CN109465594A - A kind of tubing welder of construction - Google Patents
A kind of tubing welder of construction Download PDFInfo
- Publication number
- CN109465594A CN109465594A CN201811440300.6A CN201811440300A CN109465594A CN 109465594 A CN109465594 A CN 109465594A CN 201811440300 A CN201811440300 A CN 201811440300A CN 109465594 A CN109465594 A CN 109465594A
- Authority
- CN
- China
- Prior art keywords
- positioning
- tubing
- fixed
- welder
- motor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted for a procedure covered by only one of the other main groups of this subclass
- B23K37/02—Carriages for supporting the welding or cutting element
- B23K37/0247—Driving means
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted for a procedure covered by only one of the other main groups of this subclass
- B23K37/04—Auxiliary devices or processes, not specially adapted for a procedure covered by only one of the other main groups of this subclass for holding or positioning work
- B23K37/053—Auxiliary devices or processes, not specially adapted for a procedure covered by only one of the other main groups of this subclass for holding or positioning work aligning cylindrical work; Clamping devices therefor
- B23K37/0538—Auxiliary devices or processes, not specially adapted for a procedure covered by only one of the other main groups of this subclass for holding or positioning work aligning cylindrical work; Clamping devices therefor for rotating tubes, e.g. rollers
Landscapes
- Physics & Mathematics (AREA)
- Optics & Photonics (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Butt Welding And Welding Of Specific Article (AREA)
Abstract
The present invention relates to construction equipment fields, the tubing welder of specifically a kind of construction, including T shape frame, synchronous shifter, fixed device, clamping device, positioning device, edge-neatening apparatus, welder, synchronous shifter is arranged on T shape frame, fixed device setting is sequentially connected in the shape frame two sides T and with synchronous shifter, clamping device is arranged in beam guideway two sides, clamping device is connect with fixed device, fixed device is mobile to drive clamping device to move synchronously along beam guideway, two clamping devices are arranged in close to the side of column in positioning device, edge-neatening apparatus is arranged in clamping device close to column side, welder is mounted on top in the middle part of beam guideway.The automatic welding of tubing can be achieved in the present invention, realizes being automatically aligned to for tubing welding position, can preventing building pipe, soldered position has been broken during rotation, the labor intensity of construction worker is effectively reduced, it is ensured that construction speed and construction quality.
Description
Technical field
The present invention relates to construction equipment field, the tubing welder of specifically a kind of construction.
Background technique
The tubing support and transmission material indispensable as building field, are widely used in building field.It is logical
Often for the needs of meeting construction, use etc., need to change pipe length, tool when usual tubing is bought from producer
There is fixed length, therefore in use, need for pipe length to be adjusted, is needed when too long compared to needed length
Cutting, by means of pipe cutting equipment, and it is too short compared to needed length when, then need to weld.
In the prior art, it when welding building pipe, needs to use manual operation by the welding of two building pipes
Position carries out grinding process, is then directed at the welding position of two building pipes, tubing is in the welding process by pipe structure
Influence, usually the tubing after welding is rotated after tubing welded one side, then again to tubing another side carry out
Welding.
The problem of this traditional welding manner is that manual operation is time-consuming and laborious, and be easy to cause welding position in docking
The problems such as weldering, solder skip partially occur for place is set, finally, the overturning of tubing is it is also possible to cause the generation of overlap.In addition, the pipe after welding
Material temperature is higher, is manually not easy to overturn, at the same in switching process partially weld after tubing may be subjected to gravity or external force
Influence generation be broken again.
This is proposed very high requirement to the physical strength and technology of construction worker, is now to build technology present in work progress
Problem.
Summary of the invention
The purpose of the present invention is to provide a kind of tubing welders of construction, to solve in above-mentioned background technique
Construction worker's operation of proposition is time-consuming and laborious, and building pipe can not once weld completion, be easy to appear when rotating building pipe partially
Weldering, solder skip, overlap, in tubing switching process the problems such as easy fracture.
In order to solve the above technical problems, the present invention provides a kind of tubing welder of construction, including T shape frame,
Synchronous shifter, fixed device, clamping device, positioning device, edge-neatening apparatus, welder, the T shape frame include pedestal,
Column, beam track and sealing end, the column are mounted on the base, and the beam track is horizontally arranged on column, the envelope
End is mounted on beam track both ends, and the synchronous shifter is arranged on column, and two fixed devices are arranged described
Column two sides are simultaneously sequentially connected with the synchronous shifter, and the synchronous shifter is able to drive two fixed devices
Opposite along beam track or relative synchronization moves, the clamping device is arranged in beam guideway two sides, and the clamping device is equipped with
Two, two clamping devices are connect with two fixed devices respectively, and two fixed devices are mobile to drive two
The clamping device is moved synchronously along beam guideway, and there are two be separately positioned on two clampings to the positioning device altogether
Device is close to the side of column, and there are two the edge-neatening apparatus is set, two edge-neatening apparatus are separately positioned on two folders
Device is held close to column side and is located at below the positioning device, the welder is mounted on top in the middle part of beam guideway.
