[go: up one dir, main page]

CN109595016A - False top construction method is exploited to admission passage filling under one kind - Google Patents

False top construction method is exploited to admission passage filling under one kind Download PDF

Info

Publication number
CN109595016A
CN109595016A CN201811608204.8A CN201811608204A CN109595016A CN 109595016 A CN109595016 A CN 109595016A CN 201811608204 A CN201811608204 A CN 201811608204A CN 109595016 A CN109595016 A CN 109595016A
Authority
CN
China
Prior art keywords
mining
filling
ore body
ore
constructing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811608204.8A
Other languages
Chinese (zh)
Inventor
罗周全
秦亚光
马少维
文磊
董喆喆
丁春胜
代转
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South University
Original Assignee
Central South University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South University filed Critical Central South University
Priority to CN201811608204.8A priority Critical patent/CN109595016A/en
Publication of CN109595016A publication Critical patent/CN109595016A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D19/00Provisional protective covers for working space
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/15Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
    • E21D11/152Laggings made of grids or nettings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

本发明提供了一种下向进路充填开采假顶构筑方法,包括以下步骤:矿体构成要素:矿体沿走向布置,且脉内进路也沿走向布置;采准、切割矿体;回采;假顶构筑:采场回采结束后,立即在进路底铺设残矿,在所述残矿上铺设钢筋,所述钢筋形成钢筋网,并在所述钢筋网上预留钢筋,并折弯,用充填料充填并接顶,待充填完毕之后再将预留的钢筋拉直,下边折成勾,等下一分层铺网时,用钢筋与上一分层预留的折成勾的钢筋相连。本发明主要用于矿岩不稳固或极不稳固的矿体,克服了现有技术中存在的下向进路充填开采中顶板构筑为水平或者呈大角度倒八字形状,其承载能力相对较差,而且控顶时间较短的缺陷。

The invention provides a method for constructing a false roof by filling and mining with a downward approach, comprising the following steps: ore body constituent elements: the ore body is arranged along the strike, and the access route within the vein is also arranged along the strike; the mining and cutting of the ore body; ; false roof construction: after the stope mining is completed, immediately lay residual ore at the bottom of the road, lay steel bars on the residual ore, and the steel bars form a steel mesh, and reserve steel bars on the steel mesh, and bend them, Fill and connect the top with filling material. After the filling is completed, straighten the reserved steel bars, and fold the lower side into hooks. connected. The invention is mainly used for unstable or extremely unstable ore bodies, and overcomes the fact that the roof is constructed horizontally or in the shape of a large-angle inverted figure in the downward approach filling and mining existing in the prior art, and its bearing capacity is relatively poor. , and the defect of short top control time.

