CN109611101A - A kind of section in Tunneling by mining method converts construction technology - Google Patents

A kind of section in Tunneling by mining method converts construction technology Download PDF

Info

Publication number
CN109611101A
CN109611101A CN201811471919.3A CN201811471919A CN109611101A CN 109611101 A CN109611101 A CN 109611101A CN 201811471919 A CN201811471919 A CN 201811471919A CN 109611101 A CN109611101 A CN 109611101A
Authority
CN
China
Prior art keywords
section
construction
top bar
tunneling
predicament
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811471919.3A
Other languages
Chinese (zh)
Inventor
李登科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 24th Bureau Group Co Ltd
Original Assignee
China Railway 24th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 24th Bureau Group Co Ltd filed Critical China Railway 24th Bureau Group Co Ltd
Priority to CN201811471919.3A priority Critical patent/CN109611101A/en
Publication of CN109611101A publication Critical patent/CN109611101A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/003Linings or provisions thereon, specially adapted for traffic tunnels, e.g. with built-in cleaning devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses the sections in a kind of Tunneling by mining method to convert construction technology, belong to constructing metro tunnel field, section conversion construction technology in the Tunneling by mining method includes two kinds of section conversion processes, it is big cross section respectively to light section conversion process and light section to big cross section conversion process, section in the Tunneling by mining method convert construction technology excavated from shield well toward big mileage first experience big cross section to being gone through light section to big cross section conversion process after light section conversion process, section conversion construction technology in a kind of Tunneling by mining method is closely calculated by rigorous, different section conversion process measures is provided in converting out for different section, each process linking simultaneously is close, it is preferable for the settlement control of entire section, duration progress is fast, adapt to the changeable section of cross dimensions, in addition for entire section conversion at Stability and safety have sufficient guarantee, are worth promoting and using in constructing metro tunnel field.