In a preferred embodiment of the present invention, the synchronous shifter includes synchronizing cylinder, link block, two synchronous companies
Bar, two synchronous gas holders, the synchronizing cylinder piston rod are mounted on downward on the column, and the link block is mounted on synchronization
Cylinder piston rod end, two synchronising (connecting) rod structures are identical and mirror settings are in synchronizing cylinder two sides, the synchronising (connecting) rod
Including drive connecting rod and follower link, described drive connecting rod one end is mounted on link block, the other end of the drive connecting rod with
One end of follower link is hinged, and the other end of the follower link is connected on synchronous gas holder, described two synchronous gas holders
Structure is identical and mirror settings are at beam track both ends.
In a preferred embodiment of the present invention, the fixed device includes fixed gas folder, double leval jib, round fixed block, side
Shape slide, round slide, the fixed gas folder are mounted on synchronous gas holder, be provided on the synchronous gas holder circular hole with
One pilot hole, a collet of the fixed gas folder passes through circular hole on synchronous gas holder and double leval jib one end is hinged, described
The other end that another collet of fixed gas folder passes through pilot hole and double leval jib on synchronous gas holder is hinged, described round fixed
Block is arranged on double leval jib, and the rectangular slide is fixedly connected with double leval jib close to one end of circular hole, the round slider and four
Connecting rod is fixedly connected close to one end of pilot hole.
In a preferred embodiment of the present invention, the clamping device includes Holding seat, air cylinder support, gripper cylinder, folder
Hold guide rod, roller shaft, hold-down roll, belt motor, belt pulley, the Holding seat be mounted on beam track and with rectangular cunning
Seat axis connection, the air cylinder support are mounted on Holding seat, guide groove are provided on the air cylinder support, the gripper cylinder is set
Set above air cylinder support, the clamping guide rod is mounted on gripper cylinder piston rod top end, clamping guide rod setting exists
In the guide groove of air cylinder support, the other end of clamping guide rod is arranged in the roller shaft, and the hold-down roll is arranged in roller shaft
Both ends, on clamping guide rod, the belt motor passes through belt pulley and idler wheel axis connection for the belt motor setting.
In a preferred embodiment of the present invention, the positioning device includes positioning base, positioning motor, positioning transverse slat, institute
The side that Holding seat is arranged in close to column in positioning base is stated, the positioning motor is mounted on positioning base, the positioning
Transverse slat is mounted on positioning motor.
In a preferred embodiment of the present invention, the edge-neatening apparatus includes carry arm motor, carry arm, deburring motor, deburring sand
Wheel, the carry arm motor are mounted below Holding seat, and described carry arm one end is mounted on carry arm motor, the deburring motor peace
Mounted in the carry arm other end, the deburring grinding wheel is mounted on deburring motor, and deburring grinding wheel edge is provided with oblique angle.
In a preferred embodiment of the present invention, the welder includes screw rod slide unit, anchorage clip, welding gun support, welding gun,
The screw rod slide unit is mounted on top, the anchorage clip in the middle part of beam track and is mounted on screw rod slide unit, the welding gun support peace
On anchorage clip, the welding gun is mounted in welding gun support, and welding gun is directed at beam track middle line.
In a preferred embodiment of the present invention, the Holding seat includes two semicircle claws and four positioning rollers,
Described two semicircle claws are mounted on beam track, are respectively provided with two equally distributed positioning on each semicircle claw
Idler wheel.
In a preferred embodiment of the present invention, threaded hole, adjusting screw and regulation handle are additionally provided on the carry arm, it is described
Carry arm is arranged in close to one end of deburring motor in threaded hole, and the adjusting screw is mounted in threaded hole, the regulation handle peace
Adjusting screw precession is driven by rotation regulation handle in the adjusting screw or screws out control carry arm at a distance from tubing
To control the position of deburring grinding wheel.
In a preferred embodiment of the present invention, the anchorage clip includes fixed chuck, active chuck, and fastening nut is described
Fixed chuck is mounted on screw rod slide unit, and described movable support one end is hinged on above fixed chuck, and the other end passes through fastening spiral shell
Mother is locked on fixed chuck.
The present invention provides a kind of tubing welder of construction by improving herein, compared with prior art, tool
There are following improvement and advantage:
First, phase of the present invention by devices such as synchronous shifter, positioning device, edge-neatening apparatus, clamping device, welders
Mutually cooperation realizes automatic positioning, automatically grinding, automatic rotation, automatic welding to building pipe, saves human cost,
Prevent building pipe in the inclined weldering of welding appearance, solder skip, overlap, tubing switching process the problems such as easy fracture.
Second, being equipped with synchronous shifter, building pipe synchronizing moving is driven by synchronous shifter, it can be by two pipes
Material welding position is automatically aligned to beam track midline, makes welding gun be easy to weld tubing, compared to manual-alignment
Mode, the synchronizing device are driven using a driving force, and structure is more simple and effective, and device operation is more stable, are not easy
Failure, and it is more convenient.
Third, being provided with edge-neatening apparatus, polishing pretreatment can be carried out to building pipe welding position automatically, compared to people
The mode of work polishing is more convenient and safer.
Fourth, being provided with clamping device, the clamping device is equipped with idler wheel, while being clamped to building pipe,
Tubing can also be rotated, weld welding gun uniformly to tubing always, the disposable welding completed to tubing,
There are also supporting roles to tubing for clamping device simultaneously, and preventing tubing, soldered position is broken in rotary course.
Fifth, being provided with positioning device, the quick and precisely positioning to tubing welding position can be realized before tubing welding,
Two pipe welding positions are aligned convenient for subsequent.
