CN109404000A - A kind of vacuum sewerage vertical hoisting system and its method for discharging pollution - Google Patents
A kind of vacuum sewerage vertical hoisting system and its method for discharging pollution Download PDFInfo
- Publication number
- CN109404000A CN109404000A CN201811359028.9A CN201811359028A CN109404000A CN 109404000 A CN109404000 A CN 109404000A CN 201811359028 A CN201811359028 A CN 201811359028A CN 109404000 A CN109404000 A CN 109404000A
- Authority
- CN
- China
- Prior art keywords
- gate valve
- pressure
- pneumatic
- valve
- discharge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 15
- 238000007599 discharging Methods 0.000 title claims abstract description 10
- 239000000463 material Substances 0.000 claims abstract description 72
- 239000003795 chemical substances by application Substances 0.000 claims abstract description 13
- 238000012806 monitoring device Methods 0.000 claims abstract description 11
- 239000000314 lubricant Substances 0.000 claims abstract description 6
- 230000001965 increasing effect Effects 0.000 claims abstract description 5
- 239000000654 additive Substances 0.000 claims description 6
- 230000000996 additive effect Effects 0.000 claims description 6
- 230000001939 inductive effect Effects 0.000 claims description 6
- 230000002045 lasting effect Effects 0.000 claims description 5
- 230000001976 improved effect Effects 0.000 claims description 3
- 230000006837 decompression Effects 0.000 claims 1
- 238000005086 pumping Methods 0.000 abstract description 13
- 238000012546 transfer Methods 0.000 abstract description 4
- 230000000903 blocking effect Effects 0.000 abstract description 3
- 230000001737 promoting effect Effects 0.000 abstract description 3
- 238000004140 cleaning Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005299 abrasion Methods 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 239000008187 granular material Substances 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000013011 mating Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000000746 purification Methods 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 239000002893 slag Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000010977 unit operation Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/12—Devices for removing or hauling away excavated material or spoil; Working or loading platforms
- E21D9/13—Devices for removing or hauling away excavated material or spoil; Working or loading platforms using hydraulic or pneumatic conveying means
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F04—POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
- F04B—POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
- F04B41/00—Pumping installations or systems specially adapted for elastic fluids
- F04B41/02—Pumping installations or systems specially adapted for elastic fluids having reservoirs
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F04—POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
- F04F—PUMPING OF FLUID BY DIRECT CONTACT OF ANOTHER FLUID OR BY USING INERTIA OF FLUID TO BE PUMPED; SIPHONS
- F04F5/00—Jet pumps, i.e. devices in which flow is induced by pressure drop caused by velocity of another fluid flow
- F04F5/14—Jet pumps, i.e. devices in which flow is induced by pressure drop caused by velocity of another fluid flow the inducing fluid being elastic fluid
- F04F5/16—Jet pumps, i.e. devices in which flow is induced by pressure drop caused by velocity of another fluid flow the inducing fluid being elastic fluid displacing elastic fluids
- F04F5/20—Jet pumps, i.e. devices in which flow is induced by pressure drop caused by velocity of another fluid flow the inducing fluid being elastic fluid displacing elastic fluids for evacuating
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F04—POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
- F04F—PUMPING OF FLUID BY DIRECT CONTACT OF ANOTHER FLUID OR BY USING INERTIA OF FLUID TO BE PUMPED; SIPHONS
- F04F5/00—Jet pumps, i.e. devices in which flow is induced by pressure drop caused by velocity of another fluid flow
- F04F5/44—Component parts, details, or accessories not provided for in, or of interest apart from, groups F04F5/02 - F04F5/42
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Fluid Mechanics (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Geochemistry & Mineralogy (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Sewage (AREA)
- Jet Pumps And Other Pumps (AREA)
Abstract
The invention discloses a kind of vacuum sewerage vertical hoisting system and its method for discharging pollution, solve the problems, such as that vertical transport material is difficult greatly in the prior art, transfer efficiency is low.The present invention includes air accumulator and air compressor machine, it further include several concatenated supply units, air accumulator is connected with air compressor machine, supply unit respectively, and filter is equipped between air accumulator and air compressor machine, and first manual ball valve and pressure flow monitoring device are equipped between air accumulator and supply unit.The present invention is using concatenated multistage supply unit, it is conveyed by linkage, realize the vertical transport of big conveying distance, the place big suitable for all kinds of great buryings and vertical height, in pressure vessel system pumping resistance and blocking can be reduced, all kinds of materials can be preferably conveyed by increasing modifying agent or lubricant, improve transfer efficiency, promotional value with higher.
Description
Technical field
The present invention relates to pneumatic control deslagging technique field, a kind of vacuum sewerage vertical hoisting system and its row are particularly related to
Dirty method.
