggering gel curing through the formation temperature; the third step: after the gel is solidified, verifying whether the underground pressure is completely cut off, and if the underground pressure is completely cut off, tripping the well in a conventional open-hole mode; the fourth step: when drilling down, opening the well and drilling down to the top of the gel solid slug, drilling the gel solid slug, then supplementing pressure and drilling down to the bottom of the well under pressure, and recovering drilling. The method can realize the well control safety in the fine pressure control tripping process, ensure that the drilling fluid is not leaked basically in the whole tripping process and effectively protect the oil gas reservoir.

Description

A kind of method that gel solids slug compartment makes a trip
Technical field
The present invention relates to sulfur crude gas well drillng operation fields, specifically relate to a kind of close for the narrow safety of sulfur-bearing formation The method that drilling well makes a trip after degree bed.
Background technique
Fine controlled pressure drilling tripping method is generally pulled out of hole using slurry cap method again, that is, is designed and starched cap density and height again, With pressure is drilled into design position and open well after nut cap and pull out of hole for starching again, gets into bottom under stages cycle when lower brill.But it is passed through in practice Nearly zero ' Safe Density Windows of Chang Yinwei or negative window can only starch again the trip-out of cap method, lower drilling using grouting quantity method cage is checked Ensure well control safety with counter push away of light sizing, causes a large amount of drilling fluid leakages, pollution reservoir.
Publication No. 103711452A, publication date are that the Chinese patent literature on April 9th, 2014 discloses a kind of gel section Plug packing well control method, it the following steps are included: S1, when there is spill and leakage with complicated pit shaft situation is deposited, established in pit shaft solidifying Glue slug;S2, circulating with choke exhaust is carried out to the top pit shaft after packing;S3, the safety work time provided in pit shaft packing It is interior, it carries out stopping boring leak stopping preparation;S4, by gel slug break glue release pit shaft packing after, blocked up using extrusion Leak operation;S5, throttle well killing is carried out with weighted drilling fluid.The advantageous effect of the invention is: by gel slug pit shaft packing and Broken glue releases pit shaft packing, provides a kind of completely new selection to handle complicated pit shaft situation;Gel slug blocks oil gas to move up Overflow is effectively controlled in shaft bottom, provides the safety work time for leak stopping kill-job, reduce well control safety risk by channel; With novel technical thought, reliable technical solution, practical engineering technology is advantageously formed.
But it using above patent document as the prior art of representative, is not ensured that during fine pressure control makes a trip Well control safety, operates imprecision, and the process that entirely makes a trip still can miss drilling fluid, oil and gas reservoir is caused to be contaminated.
Summary of the invention
The present invention is directed to for defect and deficiency present in the above-mentioned prior art, providing one kind can be achieved fine pressure control Well control safety in going down process guarantees that the entire process that makes a trip will not miss drilling fluid substantially, and effective protection oil and gas reservoir coagulates The method that glue solid slug compartment makes a trip.
The present invention is realized by using following technical proposals:
A kind of method that gel solids slug compartment makes a trip, it is characterised in that steps are as follows:
Step 1: with pressure is drilled into planned well depth, it is pumped into design flow gel, rises and is drilled into gel slug top;
Step 2: circulation n hours, gel solidification is triggered by formation temperature;
Step 3: whether verifying down-hole pressure separates completely after gel solidification, if partition completely, spacious well usual manner makes a trip;
Step 4: after spacious underground is drilled at the top of gel solids slug, brill opens gel solids slug, then ftercompction and band when lower brill Pressure is drilled into shaft bottom, restores drilling.
In the first step, rises and be drilled into gel slug top 0.1-100m.
In the second step, n=0.1-999 hours.
Compared with prior art, the beneficial effects obtained by the present invention are as follows it is as follows:
By above-mentioned process flow, fine pressure control not will cause the severe leakage of drilling fluid during making a trip, and both protect storage Layer, has been greatly reduced the well control risk to make a trip.Effectively separate down-hole pressure system, it can be achieved that essence by gel solids slug Well control safety during thin pressure control makes a trip;The process that entirely makes a trip will not miss drilling fluid substantially, effectively protect oil gas Reservoir.
Detailed description of the invention
Below in conjunction with specification drawings and specific embodiments, the present invention is described in further detail, in which:
Fig. 1 is principle schematic diagram of the present invention.
Marked in the figure:
1, drilling fluid, 2, gel slug, 3, oil-gas Layer, 4, lower brill surge pressure gradient, 5, trip-out swabbing pressure gradient, 6, stratum Barometric gradient.
Specific embodiment
Embodiment 1
As a better embodiment of the invention, it discloses a kind of method that gel solids slug compartment makes a trip, steps It is as follows:
Step 1: with pressure is drilled into planned well depth, it is pumped into design flow gel, rises and is drilled into gel slug top;
Step 2: circulation n hours, gel solidification is triggered by formation temperature;
Step 3: whether verifying down-hole pressure separates completely after gel solidification, if partition completely, spacious well usual manner makes a trip;
Step 4: after spacious underground is drilled at the top of gel solids slug, brill opens gel solids slug, then ftercompction and band when lower brill Pressure is drilled into shaft bottom, restores drilling.
Embodiment 2
As preferred forms of the invention, specific work process of the invention:
Step 1: with pressure is drilled into planned well depth, it is pumped into design flow gel, rises and is drilled into gel slug top 0.1-100m;
Step 2: n hours (n=0.1-999) of circulation, triggers gel solidification by formation temperature;
Step 3: whether verifying down-hole pressure separates completely after gel solidification, if partition completely, spacious well usual manner makes a trip;
Step 4: after spacious underground is drilled at the top of gel solids slug, brill opens gel solids slug, then ftercompction and band when lower brill Pressure is drilled into shaft bottom, restores drilling.
Before the trip-out of spacious well, temperature control triggering after design position in gel injection well is frozen into slug, separates down-hole pressure System prevents from altering in overflow, then opens well and pulls out of hole;When lower brill, when solid slug is got into conventional spacious underground, brill opens solid slug, Then band pressure is bored;This solves the broken glued temperature resistances of deeply limited under casing valve, gel valve, and difficult, drain spray is hung with when depositing Tank starches that the drilling fluid that cap makes a trip largely is missed and Holes of Complicated Wells makes a trip well control risk problem again.