In conclusion the tubing welder of construction designed by the present invention, can be effectively reduced construction worker
Labor intensity, adjustment when facilitating construction to pipe length, it is ensured that construction speed and construction quality.
Detailed description of the invention
The present invention is further explained with reference to the accompanying drawings and examples:
Fig. 1 is the first visual angle schematic diagram of the invention;
Fig. 2 is the second visual angle schematic diagram of the invention;
Fig. 3 is third visual angle schematic diagram of the invention;
Fig. 4 is the partial sectional view in Fig. 2 at B;
Fig. 5 is the structural schematic diagram of clamping device in the present invention;
Fig. 6 is the partial enlarged view in Fig. 1 at A;
Fig. 7 is the structural schematic diagram of edge-neatening apparatus in the present invention.
Fig. 8 is the another embodiment after the present invention makes improvements.
Description of symbols:
T shape frame 1, synchronous shifter 2, fixed device 3, clamping device 4, positioning device 5, edge-neatening apparatus 6, welder 7, bottom
Seat 1a, column 1b, beam track 1c, block 1d, synchronizing cylinder 2a, link block 2b, synchronising (connecting) rod 2c, and synchronous gas holder 2d is main
Dynamic connecting rod 2c1, follower link 2c2, fixed gas press from both sides 3a, double leval jib 3b, round fixed block 3c, rectangular slide 3d, round slide 3e,
Holding seat 4a, air cylinder support 4b, gripper cylinder 4c clamp guide rod 4d, roller shaft 4e, hold-down roll 4f, belt motor 4g, skin
Belt wheel 4h positions base 5a, positioning motor 5b, positions transverse slat 5c, carry arm motor 6a, carry arm 6b, deburring motor 6c, deburring grinding wheel
6d, screw rod slide unit 7a, anchorage clip 7b, welding gun support 7c, welding gun 7d, semicircle claw 4a1, positioning roller 4a2, threaded hole 6b1,
Adjusting screw 6b2, regulation handle 6b3, fixed chuck 7b1, active chuck 7b2, fastening nut 7b3, guide rail 8a, raised line 8b, water
Flat 8 c of extension, Universal caster 8 d, through slot 8e, bolt assembly 8f.
Specific embodiment
Below in conjunction with attached drawing 1- Fig. 8, the present invention is described in detail, technical solution in the embodiment of the present invention into
Row clearly and completely describes, it is clear that described embodiments are only a part of the embodiments of the present invention, rather than whole realities
Apply example.Based on the embodiments of the present invention, those of ordinary skill in the art are obtained without making creative work
Every other embodiment, shall fall within the protection scope of the present invention.
Embodiment 1
The present invention provides a kind of tubing welder of construction, as shown in Fig. 1-Fig. 7, including T shape frame 1, synchronizing moving
Device 2, fixed device 3, clamping device 4, positioning device 5, edge-neatening apparatus 6, welder 7, the T shape frame 1 include pedestal 1a,
Column 1b, beam track 1c and sealing end 1d, the column 1b is mounted on pedestal 1a, and the beam track 1c is horizontally arranged at vertical
On column 1b, the sealing end 1d is mounted on the both ends beam track 1c, and the synchronous shifter 2 is arranged on column 1b, two institutes
It states the fixed setting of device 3 to be sequentially connected in the two sides the column 1b and with the synchronous shifter 2, the synchronous shifter
2 are able to drive that two fixed devices 3 are opposite along beam track 1c or relative synchronization moves, and the setting of clamping device 4 exists
The two sides beam track 1c, there are two the clamping device 4 is set, two clamping devices 4 respectively with two fixed devices 3
Connection, two fixed devices 3 are mobile to drive two clamping devices 4 to move synchronously along beam track 1c, described fixed
Altogether there are two two clamping devices 4 are separately positioned on close to the side of column 1b, the edge-neatening apparatus 6 is equipped with position device 5
Two, two edge-neatening apparatus 6 are separately positioned on two clamping devices 4 close to the side column 1b and are located at the positioning
5 lower section of device, the welder 7 are mounted on top in the middle part of beam track 1c.
Workflow of the invention is: when welding to two building pipes, being first individually positioned in two root canal materials
On two clamping devices 4, the welding position of two root canal materials is carried out respectively by the positioning device 5 being mounted on clamping device 4
Positioning, the edge-neatening apparatus 6 being mounted on clamping device 4, which is lifted, carries out grinding process to the welding position respectively to two root canal materials,
After the completion of the positioning polishing to two root canal materials, unique synchronous shifter 2 is acted, and drives two fixed devices 3 and two
Clamping device 4 is aligned to beam track 1c midline along 1 relative motion of T shape frame, by two tubing to be welded, latter two fix
Device 3 acts, and respectively positions two clamping devices 4, prevents two movements of clamping devices 4 in welding process, makes to be placed on folder
Two root canal material positional shifts on device 4 are held, welding is caused to fail, after the completion of the positioning to two tubing, welder 7 starts
Movement, is adjusted at a distance from tubing, carries out automatic welding operation to tubing again later.
