A kind of electric system grid switching operation Risk Pre-control system and method
Technical field
The present invention relates to a kind of electric system back brake fields, more particularly, to a kind of electric system grid switching operation Risk Pre-control
System and method.
Background technique
Growing with society's electricity consumption load level, the maintenance of power grid enterprises, improvement project are more, existing operation
Risk assessment excessively relies on paper document to show, cannot reach real-time display, various dimensions are shown, comparison is shown, cannot be fine
Reflection operation risk actual conditions, the personnel of being also not susceptible to serve as a lookout dangerous distribution situation, be easy to cause personnel's erroneous judgement, risk of failing to judge
Cause situations such as blindly or by force operation leads to casualties, so a kind of system and method that can carry out safely grid switching operation are
It is very necessary.
Summary of the invention
The present invention mainly solves the problems, such as that the not rigorous Risk Pre-control of grid switching operation method is not in place in the prior art, provides
A kind of security risk visual electric system grid switching operation Risk Pre-control system and method.
Above-mentioned technical problem of the invention is mainly to be addressed by following technical proposals: a kind of electric system back brake
Operational risk Pre-control System, including operation order generation module, operation module, PDA module, data processing module, alarm module, behaviour
Make ticket generation module operation task input unit, operation order edit cell, operation order generation unit, operation order audit unit, institute
Operation task input unit, operation order edit cell, operation order generation unit, operation order audit unit is stated to be sequentially connected, it is described
Operation module includes simulation preview unit, galvanoscopy unit, phonetic order transmission unit, confirmation unit, the simulation preview
Unit, galvanoscopy unit, phonetic order transmission unit, confirmation unit are sequentially connected, the operation order audit unit and simulation
It previews unit to be connected, the PDA module includes power supply unit, PDA unit, and power supply unit, PDA unit are sequentially connected, described true
Recognize unit to be connected with PDA unit, generate operation order and editor's audit is carried out to the operation order of generation, is then carried out by operation order
Grid switching operation is completed after simulation preview, it will be on the item that should be noted when operating placement and screen in operating process, wherein operation
Ticket input unit is keyboard input, and operation order edit cell, operation order generation unit, operation order audit unit, simulation preview are single
Member carries out in the server, and galvanoscopy unit is current detector, and points for attention screen reminding unit is display, voice
In PDA unit, data storage cell is data storage for instruction sending unit, confirmation unit.
As a preferred embodiment, the PDA module includes power supply unit, PDA unit, and power supply unit, PDA unit are successively
It is connected, the confirmation unit is connected with PDA unit, and PDA module is used to indicate operator's operating procedure, and points for attention are being shielded
It is reminded on curtain.
As a preferred embodiment, the data processing module includes executing time recording unit, data analysis unit, number
According to writing unit, data storage cell, conclusion and comment unit, the execution time recording unit, data analysis unit, data are write
Enter unit, data storage cell, conclusion and comment unit to be sequentially connected, the execution time recording unit is connected with PDA unit, number
It realizes, after operation data is stored and analyzes, under being preferably in PDA module according to analytical unit, data write unit
Secondary back brake is prepared.
As a preferred embodiment, the operation module further includes points for attention screen reminding unit, points for attention screen
Reminding unit is connected with simulation preview unit, and points for attention screen reminding unit can remind operator.
As a preferred embodiment, the alarm module includes the anomaly analysis unit being connected with confirmation unit, with exception
The connected acousto-optic warning unit of analytical unit, anomaly analysis unit can analyze the exception generated in operation and by sound-light alarm lists
Member alarm.
A kind of electric system grid switching operation Risk Pre-control method, comprising the following steps:
S1. operation order needed for grid switching operation is generated;
S2. it sends phonetic order and indicates how grid switching operation;
S3. data storage cell and conclusion and comment are write data into.
As a preferred embodiment, S1 the following steps are included:
S11. grid switching operation operation task is inputted and is edited;
S12. operation order is generated;
S13. operation module will be sent to after operation order generated audit confirmation;
As a preferred embodiment, S2 the following steps are included:
S21. simulation preview unit carries out simulated operation according to the operation order received;
Whether S22. check in circuit has electric current and the problem of by simulated operation when occurs is labeled in and reminds on screen;
S23. phonetic order prompt is sent;
S24. confirmed after completing operation, continued in next step.
As a preferred embodiment, S3 the following steps are included:
S31. the time required to record operation;
S32. recorded data is analyzed, and writes the data into data storage element, and complete conclusion and comment.
