CN109439829A - A kind of novel blast-furnace presses coal gas processing device - Google Patents

A kind of novel blast-furnace presses coal gas processing device Download PDF

Info

Publication number
CN109439829A
CN109439829A CN201811607575.4A CN201811607575A CN109439829A CN 109439829 A CN109439829 A CN 109439829A CN 201811607575 A CN201811607575 A CN 201811607575A CN 109439829 A CN109439829 A CN 109439829A
Authority
CN
China
Prior art keywords
surge tank
pipeline
blast furnace
valve
coal gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811607575.4A
Other languages
Chinese (zh)
Inventor
张韵
李震宙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Oucheng Metallurgical Complete Equipment Co Ltd
Original Assignee
Shanghai Oucheng Metallurgical Complete Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Oucheng Metallurgical Complete Equipment Co Ltd filed Critical Shanghai Oucheng Metallurgical Complete Equipment Co Ltd
Priority to CN201811607575.4A priority Critical patent/CN109439829A/en
Publication of CN109439829A publication Critical patent/CN109439829A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B7/00Blast furnaces
    • C21B7/22Dust arresters
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B7/00Blast furnaces
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B7/00Blast furnaces
    • C21B7/002Evacuating and treating of exhaust gases

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Blast Furnaces (AREA)
  • Cyclones (AREA)
  • Filtering Of Dispersed Particles In Gases (AREA)

Abstract

The invention discloses a kind of novel blast-furnaces to press coal gas processing device, including blast furnace bucket, the upper side of the blast furnace bucket, which is exported, is communicated with one cyclonic deduster by pipeline, and the pipeline between the outlet and one cyclonic deduster entrance of the blast furnace bucket is disposed with secondary balanced pressure system and secondary equalizing valve.The present invention passes through blast furnace bucket, one cyclonic deduster, secondary balanced pressure system, secondary equalizing valve, nitrogen gas tank, muffler, balanced pressure system, equalizing valve and purge valve are used cooperatively, processing can be dusted to the exhaust gas in blast furnace bucket, exhaust gas is prevented to be directly discharged into atmosphere, atmosphere is polluted, pass through second cyclone dust extractor, surge tank and clean coal gas pipe network are used cooperatively, fining removal can be carried out to the dust in coal gas, and coal gas can be buffered, clean coal gas pipe network is protected, solve the problems, such as that existing blast furnace gas processing unit does not have fining dedusting.

