CN109577649A - A kind of SC structure is mounted for industry platform - Google Patents

A kind of SC structure is mounted for industry platform Download PDF

Info

Publication number
CN109577649A
CN109577649A CN201811300811.8A CN201811300811A CN109577649A CN 109577649 A CN109577649 A CN 109577649A CN 201811300811 A CN201811300811 A CN 201811300811A CN 109577649 A CN109577649 A CN 109577649A
Authority
CN
China
Prior art keywords
bottom plate
plate
frame
fixedly mounted
baffle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811300811.8A
Other languages
Chinese (zh)
Inventor
王暖暖
赵宇
范明钦
别刚刚
张宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nuclear Industry Huaxing Construction Co Ltd
Original Assignee
China Nuclear Industry Huaxing Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nuclear Industry Huaxing Construction Co Ltd filed Critical China Nuclear Industry Huaxing Construction Co Ltd
Priority to CN201811300811.8A priority Critical patent/CN109577649A/en
Publication of CN109577649A publication Critical patent/CN109577649A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The invention discloses a kind of SC structures to be mounted for industry platform, main contents are as follows: the bottom plate lower section, which is symmetrically welded with two pieces of stiffening plates along floor length direction, and every piece of stiffening plate or so is equipped with one can turn to steel wheel, cover board is mounted on the circular through hole on bottom plate, steel wheel is mounted in stiffening plate, equipment case is fixedly mounted on plate top surface and equipment case left side is concordant with bottom plate left side, left lifting lug is fixedly mounted on the top of equipment case, gas cylinder case is fixedly mounted on plate top surface and gas cylinder case right side is concordant with bottom plate right side, right lifting lug is fixedly mounted on the top of gas cylinder case, right handle is fixedly mounted on the leading flank of gas cylinder case.Platform is hung to Seeding location with crane using preceding by the present invention, installs stopping locking device, can carry out construction operation;When need to move horizontally, walking can be manually pushed by operating personnel, convenient and efficient, the on-site installation work of the clad steel panel construction suitable for being similar to SC structure.

