CN109471375A - A system and method for risk pre-control of power system switching operation - Google Patents

A system and method for risk pre-control of power system switching operation Download PDF

Info

Publication number
CN109471375A
CN109471375A CN201810090766.1A CN201810090766A CN109471375A CN 109471375 A CN109471375 A CN 109471375A CN 201810090766 A CN201810090766 A CN 201810090766A CN 109471375 A CN109471375 A CN 109471375A
Authority
CN
China
Prior art keywords
unit
module
grid switching
pda
switching operation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810090766.1A
Other languages
Chinese (zh)
Inventor
吴健
席俞佳
高奥
卜鹏
闵倩倩
归宇
陈昱
王涤
章铭
凌秋阳
杨海威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUZHOU ELECTRIC POWER DESIGN INSTITUTE Co Ltd
State Grid Corp of China SGCC
Huzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
HUZHOU ELECTRIC POWER DESIGN INSTITUTE Co Ltd
State Grid Corp of China SGCC
Huzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUZHOU ELECTRIC POWER DESIGN INSTITUTE Co Ltd, State Grid Corp of China SGCC, Huzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical HUZHOU ELECTRIC POWER DESIGN INSTITUTE Co Ltd
Priority to CN201810090766.1A priority Critical patent/CN109471375A/en
Publication of CN109471375A publication Critical patent/CN109471375A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Emergency Protection Circuit Devices (AREA)

Abstract

本发明涉及一种电力系统倒闸操作风险预控系统及方法,解决现有技术中倒闸操作方法不严谨风险预控不到位的问题,一种电力系统倒闸操作风险预控系统,包括操作票生成模块、操作模块、PDA模块、数据处理模块、报警模块,操作票生成模块包括操作任务输入单元、操作票编辑单元、操作票生成单元、操作票审核单元,操作模块包括模拟预演单元、电流检查单元、语音指令发送单元、确认单元,模拟预演单元、电流检查单元、语音指令发送单元、确认单元依次相连,所述操作票审核单元与模拟预演单元相连,PDA模块包括电源单元、PDA单元,风险可视化,能安全的对电力系统进行倒闸操作,通过一系列指示提醒模块,提示倒闸操作时产生的风险危险。

The present invention relates to a system and method for pre-controlling the risk of switching off operation of a power system, which solves the problem that the switching operation method in the prior art is not rigorous and the risk pre-control is not in place. Ticket generation module, operation module, PDA module, data processing module, and alarm module. The operation ticket generation module includes an operation task input unit, an operation ticket editing unit, an operation ticket generation unit, and an operation ticket review unit. The operation module includes a simulation rehearsal unit, a current The checking unit, the voice command sending unit, the confirming unit, the analog rehearsal unit, the current checking unit, the voice command sending unit, and the confirming unit are connected in sequence, the operation ticket checking unit is connected with the analog rehearsal unit, and the PDA module includes a power supply unit, a PDA unit, The risk is visualized, which can safely perform the switch-off operation of the power system. A series of indication reminder modules are used to remind the risks and dangers generated during the switch-off operation.