Description

False top construction method is exploited to admission passage filling under one kind
Technical field
The present invention relates to mining technique fields, exploit false top construction method to admission passage filling more particularly, under one kind.
Background technique
It is lower to access back-filling method be suitable for ore value is high, ore-rock is soft, earth's surface and overlying rock need it is to be protected Deposit mining.Since ore-rock is soft, in order to guarantee safety coal extraction, need manually to construct false top to bear top loose rock mass and fill Fill out the load of body.In Man-made False construction method, experience is constructed on most Reference Design handbook or adjacent mine vacation top.It is easy to make Not high enough and then influence resource the safe retrieving at false top intensity, and then production efficiency is caused to reduce.
Patent No. " ZL201721371238.0 ", that records in entitled " large-inclination-angle coal bed Man-made False facility " is artificial The lower surface of top plate is concordant with coal working face top plate, and artificial roof is fixed with crossbeam, and anchor pole is arranged on crossbeam, and anchor pole front end is beaten Enter and leak at top in rock stratum, end of anchor rod sockets crossbeam, and sprag is provided with above crossbeam, and sprag is supported at crossbeam and leakage top Between rock stratum, steel wire is covered in rock layer surface.Man-made False bottom plate is flat in such mounting means, and bearing capacity is opposite It is poor, it just needs to encrypt steel mesh to improve bearing capacity, consumes lot of materials, and complex manufacturing technology.
Patent No. " ZL201110232081.4 ", entitled " a kind of flat-bottom structure with steel reinforced concrete structure artificial vacation top has The Man-made False recorded in foundation sublevel caving method " is poured by the diamond shape steel mesh and concrete of bottom bottom fashioned iron rest and upper layer Layer composition is filled, bottom fashioned iron carries out welding with top mat and forms inverted eight like, this Man-made False construction complexity, still Bearing capacity is also relatively poor, and the control top time is also shorter
Summary of the invention
The purpose of the present invention is to provide false top construction method is exploited to admission passage filling under one kind, to solve in the prior art Into admission passage filling exploitation, top plate is constructed as level or is in that wide-angle is inverted eight like, and bearing capacity is relatively under existing Difference, and the technical problem that the control top time is shorter.
To achieve the above object, the present invention provides following technical schemes:
False top construction method is exploited to admission passage filling under one kind provided by the invention, comprising the following steps:
S1, ore body constituent element: ore body across pitch arrangement, and interior route also arrange by across pitch;
S2, quasi-, cutting ore body is adopted;
S3, back production;
S4, false top are constructed: after stope mining, it be laid with residual mine at route bottom immediately, is laid with reinforcing bar in the residual mine, The reinforcing bar forms steel mesh, and the reserved steel bar on the steel mesh, and bending, and top is filled and connect with filling material, to be filled After finishing reserved reinforcement metal straightening is converted into hook again below, when waiting next layering lapping, is reserved with reinforcing bar and a upper layering The reinforcing bar for being converted into hook is connected.
Preferably, the reinforcing bar includes thick muscle and thin muscle, and the thick muscle and the thin muscle are criss-cross, forms the reinforcing bar Net.
Preferably, the thick muscle is longitudinally arranged, the thin muscle lateral arrangement.
Preferably, the reserved reinforcing bar is located at the middle part of the steel mesh.
Preferably, the reserved steel-bar arrangement is the thick muscle.
Preferably, the hook part for being converted into the reinforcing bar of hook is symmetrical arranged.
Preferably, it is first filled with the filling material of cement-sand ratio 1:4, is then filled with the filling material of cement-sand ratio 1:8 It fills out.
Preferably, described to adopt quasi-, cutting ore body technique include ore body lower wall driving exploiting field ramp, from the exploiting field slope Road tunnels slice drift, from slice drift driving layered-liaison tunnel to ore body, and Slice by slice cutting tunnel is tunneled in ore body, It prepares for driving route.