Claims (3)

1. a kind of method that gel solids slug compartment makes a trip, it is characterised in that steps are as follows:
Step 1: with pressure is drilled into planned well depth, it is pumped into design flow gel, rises and is drilled into gel slug top;
Step 2: circulation n hours, gel solidification is triggered by formation temperature;
Step 3: whether verifying down-hole pressure separates completely after gel solidification, if partition completely, spacious well usual manner makes a trip;
Step 4: after spacious underground is drilled at the top of gel solids slug, brill opens gel solids slug, then ftercompction and band when lower brill Pressure is drilled into shaft bottom, restores drilling.
2. the method that a kind of gel solids slug compartment according to claim 1 makes a trip, it is characterised in that: described first In step, rises and be drilled into gel slug top 0.1-100m.
3. the method that a kind of gel solids slug compartment according to claim 1 makes a trip, it is characterised in that: described second In step, n=0.1-999 hours.
CN201811286593.7A 2018-10-31 2018-10-31 Method for tripping partition of gel solid slug Pending CN109630063A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811286593.7A CN109630063A (en) 2018-10-31 2018-10-31 Method for tripping partition of gel solid slug

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811286593.7A CN109630063A (en) 2018-10-31 2018-10-31 Method for tripping partition of gel solid slug

Publications (1)

Publication Number Publication Date
CN109630063A true CN109630063A (en) 2019-04-16

Family

ID=66067033

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811286593.7A Pending CN109630063A (en) 2018-10-31 2018-10-31 Method for tripping partition of gel solid slug