The synchronous shifter 2 includes synchronizing cylinder 2a, link block 2b, two synchronising (connecting) rod 2c, two synchronous gas folders
Seat 2d, the synchronizing cylinder 2a piston rod are mounted on downward on the column 1b, and the link block 2b is mounted on synchronizing cylinder 2a
Piston-rod end, two synchronising (connecting) rod 2c structures are identical and mirror settings are in the two sides synchronizing cylinder 2a, the synchronising (connecting) rod
2c includes that drive connecting rod 2c1 and the one end follower link 2c2, the drive connecting rod 2c1 are mounted on link block 2b, and the active connects
The other end of bar 2c1 and one end of follower link 2c2 are hinged, and the other end of the follower link 2c2 is connected to synchronous gas holder
On 2d, described two synchronous gas holder 2d structures are identical and mirror settings are at the both ends beam track 1c.The movement of synchronizing device is former
Reason: unique synchronization cylinder 2a is acted along the vertical direction, drives two drive connecting rod 2c1 and two driven companies by link block 2b
The displacement of vertical direction, is become the displacement of horizontal direction by bar 2c2 movement, is driven on a company of being respectively hinged at follower link 2c2
A synchronous gas holder 2d is opposite in the horizontal direction or synchronizing moving of supporting or opposing, allow two root canal materials that synchronizing moving may be implemented, from
And the welding position of tubing is aligned in traverse rod road midline.
The fixed device 3 includes fixed gas folder 3a, double leval jib 3b, round fixed block 3c, rectangular slide 3d, round slide
3e, the fixed gas folder 3a are mounted on synchronous gas holder 2d, are provided with a circular hole on the synchronous gas holder 2d and lead with one
Xiang Kong, a collet of the fixed gas folder 3a passes through circular hole on synchronous gas holder 2d and the one end double leval jib 3b is hinged, described
The other end that another collet of fixed gas folder 3a passes through pilot hole and double leval jib 3b on synchronous gas holder 2d is hinged, the circle
Shape fixed block 3c is arranged on double leval jib 3b, and the rectangular slide 3d is fixedly connected with double leval jib 3b close to one end of circular hole, institute
It states round slide 3e and is fixedly connected with double leval jib 3b close to one end of pilot hole.Fixed gas folder 3a movement, two collets clamp or pine
It opens, drives two end motions of double leval jib 3b horizontal direction, push the both ends of double leval jib 3b vertical direction towards or away from movement, make
The round fixing seat for being mounted on both ends on double leval jib 3b vertical direction compresses or unclamps beam track 1c, to play fixed function.
The clamping device 4 includes Holding seat 4a, air cylinder support 4b, gripper cylinder 4c, clamping guide rod 4d, roller shaft
4e, hold-down roll 4f, belt motor 4g, belt pulley 4h, the Holding seat 4a be mounted on beam track 1c and with rectangular cunning
Seat 3d axis connection, the air cylinder support 4b are mounted on Holding seat 4a, and guide groove, the folder are provided on the air cylinder support 4b
Hold cylinder 4c be arranged above air cylinder support 4b, the clamping guide rod 4d be mounted on gripper cylinder 4c piston rod top end, the folder
The one end guide rod 4d is held to be arranged in the guide groove of air cylinder support 4b, the other end of clamping guide rod 4d is arranged in the roller shaft 4e,
The hold-down roll 4f setting is at the both ends roller shaft 4e, and the belt motor 4g setting is on clamping guide rod 4d, the belt electricity
Machine 4g is connect by belt pulley 4h with roller shaft 4e.After tubing is placed on Holding seat 4a, gripper cylinder 4c movement drives folder
Guide groove vertical motion of the guide rod 4d on air cylinder support 4b is held, the hold-down roll 4f being mounted on clamping guide rod 4d is contradicted
On tubing, tubing is clamped, belt motor 4g is acted later, by belt pulley 4h by power transmission to hold-down roll 4f,
Hold-down roll 4f drives steel pipe rotation by frictional force, in order to complete welding.
The positioning device 5 includes positioning base 5a, positioning motor 5b, positioning transverse slat 5c, the positioning base 5a setting
In Holding seat 4a close to the side of column 1b, the positioning motor 5b is mounted on positioning base 5a, the positioning transverse slat 5c
It is mounted on positioning motor 5b.Positioning motor 5b movement drives positioning transverse slat 5c to lift or fall, when positioning transverse slat 5c is lifted,
The steel pipe being placed on Holding seat 4a passes through the one end that will need to weld and contradicts on transverse slat, to complete to tubing welding position
Positioning, after positioning transverse slat 5c is fallen, can make to avoid positioning transverse slat 5c to cause to hinder to tubing welding.
The edge-neatening apparatus 6 includes carry arm motor 6a, carry arm 6b, deburring motor 6c, deburring grinding wheel 6d, the carry arm motor
6a is mounted below Holding seat 4a, and the one end the carry arm 6b is mounted on carry arm motor 6a, and the deburring motor 6c is mounted on
The carry arm 6b other end, the deburring grinding wheel 6d are mounted on deburring motor 6c, and the edge deburring grinding wheel 6d is provided with oblique angle.Right
After the completion of the positioning of tubing, deburring grinding wheel 6d rotation, carry arm motor 6a is acted later, is driven carry arm 6b and is mounted on carry arm 6b
Carry arm motor 6a be moved to below tubing, the tubing of rotation will be driven to carry out grinding process by clamping device 4, with this complete from
Dynamic polishing, compared to manual polishing more fast power-saving.