Preferably, mine chute is tunneled from ore body lower wall drift, extremely from lower wall country rock driving return air filling well Cutting work is adopted in upper middle section, completion.
Preferably, the process for stoping includes from cutting tunnel along orebody trend, and Mining entrance is tunneled at the both ends Xiang Caiqu, Every back production, driving uses drill jumbo, and ore removal uses electric LHD.
Exploiting false top construction method compared with the existing technology to admission passage filling under one kind provided by the invention has following Technical effect:
The false top that this method is constructed is laid with residual mine using at route bottom, and reinforcing bar is laid in residual mine, and reinforcing bar forms steel mesh, And the reserved steel bar on steel mesh, and bending, top is filled and connect with filling material, and the reinforcing bar to be filled that will reserve again later that finishes is drawn Directly, it is converted into hook below, when waiting next layering lapping, is connected with the reinforcing bar reinforcing bar that is converted into hook reserved with a upper layering, to make The false top of upper and lower two layerings can connect together, that is, the intensity for improving false top also improves its stability, be mainly used for ore-rock Built on the sand or extremely unsteady ore body, the lower top plate into admission passage filling exploitation existing in the prior art is overcome to construct as level Or it is inverted eight like in wide-angle, bearing capacity is relatively poor, and the defect that the control top time is shorter.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is the structural front view of the production zone of an embodiment of the present invention;
Fig. 2 is the structural side view of the production zone of an embodiment of the present invention;
Fig. 3 is the structure top view of the production zone of an embodiment of the present invention;
Fig. 4 is the top view on the steel mesh vacation top of an embodiment of the present invention;
Fig. 5 is the first state main view on the steel mesh vacation top of an embodiment of the present invention;
Fig. 6 is the second state main view on the steel mesh vacation top of an embodiment of the present invention.
In figure:
101, level haulage gallery 102, middle section Chuan Mai;103, exploiting field ramp;104, slice drift;105, layering contact Road;106, drop shaft connecting taxiway;107, drop shaft;108, return air fill pass;109, steel mesh vacation top;110, tailing cemented filling Body;111, thick muscle;112, thin muscle.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, technical solution of the present invention will be carried out below Detailed description.Obviously, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Base Embodiment in the present invention, those of ordinary skill in the art are obtained all without making creative work Other embodiment belongs to the range that the present invention is protected.
In the description of the present invention, it is to be understood that, term " center ", " length ", " width ", " height ", "upper", The orientation of instructions such as "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside", " side " or Positional relationship is to be merely for convenience of description of the present invention and simplification of the description based on attached orientation or positional relationship shown in FIG. 1, without It is that the equipment of indication or suggestion meaning or element must have a particular orientation, be constructed and operated in a specific orientation, therefore not It can be interpreted as limitation of the present invention.In the description of the present invention, unless otherwise indicated, the meaning of " plurality " is two or two More than.
The gallery is the entry not communicated directly with ground, and long axis direction is substantially parallel with orebody trend.Position It is reef drift in ore body, is fringedrift in country rock.The gradient of gallery is true according to the requirement of transport and draining It is fixed, generally 3 ‰~5 ‰.
Described to wear arteries and veins, English name: transverse drift is a kind of investigation method of probing engineering.It is mainly used for Ore body position is controlled, orebody thickness is disclosed, understands ore composition and Grade change, and finds out the contact relation of ore body and country rock Deng.Wearing arteries and veins is from along the pulse or crossdrift is tunneled to ore body and ground is without a kind of directly exported adit.It is required that vertical ore body Move towards driving, with understand ore body and its top, floor rocks thickness direction variation.Wearing arteries and veins is to obtain geologic information and sample Main tunnel.Therefore, have to direction, specification, interval, depth and the flatness in sampling work face etc. of wearing arteries and veins stringenter It is required that.