Description

A kind of novel blast-furnace presses coal gas processing device
Technical field
The present invention relates to blast furnace ironmaking equipment technical field, specially a kind of novel blast-furnace presses coal gas processing device.
Background technique
Blast furnace process is in normal productive process, when furnace roof batch can material feeding, need to by batch can with pressure and height contains The blast furnace gas of dust quantity, also referred to as blast furnace press coal gas, after cyclone dust collectors and muffler, are run in into big Gas is directly discharged to atmosphere, and when the empty batch can after release does not have pressure, acceptable blast furnace raw material is put into batch can, when After raw material is put into batch can, batch can upper sealing valve is closed, and pressurising is carried out to batch can, the pressure of pressurising reaches or slightly above blast furnace When furnace pressure, the blast furnace raw material in batch can is put into State of Blast Furnace by openable batch can lower part lower sealing valve, carries out cloth, complete At blast furnace material feeding, the production process of blowing, cloth.
When the blast furnace with pressure and high dustiness in batch can is pressed coal gas, pass through cyclone dust collectors and muffler It afterwards, is usually all when running in carry out release wind to atmosphere into atmosphere, pressure coal gas is containing a large amount of CO, CO2With dust it is toxic, Combustible mixed gas causes air environmental pollution, while wasting the energy.Currently, blast furnace roof presses coal gas directly to arrange It is generated during putting and largely contains CO, CO2With toxic, the combustible mixed gas of dust, air environmental pollution is caused, and is recycled Dust content of gas is high, pollutes after grid-connected to purified gas.
Chinese patent net discloses " blast furnace presses gas recovery system ", Patent No.: CN207483776U, and the patent is logical Cross that " batch can high pressure gas is connected to clean coal gas pipe network through batch can gaspipe line, is provided with deduster on batch can gaspipe line ... It is recycled by the purging of pressure equalizing in deduster bottom, realizes the dual recycling of coal gas and gas ash.It is fast to recycle speed, the time It is short, operating rate of blast furnace is influenced ", but the patent gas recovery pressure oscillation is big, pulsed pressure wave is influenced into clean coal gas pipe network Other user's point coal gas use near access point, gas recovery pipeline serious wear, elbow cracky, and deduster is easy breakage, It easily causes blast furnace to press coal gas dust removal processing not enough fining, is easy CO, CO2Poisonous fume pollutant is directly discharged to atmosphere In, severe environmental pollution is caused, carrys out certain harm to the health care belt of nearby residents.
Summary of the invention
The purpose of the present invention is to provide a kind of novel blast-furnaces to press coal gas processing device, has the excellent of fining dedusting Point solves the problems, such as that existing blast furnace gas processing unit does not have fining dedusting.
To achieve the above object, the invention provides the following technical scheme: a kind of novel blast-furnace presses coal gas processing device, packet Blast furnace bucket is included, the left side outlet of the blast furnace bucket is communicated with one cyclonic deduster by pipeline, the blast furnace bucket Pipeline between outlet and one cyclonic deduster entrance is disposed with secondary balanced pressure system and secondary equalizing valve, described secondary Balanced pressure system control has nitrogen gas tank, and the outlet of the one cyclonic deduster is communicated with muffler, the level-one rotation by pipeline Pipeline between the outlet and muffler inlet of wind deduster sets gradually once balanced pressure system, an equalizing valve and row pressure Valve;
The right-side outlet of the blast furnace bucket is communicated with second cyclone dust extractor by pipeline, and the second cyclone dust extractor goes out Mouth is communicated with surge tank by pipeline, and the outlet of the surge tank is communicated with clean coal gas pipe network by pipeline;
Pipe installing between the blast furnace bucket and second cyclone dust extractor has an ash-removing valve, the second cyclone dust extractor and slow The Pipe installing rushed between tank has the first stop valve, and the pipeline between the surge tank and clean coal gas pipe network is sequentially installed with second Stop valve and check valve, the Pipe installing above second stop valve have diffusion valve.
Preferably, the Pipe installing between the outlet on the left of the blast furnace bucket and one cyclonic deduster entrance has washing Device, the washer is by grit in liquid trap air-flow or gas pollutant to make gas be purified.
Preferably, the surge tank includes ash inlet, acoustic wave soot blower, manhole, stainless steel filter layer, column, surveys press fitting It sets and ash hole, the bottom of the ash inlet runs through surge tank and extend to the inside of surge tank, the acoustic wave soot blower is located at Top inside surge tank, the right side of the manhole are connected to the left side of surge tank, and the stainless steel filter layer is located at surge tank Inside, the stainless steel filter layer be located at ash inlet outlet top, the top of the column and the bottom of surge tank are fixed It connects, pressure measuring unit is installed on the right side of the surge tank, the top of the surge tank is connected to the bottom of ash hole.