The welder 7 includes screw rod slide unit 7a, anchorage clip 7b, welding gun support 7c, welding gun 7d, the screw rod slide unit 7a
It is mounted on top, the anchorage clip 7b in the middle part of beam track 1c to be mounted on screw rod slide unit 7a, the welding gun support 7c is mounted on
On anchorage clip 7b, the welding gun 7d is mounted on welding gun support 7c, and welding gun 7d is directed at beam track 1c middle line.It is welded in tubing
After portion's alignment, the screw rod slide unit 7a of welder 7 is moved, and is driven welding gun support 7c movement, is kept welding gun 7d vertically moving,
Adjustment needs at a distance from welding position with tubing, to preferably complete the welding for tubing.
The Holding seat 4a includes two semicircle claw 4a1 and four positioning roller 4a2, described two semicircle supports
Pawl 4a1 is mounted on beam track 1c, is respectively provided with two equally distributed positioning roller 4a2 on each semicircle claw 4a1.
The setting of semicircle claw 4a1 can be such that the positioning roller 4a2 installed thereon is preferably fitted on tubing, be positioned by four
Idler wheel 4a2 auxiliary tubing is rotated, and can reduce the frictional force between tubing and Holding seat 4a, keeps tubing rotation more suitable
Freely.
Threaded hole 6b1, adjusting screw 6b2 and regulation handle 6b3 are additionally provided on the carry arm 6b, the threaded hole 6b1 is set
It sets in carry arm 6b close to one end of deburring motor 6c, the adjusting screw 6b2 is mounted in threaded hole 6b1, the regulation handle
6b3, which is mounted on the adjusting screw 6b2, to be driven adjusting screw 6b2 precession by rotation regulation handle 6b3 or screws out console
Arm 6b controls the position of deburring grinding wheel 6d at a distance from tubing.It, can also be by being opened on carry arm 6b in addition to the present embodiment
If location hole, the position carry arm 6b is positioned in such a way that pin positions, so that carry arm 6b is controlled at a distance from tubing, but
Carry arm 6b is positioned in this way, and the position carry arm 6b is relatively fixed, can not adapt to the tubing of different-diameter, and use this mode
Positioning is automatically positioned to realize, the structure needed is increasingly complex, is used in the present embodiment and is opened up threaded hole on carry arm 6b
6b1, structure is more simple in such a way that adjusting screw 6b2 is positioned, and equally may be implemented to the positioning with carry arm 6b, therefore this
Embodiment is optimal embodiment.
The anchorage clip 7b includes fixed chuck 7b1, active chuck 7b2, fastening nut 7b3, the fixed chuck 7b1 peace
On screw rod slide unit 7a, fixed chuck 7b1 is equipped with semi-circular recesses, and described movable support one end is hinged on fixed chuck 7b1
Top, the other end are locked on fixed chuck 7b1 by fastening nut 7b3, and the active chuck 7b2 is equipped with semicircle recessed
Slot.Welding support is placed in fixed chuck 7b1 upper half circular groove, and welding support is pressed in fixation by active chuck 7b2
On collet 7b1, welding support is just fastened in the semi-circular recesses on active chuck 7b2, later precession fastening nut 7b3,
Welding support is compressed.
The tubing welder of construction described in the present embodiment, can be used for the steel railing on Bridge guardrail into
Row welding lengthens.
Embodiment 2
Another scheme after the tubing welder of construction of the present invention makes improvements is as follows, it is that one kind can be moved easily
The scheme of formula, such as Fig. 8, it includes the guide rail 8a being used in combination with pedestal 1a, and guide rail 8a is fixedly mounted on mill floor
On, the top surface of guide rail 8a is equipped with raised line 8b, and the front end face of guide rail 8a is equipped with horizontal extension 8c, on horizontal extension 8c
Equipped with a through slot 8e;Multiple Universal caster 8d are set on the top surface of raised line 8b, pedestal 1a can be slided on raised line 8b, and ten thousand
Frictional force when can reduce from sliding to ball 8d;The bolt assembly 8f, bolt assembly 8f that can be locked there are two being set on pedestal 1a
Simultaneously can be slided in through slot 8e, when pedestal 1a is moved to suitable position, bolt assembly 8f locking, by pedestal 1a with lead
Rail 8a integrator makes tubing welder be in a reasonable station.The benefit of this scheme is that tubing welder is whole
Body can move left and right as needed, and the length of tubing can be cooperated to make the variation of adaptability.
Claims (10)
1. a kind of tubing welder of construction, it is characterised in that: including T shape frame (1), synchronous shifter (2), consolidate
Determine device (3), clamping device (4), positioning device (5), edge-neatening apparatus (6), welder (7), the T shape frame (1) includes bottom
Seat (1a), column (1b), beam track (1c) and sealing end (1d), the column (1b) are mounted on pedestal (1a), the crossbeam
Track (1c) is horizontally arranged on column (1b), and the sealing end (1d) is mounted on the both ends beam track (1c), the synchronizing moving
Device (2) is arranged on column (1b), two fixed devices (3) settings the column two sides (1b) and with it is described synchronous
Mobile device (2) transmission connection, the synchronous shifter (2) are able to drive two fixed devices (3) along beam track
(1c) is opposite or relative synchronization movement, the clamping device (4) are arranged in the two sides beam track (1c), the clamping device (4)
If there are two, two clamping devices (4) connect with two fixed devices (3) respectively, two fixed devices (3)
It is mobile that two clamping devices (4) is driven to move synchronously along beam track (1c), the positioning device (5) altogether there are two
It is separately positioned on side of two clamping devices (4) close to column (1b), there are two the edge-neatening apparatus (6) sets, two
The edge-neatening apparatus (6) is separately positioned on two clamping devices (4) close to the column side (1b) and is located at positioning dress
It sets below (5), the welder (7) is mounted on top in the middle part of beam track (1c).