The ramp refers to the ramp way that underground is entered and left for the trackless equipment that passes through, transport ore and trackless equipment.
The connecting taxiway is the tunnel for entering stope from courtyard for personnel, is called pavement.
The drop shaft refers to the tunnel using self weight rolling ore from top to bottom.It is being opened up by adits or the mine of shaft development Mountain is widely applied.Be accustomed to there are two types of signified drop shafts: one is relay ore or barren rock to lower stage for the top bench Or lower part ore storage bin claims main chute, it belongs to auxiliary development work for one or more stage services;Another kind is for stope Ore is inside relayed to level haulageway, for the title Stope chute of one or more stope services, the latter belongs to development heading.
Fig. 1 is the structural front view of the production zone of an embodiment of the present invention, and Fig. 2 is opening for an embodiment of the present invention The structural side view in exploiting field domain, Fig. 3 are the structure top views of the production zone of an embodiment of the present invention, and Fig. 4 is the present invention one The top view on the steel mesh vacation top of kind embodiment, Fig. 5 is the first state main view on the steel mesh vacation top of an embodiment of the present invention Figure, Fig. 6 is the second state main view on the steel mesh vacation top of an embodiment of the present invention.
As shown in figs. 1 to 6, false top construction method is exploited to admission passage filling under one kind, comprising the following steps:
S1, ore body constituent element: ore body across pitch arrangement, long 75~100m, width are orebody thickness, foundation 5m, segmentation height 9~12m, layer height 4m are spent, route across pitch arrangement, 4 × 4m of route section in ore body;
S2, quasi-, cutting engineering is adopted: in ore body lower wall tunnels level haulage gallery 101, arteries and veins 102 and exploiting field slope are worn in middle section Road 103 tunnels slice drift 104 every 9~12m (height of lift) from exploiting field ramp 103, from the driving point of slice drift 104 Layer connecting taxiway 105 tunnels Slice by slice cutting tunnel to ore body in ore body, prepares for driving route, along the pulse from ore body lower wall Tunnelling drop shaft connecting taxiway 106 and drop shaft 107 tunnel the supreme middle section of return air fill pass 108 from lower wall country rock, and completion, which is adopted, cuts Work;
S3, process for stoping: from cutting tunnel along orebody trend, the both ends Xiang Caiqu excavated section is the Mining entrance of 4 × 4m, It is spaced back production, driving uses drill jumbo, and ore removal uses electric LHD.
S4, false top are constructed: after stope mining, being laid with the thick residual mine of 0.2m at route bottom immediately, be laid in thick residual mine 112 φ 6mm of thick 111 φ 12mm of muscle and thin muscle, net degree are the steel mesh of 250 × 250mm, and reserve 20cm's in the middle part of steel mesh Thick muscle 111, and bending;0.5m height is filled with the filling material of cement-sand ratio 1:4, remaining dead zone is used cement-sand ratio 1:8 filling material instead and filled Top is filled out and connects, the reserved thick muscle 111 of 20cm is straightened again later for be filled finish, and is converted into hook below;
As shown in figures 4-6, when waiting next layering lapping, it is connected with the thick muscle 111 thick muscle 111 reserved with a upper layering, shape At steel mesh vacation top 109, the steel mesh vacation top 109 of upper and lower two layerings is enable to connect together in this way, that is, improves false top Intensity also improves its stability.
Wherein, in order to save filling cost and guarantee the false stability pushed up simultaneously, the filling material of cement-sand ratio 1:4 is first used Filling, then in the filling material filling with cement-sand ratio 1:8, sand-lime is Cemented Filling 110.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any Those familiar with the art in the technical scope disclosed by the present invention, can easily think of the change or the replacement, and should all contain Lid is within protection scope of the present invention.Therefore, protection scope of the present invention should be based on the protection scope of the described claims.