Description

A kind of electric system grid switching operation Risk Pre-control system and method
Technical field
The present invention relates to a kind of electric system back brake fields, more particularly, to a kind of electric system grid switching operation Risk Pre-control System and method.
Background technique
Growing with society's electricity consumption load level, the maintenance of power grid enterprises, improvement project are more, existing operation Risk assessment excessively relies on paper document to show, cannot reach real-time display, various dimensions are shown, comparison is shown, cannot be fine Reflection operation risk actual conditions, the personnel of being also not susceptible to serve as a lookout dangerous distribution situation, be easy to cause personnel's erroneous judgement, risk of failing to judge Cause situations such as blindly or by force operation leads to casualties, so a kind of system and method that can carry out safely grid switching operation are It is very necessary.
Summary of the invention
The present invention mainly solves the problems, such as that the not rigorous Risk Pre-control of grid switching operation method is not in place in the prior art, provides A kind of security risk visual electric system grid switching operation Risk Pre-control system and method.
Above-mentioned technical problem of the invention is mainly to be addressed by following technical proposals: a kind of electric system back brake Operational risk Pre-control System, including operation order generation module, operation module, PDA module, data processing module, alarm module, behaviour Make ticket generation module operation task input unit, operation order edit cell, operation order generation unit, operation order audit unit, institute Operation task input unit, operation order edit cell, operation order generation unit, operation order audit unit is stated to be sequentially connected, it is described Operation module includes simulation preview unit, galvanoscopy unit, phonetic order transmission unit, confirmation unit, the simulation preview Unit, galvanoscopy unit, phonetic order transmission unit, confirmation unit are sequentially connected, the operation order audit unit and simulation It previews unit to be connected, the PDA module includes power supply unit, PDA unit, and power supply unit, PDA unit are sequentially connected, described true Recognize unit to be connected with PDA unit, generate operation order and editor's audit is carried out to the operation order of generation, is then carried out by operation order Grid switching operation is completed after simulation preview, it will be on the item that should be noted when operating placement and screen in operating process, wherein operation Ticket input unit is keyboard input, and operation order edit cell, operation order generation unit, operation order audit unit, simulation preview are single Member carries out in the server, and galvanoscopy unit is current detector, and points for attention screen reminding unit is display, voice In PDA unit, data storage cell is data storage for instruction sending unit, confirmation unit.
As a preferred embodiment, the PDA module includes power supply unit, PDA unit, and power supply unit, PDA unit are successively It is connected, the confirmation unit is connected with PDA unit, and PDA module is used to indicate operator's operating procedure, and points for attention are being shielded It is reminded on curtain.
As a preferred embodiment, the data processing module includes executing time recording unit, data analysis unit, number According to writing unit, data storage cell, conclusion and comment unit, the execution time recording unit, data analysis unit, data are write Enter unit, data storage cell, conclusion and comment unit to be sequentially connected, the execution time recording unit is connected with PDA unit, number It realizes, after operation data is stored and analyzes, under being preferably in PDA module according to analytical unit, data write unit Secondary back brake is prepared.
As a preferred embodiment, the operation module further includes points for attention screen reminding unit, points for attention screen Reminding unit is connected with simulation preview unit, and points for attention screen reminding unit can remind operator.
As a preferred embodiment, the alarm module includes the anomaly analysis unit being connected with confirmation unit, with exception The connected acousto-optic warning unit of analytical unit, anomaly analysis unit can analyze the exception generated in operation and by sound-light alarm lists Member alarm.
A kind of electric system grid switching operation Risk Pre-control method, comprising the following steps:
S1. operation order needed for grid switching operation is generated;
S2. it sends phonetic order and indicates how grid switching operation;
S3. data storage cell and conclusion and comment are write data into.
As a preferred embodiment, S1 the following steps are included:
S11. grid switching operation operation task is inputted and is edited;
S12. operation order is generated;
S13. operation module will be sent to after operation order generated audit confirmation;
As a preferred embodiment, S2 the following steps are included:
S21. simulation preview unit carries out simulated operation according to the operation order received;
Whether S22. check in circuit has electric current and the problem of by simulated operation when occurs is labeled in and reminds on screen;
S23. phonetic order prompt is sent;
S24. confirmed after completing operation, continued in next step.
As a preferred embodiment, S3 the following steps are included:
S31. the time required to record operation;
S32. recorded data is analyzed, and writes the data into data storage element, and complete conclusion and comment.