Description

A kind of SC structure is mounted for industry platform
Technical field
The invention belongs to a kind of job platform technical fields, and in particular to a kind of SC structure is mounted for industry platform.
Background technique
Large-scale advanced pressurized water reactor nuclear power plant CAP1400 nuclear power plant reactor workshop is double layer security shell structure, and inner casing is steel Containment CV processed, shell are the barrier shield of concrete structure and SC structure composition.The SC structure of barrier shield is double-layer barrel structure, Distance is about 1.1m, outer radius 23.985m, inside radius 22.885m, total height about 50m between ectonexine cylinder.
It constructs when in-site installation operation by layer, every layer height is about 3m.Traditional construction measure are as follows: set up aisle platform, apply Equipment, equipment used in work, material etc. are placed on the platform of aisle, and traditional measures are unfavorable for safety construction, while also increasing Aisle platform loads, increase construction risk.Due to design feature, applied in the interior outside of SC structure double-layer barrel Work, staff need to be moved to the other side from side and carry out operation when necessary, and when highly higher, personnel need to be moved to from side Bottom is pierced by from foot passage, then is moved upward to other side setting, is taken a long time, and construction efficiency is reduced.
Summary of the invention
The technical problem to be solved by the present invention is to provide a kind of SC structure installation use in view of the above shortcomings of the prior art Job platform, the storage of the items such as implementation tool, equipment, material, pedestrian passage and concreting are vibrated the functions collection such as platform One purpose improves construction efficiency and construction activities safety.
To realize the above-mentioned technical purpose, the technical scheme adopted by the invention is as follows:
A kind of SC structure is mounted for industry platform, in which: including bottom plate, stiffening plate, equipment case, left lifting lug, left handle, the right side Handle, right lifting lug, gas cylinder case, cover board and steel wheel, the bottom plate lower section are symmetrically welded with two pieces along floor length direction Stiffening plate and every piece of stiffening plate or so, which are equipped with one, can turn to steel wheel, and the bottom plate is stiff rectangular plate and bottom plate On be provided with circular through hole, the cover board is mounted on the circular through hole on bottom plate, the cover board by two pieces it is identical just Property rectangular slab composition and stiff rectangular plate long side it is parallel with floor length direction, respectively side long side passes through conjunction to two stiff rectangular plates Page is connect with bottom plate and other side long side passes through circular through hole, and the steel wheel is mounted in stiffening plate, the machine Tool case is fixedly mounted on plate top surface and equipment case left side is concordant with bottom plate left side, and the left lifting lug is fixedly mounted on The top of equipment case, the left handle are fixedly mounted on the leading flank of equipment case, and the gas cylinder case is fixedly mounted on bottom On plate top surface and gas cylinder case right side is concordant with bottom plate right side, and the right lifting lug is fixedly mounted on the top of gas cylinder case, institute The right handle stated is fixedly mounted on the leading flank of gas cylinder case.
To optimize above-mentioned technical proposal, the concrete measure taken further include:
Above-mentioned equipment case is by first baffle, the first ventilating board, the second ventilating board, the first cover board, the first top plate, the second lid Plate, the first frame and partition composition, first base of frame are fixedly mounted on the top surface of bottom plate, first top plate It is fixedly mounted on the top surface of the first frame, second cover board is fixedly mounted on the right side of the first frame, described Partition is mounted in the first frame and partition is parallel with bottom plate, and first cover board is fixedly mounted on the leading flank of the first frame On, the first ventilating board is installed below first cover board and the first ventilating board is connected by hinge with the first cover board, it is described The first ventilating board locked by hinge and be connected with first baffle, the first ventilating board lower section is provided with first baffle, described First baffle be that rectangular slab and first baffle bottom open up semicircle weep hole, the first baffle bottom is welded on bottom plate The welding of upper and first baffle both sides is mounted on the first frame, and second ventilating board is mounted on the left side of the first frame On.
Above-mentioned gas cylinder case is made of the second top plate, third cover board, second baffle, the second frame, fixed ring and loading bar, Second frame is fixedly mounted on the top surface of bottom plate, and second top plate is fixedly mounted on the top surface of the second frame On, the third cover board is fixedly mounted on the right side of the second frame, and the second baffle is rectangular slab and second gear Board bottom portion opens up semicircle weep hole, and the second baffle bottom is welded on bottom plate and the welding of second baffle both sides is mounted on On second frame, the loading bar is mounted on the second frame, and the fixed ring welding is mounted on loading bar.
Above-mentioned stiffening plate is made using channel steel.
Above-mentioned fixed ring is semicircular ring structure type.
Gas cylinder case is made of fixed ring and loading bar in the present invention, and the fixed ring is semicircle, and diameter is slightly larger than gas Bottle diameter, fixed ring and loading bar connection type are rigid connection;The loading bar is made of straight-bar and both ends snap ring, and snap ring is straight Diameter is slightly larger than railing diameter;Gas cylinder in the same vertical plane, passes through three fixed rings to three fixed ring central points of vertical direction Collective effect realize gas cylinder fix.Equipment case and gas cylinder case intermediate region are pedestrian passage, are equipped on railing at passway Handrail;Lifting lug is installed in job platform equipment case and gas cylinder box top, and bottom plate is provided with hole, hole cover board is arranged thereon;Operation horizontal Platform is provided with stopping locking device.After first ventilating board is dug upwards, the first ventilating board and first baffle are realized using strong magnet Fixation.Job platform space planning has 5 functional areas, comprising: welding machine storage area, gas cylinder storage area, work equipment storage area, vibration Hole pounding mouth and pedestrian passage sufficiently meet construction demand.Platform is hung to Seeding location with crane using preceding, installs lock stop Tight device can carry out construction operation;When need to move horizontally, walking can be manually pushed by operating personnel, it is convenient and efficient, it is suitable for class It is similar to the on-site installation work of the clad steel panel construction of SC structure.