Description

A kind of section in Tunneling by mining method converts construction technology
Technical field
The present invention relates to constructing metro tunnel field, the section in specifically a kind of Tunneling by mining method converts construction technology.
Background technique
Xi'an geothermic field science and technology eight tunnels~science and technology, six road shallow buried covered excavation section working procedures are complicated, entering and leaving section Tunneling by mining method In, there is a problem of that the transformation between big cross section, light section is frequent between running tunnel, the engineering method conversion of section variation complexity It is the construction emphasis and construction Difficulties in this section, its construction technology quality not only decides the stability and peace of construction tunnel Quan Xing, it is often more important that it is related to the water-impervious operation and tunnel anti-deformation operation of subway tunnel in the future, for subway tunnel Service life it is most important.
For the problems in above-mentioned background technology, the present invention is intended to provide the section in a kind of Tunneling by mining method converts construction Technique.
Summary of the invention
The purpose of the present invention is to provide the sections in a kind of Tunneling by mining method to convert construction technology, to solve above-mentioned background The problem of being proposed in technology.
To achieve the above object, the invention provides the following technical scheme:
A kind of section in Tunneling by mining method converts construction technology, including two kinds of section conversion processes, is big cross section respectively To light section conversion process and light section to big cross section conversion process, from shield well toward big mileage excavate first experience big cross section to Light section conversion process is digging to section variation by light section is gone through to big cross section conversion process, is needing that 1.5m long is arranged Changeover portion, the changeover portion is made of three Pin grids, and the effect of changeover portion is that gradually transition expands or shrinks section.
As a further solution of the present invention: Change measure of the big cross section to light section conversion process are as follows:
Step 1: applying preliminary bracing at top bar 3 construction to section variations, and reserved standard outline excavation, spray are mixed Solidifying grave closes reserved excavation face, gets out of a predicament or an embarrassing situation 4 away from stopping construction at 3m at section variation, and complete supporting construction;
Step 2: applying preliminary bracing and reserved standard section outline excavation at 5 construction to section variations, initial stage is completed Supporting, pneumatically placed concrete close reserved excavation face, get out of a predicament or an embarrassing situation 6 away from construction is stopped at 3m at section variation, complete preliminary bracing. Face has formed positive step at this time;
Step 3: construction top bar standard paragraphs advanced tubule, and a Pin standard section grid steel frame is set up in face, Gunite concrete is fixed;
Step 4: excavating arch annular, Core Soil is stayed, excavates drilling depth 0.5m, supporting top bar arch forms positive step and applies Work.
As further scheme of the invention: Change measure of the light section to big cross section conversion process are as follows:
The 5-6m step 1: top bar is got out of a predicament or an embarrassing situation in advance stops top bar arch annular when top bar is constructed to transition Excavation supporting excavates intercalated nucleus cubsoil, closes face, while getting out of a predicament or an embarrassing situation and continuing to construct.It is getting out of a predicament or an embarrassing situation away from transition 3.0m When, stop construction of getting out of a predicament or an embarrassing situation;
Step 2: gunite concrete closes top bar face after the completion of top bar Core Soil excavates, divide face. The top bar that the soil body is stitched to idio-morphosis on the left of top bar is digged, excavation cyclic advance is 0.5m.After excavation, appear on the stage in time Rank preliminary bracing, it is longitudinal to be connected with A22 connection reinforcing bar;
Step 3: it is disconnected to idio-morphosis seam to dig the left side soil body of getting out of a predicament or an embarrassing situation after left half side construction to transition of getting out of a predicament or an embarrassing situation Face is got out of a predicament or an embarrassing situation, and excavates cyclic advance 0.5m, and apply preliminary bracing in time.
Compared with prior art, the beneficial effects of the present invention are:
Section conversion construction technology in a kind of Tunneling by mining method is closely calculated by rigorous, in different section Convert out the different section conversion process measure that is provided with, while each process linking is close, and the sedimentation of entire section is become Preferably, duration progress is fast for shape control, adapts to the changeable section of cross dimensions, engineering cost is greatly reduced, in addition for entire Stability and safety at section conversion have sufficient guarantee.
Section conversion construction technology in a kind of Tunneling by mining method is worth promoting and using in subway work field.
Detailed description of the invention
Fig. 1 is that a kind of big cross section of the section conversion construction technology in Tunneling by mining method converts light-gauge B3-B2 section Transformational structure schematic diagram.
Fig. 2 is a kind of bis- lining structure schematic diagram of plug wall DT3 of the section conversion construction technology in Tunneling by mining method.
Fig. 3 is that a kind of big cross section of the section conversion construction technology in Tunneling by mining method converts light-gauge B2-B1 section Transformational structure schematic diagram.
Fig. 4 is a kind of bis- lining structure schematic diagram of plug wall DT2 of the section conversion construction technology in Tunneling by mining method.
Fig. 5 is that a kind of light section of the section conversion construction technology in Tunneling by mining method converts the conversion of big cross section B1-B4 section Structural schematic diagram.
Fig. 6 is a kind of bis- lining structure schematic diagram of plug wall DT1 of the section conversion construction technology in Tunneling by mining method.
Specific embodiment
Technical solution of the present invention is described in more detail With reference to embodiment.
Please refer to Fig. 1-3, the section in a kind of Tunneling by mining method converts construction technology comprising two kinds of sections are converted Journey is big cross section respectively to light section conversion process and light section to big cross section conversion process, is excavated from shield well toward big mileage First experience big cross section is to light section conversion process, as shown in Fig.1 and Fig.2;By light section is gone through to big cross section conversion process, such as scheme Shown in 3, is digging to section variation, needing to be arranged the changeover portion of 1.5m long, the changeover portion is made of three Pin grids, transition The effect of section is that gradually transition expands or shrinks section.
Change measure of the big cross section to light section conversion process are as follows:
Step 1: applying preliminary bracing at top bar 3 construction to section variations, and reserved standard outline excavation, spray are mixed Solidifying grave closes reserved excavation face, gets out of a predicament or an embarrassing situation 4 away from stopping construction at 3m at section variation, and complete supporting construction;
Step 2: applying preliminary bracing and reserved standard section outline excavation at 5 construction to section variations, initial stage is completed Supporting, pneumatically placed concrete close reserved excavation face, get out of a predicament or an embarrassing situation 6 away from construction is stopped at 3m at section variation, complete preliminary bracing. Face has formed positive step at this time;
Step 3: construction top bar standard paragraphs advanced tubule, and a Pin standard section grid steel frame is set up in face, Gunite concrete is fixed;
Step 4: excavating arch annular, Core Soil is stayed, excavates drilling depth 0.5m, supporting top bar arch forms positive step and applies Work.
Change measure of the light section to big cross section conversion process are as follows:
The 5-6m step 1: top bar is got out of a predicament or an embarrassing situation in advance stops top bar arch annular when top bar is constructed to transition Excavation supporting excavates intercalated nucleus cubsoil, closes face, while getting out of a predicament or an embarrassing situation and continuing to construct.It is getting out of a predicament or an embarrassing situation away from transition 3.0m When, stop construction of getting out of a predicament or an embarrassing situation;
Step 2: gunite concrete closes top bar face after the completion of top bar Core Soil excavates, divide face. The top bar that the soil body is stitched to idio-morphosis on the left of top bar is digged, excavation cyclic advance is 0.5m.After excavation, appear on the stage in time Rank preliminary bracing, it is longitudinal to be connected with A22 connection reinforcing bar;
Step 3: it is disconnected to idio-morphosis seam to dig the left side soil body of getting out of a predicament or an embarrassing situation after left half side construction to transition of getting out of a predicament or an embarrassing situation Face is got out of a predicament or an embarrassing situation, and excavates cyclic advance 0.5m, and apply preliminary bracing in time.
Better embodiment of the invention is explained in detail above, but the present invention is not limited to above-mentioned embodiment party Formula within the knowledge of one of ordinary skill in the art can also be without departing from the purpose of the present invention Various changes can be made.