Therefore, the invention has the advantages that risk visualizes, energy safety carries out grid switching operation to electric system, passes through one Serial indicating reminders module, the Risk generated when by grid switching operation are prompted to operator, avoid risk.
Detailed description of the invention
Attached drawing 1 is system structure frame figure in the present invention
1. 2. operation order edit cell of operation task input unit
3. operation order generation unit 4. executes time recording unit
5. 6. data write unit of data analysis unit, 7. alarm module
8. 10. power supply unit of galvanoscopy unit 9.PDA unit
11. simulation preview 13. confirmation unit of unit of points for attention screen reminding unit 12.
14. 15. anomaly analysis unit of acousto-optic warning unit, 16. phonetic order transmission unit
17. operation order audits 18. conclusion and comment unit of unit, 19. data storage cell
21. data processing module of 20.PDA module, 22. operation order generation module
23. operation module.
Specific embodiment
A kind of electric system grid switching operation Risk Pre-control system of the present embodiment, including operation order generation module 22, operation mould Block 23, PDA module 20, data processing module 21, alarm module 7, operation order generation module operation task input unit 1, operation Ticket edit cell 2, operation order generation unit 3, operation order audit unit 17, operation task input unit, operation order edit cell, Operation order generation unit, operation order audit unit are sequentially connected, and operation module includes simulation preview unit 12, galvanoscopy unit 8, phonetic order transmission unit 16, confirmation unit 13, simulation preview unit, galvanoscopy unit, phonetic order transmission unit, really Recognize unit to be sequentially connected, operation order audit unit previews unit with simulation and is connected, and PDA module includes power supply unit 10, PDA mono- Member 9, power supply unit, PDA unit are sequentially connected, and confirmation unit is connected with PDA unit, generate operation order and the operation order to generation Editor's audit is carried out, completes grid switching operation after then carrying out simulation preview by operation order, it is required when will be operated in operating process In the item placement paid attention to and screen, wherein operation order input unit is keyboard input, and operation order edit cell, operation order are raw It being carried out in the server at unit, operation order audit unit, simulation preview unit, galvanoscopy unit is current detector, Points for attention screen reminding unit is display, and in PDA unit, data storage is single for phonetic order transmission unit, confirmation unit Member is data storage.
Data processing module includes executing time recording unit 4, data analysis unit 5, data write unit 6, data to deposit Storage unit 19, conclusion and comment unit 18 execute time recording unit, data analysis unit, data write unit, data storage list Member, conclusion and comment unit are sequentially connected, and are executed time recording unit and are connected with PDA unit, and data analysis unit, data write-in are single Member is realized in PDA module, after operation data is stored and is analyzed, and can preferably be prepared for next back brake.
Operation module further includes points for attention screen reminding unit 11, and points for attention screen reminding unit and simulation preview are single Member is connected, and points for attention screen reminding unit can remind operator.
Alarm module includes the anomaly analysis unit 15 being connected with confirmation unit, the acousto-optic report being connected with anomaly analysis unit Alert unit 14, anomaly analysis unit can analyze the exception generated in operation and be alarmed by acousto-optic warning unit.
A kind of electric system grid switching operation Risk Pre-control method, comprising the following steps:
S1. operation order needed for grid switching operation is generated;
S2. it sends phonetic order and indicates how grid switching operation;
S3. data storage cell and conclusion and comment are write data into.
As a preferred embodiment, S1 the following steps are included:
S11. grid switching operation operation task is inputted and is edited;
S12. operation order is generated;
S13. operation module will be sent to after operation order generated audit confirmation;
As a preferred embodiment, S2 the following steps are included:
S21. simulation preview unit carries out simulated operation according to the operation order received;
Whether S22. check in circuit has electric current and the problem of by simulated operation when occurs is labeled in and reminds on screen;
S23. phonetic order prompt is sent;
S24. confirmed after completing operation, continued in next step.
As a preferred embodiment, S3 the following steps are included:
S31. the time required to record operation;
S32. recorded data is analyzed, and writes the data into data storage element, and complete conclusion and comment.
Specific embodiment described herein is only an example for the spirit of the invention.The neck of technology belonging to the present invention The technical staff in domain can make various modifications or additions to the described embodiments or replace by a similar method In generation, however, it does not deviate from the spirit of the invention or beyond the scope of the appended claims.
Although confirmation unit is used more herein, data storage cell, data analysis unit, data write unit, The terms such as PDA unit, but it does not exclude the possibility of using other terms.The use of these items is only for more easily retouch State and explain essence of the invention;Being construed as any additional limitation is disagreed with spirit of that invention.