Background technique
There are vertical conveyor, all kinds of centrifugal pumps series connection pumping or plunger pump pumps in series in the country in vertical-lift mode at present
It send.The various development machines used during constructing tunnel, soil body conveyer method generally use rear mating marshaling mode into
Row, which carries, slags tap, and is realized using handling marshaling and is slagged tap by phased manner, reduces construction efficiency.Exist for vertical shaft or deep-well
Under the limited circumstances of space, most equipment are limited to be not easy to realize that pumping is slagged tap.Existing blowdown mode has the following problems: vacuum sewerage
Vertical-lift there is a problem of promoting dregs difficulty in reverse backflow and vertical height;Centrifugal pump is easy during conveying material
Generate cavitation;The high-pressure delivery mode energy consumption that plunger pump uses during transportation is big;Screw rod transmission material process
Middle stator and rotor abrasion loss and conveying large granular materials are difficult.Therefore pump can be increased in certain degree by developing one kind
Send the pneumatic control dreg removing system of lift necessary.
Summary of the invention
For the deficiency in above-mentioned background technique, the present invention proposes a kind of vacuum sewerage vertical hoisting system and its blowdown side
Method solves the problems, such as that vertical transport material is difficult greatly in the prior art, transfer efficiency is low.
The technical scheme of the present invention is realized as follows: a kind of vacuum sewerage vertical hoisting system, including air accumulator and sky
Press further includes several concatenated supply units, and air accumulator is connected with air compressor machine, supply unit respectively, air accumulator and sky
It is equipped with filter between press, first manual ball valve and pressure flow monitoring device are equipped between air accumulator and supply unit.
The pressure flow monitoring device includes gas flowmeter, pressure sensor and pressure gauge, gas flowmeter, pressure
Sensor and pressure gauge are arranged on the pipeline between air accumulator and supply unit.
The supply unit includes pressure vessel and Laval nozzle vacuum generator, and pressure vessel and Laval nozzle are true
Empty generator is connected and is equipped with Pneumatic gate valve V2 between the two, and pressure vessel is connected by first pipe with air accumulator, draws
Wa Er jet pipe vacuum generator is connected by second pipe with air accumulator, and pressure vessel is equipped with discharge of materials pipeline, material
Intake line and modifying agent add pipeline.
The first pipe be equipped with pressure reducing valve and aerating pneumatic ball valve V6, second pipe be equipped with the second manual ball valve and
Pneumatic ball valve V4 is connected with muffler on Laval nozzle vacuum generator.
The discharge of materials pipeline is equipped with discharge Pneumatic gate valve V1, and material intake line is equipped with charging Pneumatic gate valve
V3, modifying agent add pipeline and are equipped with additive pneumatic ball valve V7 and check valve.
The discharge of materials pipeline is connected with the material intake line of next stage.
The pressure vessel is equipped with safety valve and pressure monitoring device;Discharge Pneumatic gate valve V1, Pneumatic gate valve V2, charging
Pneumatic gate valve V3 and pneumatic ball valve V4 is solenoid valve of the band close to switch.
A kind of method for discharging pollution of vacuum sewerage vertical hoisting system, include the following steps: S1: pressure vessel vacuumizes: will
Discharge Pneumatic gate valve V1 and charging Pneumatic gate valve V3 are closed, and open Pneumatic gate valve V2 and pneumatic ball valve V4, air compressor machine and other valves
Door is in running order, vacuumizes to form negative pressure to pressure vessel;
S2: pressure vessel charging: pressure vessel opens charging Pneumatic gate valve V3 after reaching certain pressure, and material is sucked through material
Pipeline is by lasting suction pressure container, until suction finishes;
S3: pressure vessel discharge: supply unit closes Pneumatic gate valve V2 and charging Pneumatic gate valve V3, opens discharge Pneumatic gate valve
V1, carries out material counterflow-preventing pneumatic conveying, and conveying speed and flow can come by adjusting the pressure of the pressure reducing valve in first pipe
It realizes;Work as pipeline blockage, pipeline pressure opens backwash mode when increasing in time;
S4: repeating step S1-S3, realizes more supply unit linkage blowdowns.