Preferably, the outlet on the left of the second cyclone dust extractor is connected by the entrance of pipeline and one cyclonic deduster Logical, the Pipe installing between the second cyclone dust extractor and one cyclonic deduster has third stop valve.
Preferably, the outlet of the buffering pot bottom is communicated with unloading valve, the bottom connection of the unloading valve by pipeline There is dust leg.
Compared with prior art, beneficial effects of the present invention are as follows:
1, the present invention passes through blast furnace bucket, one cyclonic deduster, secondary balanced pressure system, secondary equalizing valve, nitrogen gas tank, noise reduction Device, a balanced pressure system, an equalizing valve and purge valve are used cooperatively, and can be dusted place to the exhaust gas in blast furnace bucket Reason, prevents exhaust gas to be directly discharged into atmosphere, pollutes to atmosphere.
2, the present invention being used cooperatively by second cyclone dust extractor, surge tank and clean coal gas pipe network, can be in coal gas Dust carry out fining removal, and coal gas can be buffered, clean coal gas pipe network is protected, solves existing height Producer gas processing unit does not have the problem of fining dedusting.
3, the present invention, can be to the coal gas between blast furnace bucket and second cyclone dust extractor pipeline by the use of ash-removing valve Flow direction is controlled, can be to the coal gas between second cyclone dust extractor and surge tank pipeline by the use of the first stop valve Flow direction controlled, can be to surge tank and purified gas pipe network pipeline by being used cooperatively for the second stop valve and check valve Between coal gas carry out traffic organising, and prevent coal gas carry out suck-back can be in blast furnace bucket by the use of diffusion valve Pressure is controlled.
4, the present invention is by the use of washer, can in exhaust gas dust and pollutant carry out washing filtering, make to give up Gas is purified, and passes through matching for ash inlet, acoustic wave soot blower, manhole, stainless steel filter layer, column, pressure measuring unit and ash hole It closes and uses, the coal gas entered in surge tank can be filtered, make the available purification of coal gas, enhance surge tank to coal gas Buffering and dust removing effects can be to second cyclone dust extractors and one cyclonic pipeline of dust collector by the use of third stop valve Between exhaust gas carry out traffic organising, by being used cooperatively for unloading valve and dust leg, the dust in surge tank can be carried out Discharge and storage.
Detailed description of the invention
Fig. 1 is structure of the invention flow diagram,
Fig. 2 is buffer tank structure main view of the present invention.
In figure: 1 blast furnace bucket, 2 one cyclonic dedusters, 3 two balanced pressure systems, 4 two equalizing valves, 5 nitrogen gas tanks, 6 disappear Sound device, 7 balanced pressure systems, 8 equalizing valves, 9 purge valves, 10 second cyclone dust extractors, 11 surge tanks, 111 ash inlets, 112 acoustic wave soot blowers, 113 manholes, 114 stainless steel filter layers, 115 columns, 116 pressure measuring units, 117 ash holes, 12 purified gas Pipe network, 13 ash-removing valves, 14 first stop valves, 15 second stop valves, 16 check valves, 17 diffusion valves, 18 washers, the cutting of 19 thirds Valve, 20 unloading valves, 21 dust legs.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
A kind of novel blast-furnace presses coal gas processing device, including blast furnace bucket 1,1 left side of blast furnace bucket referring to FIG. 1-2, 2 entrance of outlet and one cyclonic deduster between Pipe installing have a washer 18, washer 18 passes through liquid trap air-flow Middle grit or gas pollutant are to make gas be purified, by the use of washer 18, can in exhaust gas dust and Pollutant carries out washing filtering, is purified exhaust gas, and the left side outlet of blast furnace bucket 1 is communicated with one cyclonic by pipeline and removes Dirt device 2, the pipeline between 2 entrance of outlet and one cyclonic deduster of blast furnace bucket 1 be disposed with secondary balanced pressure system 3 and Secondary equalizing valve 4, the secondary control of balanced pressure system 3 have nitrogen gas tank 5, and the outlet of one cyclonic deduster 2 is communicated with by pipeline to disappear Sound device 6, the pipeline between 6 entrance of outlet and muffler of one cyclonic deduster 2 set gradually once balanced pressure system 7, one Secondary equalizing valve 8 and purge valve 9 pass through blast furnace bucket 1, one cyclonic deduster 2, secondary balanced pressure system 3, secondary equalizing valve 4, nitrogen Gas tank 5, the equalizing valve 8 of balanced pressure system 7, one times of muffler 6, one times and purge valve 9 are used cooperatively, can be in blast furnace bucket 1 Exhaust gas be dusted processing, prevent exhaust gas to be directly discharged into atmosphere, atmosphere polluted, the right-side outlet of blast furnace bucket 1 It is communicated with second cyclone dust extractor 10 by pipeline, the outlet in 10 left side of second cyclone dust extractor is removed by pipeline and one cyclonic The entrance of dirt device 2 is connected to, and the Pipe installing between second cyclone dust extractor 10 and one cyclonic deduster 2 has third stop valve 19, it, can be to useless between 2 pipeline of second cyclone dust extractor 10 and one cyclonic deduster by the use of