Claims (3)

1. the section in a kind of Tunneling by mining method converts construction technology, characterized by comprising: two kinds of section conversion processes, respectively It is big cross section to light section conversion process and light section to big cross section conversion process, the section conversion in the Tunneling by mining method is applied Work construction technology process is to excavate first that experience big cross section is to light section conversion process from shield well toward big mileage, by going through light section To big cross section conversion process, is digging to section variation, needing to be arranged the changeover portion of 1.5m long, the changeover portion is by three Pin grids Composition.
2. the section in a kind of Tunneling by mining method according to claim 1 converts construction technology, it is characterised in that: described big Change measure of the section to light section conversion process are as follows:
Step 1: preliminary bracing is applied at top bar 3 construction to section variations, and reserved standard outline excavation, pneumatically placed concrete Reserved excavation face is closed, gets out of a predicament or an embarrassing situation 4 away from stopping construction at 3m at section variation, and complete supporting construction;
Step 2: applying preliminary bracing and reserved standard section outline excavation at 5 construction to section variations, initial stage branch is completed Shield, pneumatically placed concrete close reserved excavation face, get out of a predicament or an embarrassing situation 6 away from construction is stopped at 3m at section variation, complete preliminary bracing.At this time Face has formed positive step;
Step 3: construction top bar standard paragraphs advanced tubule, and a Pin standard section grid steel frame, injection are set up in face Concrete is fixed;
Step 4: excavating arch annular, Core Soil is stayed, excavates drilling depth 0.5m, supporting top bar arch forms main step construction.
3. the section in a kind of Tunneling by mining method according to claim 1 converts construction technology, it is characterised in that: described small Change measure of the section to big cross section conversion process are as follows:
The 5-6m step 1: top bar is got out of a predicament or an embarrassing situation in advance stops top bar arch Ring Cutting when top bar is constructed to transition Intercalated nucleus cubsoil is excavated in supporting, closes face, while getting out of a predicament or an embarrassing situation and continuing to construct.When getting out of a predicament or an embarrassing situation away from transition 3.0m, stop It gets out of a predicament or an embarrassing situation construction;
Step 2: gunite concrete closes top bar face after the completion of top bar Core Soil excavates, divide face.It digs The top bar that the soil body is stitched to idio-morphosis on the left of top bar, excavation cyclic advance are 0.5m.After excavation, top bar initial stage is done in time Supporting, it is longitudinal to be connected with A22 connection reinforcing bar;
Step 3: digging the left side soil body to idio-morphosis of getting out of a predicament or an embarrassing situation after left half side construction to transition of getting out of a predicament or an embarrassing situation and stitching under section Step excavates cyclic advance 0.5m, and applies preliminary bracing in time.
CN201811471919.3A 2018-12-04 2018-12-04 A kind of section in Tunneling by mining method converts construction technology Pending CN109611101A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811471919.3A CN109611101A (en) 2018-12-04 2018-12-04 A kind of section in Tunneling by mining method converts construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811471919.3A CN109611101A (en) 2018-12-04 2018-12-04 A kind of section in Tunneling by mining method converts construction technology