Therefore, the invention has the advantages that risk visualizes, energy safety carries out grid switching operation to electric system, passes through one
Serial indicating reminders module, the Risk generated when by grid switching operation are prompted to operator, avoid risk.
Detailed description of the invention
Attached drawing 1 is system structure frame figure in the present invention
1. 2. operation order edit cell of operation task input unit
3. operation order generation unit 4. executes time recording unit
5. 6. data write unit of data analysis unit, 7. alarm module
8. 10. power supply unit of galvanoscopy unit 9.PDA unit
11. simulation preview 13. confirmation unit of unit of points for attention screen reminding unit 12.
14. 15. anomaly analysis unit of acousto-optic warning unit, 16. phonetic order transmission unit
17. operation order audits 18. conclusion and comment unit of unit, 19. data storage cell
21. data processing module of 20.PDA module, 22. operation order generation module
23. operation module.
Specific embodiment
A kind of electric system grid switching operation Risk Pre-control system of the present embodiment, including operation order generation module 22, operation mould
Block 23, PDA module 20, data processing module 21, alarm module 7, operation order generation module operation task input unit 1, operation
Ticket edit cell 2, operation order generation unit 3, operation order audit unit 17, operation task input unit, operation order edit cell,
Operation order generation unit, operation order audit unit are sequentially connected, and operation module includes simulation preview unit 12, galvanoscopy unit
8, phonetic order transmission unit 16, confirmation unit 13, simulation preview unit, galvanoscopy unit, phonetic order transmission unit, really
Recognize unit to be sequentially connected, operation order audit unit previews unit with simulation and is connected, and PDA module includes power supply unit 10, PDA mono-
Member 9, power supply unit, PDA unit are sequentially connected, and confirmation unit is connected with PDA unit, generate operation order and the operation order to generation
Editor's audit is carried out, completes grid switching operation after then carrying out simulation preview by operation order, it is required when will be operated in operating process
In the item placement paid attention to and screen, wherein operation order input unit is keyboard input, and operation order edit cell, operation order are raw
It being carried out in the server at unit, operation order audit unit, simulation preview unit, galvanoscopy unit is current detector,
Points for attention screen reminding unit is display, and in PDA unit, data storage is single for phonetic order transmission unit, confirmation unit
Member is data storage.
Data processing module includes executing time recording unit 4, data analysis unit 5, data write unit 6, data to deposit
Storage unit 19, conclusion and comment unit 18 execute time recording unit, data analysis unit, data write unit, data storage list
Member, conclusion and comment unit are sequentially connected, and are executed time recording unit and are connected with PDA unit, and data analysis unit, data write-in are single
Member is realized in PDA module, after operation data is stored and is analyzed, and can preferably be prepared for next back brake.
Operation module further includes points for attention screen reminding unit 11, and points for attention screen reminding unit and simulation preview are single
Member is connected, and points for attention screen reminding unit can remind operator.
Alarm module includes the anomaly analysis unit 15 being connected with confirmation unit, the acousto-optic report being connected with anomaly analysis unit
Alert unit 14, anomaly analysis unit can analyze the exception generated in operation and be alarmed by acousto-optic warning unit.
A kind of electric system grid switching operation Risk Pre-control method, comprising the following steps:
S1. operation order needed for grid switching operation is generated;
S2. it sends phonetic order and indicates how grid switching operation;
S3. data storage cell and conclusion and comment are write data into.
As a preferred embodiment, S1 the following steps are included:
S11. grid switching operation operation task is inputted and is edited;
S12. operation order is generated;
S13. operation module will be sent to after operation order generated audit confirmation;
As a preferred embodiment, S2 the following steps are included:
S21. simulation preview unit carries out simulated operation according to the operation order received;
Whether S22. check in circuit has electric current and the problem of by simulated operation when occurs is labeled in and reminds on screen;
S23. phonetic order prompt is sent;
S24. confirmed after completing operation, continued in next step.
As a preferred embodiment, S3 the following steps are included:
S31. the time required to record operation;
S32. recorded data is analyzed, and writes the data into data storage element, and complete conclusion and comment.
Specific embodiment described herein is only an example for the spirit of the invention.The neck of technology belonging to the present invention
The technical staff in domain can make various modifications or additions to the described embodiments or replace by a similar method
In generation, however, it does not deviate from the spirit of the invention or beyond the scope of the appended claims.
Although confirmation unit is used more herein, data storage cell, data analysis unit, data write unit,
The terms such as PDA unit, but it does not exclude the possibility of using other terms.The use of these items is only for more easily retouch
State and explain essence of the invention;Being construed as any additional limitation is disagreed with spirit of that invention.