Claims (9)

1. a kind of electric system grid switching operation Risk Pre-control system, it is characterised in that: including operation order generation module (22), operation Module (23), PDA module (20), data processing module (21), alarm module (7), the input of operation order generation module operation task Unit (1), operation order edit cell (2), operation order generation unit (3), operation order audit unit (17), the operation task are defeated Enter unit, operation order edit cell, operation order generation unit, operation order audit unit to be sequentially connected, the operation module includes Simulation preview unit (12), galvanoscopy unit (8), phonetic order transmission unit (16), confirmation unit (13), the simulation are pre- It drills unit, galvanoscopy unit, phonetic order transmission unit, confirmation unit to be sequentially connected, the operation order audit unit and mould Quasi- preview unit is connected.
2. a kind of electric system grid switching operation Risk Pre-control system according to claim 1, which is characterized in that the PDA Module includes power supply unit (10), PDA unit (9), and power supply unit, PDA unit are sequentially connected, and the confirmation unit and PDA are mono- Member is connected.
3. a kind of electric system grid switching operation Risk Pre-control system according to claim 2, which is characterized in that the number It include executing time recording unit (4), data analysis unit (5), data write unit (6), data storage list according to processing module First (19), conclusion and comment unit (18), the execution time recording unit, data analysis unit, data write unit, data are deposited Storage unit, conclusion and comment unit are sequentially connected, and the execution time recording unit is connected with PDA unit.
4. a kind of electric system grid switching operation Risk Pre-control system according to claim 1, which is characterized in that the behaviour It further include points for attention screen reminding unit (11) as module, points for attention screen reminding unit is connected with simulation preview unit.
5. a kind of electric system grid switching operation Risk Pre-control system described in -4 according to claim 1, which is characterized in that described Alarm module includes the anomaly analysis unit (15) being connected with confirmation unit, the acousto-optic warning unit being connected with anomaly analysis unit (14).
6. a kind of electric system grid switching operation Risk Pre-control method, using the system in any one of right 1-5, it is characterized in that packet Include following steps:
S1. operation order needed for grid switching operation is generated;
S2. it sends phonetic order and indicates how grid switching operation;
S3. data storage cell and conclusion and comment are write data into.
7. a kind of electric system grid switching operation Risk Pre-control method according to claim 6, it is characterized in that S1 includes following Step:
S11. grid switching operation operation task is inputted and is edited;
S12. operation order is generated;
S13. operation module will be sent to after operation order generated audit confirmation.
8. a kind of electric system grid switching operation Risk Pre-control method according to claim 6, it is characterized in that S2 includes following Step:
S21. simulation preview unit carries out simulated operation according to the operation order received;
Whether S22. check in circuit has electric current and the problem of by simulated operation when occurs is labeled in and reminds on screen;
S23. phonetic order prompt is sent;
S24. confirmed after completing operation, continued in next step.
9. a kind of electric system grid switching operation Risk Pre-control method according to claim 6, it is characterized in that S3 includes following Step:
S31. the time required to record operation;
S32. recorded data is analyzed, and writes the data into data storage element, and complete conclusion and comment.
CN201810090766.1A 2018-01-30 2018-01-30 A system and method for risk pre-control of power system switching operation Pending CN109471375A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810090766.1A CN109471375A (en) 2018-01-30 2018-01-30 A system and method for risk pre-control of power system switching operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810090766.1A CN109471375A (en) 2018-01-30 2018-01-30 A system and method for risk pre-control of power system switching operation

Publications (1)

Publication Number Publication Date
CN109471375A true CN109471375A (en) 2019-03-15

Family

ID=65659894

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810090766.1A Pending CN109471375A (en) 2018-01-30 2018-01-30 A system and method for risk pre-control of power system switching operation

Country Status (1)

Country Link
CN (1) CN109471375A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110571929A (en) * 2019-09-09 2019-12-13 珠海优特电力科技股份有限公司 Switching operation control method and device, storage medium and electronic device
CN111048080A (en) * 2019-11-22 2020-04-21 广东电网有限责任公司 Intelligent dispatching command system based on voice recognition technology
CN118249516A (en) * 2024-05-20 2024-06-25 广东电网有限责任公司中山供电局 Switch switching method, switch switching device, electronic equipment, storage medium and program product