Publications (1)

Publication Number Publication Date
CN109611101A true CN109611101A (en) 2019-04-12

Family

ID=66005842

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811471919.3A Pending CN109611101A (en) 2018-12-04 2018-12-04 A kind of section in Tunneling by mining method converts construction technology

Country Status (1)

Country Link
CN (1) CN109611101A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110306986A (en) * 2019-05-09 2019-10-08 深圳市综合交通设计研究院有限公司 A kind of anti-cut construction method of underground interchange fork node Tunneling by mining method
CN110331980A (en) * 2019-06-17 2019-10-15 中国铁建大桥工程局集团有限公司 A kind of shallow embedding fine sand layer tunnel Varied section transition and conversion construction method
CN111852501A (en) * 2020-07-08 2020-10-30 深圳市综合交通设计研究院有限公司 Transfer structure between double-layer and single-layer mine method tunnel and its construction method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1952350A (en) * 2006-10-27 2007-04-25 中铁四局集团有限公司 Rapid construction method for small-section abrupt change tunnel to large-section tunnel
CN102312672A (en) * 2011-09-23 2012-01-11 中南大学 Fast large-cross-section tunnel construction method adapting to complicated and variable geological conditions
RU115413U1 (en) * 2012-02-07 2012-04-27 Открытое Акционерное Общество "Метрогипротранс" (Оао "Метрогипротранс") DEVICE FOR TURNING AND MOVING LARGE-SIZED EQUIPMENT IN UNDERGROUND OPERATIONS OF LIMITED DIMENSIONS
CN102852525A (en) * 2012-09-29 2013-01-02 中铁二局股份有限公司 Underground tunnel enlarging and excavating method from small section of single-line tunnel to large section of double-line tunnel
CN103334761A (en) * 2013-06-28 2013-10-02 中国一冶集团有限公司 Method of constructing shallow tunnel underground passage variable-cross section cross mid-partition wall
CN103939106A (en) * 2014-04-03 2014-07-23 北京交科公路勘察设计研究院有限公司 Construction method for converting two side-wall pilot tunnel method to CRD method
CN107605490A (en) * 2017-08-28 2018-01-19 中交第二航务工程局有限公司 Single hole large cross-section tunnel double side wall construction conversion process
CN108316931A (en) * 2018-03-05 2018-07-24 北京市政建设集团有限责任公司 A kind of branch-cut bridge section tunnel CRD method construction methods
CN108442943A (en) * 2018-03-05 2018-08-24 北京市政建设集团有限责任公司 A kind of branch-cut bridge section tunnel and Double side heading method construction method
CN108457656A (en) * 2018-03-05 2018-08-28 北京市政建设集团有限责任公司 A kind of unearthed method for tunnel construction