2. a kind of tubing welder of construction according to claim 1, it is characterised in that: the synchronizing moving
Device (2) includes synchronizing cylinder (2a), link block (2b), two synchronising (connecting) rods (2c), two synchronous gas holders (2d), described same
Step cylinder (2a) piston rod is mounted on downward on the column (1b), and the link block (2b) is mounted on synchronizing cylinder (2a) piston
Bar end, two synchronising (connecting) rod (2c) structure is identical and mirror settings are in the two sides synchronizing cylinder (2a), the synchronising (connecting) rod
(2c) includes drive connecting rod (2c1) and follower link (2c2), and described drive connecting rod (2c1) one end is mounted on link block (2b),
The other end of the drive connecting rod (2c1) and one end of follower link (2c2) are hinged, the other end of the follower link (2c2)
It is connected on synchronous gas holder (2d), described two synchronous gas holder (2d) structures are identical and mirror settings are at beam track (1c)
Both ends.
3. a kind of tubing welder of construction according to claim 2, it is characterised in that: the fixed device
It (3) include that fixed gas presss from both sides (3a), double leval jib (3b), round fixed block (3c), rectangular slide (3d), round slide (3e), it is described
Fixed gas folder (3a) is mounted on synchronous gas holder (2d), and a circular hole and a guiding are provided on the synchronous gas holder (2d)
Hole, a collet of the fixed gas folder (3a) passes through circular hole on synchronous gas holder (2d) and the one end double leval jib (3b) is hinged,
Another collet of the fixed gas folder (3a) passes through the other end of pilot hole and double leval jib (3b) on synchronous gas holder (2d)
Hingedly, the round fixed block (3c) is arranged on double leval jib (3b), and the rectangular slide (3d) and double leval jib (3b) are close to circle
The one end in hole is fixedly connected, and the circle slide (3e) is fixedly connected with double leval jib (3b) close to one end of pilot hole.
4. a kind of tubing welder of construction according to claim 3, it is characterised in that: the clamping device
It (4) include Holding seat (4a), air cylinder support (4b), gripper cylinder (4c), clamping guide rod (4d), roller shaft (4e), clamping rolling
Take turns (4f), belt motor (4g), belt pulley (4h), the Holding seat (4a) be mounted on beam track (1c) and with rectangular cunning
Seat (3d) axis connection, the air cylinder support (4b) are mounted on Holding seat (4a), are provided with guiding on the air cylinder support (4b)
Slot, gripper cylinder (4c) setting is above air cylinder support (4b), the clamping guide rod (4d) is mounted on gripper cylinder (4c)
Piston rod top end, described clamping guide rod one end (4d) are arranged in the guide groove of air cylinder support (4b), and the roller shaft (4e) sets
The other end in clamping guide rod (4d) is set, the hold-down roll (4f) is arranged in the both ends roller shaft (4e), the belt motor
In clamping guide rod (4d), the belt motor (4g) is connect by belt pulley (4h) with roller shaft (4e) for (4g) setting.
5. a kind of tubing welder of construction according to claim 4, it is characterised in that: the positioning device
It (5) include positioning base (5a), positioning motor (5b), positioning transverse slat (5c), the positioning base (5a) is arranged in Holding seat
(4a) close to the side of column (1b), the positioning motor (5b) is mounted in positioning base (5a), the positioning transverse slat (5c)
It is mounted on positioning motor (5b).
6. a kind of tubing welder of construction according to claim 4, it is characterised in that: the edge-neatening apparatus
It (6) include carry arm motor (6a), carry arm (6b), deburring motor (6c), deburring grinding wheel (6d), the carry arm motor (6a) is mounted on
Below Holding seat (4a), described carry arm (6b) one end is mounted on carry arm motor (6a), and the deburring motor (6c) is mounted on
Carry arm (6b) other end, the deburring grinding wheel (6d) are mounted on deburring motor (6c), and deburring grinding wheel (6d) edge is provided with
Oblique angle.
7. a kind of tubing welder of construction according to claim 1, it is characterised in that: the welder
It (7) include screw rod slide unit (7a), anchorage clip (7b), welding gun support (7c), welding gun (7d), the screw rod slide unit (7a) is mounted on cross
Top, the anchorage clip (7b) are mounted on screw rod slide unit (7a) in the middle part of beam orbit (1c), and the welding gun support (7c) is mounted on
On anchorage clip (7b), the welding gun (7d) is mounted on welding gun support (7c), and welding gun (7d) is directed at beam track (1c) middle line.
8. a kind of tubing welder of construction according to claim 4, it is characterised in that: the Holding seat
(4a) includes two semicircle claws (4a1) and four positioning rollers (4a2), and described two semicircle claws (4a1) are mounted on
On beam track (1c), two equally distributed positioning rollers (4a2) are respectively provided on each semicircle claw (4a1).