The present invention mainly realizes four Xiang Gongneng: items storage, pedestrian passage, cage and concrete vibrating platform.Raising is applied The tidiness of work safety and construction environment reduces construction cost, improves construction efficiency, suitable for being similar to the bilayer of SC structure The on-site installation work of steel facing structure.
The advantage of the invention is that the following: being set up compared with aisle platform carries out construction operation with traditional, the present invention SC structure is mounted for industry platform, provides the parking space of construct equipment, equipment, material used etc., alleviates aisle platform Load;Pedestrian passage is used cooperatively with construction ladder, and it is rapid from SC structure bilayer steel facing side that operating personnel may be implemented It is moved to the other side, reduces operating personnel and moves up and down number;Job platform can be used as the erect-position point of concrete construction personnel, Vibrate hole of the hole reserved thereon as concrete pouring operation, avoids setting up concrete pouring construction platform again;It applies Before the industry that works, machinery, tool, material etc. will be placed in the predetermined region of job platform needed for construction, by above-mentioned items and Platform is lifted as a whole to setting, avoids repeating to lift biggish construction items.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention;
Fig. 2 is the structural schematic diagram that the present invention removes surrounding panel member.
Appended drawing reference therein are as follows: bottom plate 1, through-hole 11, stiffening plate 2, equipment case 3, first baffle 31, the first ventilating board 32, the second ventilating board 33, the first cover board 34, the first top plate 35, the second cover board 36, the first frame 37, partition 38, left lifting lug 4, a left side Handle 5, right lifting lug 7, gas cylinder case 8, the second top plate 81, third cover board 82, second baffle 83, the second frame 84, is consolidated right handle 6 Determine ring 85, loading bar 86, cover board 9, steel wheel 10.
Specific embodiment
A specific embodiment of the invention is further illustrated with reference to the accompanying drawing:
A kind of SC structure is mounted for industry platform, in which: including bottom plate 1, stiffening plate 2, equipment case 3, left lifting lug 4, left Hand 5, right handle 6, right lifting lug 7, gas cylinder case 8, cover board 9 and steel wheel 10,1 lower section of bottom plate is along 1 length direction of bottom plate It is symmetrically welded with two pieces of stiffening plates 2 and every piece of stiffening plate 2 or so is equipped with one can turn to steel wheel 10, the bottom plate 1 is provided with circular through hole 11 for stiff rectangular plate and on bottom plate 1, the cover board 9 be mounted on the circular through hole 11 on bottom plate 1 it On, the cover board 9 by two pieces of identical stiff rectangular board groups at and stiff rectangular plate long side it is parallel with 1 length direction of bottom plate, Respectively side long side is connect by hinge with bottom plate 1 two stiff rectangular plates and other side long side passes through circular through hole 11, described Steel wheel 10 be mounted in stiffening plate 2, the equipment case 3 is fixedly mounted on 1 top surface of bottom plate and 3 left side of equipment case Concordant with 1 left side of bottom plate, the left lifting lug 4 is fixedly mounted on the top of equipment case 3, and the left handle 5 is fixedly mounted On the leading flank of equipment case 3, the gas cylinder case 8 is fixedly mounted on 1 top surface of bottom plate and 8 right side of gas cylinder case and bottom plate 1 Right side is concordant, and the right lifting lug 7 is fixedly mounted on the top of gas cylinder case 8, and the right handle 6 is fixedly mounted on gas cylinder case On 8 leading flank.
In embodiment, equipment case 3 is by first baffle 31, the first ventilating board 32, the second ventilating board 33, the first cover board 34, One top plate 35, the second cover board 36, the first frame 37 and partition 38 form, and 37 bottom of the first frame is fixedly mounted on bottom plate On 1 top surface, first top plate 35 is fixedly mounted on the top surface of the first frame 37, the fixed peace of second cover board 36 On the right side of the first frame 37, the partition 38 is mounted in the first frame 37 and partition 38 is parallel with bottom plate 1, institute The first cover board 34 stated is fixedly mounted on the leading flank of the first frame 37, and it is logical that first is equipped with below first cover board 34 Aerofoil 32 and the first ventilating board 32 are connected by hinge with the first cover board 34, and first ventilating board 32 is locked and the by hinge One baffle 31 is connected, and first baffle 31 is provided with below first ventilating board 32, and the first baffle 31 is rectangular slab And 31 bottom of first baffle opens up semicircle weep hole, 31 bottom of first baffle is welded on bottom plate 1 and first baffle The welding of 31 both sides is mounted on the first frame 37, and second ventilating board 33 is mounted on the left side of the first frame 37.
In embodiment, gas cylinder case 8 is by the second top plate 81, third cover board 82, second baffle 83, the second frame 84, fixed ring 85 and loading bar 86 form, second frame 84 is fixedly mounted on the top surface of bottom plate 1, and second top plate 81 is fixed It is mounted on the top surface of the second frame 84, the third cover board 82 is fixedly mounted on the right side of the second frame 84, described Second baffle 83 be that rectangular slab and 83 bottom of second baffle open up semicircle weep hole, 83 bottom of the second baffle welding On bottom plate 1 and the welding of 83 both sides of second baffle is mounted on the second frame 84, and the loading bar 86 is mounted on the second frame On 84, the welding of fixed ring 85 is mounted on loading bar 86.
In embodiment, stiffening plate 2 is made using channel steel.
In embodiment, fixed ring 85 is semicircular ring structure type.
The above is only the preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-described embodiment, All technical solutions belonged under thinking of the present invention all belong to the scope of protection of the present invention.It should be pointed out that for the art For those of ordinary skill, several improvements and modifications without departing from the principles of the present invention should be regarded as protection of the invention Range.