Claims (10)

1.一种下向进路充填开采假顶构筑方法,其特征在于,包括以下步骤:1. a method for constructing a false roof by filling and exploiting downward approach, is characterized in that, comprises the following steps: S1、矿体构成要素:矿体沿走向布置,且脉内进路也沿走向布置;S1. Elements of ore body: the ore body is arranged along the strike, and the access within the vein is also arranged along the strike; S2、采准、切割矿体;S2, mining accurate, cutting ore body; S3、回采;S3, mining; S4、假顶构筑:采场回采结束后,立即在进路底铺设残矿,在所述残矿上铺设钢筋,所述钢筋形成钢筋网,并在所述钢筋网上预留钢筋,并折弯,用充填料充填并接顶,待充填完毕之后再将预留的钢筋拉直,下边折成勾,等下一分层铺网时,用钢筋与上一分层预留的折成勾的钢筋相连。S4, false roof construction: after the stope mining is completed, immediately lay residual ore at the bottom of the road, lay steel bars on the residual ore, the steel bars form a steel mesh, and reserve steel bars on the steel mesh, and bend them , fill and connect the top with filling material. After the filling is completed, straighten the reserved steel bars and fold the lower side into a hook. When the next layer is laid, use the steel bar and the reserved bar for the previous layer Steel bars are connected. 2.根据权利要求1所述的一种下向进路充填开采假顶构筑方法,其特征在于,所述钢筋包括粗筋和细筋,所述粗筋和所述细筋纵横交错,形成所述钢筋网。2 . The method for constructing a false roof by filling and mining in a downward approach according to claim 1 , wherein the reinforcing bars comprise thick bars and fine bars, and the thick bars and the fine bars are crisscrossed to form the reinforcing bars. 3 . network. 3.根据权利要求2所述的一种下向进路充填开采假顶构筑方法,其特征在于,所述粗筋纵向布置,所述细筋横向布置。3 . The method for constructing a false roof by filling and mining in a downward approach according to claim 2 , wherein the thick ribs are arranged longitudinally and the thin ribs are arranged laterally. 4 . 4.根据权利要求3所述的一种下向进路充填开采假顶构筑方法,其特征在于,预留的所述钢筋位于所述钢筋网的中部。4 . The method for constructing a false roof by filling and mining in a downward approach according to claim 3 , wherein the reserved steel bars are located in the middle of the steel mesh. 5 . 5.根据权利要求4所述的一种下向进路充填开采假顶构筑方法,其特征在于,预留的所述钢筋设置为所述粗筋。5 . The method for constructing a false roof by filling and mining in a downward approach according to claim 4 , wherein the reserved steel bars are set as the thick bars. 6 . 6.根据权利要求1所述的一种下向进路充填开采假顶构筑方法,其特征在于,折成勾的所述钢筋的勾部对称设置。6 . The method for constructing a false roof with downward approach filling and mining according to claim 1 , wherein the hooks of the steel bars folded into hooks are symmetrically arranged. 7 . 7.根据权利要求1所述的一种下向进路充填开采假顶构筑方法,其特征在于,先用灰砂比1:4的所述充填料充填,然后在用灰砂比1:8的所述充填料充填。7 . The method for constructing a false roof by filling and mining in a downward approach according to claim 1 , wherein the filling is first filled with the filling material with a lime-sand ratio of 1:4, and then filled with a lime-sand ratio of 1:8. 8 . filled with the filling material. 8.根据权利要求1所述的一种下向进路充填开采假顶构筑方法,其特征在于,所述采准、切割矿体工艺包括矿体下盘掘进采区斜坡道,自所述采区斜坡道掘进分段平巷,自所述分段平巷掘进分层联络道至矿体,并在矿体内掘进分层切割巷道,为掘进进路做准备。8 . The method for constructing a false roof by filling and mining in a downward approach according to claim 1 , wherein the method of mining and cutting the ore body comprises the process of excavating the lower wall of the ore body and excavating the slope of the mining area. 9 . The sectional level roadway is excavated from the slope road in the district, and the layered connection road is excavated from the segmented roadway to the ore body, and the layered and cut roadway is excavated in the ore body to prepare for the excavation road. 9.根据权利要求8所述的一种下向进路充填开采假顶构筑方法,其特征在于,自所述矿体下盘沿脉巷道掘进矿石溜井,自下盘围岩掘进回风充填井至上中段,完成采切工作。9 . The method for constructing a false roof by filling and mining in a downward approach according to claim 8 , wherein the ore chute is excavated along the vein roadway from the bottom wall of the ore body, and the back-air filling well is excavated from the surrounding rock of the bottom wall. 10 . Go to the upper middle section to complete the cutting work. 10.根据权利要求1所述的一种下向进路充填开采假顶构筑方法,其特征在于,所述回采工艺包括从切割巷道沿矿体走向,向采区两端掘进采矿进路,间隔回采,掘进采用凿岩台车,出矿采用电动铲运机。10 . The method for constructing a false roof by filling and mining with a downward approach according to claim 1 , wherein the mining process comprises the steps of moving along the ore body from the cutting roadway, and excavating the mining approach to both ends of the mining area. For mining and excavation, rock drilling trolleys are used, and electric scrapers are used for mining.
CN201811608204.8A 2018-12-27 2018-12-27 False top construction method is exploited to admission passage filling under one kind Pending CN109595016A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811608204.8A CN109595016A (en) 2018-12-27 2018-12-27 False top construction method is exploited to admission passage filling under one kind

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811608204.8A CN109595016A (en) 2018-12-27 2018-12-27 False top construction method is exploited to admission passage filling under one kind

Publications (1)

Publication Number Publication Date
CN109595016A true CN109595016A (en) 2019-04-09

Family

ID=65964452

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811608204.8A Pending CN109595016A (en) 2018-12-27 2018-12-27 False top construction method is exploited to admission passage filling under one kind

Country Status (1)