third stop valve 19 Gas carries out traffic organising, and the outlet of second cyclone dust extractor 10 is communicated with surge tank 11 by pipeline, and surge tank 11 includes into ash Mouth 111, acoustic wave soot blower 112, manhole 113, stainless steel filter layer 114, column 115, pressure measuring unit 116 and ash hole 117, into The bottom of grey mouth 111 runs through surge tank 11 and extends to the inside of surge tank 11, and acoustic wave soot blower 112 is located inside surge tank 11 Top, the right side of manhole 113 is connected to the left side of surge tank 11, and stainless steel filter layer 114 is located at the inside of surge tank 11, no Rust steel filter layer 114 is located at the top of the outlet of ash inlet 111, and the top of column 115 is fixedly connected with the bottom of surge tank 11, delays The right side for rushing tank 11 is equipped with pressure measuring unit 116, and the top of surge tank 11 is connected to the bottom of ash hole 117, passes through ash inlet 111, acoustic wave soot blower 112, manhole 113, stainless steel filter layer 114, column 115, pressure measuring unit 116 and ash hole 117 are matched It closes and uses, the coal gas entered in surge tank 11 can be filtered, make the available purification of coal gas, enhance surge tank 11 to coal The outlet of the buffering and dust removing effects of gas, 11 bottom of surge tank is communicated with unloading valve 20 by pipeline, and the bottom of unloading valve 20 connects It is connected with dust leg 21, by being used cooperatively for unloading valve 20 and dust leg 21, the dust in surge tank 11 can be discharged And storage, the outlet of surge tank 11 are communicated with clean coal gas pipe network 12 by pipeline, pass through second cyclone dust extractor 10, surge tank 11 With being used cooperatively for clean coal gas pipe network 12, fining removal can be carried out to the dust in coal gas, and coal gas can be delayed Punching, protects clean coal gas pipe network 12, solves the problems, such as that existing blast furnace gas processing unit does not have fining dedusting, Pipe installing between blast furnace bucket 1 and second cyclone dust extractor 10 has ash-removing valve 13, can be right by the use of ash-removing valve 13 Gas flow between 10 pipeline of blast furnace bucket 1 and second cyclone dust extractor is controlled, second cyclone dust extractor 10 and buffering Pipe installing between tank 11 has the first stop valve 14, can be to second cyclone dust extractor by the use of the first stop valve 14 The flow direction of coal gas between 10 and 11 pipeline of surge tank is controlled, and the pipeline between surge tank 11 and clean coal gas pipe network 12 is successively Second stop valve 15 and check valve 16 are installed, it, can be to buffering by being used cooperatively for the second stop valve 15 and check valve 16 Coal gas between 12 pipeline of tank 11 and clean coal gas pipe network carries out traffic organising, and prevents coal gas from carrying out suck-back, the second stop valve 15 The Pipe installing of top has diffusion valve 17, by the use of diffusion valve 17, can control the pressure in blast furnace bucket 1.
In use, material layering is distributed into blast furnace bucket 1 by user, and when the pressure in blast furnace bucket 1 is too low, nitrogen gas tank Nitrogen in 5 is entered in blast furnace bucket 1 after secondary balanced pressure system 3 pressure processing by pipeline, so that nitrogen gas tank 5 is to blast furnace Pressure in batch can 1 carries out boosting operation, and user opens secondary equalizing valve 4, pressurizes to the pressure in blast furnace bucket 1, Subsequent exhaust gas is discharged from 1 left side outlet of blast furnace bucket, and is washed into washer 18, and dust is removed, and then, exhaust gas enters In one cyclonic deduster 2, one cyclonic deduster 2 is dusted processing to exhaust gas, to one cyclonic deduster 2 to exhaust gas at After the completion of reason, user successively opens an equalizing valve 8 and purge valve 9, and one time balanced pressure system 7 can be to one cyclonic deduster 2 Interior exhaust gas pressure carries out pressure and handles, and then exhaust gas is discharged from muffler 6, and user opens diffusion valve 17 and ash-removing valve 13, Coal gas in blast furnace bucket 1 enters second cyclone dust extractor 10, and after second cyclone dust extractor 10 is to coal gas dust removal, user is beaten Third stop valve 19 is opened, treated, and exhaust gas passes through pipeline again enters one cyclonic deduster 2, and subsequent exhaust gas enters muffler 6 After discharge, user opens the first stop valve 14 at this time, and coal gas after 10 dedusting of second cyclone dust extractor enters from ash inlet 111 Surge tank 11, stainless steel filter layer 114 are filtered coal gas, and surge tank 11 is discharged from ash hole 117 in filtered coal gas, make User successively opens the second stop valve 15 and check valve 16, and pure coal gas is made to enter clean coal gas pipe network 12.
In summary: the novel blast-furnace presses coal gas processing device, passes through blast furnace bucket 1, one cyclonic deduster 2, two Secondary balanced pressure system 3, secondary equalizing valve 4, nitrogen gas tank 5, the balanced pressure system 7, one times of muffler 6, one times equalizing valve 8, purge valve 9, two Grade cyclone dust collectors 10, surge tank 11 and clean coal gas pipe network 12 are used cooperatively, and solve existing blast furnace gas processing unit The problem of without fining dedusting.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (5)