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101458502A (en) * 2008-12-30 2009-06-17 湖南省电力公司湘潭电业局 Electrical power system standardized work intelligent control method and special equipment
CN103593809A (en) * 2013-12-03 2014-02-19 国家电网公司 Intelligent operation-ticket semanteme verification method of automatic power dispatching system
CN104915750A (en) * 2015-04-17 2015-09-16 华中电网有限公司 Intelligent operation ticket management method and system for achieving integration with an EMS and an OMS
JP5862236B2 (en) * 2010-11-30 2016-02-16 株式会社ジェイテクト Control program editing apparatus and control program creation support program
CN106877508A (en) * 2017-03-28 2017-06-20 长园共创电力安全技术股份有限公司 A kind of grid switching operation monitor in real time anti-error system and its control method
CN208623228U (en) * 2018-01-30 2019-03-19 国网浙江省电力公司湖州供电公司 A power system switching operation risk pre-control system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101458502A (en) * 2008-12-30 2009-06-17 湖南省电力公司湘潭电业局 Electrical power system standardized work intelligent control method and special equipment
JP5862236B2 (en) * 2010-11-30 2016-02-16 株式会社ジェイテクト Control program editing apparatus and control program creation support program
CN103593809A (en) * 2013-12-03 2014-02-19 国家电网公司 Intelligent operation-ticket semanteme verification method of automatic power dispatching system
CN104915750A (en) * 2015-04-17 2015-09-16 华中电网有限公司 Intelligent operation ticket management method and system for achieving integration with an EMS and an OMS
CN106877508A (en) * 2017-03-28 2017-06-20 长园共创电力安全技术股份有限公司 A kind of grid switching operation monitor in real time anti-error system and its control method
CN208623228U (en) * 2018-01-30 2019-03-19 国网浙江省电力公司湖州供电公司 A power system switching operation risk pre-control system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110571929A (en) * 2019-09-09 2019-12-13 珠海优特电力科技股份有限公司 Switching operation control method and device, storage medium and electronic device
CN111048080A (en) * 2019-11-22 2020-04-21 广东电网有限责任公司 Intelligent dispatching command system based on voice recognition technology
CN118249516A (en) * 2024-05-20 2024-06-25 广东电网有限责任公司中山供电局 Switch switching method, switch switching device, electronic equipment, storage medium and program product

Similar Documents

Publication Publication Date Title
CN107689887B (en) Temporary control change online management system of nuclear power plant control system
CN105868876A (en) Centralized operation and maintenance fault closed-loop processing method based on process monitoring
Yang et al. Development of a risk monitoring system for nuclear power plants based on GO-FLOW methodology
CN109471375A (en) A system and method for risk pre-control of power system switching operation
CN103198231B (en) The method and system of the reliability of Digitizing And Control Unit man-machine interface is judged by human factors analysis
JP2009193294A (en) Nuclear power plant operation management system, nuclear power plant operation management server, and nuclear power plant operation management method
Jiang et al. System hazard analysis of tower crane in different phases on construction site
Hugo et al. The strategic value of human factors engineering in control room modernization
CN208623228U (en) A power system switching operation risk pre-control system
Vechgama et al. Application of hazard and operability technique to level 1 probabilistic safety assessment of Thai research reactor-1/modification 1: Internal events and human errors
KR101323727B1 (en) Static measuring and dynamic diagnostic apparatus for control module at engine control system in nuclear emergency diesel generator
JPH096428A (en) Plant monitoring equipment
Krivanek et al. Main deficiencies and corrective measures of nuclear power plants in ageing management for safe long term operation
Wolff et al. Early lessons from the application of systems engineering at UKAEA (May 2017)
CN109709884B (en) Electric power five-prevention intelligent logic verification system and method
CN203930461U (en) For the system of infrastructure Monitoring and Controlling
CN116341899A (en) Intelligent risk index management system and method based on disduty and dead duty
CN106549423A (en) Electric network fault multi-stage scheduling cooperative processing method and device
JP2010277157A (en) Water treatment facility management method and system
Boring et al. Considerations for the treatment of computerized procedures in human reliability analysis
Yang et al. An Event-Driven Scenario Modeling and Replay Method for Operational Safety Audits in NPPs
Berri et al. Integrating Functional Block Diagrams and Systems-Theoretic Process Analysis: A Case Study of a Nuclear Power Station.
JP2014026403A (en) Repair plan support system for power station/substation equipment, and repair plan support system for power station/substation equipment
Yang et al. Team error analysis in a digitalized control room by using a novel crew reliability model
Lee et al. Accuracy enhancement in estimation of the initiating event frequencies in risk monitor application on Kuosheng NPP

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190315