Country Link
CN (1) CN109595016A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110118089A (en) * 2019-05-23 2019-08-13 新疆大学 A kind of mining FRP grid-gangue-self-compacting concrete mat and its construction method
CN111425247A (en) * 2020-03-27 2020-07-17 北京矿冶科技集团有限公司 Downward access filling body false roof with built-in prefabricated metal mesh reinforcing structure and construction method thereof
CN111456735A (en) * 2020-04-17 2020-07-28 山东科技大学 Method for filling false roof without interval column and maintaining stability of downward single access
CN111456736A (en) * 2020-04-17 2020-07-28 山东科技大学 A method for maintaining the stability of the down-flow single-pass filling false roof and recovering the inter-column
CN111561318A (en) * 2020-04-29 2020-08-21 北京科技大学 Artificial false roof construction method capable of realizing pre-supporting effect
CN111828008A (en) * 2020-07-31 2020-10-27 驰宏科技工程股份有限公司 Filling mining method for downward layered herringbone access arrangement
CN113738367A (en) * 2021-09-02 2021-12-03 北京科技大学 A downward filling mining method for complex crushing steeply inclined thin veins with subsection collapse
CN113833497A (en) * 2021-10-21 2021-12-24 北京金诚信矿山技术研究院有限公司 Arrangement method and arrangement structure of preparation layer for downward single-route type cut-and-fill mining
CN114412551A (en) * 2021-12-20 2022-04-29 江西理工大学 Downward horizontal drift full-tailing cemented filling mining method for stoping ore body
CN114592868A (en) * 2022-03-09 2022-06-07 长沙矿山研究院有限责任公司 Ore mining structure and method under extremely-broken ore body condition
CN115163070A (en) * 2022-06-14 2022-10-11 山东黄金矿业(莱州)有限公司三山岛金矿 Downward mining method suitable for steeply inclined thin ore body
CN115263417A (en) * 2022-09-01 2022-11-01 中煤第七十一工程处有限责任公司 A construction technology of artificial false roof by down-entry filling mining method
WO2023134375A1 (en) * 2022-01-12 2023-07-20 山东黄金矿业(莱州)有限公司焦家金矿 Large-span false roof structure using downward horizontal approach filling method, and construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU732544A1 (en) * 1977-11-10 1980-05-05 Кузбасский Политехнический Институт Protective and installation mining roof support
SU742598A1 (en) * 1976-06-07 1980-06-25 Институт Горного Дела Со Ан Ссср Inter-level roof support
CN85100396A (en) * 1985-04-01 1986-10-01 冶金工业部长沙矿冶研究院 Method and equipment for leaching chromite alkaline roasting clinker by continuous multi-section countercurrent fluidization
CN108060924A (en) * 2018-01-15 2018-05-22 中南大学 High-dipping multi-seams thin deposit mechanization combinations for mining methods

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU742598A1 (en) * 1976-06-07 1980-06-25 Институт Горного Дела Со Ан Ссср Inter-level roof support
SU732544A1 (en) * 1977-11-10 1980-05-05 Кузбасский Политехнический Институт Protective and installation mining roof support
CN85100396A (en) * 1985-04-01 1986-10-01 冶金工业部长沙矿冶研究院 Method and equipment for leaching chromite alkaline roasting clinker by continuous multi-section countercurrent fluidization
CN108060924A (en) * 2018-01-15 2018-05-22 中南大学 High-dipping multi-seams thin deposit mechanization combinations for mining methods

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
解世俊: "《金属矿床地下开采》", 30 November 1979 *