1. a kind of novel blast-furnace presses coal gas processing device, including blast furnace bucket (1), it is characterised in that: the blast furnace bucket (1) Upper side outlet be communicated with one cyclonic deduster (2) by pipeline, the outlet of the blast furnace bucket (1) and one cyclonic dedusting Pipeline between device (2) entrance is disposed with secondary balanced pressure system (3) and secondary equalizing valve (4), the secondary balanced pressure system (3) control has nitrogen gas tank (5), and the outlet of the one cyclonic deduster (2) is communicated with muffler (6) by pipeline, and described one Grade cyclone dust collectors (2) outlet and muffler (6) entrance between pipeline set gradually once balanced pressure system (7), once Equalizing valve (8) and purge valve (9);
The right-side outlet of the blast furnace bucket (1) is communicated with second cyclone dust extractor (10) by pipeline, and the second level whirlwind removes The outlet of dirt device (10) is communicated with surge tank (11) by pipeline, and the outlet of the surge tank (11) is communicated with clean coal by pipeline Gas pipe network (12);
Pipe installing between the blast furnace bucket (1) and second cyclone dust extractor (10) has ash-removing valve (13), the second level rotation Pipe installing between wind deduster (10) and surge tank (11) has the first stop valve (14), the surge tank (11) and purified gas Pipeline between pipe network (12) is sequentially installed with the second stop valve (15) and check valve (16), the second stop valve (15) top Pipe installing have diffusion valve (17).
2. a kind of novel blast-furnace according to claim 1 presses coal gas processing device, it is characterised in that: the blast furnace bucket (1) Pipe installing between the outlet on the left of and one cyclonic deduster (2) entrance has washer (18), the washer (18) By grit in liquid trap air-flow or gas pollutant to make gas be purified.
3. a kind of novel blast-furnace according to claim 1 presses coal gas processing device, it is characterised in that: the surge tank (11) include ash inlet (111), acoustic wave soot blower (112), manhole (113), stainless steel filter layer (114), column (115), survey The bottom of pressure device (116) and ash hole (117), the ash inlet (111) through surge tank (11) and extends to surge tank (11) inside, the acoustic wave soot blower (112) are located at the internal top of surge tank (11), the right side of the manhole (113) with The left side of surge tank (11) is connected to, and the stainless steel filter layer (114) is located at the inside of surge tank (11), the stainless steel filtering Layer (114) is located at the top of ash inlet (111) outlet, the fixed company in the top of the column (115) and the bottom of surge tank (11) It connects, is equipped with pressure measuring unit (116) on the right side of the surge tank (11), the top and ash hole (117) of the surge tank (11) Bottom connection.
4. a kind of novel blast-furnace according to claim 1 presses coal gas processing device, it is characterised in that: the second level whirlwind Outlet on the left of deduster (10) is connected to by pipeline with the entrance of one cyclonic deduster (2), the second cyclone dust extractor (10) Pipe installing between one cyclonic deduster (2) has third stop valve (19).
5. a kind of novel blast-furnace according to claim 1 presses coal gas processing device, it is characterised in that: the surge tank (11) outlet of bottom is communicated with unloading valve (20) by pipeline, and the bottom of the unloading valve (20) is communicated with dust leg (21).
CN201811607575.4A 2018-12-27 2018-12-27 A kind of novel blast-furnace presses coal gas processing device Pending CN109439829A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811607575.4A CN109439829A (en) 2018-12-27 2018-12-27 A kind of novel blast-furnace presses coal gas processing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811607575.4A CN109439829A (en) 2018-12-27 2018-12-27 A kind of novel blast-furnace presses coal gas processing device