Claims (5)

1. a kind of SC structure is mounted for industry platform, it is characterised in that: including bottom plate (1), stiffening plate (2), equipment case (3), a left side Lifting lug (4), left handle (5), right handle (6), right lifting lug (7), gas cylinder case (8), cover board (9) and steel wheel (10), it is described Two pieces of stiffening plates (2) and every piece of each installation in stiffening plate (2) left and right are symmetrically welded with along bottom plate (1) length direction below bottom plate (1) There is one can turn to steel wheel (10), the bottom plate (1) is to be provided with circular through hole on stiff rectangular plate and bottom plate (1) (11), the cover board (9) is mounted on the circular through hole (11) on bottom plate (1), and the cover board (9) is identical by two pieces Stiff rectangular board group at and stiff rectangular plate long side it is parallel with bottom plate (1) length direction, the respective side long side of two stiff rectangular plates It is connect by hinge with bottom plate (1) and other side long side passes through circular through hole (11), the steel wheel (10) is mounted on In stiffening plate (2), the equipment case (3) is fixedly mounted on bottom plate (1) top surface and equipment case (3) left side and bottom plate (1) Left side is concordant, and the left lifting lug (4) is fixedly mounted on the top of equipment case (3), and the left handle (5) is fixedly mounted on On the leading flank of equipment case (3), the gas cylinder case (8) be fixedly mounted on bottom plate (1) top surface and gas cylinder case (8) right side with Bottom plate (1) right side is concordant, and the right lifting lug (7) is fixedly mounted on the top of gas cylinder case (8), and the right handle (6) is solid Dingan County is on the leading flank of gas cylinder case (8).
2. a kind of SC structure according to claim 1 is mounted for industry platform, it is characterised in that: the equipment case (3) By first baffle (31), the first ventilating board (32), the second ventilating board (33), the first cover board (34), the first top plate (35), the second lid Plate (36), the first frame (37) and partition (38) composition, described the first frame (37) bottom is fixedly mounted on the top of bottom plate (1) On face, first top plate (35) is fixedly mounted on the top surface of the first frame (37), and second cover board (36) is fixed It is mounted on the right side of the first frame (37), the partition (38) is mounted in the first frame (37) and partition (38) and bottom In parallel, first cover board (34) is fixedly mounted on the leading flank of the first frame (37) plate (1), first cover board (34) lower section is equipped with the first ventilating board (32) and the first ventilating board (32) is connected by hinge with the first cover board (34), described First ventilating board (32) is locked by hinge to be connected with first baffle (31), is provided with first below first ventilating board (32) Baffle (31), the first baffle (31) is rectangular slab and first baffle (31) bottom opens up semicircle weep hole, described First baffle (31) bottom is welded on bottom plate (1) and the welding of first baffle (31) both sides is mounted on the first frame (37), institute The second ventilating board (33) stated is mounted on the left side of the first frame (37).
3. a kind of SC structure according to claim 1 is mounted for industry platform, it is characterised in that: the gas cylinder case (8) By the second top plate (81), third cover board (82), second baffle (83), the second frame (84), fixed ring (85) and loading bar (86) Composition, second frame (84) are fixedly mounted on the top surface of bottom plate (1), and second top plate (81) is fixedly mounted on On the top surface of second frame (84), the third cover board (82) is fixedly mounted on the right side of the second frame (84), described Second baffle (83) be that rectangular slab and second baffle (83) bottom open up semicircle weep hole, the second baffle (83) bottom Portion is welded on bottom plate (1) and the welding of second baffle (83) both sides is mounted on the second frame (84), the loading bar (86) It is mounted on the second frame (84), the fixed ring (85) welding is mounted on loading bar (86).
4. a kind of SC structure according to claim 1 is mounted for industry platform, it is characterised in that: the stiffening plate (2) It is made using channel steel.
5. a kind of SC structure according to claim 3 is mounted for industry platform, it is characterised in that: the fixed ring (85) For semicircular ring structure type.
CN201811300811.8A 2018-11-02 2018-11-02 A kind of SC structure is mounted for industry platform Pending CN109577649A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811300811.8A CN109577649A (en) 2018-11-02 2018-11-02 A kind of SC structure is mounted for industry platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811300811.8A CN109577649A (en) 2018-11-02 2018-11-02 A kind of SC structure is mounted for industry platform