Pressure vessel in the step S1 is vacuumized including manual underpressure pattern and automatic vacuum mode;It takes out manually
Under vacuum mode, discharge Pneumatic gate valve V1 and charging Pneumatic gate valve V3, manually opened Pneumatic gate valve V2 and Pneumatic ball is turned off manually
Valve V4;Under automatic vacuum mode, charging Pneumatic gate valve V3 is closed, while being fed Pneumatic gate valve V3 itself and being believed close to inductive switching
Number output, Pneumatic gate valve V2 is opened, and itself is exported close to inductive switching signal, and pneumatic ball valve V4 is opened, in pressure vessel
Discharge Pneumatic gate valve V1 is opened after pressure reaches certain value, carries out continuous underpressure pattern;
Backwash mode in the step S3 includes discharge of materials pipeline backwash mode and material intake line recoil mold cleaning
Formula;When material intake line backwash mode, when any one supply unit is in pressure vessel vacuumizing phase and starts, open
Charging Pneumatic gate valve V3 and aerating pneumatic ball valve V6 is opened, continues 3 ~ 9 seconds, is then shut off charging Pneumatic gate valve V3 and aerating Pneumatic ball
Valve V6 operates 2 ~ 4 achievable material intake line recoils repeatedly;When discharge of materials pipeline backwash mode, at any one
When supply unit is in pressure vessel vacuumizing phase and starts, discharge Pneumatic gate valve V1 is opened, continues lasting 3 ~ 9 seconds, then closes
Discharge Pneumatic gate valve V1 is closed, operates 2 ~ 4 achievable discharge of materials pipeline recoils repeatedly.
In the step S1-S4, reclamation pattern is opened according to material situation;When reclamation pattern, it is pneumatic additive need to be opened
Ball valve V7 adds modifying agent or lubricant into pressure vessel, improves to material.
Pressure vessel is formed subnormal ambient by Laval nozzle vacuum generator using positive pressure compressed gas by the present invention,
To make material be inhaled into inside pressure vessel.When dregs needs to be promoted, vacuumized by the pressure vessel of next stage, this
Grade pressure vessels positive pressure compressed air realizes pneumatic conveying, increases vertical-lift height to realize and prevents backflow phenomenon.
The present invention is conveyed by linkage using concatenated multistage supply unit, realizes the vertical transport of big conveying distance, be suitable for all kinds of
Great burying and vertical height big place can pass through in pressure vessel and increase modifying agent or lubricant, reduce system pumping resistance
And blocking, all kinds of materials can be preferably conveyed, transfer efficiency, promotional value with higher are improved.
Detailed description of the invention
In order to illustrate the embodiments of the present invention more clearly, attached drawing needed in describing below to embodiment makees letter
Singly introduce, it should be apparent that, drawings in the following description are only some embodiments of the invention, skill common for this field
For art personnel, without creative efforts, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is vacuum sewerage vertical hoisting system operation schematic diagram of the present invention.
Fig. 2 is supply unit operation schematic diagram of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained every other under that premise of not paying creative labor
Embodiment shall fall within the protection scope of the present invention.
As shown in Figure 1, embodiment 1, a kind of vacuum sewerage vertical hoisting system, including air accumulator 3 and air compressor machine 1, are also wrapped
Several concatenated supply units 8 are included, the quantity of supply unit 8 is rationally arranged according to the height to be conveyed, supply unit 8
Structure it is identical, multiple supply units are used in series to realize great burying rise from vertical pumping.Air accumulator 3 respectively with air compressor machine
1, supply unit 8 is connected, and for generating compressed gas, provides power.Filter 2 is equipped between air accumulator 3 and air compressor machine 1,
For purification gas.First manual ball valve 5 and pressure flow monitoring device are equipped between air accumulator 3 and supply unit 8, it is first-hand
Dynamic ball valve realizes and closes that pressure flow monitoring device is used to monitor the pressure between air compressor machine and air accumulator manually opened.
As shown in Fig. 2, the pressure flow monitoring device includes gas flowmeter 4, pressure sensor 7 and pressure gauge 6, gas
Flowmeter body 4, pressure sensor 7 and pressure gauge 6 are arranged on the pipeline between air accumulator 3 and supply unit 8.The conveying
Unit 8 includes pressure vessel 8-6 and Laval nozzle vacuum generator 8-3, and pressure vessel is to suck material and pumping material
Storage, Laval nozzle vacuum generator 8-3 is the main components that positive pressure compressed air is converted into subnormal ambient;Pressure vessel
8-6 is connected with Laval nozzle vacuum generator 8-3 and is equipped with Pneumatic gate valve 8-5(i.e. V2 between the two), pressure vessel 8-6
It is connected by first pipe 11 with air accumulator 3, Laval nozzle vacuum generator 8-3 passes through second pipe 12 and air accumulator 3
It is connected, pressure vessel 8-6 is equipped with discharge of materials pipeline 13, material intake line 14 and modifying agent and adds pipeline 15.Material
Discharge of the discharge tube 13 for material in pressure vessel, material intake line 14 are used for the entrance of material, modifying agent adding tube
Road 15 is used to add modifying agent or lubricant into pressure vessel, reduces system pumping resistance and blocking, can preferably convey each
Class material.