9. a kind of tubing welder of construction according to claim 6, it is characterised in that: the carry arm (6b)
On be additionally provided with threaded hole (6b1), adjusting screw (6b2) and regulation handle (6b3), the threaded hole (6b1) is arranged in carry arm
(6b) close to the one end of deburring motor (6c), the adjusting screw (6b2) is mounted in threaded hole (6b1), the regulation handle
(6b3), which is mounted on the adjusting screw (6b2), drives adjusting screw (6b2) precession or rotation by rotation regulation handle (6b3)
Control carry arm (6b) controls the position of deburring grinding wheel (6d) at a distance from tubing out.
10. a kind of tubing welder of construction according to claim 7, it is characterised in that: the anchorage clip
(7b) includes fixed chuck (7b1), active chuck (7b2), fastening nut (7b3), and the fixed chuck (7b1) is mounted on screw rod
On slide unit (7a), described movable support one end is hinged on above fixed chuck (7b1), and the other end is locked by fastening nut (7b3)
Tightly on fixed chuck (7b1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811440300.6A CN109465594B (en) | 2018-11-29 | 2018-11-29 | Tubular product welding set that construction used |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811440300.6A CN109465594B (en) | 2018-11-29 | 2018-11-29 | Tubular product welding set that construction used |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109465594A true CN109465594A (en) | 2019-03-15 |
CN109465594B CN109465594B (en) | 2020-11-03 |
Family
ID=65674447
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811440300.6A Active CN109465594B (en) | 2018-11-29 | 2018-11-29 | Tubular product welding set that construction used |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109465594B (en) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110480226A (en) * | 2019-07-29 | 2019-11-22 | 马鞍山致青工业设计有限公司 | A kind of building pipe welder of double-station accurate positioning |
CN110524900A (en) * | 2019-07-22 | 2019-12-03 | 嘉兴学院 | A kind of plastics welding tool setup |
CN111098085A (en) * | 2020-01-19 | 2020-05-05 | 荆门怡盛源环保科技有限公司 | Auxiliary welding device for steel pipe for building |
CN111136635A (en) * | 2019-12-27 | 2020-05-12 | 广东电网有限责任公司 | Archive management robot |
CN111558804A (en) * | 2020-06-05 | 2020-08-21 | 芜湖芬特勘测服务有限公司 | A steel member assistance-localization real-time clamping device for pipe fitting |
CN111606188A (en) * | 2020-06-03 | 2020-09-01 | 大连交通大学 | A more stable lifting equipment for pipe processing |
CN111660052A (en) * | 2020-06-01 | 2020-09-15 | 芜湖芬特勘测服务有限公司 | A processing welding auxiliary device for pipe steel member |
CN111673340A (en) * | 2020-06-19 | 2020-09-18 | 刘晨辉 | Welding robot |
CN112372209A (en) * | 2020-11-09 | 2021-02-19 | 马鞍山市盛远管道有限公司 | Cast tube mouth processing equipment |
CN115106688A (en) * | 2022-07-19 | 2022-09-27 | 中交四公局第三工程有限公司 | A kind of bridge construction template auxiliary processing device |
CN115570306A (en) * | 2022-12-12 | 2023-01-06 | 中国电建集团山东电力建设第一工程有限公司 | Auxiliary welding device for tubular bus |
CN116213880A (en) * | 2023-05-08 | 2023-06-06 | 中国核工业中原建设有限公司 | Tubular product welding set is used in construction is built in room |
CN116441784A (en) * | 2023-06-14 | 2023-07-18 | 山东产研咨询有限公司 | Multi-span greenhouse steel frame structure welding device |
CN118682406A (en) * | 2024-08-22 | 2024-09-24 | 广东新力新材料有限公司 | Automatic welding equipment for metal folding filter cartridge processing |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9156138B1 (en) * | 2012-02-03 | 2015-10-13 | Gregory Louis Prescott | Extended bar clamp/spreader |
CN204771162U (en) * | 2015-05-11 | 2015-11-18 | 台州学院 | Thin cylinder part laser welding is with pressing from both sides tight positioner |
CN205309521U (en) * | 2015-12-29 | 2016-06-15 | 浙江嘉兴格锐管业有限公司 | A girth welding machine for pipeline welding |
CN205753224U (en) * | 2016-06-27 | 2016-11-30 | 无锡南方电工机械有限公司 | Cable laying machine guider |
CN206248484U (en) * | 2016-10-26 | 2017-06-13 | 东莞市锐祥智能卡科技有限公司 | A steel ball drop test device |
CN108857173A (en) * | 2018-07-23 | 2018-11-23 | 张健 | Ancillary equipment suitable for running water pipe welding |
-
2018
- 2018-11-29 CN CN201811440300.6A patent/CN109465594B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9156138B1 (en) * | 2012-02-03 | 2015-10-13 | Gregory Louis Prescott | Extended bar clamp/spreader |
CN204771162U (en) * | 2015-05-11 | 2015-11-18 | 台州学院 | Thin cylinder part laser welding is with pressing from both sides tight positioner |
CN205309521U (en) * | 2015-12-29 | 2016-06-15 | 浙江嘉兴格锐管业有限公司 | A girth welding machine for pipeline welding |
CN205753224U (en) * | 2016-06-27 | 2016-11-30 | 无锡南方电工机械有限公司 | Cable laying machine guider |