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110118089B (en) * 2019-05-23 2021-09-07 新疆大学 A kind of mining FRP grid-coal gangue-self-compacting concrete recycled roof and its construction method
CN110118089A (en) * 2019-05-23 2019-08-13 新疆大学 A kind of mining FRP grid-gangue-self-compacting concrete mat and its construction method
CN111425247A (en) * 2020-03-27 2020-07-17 北京矿冶科技集团有限公司 Downward access filling body false roof with built-in prefabricated metal mesh reinforcing structure and construction method thereof
CN111425247B (en) * 2020-03-27 2021-10-08 北京矿冶科技集团有限公司 Downward access filling body false roof with built-in prefabricated metal mesh reinforcing structure and construction method thereof
CN111456735A (en) * 2020-04-17 2020-07-28 山东科技大学 Method for filling false roof without interval column and maintaining stability of downward single access
CN111456736A (en) * 2020-04-17 2020-07-28 山东科技大学 A method for maintaining the stability of the down-flow single-pass filling false roof and recovering the inter-column
CN111456735B (en) * 2020-04-17 2021-08-13 山东科技大学 A method for uninterrupted column and maintaining the stability of filling false roof down to single access
CN111561318A (en) * 2020-04-29 2020-08-21 北京科技大学 Artificial false roof construction method capable of realizing pre-supporting effect
CN111828008A (en) * 2020-07-31 2020-10-27 驰宏科技工程股份有限公司 Filling mining method for downward layered herringbone access arrangement
CN113738367A (en) * 2021-09-02 2021-12-03 北京科技大学 A downward filling mining method for complex crushing steeply inclined thin veins with subsection collapse
CN113738367B (en) * 2021-09-02 2022-06-14 北京科技大学 Sublevel caving downward filling mining method for complex broken and steeply inclined thin vein
CN113833497A (en) * 2021-10-21 2021-12-24 北京金诚信矿山技术研究院有限公司 Arrangement method and arrangement structure of preparation layer for downward single-route type cut-and-fill mining
CN114412551A (en) * 2021-12-20 2022-04-29 江西理工大学 Downward horizontal drift full-tailing cemented filling mining method for stoping ore body
WO2023134375A1 (en) * 2022-01-12 2023-07-20 山东黄金矿业(莱州)有限公司焦家金矿 Large-span false roof structure using downward horizontal approach filling method, and construction method
CN114592868A (en) * 2022-03-09 2022-06-07 长沙矿山研究院有限责任公司 Ore mining structure and method under extremely-broken ore body condition
CN115163070A (en) * 2022-06-14 2022-10-11 山东黄金矿业(莱州)有限公司三山岛金矿 Downward mining method suitable for steeply inclined thin ore body
CN115163070B (en) * 2022-06-14 2024-03-12 山东黄金矿业(莱州)有限公司三山岛金矿 Downward mining method suitable for steep thin ore body
CN115263417A (en) * 2022-09-01 2022-11-01 中煤第七十一工程处有限责任公司 A construction technology of artificial false roof by down-entry filling mining method

Similar Documents

Publication Publication Date Title
CN109595016A (en) False top construction method is exploited to admission passage filling under one kind
CN104747190B (en) Thin ore-body mechanized highly-layering continuous mining method
CN104612698B (en) A kind of shallow-depth-excavation tunnel top bar interval wall construction method
Sadaghiani et al. Study on the effect of a new construction method for a large span metro underground station in Tabriz-Iran
CN102251773B (en) Route type upward horizontal layered filling mining method suitable for extremely complex ore body mining
CN104895566B (en) A kind of residual ore recovery mining method
CN102337892B (en) Upward access filling method
CN106567717A (en) Construction oblique channel structure utilizing subway exit and entrance and construction method
CN109184694A (en) A kind of pre- anchor sublevel drilling stage open stope afterwards filling mining method of upper disk
CN102518438A (en) Roof regeneration medium-length hole ore blast backfill mining method
CN102758632A (en) Rock stratum double initial support layering method for establishing large-scale underground structure
CN103147792B (en) Drift type coal mining filling method
CN106437726A (en) Ground fracture crushed zone passing construction method for shallow-buried tunnel excavation
CN105649631A (en) Efficient mechanical mining method for gently-inclined thin ore bodies
CN110374657A (en) The Mining Method Subway Tunnel ventilating shaft and its construction method of " well after first shield "
CN109869150A (en) A kind of mine resources are segmented the full office of adopting and fill recovery method
CN110017149A (en) A kind of underground structure and construction method of underground excavation and construction of arch cover
CN107448204A (en) Closely wear construction method of deep foundation ditch down in sandy gravel accumulation horizon shallow burial hidden digging tunnel
CN113187482B (en) Upward mining quasi-downward drift filling mining method
CN109268011B (en) Combined filling mining method
CN117685047A (en) Mechanical long-way filling mining method for steep thin lean ore vein area
CN209324377U (en) Ledge method tunneling subway station arch springing ruggedized construction
CN111894026A (en) A tunnel-type pile foundation bearing platform combined anchor structure and its installation method
Insam et al. Brenner Base Tunnel–interaction between underground structures, complex challenges and strategies
CN206917657U (en) A kind of shallow buried covered excavation benching tunnelling method constructing structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190409

RJ01 Rejection of invention patent application after publication