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1952350A (en) * 2006-10-27 2007-04-25 中铁四局集团有限公司 Rapid construction method for small-section abrupt change tunnel to large-section tunnel
CN102312672A (en) * 2011-09-23 2012-01-11 中南大学 Fast large-cross-section tunnel construction method adapting to complicated and variable geological conditions
RU115413U1 (en) * 2012-02-07 2012-04-27 Открытое Акционерное Общество "Метрогипротранс" (Оао "Метрогипротранс") DEVICE FOR TURNING AND MOVING LARGE-SIZED EQUIPMENT IN UNDERGROUND OPERATIONS OF LIMITED DIMENSIONS
CN102852525A (en) * 2012-09-29 2013-01-02 中铁二局股份有限公司 Underground tunnel enlarging and excavating method from small section of single-line tunnel to large section of double-line tunnel
CN103334761A (en) * 2013-06-28 2013-10-02 中国一冶集团有限公司 Method of constructing shallow tunnel underground passage variable-cross section cross mid-partition wall
CN103939106A (en) * 2014-04-03 2014-07-23 北京交科公路勘察设计研究院有限公司 Construction method for converting two side-wall pilot tunnel method to CRD method
CN107605490A (en) * 2017-08-28 2018-01-19 中交第二航务工程局有限公司 Single hole large cross-section tunnel double side wall construction conversion process
CN108316931A (en) * 2018-03-05 2018-07-24 北京市政建设集团有限责任公司 A kind of branch-cut bridge section tunnel CRD method construction methods
CN108442943A (en) * 2018-03-05 2018-08-24 北京市政建设集团有限责任公司 A kind of branch-cut bridge section tunnel and Double side heading method construction method
CN108457656A (en) * 2018-03-05 2018-08-28 北京市政建设集团有限责任公司 A kind of unearthed method for tunnel construction

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
任瑞华: "北京地铁陶然亭站-菜市口站区间渡线区隧道暗挖施工技术", 《科学之友》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110306986A (en) * 2019-05-09 2019-10-08 深圳市综合交通设计研究院有限公司 A kind of anti-cut construction method of underground interchange fork node Tunneling by mining method
CN110331980A (en) * 2019-06-17 2019-10-15 中国铁建大桥工程局集团有限公司 A kind of shallow embedding fine sand layer tunnel Varied section transition and conversion construction method
CN111852501A (en) * 2020-07-08 2020-10-30 深圳市综合交通设计研究院有限公司 Transfer structure between double-layer and single-layer mine method tunnel and its construction method

Similar Documents

Publication Publication Date Title
CN101440708B (en) PBA shallow buried underground excavating close range large section three-hole separated island type structure construction method
CN102562075B (en) Large cross-section weak surrounding rock tunnel three-step and six-part short-distance construction method
CN103775092B (en) Tunnels in Shallow Buried tunneling remaining core soil in advance improvement CRD construction
CN102562099B (en) Method for carrying out rapid face excavation construction of loess tunnel by double rows of small conduits
CN100487224C (en) Rapid construction method for tunnels with sudden change from small section to large section
CN103277106B (en) Highway tunnel three-step five-procedure excavation construction method
CN108756894B (en) Tunnel micro- three step top Core Soil construction
CN104806251B (en) Subsidiary inverted excavation construction method for urban subway station under complex environment
CN102071947A (en) Construction method for soft surrounding rock section of large-span tunnel portal
CN104653187B (en) Method for excavating geological large-section tunnel with water-rich sand layer
CN108442943A (en) A kind of branch-cut bridge section tunnel and Double side heading method construction method
CN108843338A (en) A kind of integrated excavation construction method of Construction of Silo channel conversion large cross-section tunnel
CN102979531B (en) Reinforce construction method and the structure of large-scale rock slope deep weak structural plane
CN110242305A (en) A kind of inclined shaft applies the construction technique in main hole into single side heading method
CN103993885A (en) Construction method for underground excavation tunnel side-direction hole opening supporting system
CN101539021B (en) Road tunnel excavation method
CN103628889A (en) Quick sealing method for excavating phyllite stratum tunnel
CN109611101A (en) A kind of section in Tunneling by mining method converts construction technology
CN104632227B (en) Subway station excavation technology of single-layer beam arch structure
CN103899318A (en) Medium ground tunnel milling excavating and mating mechanized construction method
CN110439574A (en) It is originated for shield lateral translation and the tunnel structure and construction method of haul of slagging tap
CN108361036B (en) A kind of construction method that subway station accessory structure is plug-in
CN107401161A (en) High ferro shield tunnel construction method is worn under pipe-roof method and MJS method joint reinforcements
CN205100989U (en) Utilize oblique access structure of subway access & exit double as construction
CN203925513U (en) The tunnel portal liner structure in steep location, slope is faced upward on limit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190412

RJ01 Rejection of invention patent application after publication