CN206248484U (en) * | 2016-10-26 | 2017-06-13 | 东莞市锐祥智能卡科技有限公司 | A steel ball drop test device |
CN108857173A (en) * | 2018-07-23 | 2018-11-23 | 张健 | Ancillary equipment suitable for running water pipe welding |
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110524900B (en) * | 2019-07-22 | 2021-07-16 | 嘉兴学院 | A welding fixture for plastics |
CN110524900A (en) * | 2019-07-22 | 2019-12-03 | 嘉兴学院 | A kind of plastics welding tool setup |
CN110480226A (en) * | 2019-07-29 | 2019-11-22 | 马鞍山致青工业设计有限公司 | A kind of building pipe welder of double-station accurate positioning |
CN111136635A (en) * | 2019-12-27 | 2020-05-12 | 广东电网有限责任公司 | Archive management robot |
CN111098085A (en) * | 2020-01-19 | 2020-05-05 | 荆门怡盛源环保科技有限公司 | Auxiliary welding device for steel pipe for building |
CN111660052A (en) * | 2020-06-01 | 2020-09-15 | 芜湖芬特勘测服务有限公司 | A processing welding auxiliary device for pipe steel member |
CN111606188A (en) * | 2020-06-03 | 2020-09-01 | 大连交通大学 | A more stable lifting equipment for pipe processing |
CN111558804A (en) * | 2020-06-05 | 2020-08-21 | 芜湖芬特勘测服务有限公司 | A steel member assistance-localization real-time clamping device for pipe fitting |
CN111673340A (en) * | 2020-06-19 | 2020-09-18 | 刘晨辉 | Welding robot |
CN112372209A (en) * | 2020-11-09 | 2021-02-19 | 马鞍山市盛远管道有限公司 | Cast tube mouth processing equipment |
CN115106688A (en) * | 2022-07-19 | 2022-09-27 | 中交四公局第三工程有限公司 | A kind of bridge construction template auxiliary processing device |
CN115106688B (en) * | 2022-07-19 | 2025-02-18 | 中交建筑集团第六工程有限公司 | A bridge construction template auxiliary processing device |
CN115570306A (en) * | 2022-12-12 | 2023-01-06 | 中国电建集团山东电力建设第一工程有限公司 | Auxiliary welding device for tubular bus |
CN116213880A (en) * | 2023-05-08 | 2023-06-06 | 中国核工业中原建设有限公司 | Tubular product welding set is used in construction is built in room |
CN116441784A (en) * | 2023-06-14 | 2023-07-18 | 山东产研咨询有限公司 | Multi-span greenhouse steel frame structure welding device |
CN116441784B (en) * | 2023-06-14 | 2023-08-11 | 山东产研咨询有限公司 | Multi-span greenhouse steel frame structure welding device |
CN118682406A (en) * | 2024-08-22 | 2024-09-24 | 广东新力新材料有限公司 | Automatic welding equipment for metal folding filter cartridge processing |
CN118682406B (en) * | 2024-08-22 | 2024-11-05 | 广东新力新材料有限公司 | Automatic welding equipment for processing metal folding filter cylinder |
Also Published As
Publication number | Publication date |
---|---|
CN109465594B (en) | 2020-11-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109465594A (en) | A kind of tubing welder of construction | |
CN111958174A (en) | Automatic positioning welding robot for steel pipes | |
CN112059517B (en) | Automatic welding system for gantry type flowmeter | |
CN201573014U (en) | Gantry-type double-head welding machine | |
CN213105368U (en) | Automatic welding system for gantry type flowmeter | |
CN215967133U (en) | Welding production line of piece type standard knot robot | |
CN114473316A (en) | Welding jig and automatic welding equipment of aluminum alloy window frame welding robot | |
CN116511835A (en) | Barrel automatic processing system, barrel processing method and barrel automatic processing technology | |
CN112958972A (en) | Multi-angle welding forming machine for pipes | |
CN113770618A (en) | Robot welding system | |
CN210549160U (en) | Plate welding angle fixing workbench for processing reaction kettle | |
CN110576285B (en) | Steel bar butt welder for building construction | |
CN209664654U (en) | A kind of robot welding workstation | |
CN111660047A (en) | Truss structure welding platform | |
CN209867637U (en) | Gas shielded welding frock | |
CN220993343U (en) | Automatic welding tool for edge beam of underframe | |
CN211866912U (en) | Welding equipment for welding bus tube and bus joint | |
CN219152000U (en) | Welding positioning mechanism | |
CN218362616U (en) | Cantilever type submerged arc welding machine | |
CN214684899U (en) | Double-pendulum type reinforcement cage welding head | |
CN216264239U (en) | Full-automatic welding machine manipulator | |
CN214109333U (en) | Four-axis welding machine | |
CN213289380U (en) | Rolling slats door axis of rotation welding equipment of polishing | |
JP3675513B2 (en) | Welding method and welding equipment | |
CN220971047U (en) | Welding angle adjusting mechanism of gas shielded welding machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20201016 Address after: 317600 Taizhou City, Zhejiang Province, Yuhuan City, barley Lantau Street Applicant after: ZHEJIANG AOCHUAN HYDRAULIC EQUIPMENT Co.,Ltd. Address before: Hangzhou City, Zhejiang province Xiaoshan District 311200 North Street Rong Xing Cun Gao Jia Tan Applicant before: Gao Yuanqin |
|
GR01 | Patent grant | ||
GR01 | Patent grant |