Publications (1)

Publication Number Publication Date
CN109577649A true CN109577649A (en) 2019-04-05

Family

ID=65921262

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811300811.8A Pending CN109577649A (en) 2018-11-02 2018-11-02 A kind of SC structure is mounted for industry platform

Country Status (1)

Country Link
CN (1) CN109577649A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111472533A (en) * 2020-03-04 2020-07-31 中国核工业华兴建设有限公司 Block detachable annular operation platform and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040232127A1 (en) * 2002-05-15 2004-11-25 Andersen Bryan P. Apparatus for a welding machine having a cooling assembly mounted to a mid-plane baffle for improved cooling within the welding machine
CN103056563A (en) * 2012-12-24 2013-04-24 伊达新技术电源(昆山)有限公司 Welding machine host case
CN203401201U (en) * 2013-07-23 2014-01-22 昆明天经电力设备有限公司 Welding equipment moving device of gas shielded welding
CN203766838U (en) * 2014-04-17 2014-08-13 四川石油天然气建设工程有限责任公司 Mobile working platform for installing pipeline in tunnel
CN105710575A (en) * 2016-04-22 2016-06-29 安徽捷迅光电技术有限公司 Transfer cart for welding machines and gas cylinder
CN205777419U (en) * 2016-05-16 2016-12-07 中国建筑第二工程局有限公司 A suspension type moving platform for steel construction installation

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040232127A1 (en) * 2002-05-15 2004-11-25 Andersen Bryan P. Apparatus for a welding machine having a cooling assembly mounted to a mid-plane baffle for improved cooling within the welding machine
CN103056563A (en) * 2012-12-24 2013-04-24 伊达新技术电源(昆山)有限公司 Welding machine host case
CN203401201U (en) * 2013-07-23 2014-01-22 昆明天经电力设备有限公司 Welding equipment moving device of gas shielded welding
CN203766838U (en) * 2014-04-17 2014-08-13 四川石油天然气建设工程有限责任公司 Mobile working platform for installing pipeline in tunnel
CN105710575A (en) * 2016-04-22 2016-06-29 安徽捷迅光电技术有限公司 Transfer cart for welding machines and gas cylinder
CN205777419U (en) * 2016-05-16 2016-12-07 中国建筑第二工程局有限公司 A suspension type moving platform for steel construction installation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111472533A (en) * 2020-03-04 2020-07-31 中国核工业华兴建设有限公司 Block detachable annular operation platform and construction method

Similar Documents

Publication Publication Date Title
CN103225513B (en) Integral pouring construction method of ventilation inclined shaft provided with mid-partition and integral trolleys
CN206591432U (en) Pipe installing job platform
CN107083843A (en) It is a kind of to be used for the mobile platform of high-rise building equipment and material fast transportation
CN203487803U (en) Safety protection structure for elevator shaft construction
CN206873307U (en) Movable type bridge justifies pier stud work high above the ground operating platform
CN206553923U (en) A kind of mobile platform device for being used to install Collison fence for bridge
CN104876131A (en) Method for dismantling large tower crane by using small tower crane
CN109577649A (en) A kind of SC structure is mounted for industry platform
CN203834928U (en) Automatic climbing formwork
CN205654127U (en) Portable operation protective platform of assembly type structure stairwell
CN206233546U (en) A kind of elevator hoistways workbench
CN104261269A (en) Special hoisting mechanism for annular dual-rail sliding track
CN201786010U (en) Elevating platform for construction use
CN207312995U (en) One kind self-control bridge-collision-avoidance wall form hanging device
CN111058609A (en) Construction and protection integrated portable operation platform and method
CN205935746U (en) Simple and easy terraced barreled is put
CN105731268A (en) Cargo transportation, hoisting and transferring device
CN209244233U (en) One kind can automatic lifting steel structure floor operation platform
CN215107693U (en) Movable tea booth
CN206800974U (en) Lower-hanging type outer wall moving cantilever operation frame
CN204096948U (en) Annular double track sliding rail Special hoisting mechanism
CN208617174U (en) Construction elevator foundation support formula reinforcing apparatus
CN114439213A (en) Shaft operation platform device and construction method thereof
CN217480755U (en) Steel construction faces limit position coating spraying and removes operation platform
CN208792738U (en) A kind of upper and lower safety climbing ladder of bridge pier column binder pouring construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190405