Publications (1)

Publication Number Publication Date
CN109439829A true CN109439829A (en) 2019-03-08

Family

ID=65537580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811607575.4A Pending CN109439829A (en) 2018-12-27 2018-12-27 A kind of novel blast-furnace presses coal gas processing device

Country Status (1)

Country Link
CN (1) CN109439829A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4315619A (en) * 1979-10-30 1982-02-16 Ishikawajima-Harima Jukogyo Kabushiki Kaisha Process and system for recovering top gas from blast furnace or the like
CN102031321A (en) * 2010-12-23 2011-04-27 中冶京诚工程技术有限公司 Blast Furnace Roof Pressure Equalized Gas Recovery Method and Recovery Device
CN106191353A (en) * 2016-08-29 2016-12-07 北京首钢国际工程技术有限公司 A kind of blast furnace top pressure-equalizing bleeding gas recovering device and using method thereof
CN207210461U (en) * 2017-07-24 2018-04-10 钱玉 Dedusting of blast furnace gas retracting device
CN209227010U (en) * 2018-12-27 2019-08-09 上海欧骋冶金成套设备有限公司 A kind of novel blast-furnace presses coal gas processing device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4315619A (en) * 1979-10-30 1982-02-16 Ishikawajima-Harima Jukogyo Kabushiki Kaisha Process and system for recovering top gas from blast furnace or the like
CN102031321A (en) * 2010-12-23 2011-04-27 中冶京诚工程技术有限公司 Blast Furnace Roof Pressure Equalized Gas Recovery Method and Recovery Device
CN106191353A (en) * 2016-08-29 2016-12-07 北京首钢国际工程技术有限公司 A kind of blast furnace top pressure-equalizing bleeding gas recovering device and using method thereof
CN207210461U (en) * 2017-07-24 2018-04-10 钱玉 Dedusting of blast furnace gas retracting device
CN209227010U (en) * 2018-12-27 2019-08-09 上海欧骋冶金成套设备有限公司 A kind of novel blast-furnace presses coal gas processing device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
[苏]A.A.古尔维茨: "高速洗涤器", 《冶金除尘手册》, pages 289 - 290 *

Similar Documents

Publication Publication Date Title
CN209227010U (en) A kind of novel blast-furnace presses coal gas processing device
CN101480550A (en) Intelligent high-efficient bag dust collector and method for blowing and cleaning dust thereof
CN201058261Y (en) A deep purification bag type dust removal device
CN202724935U (en) Dust removal device used for petroleum coke conveying system
CN208177025U (en) A kind of boiler flue dust pelletizing system
CN108421362A (en) A kind of industrial dedusting unit
CN101569887A (en) Method for movably collecting, conveying, dedusting and desulfurizing dust of coke oven coke guide
CN207187301U (en) A kind of quartz filter
CN206973575U (en) A kind of self-cleaning device of waste incinerator primary air nozzle filter screen
CN109439829A (en) A kind of novel blast-furnace presses coal gas processing device
CN102518406A (en) Dust and sand removing recovery device for gases
CN219470090U (en) Gas dust removal device and blast furnace gas dry dust removal system
CN108579268A (en) A kind of mine dry-type Rose Box
CN110215783A (en) A kind of emission-control equipment using ultrasonic atomizer
CN109647108A (en) A kind of high effect dust cleaner
CN215404318U (en) Non-diffusion recovery system for blast furnace top pressure-equalizing gas
CN109603399A (en) A kind of whistle type rotary pulse bag filter
CN211635760U (en) Concrete stone unloading, absorbing and dust-raising filtering system
CN207237595U (en) One kind polishing workshop air cleaning system
CN207259529U (en) A kind of blast furnace roof presses coal-gas recovering internal circulation system
CN1224444C (en) Cyclone-wet type dcompound dust collector with fiber grid mesh
CN209034007U (en) A kind of smoke dust-removing equipment
CN212327509U (en) Improved structure of rainwater harvesting filter
CN116334332B (en) Gas dust removal device, wind-down dust removal system, process and gas full recovery process
CN211645062U (en) Lime shaft furnace convenient for collecting ash

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190308