Country Status (1)

Country Link
CN (1) CN109630063A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115653536A (en) * 2022-09-30 2023-01-31 中国石油天然气集团有限公司 Circulating pressure control method and system for liquid rubber plug packing production zone in drilling process
CN117888842A (en) * 2024-03-18 2024-04-16 中国石油大学(华东) Ultra-deep wellbore pressure control method and system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5291949A (en) * 1991-05-07 1994-03-08 Union Oil Company Of California Method for inhibiting caustic flood breakthrough
CN103711452A (en) * 2013-12-31 2014-04-09 西南石油大学 Gel plug packing well control method
CN105464645A (en) * 2016-01-11 2016-04-06 西南石油大学 Well-completion wellbore simulation experimental device and method suitable for deep well high-temperature fluid slug
CN106703743A (en) * 2015-11-18 2017-05-24 中国石油天然气股份有限公司 Gel isolation well control method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5291949A (en) * 1991-05-07 1994-03-08 Union Oil Company Of California Method for inhibiting caustic flood breakthrough
CN103711452A (en) * 2013-12-31 2014-04-09 西南石油大学 Gel plug packing well control method
CN106703743A (en) * 2015-11-18 2017-05-24 中国石油天然气股份有限公司 Gel isolation well control method
CN105464645A (en) * 2016-01-11 2016-04-06 西南石油大学 Well-completion wellbore simulation experimental device and method suitable for deep well high-temperature fluid slug

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115653536A (en) * 2022-09-30 2023-01-31 中国石油天然气集团有限公司 Circulating pressure control method and system for liquid rubber plug packing production zone in drilling process
CN115653536B (en) * 2022-09-30 2024-06-07 中国石油天然气集团有限公司 Circulating pressure control method and system for liquid rubber plug packing production layer in drilling process
CN117888842A (en) * 2024-03-18 2024-04-16 中国石油大学(华东) Ultra-deep wellbore pressure control method and system

Similar Documents

Publication Publication Date Title
RU2196892C2 (en) Device and system (versions) for increase of liquid recovery from underground beds
US4022280A (en) Thermal recovery of hydrocarbons by washing an underground sand
US20060175065A1 (en) Water shut off method and apparatus
EP0435727B1 (en) Method and device for stimulation of an underground formation by injection of a fluid coming from an adjacent zone being connected to the first one by a drain hole transversing a low-permeable intermediate layer
CN102330545A (en) Sand prevention method for heavy oil reservoir oil well
CN109630063A (en) Method for tripping partition of gel solid slug
CN103603628A (en) Downhole operation plug injection method
CN107780879A (en) A kind of reverse inlet well well formation device and method
RU2203405C1 (en) Method of development of oil field
CN110439510A (en) A kind of method of layer-by-layer acidification seperated layer water injection
CA2707776C (en) A method and apparatus for the preferential production of fluids from horizontal wells
WO2021022909A1 (en) Method for achieving water self-plugging by means of stacking packer particles, water self-plugging pipe string, and well completion structure
CN109322644A (en) A kind of coal bed gas well pressure control water pumping gas production method and system
RU2317407C1 (en) Well operation method
US2104488A (en) Treatment of wells
RU2304703C1 (en) Method for extracting an oil deposit with low penetrability terrigenous collector
US1851446A (en) Oil recharging and recovery method and apparatus
US4676314A (en) Method of recovering oil
CN110469292B (en) Circulating channeling sealing method
RU2480581C1 (en) Method to isolate inflow of reservoir water in low-angle and horizontal wells
CN114718502A (en) Abandoned well plugging method
CN207017983U (en) A kind of low sheraing pinpoints profile control injection string
RU2524800C1 (en) Development of inhomogeneous deposit by inclined and horizontal wells
CN112780184A (en) Self-balancing anti-pollution well completion pipe string for gas well
US3123140A (en) Connally

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190416