As shown in Fig. 2, embodiment 2, a kind of vacuum sewerage vertical hoisting system, the first pipe 11 are equipped with pressure reducing valve
8-11 and aerating pneumatic ball valve 8-12(, that is, V6), pressure reducing valve control conveying gas pressure is to carry out the speed that control system conveys material
Degree and the movement speed that aerating pneumatic ball valve is controlled by adjusting output pressure size.Second pipe 12 is equipped with second manually
Ball valve 8-1 and pneumatic ball valve 8-2(, that is, V4), muffler 8-4, pneumatic ball valve are connected on Laval nozzle vacuum generator 8-3
Realize that Laval nozzle vacuum generator generates negative pressure and positive pumping material to open and close compressed air gas source.
Further, the discharge of materials pipeline 13 is equipped with discharge Pneumatic gate valve 8-7(, that is, V1), on material intake line 14
Equipped with charging Pneumatic gate valve 8-8(, that is, V3), modifying agent adds pipeline 15 and is equipped with additive pneumatic ball valve 8-9(, that is, V7) and it is unidirectional
Valve 8-10.The discharge of materials pipeline 13 is connected with the material intake line 14 of next stage.The pressure vessel 8-6 is equipped with
Safety valve 8-15 and pressure monitoring device;Discharge Pneumatic gate valve 8-7(, that is, V1), Pneumatic gate valve 8-5(, that is, V2), charging Pneumatic gate valve
8-8(V3) it is solenoid valve of the band close to switch with pneumatic ball valve 8-2(, that is, V4), and is knife gate valve, three knife-shape gate valve bands
There is the external environment for carrying out cut-out pressure container close to switch, and by interlocking the pneumatic of response close to switch and pressure sensor
Ball valve valve event, thus realize vacuum intake in pressure vessel, positive pressure discharge conveying material.
It is further illustrated by taking three supply units as an example, system realizes the sucking of material by underpressure pattern, is hanging down
When straight conveying, after next stage completes underpressure pattern, upper level opens the pneumatic conveying that material is carried out under discharge mode, in this way may be used
To reduce pipeline material reverse flow, and improve single supply unit lift.Work as pipeline blockage, when pipeline pressure increases can and
Shi Kaiqi backwash mode, system pumping difficulties open reclamation pattern and reduce system pumping resistance, and big height difference can connect when conveying
Multiple supply units realize the conveying of high lift.Under normal circumstances, when initial, vacuum intake mode is completed in the first supply unit
When, the supply unit of rear two-stage completes underpressure pattern.When the first supply unit needs positive pneumatic conveying, the second conveying is single
Member also opens vacuum intake mode simultaneously, to improve vertical pumping lift.After the emptying of first supply unit pressure vessel, second
The pressure vessel of supply unit is full of.When linkage next time, when the second supply unit needs positive pneumatic conveying, third conveying is single
Member also opens vacuum intake mode simultaneously, to improve vertical pumping lift, while the first supply unit opens suction mould
Formula.The second supply unit pressure vessel empties at this time, and the pressure vessel of third supply unit is full of.Again when linkage next time, the
Three supply units need positive pneumatic conveying and empty, when the first supply unit needs positive pneumatic conveying, the second supply unit
Also vacuum intake mode is opened simultaneously.The emptying of third supply unit pressure vessel, the second supply unit pressure vessel are full of, and first
Cell pressure vessel empty.Here be only the linkage of three supply units, when there are three or when multiple supply units, system still can be with
Continuous action is carried out according to the linkage.
Other structures are same as Example 1.
A kind of embodiment 3, method for discharging pollution of vacuum sewerage vertical hoisting system, includes the following steps: S1: pressure vessel is taken out
Vacuum: discharge Pneumatic gate valve 8-7(, that is, V1) and charging Pneumatic gate valve 8-8(, that is, V3) is closed, Pneumatic gate valve 8-5(, that is, V2 is opened)
With pneumatic ball valve 8-2(, that is, V4), air compressor machine and other valves are in running order, vacuumize to form negative pressure to pressure vessel;
S2: pressure vessel charging (as vacuum intake mode): pressure vessel opens charging pneumatic brake after reaching certain pressure
Valve 8-8(, that is, V3), material through material intake line 14 by lasting suction pressure container, until suction finishes;
S3: pressure vessel discharge: supply unit closes Pneumatic gate valve 8-5(, that is, V2) and charging Pneumatic gate valve 8-8(, that is, V3), it opens
Discharge Pneumatic gate valve 8-7(, that is, V1), material counterflow-preventing pneumatic conveying is carried out, conveying speed and flow can be by adjusting first pipes
The pressure of pressure reducing valve 8-11 on 11 is realized;Work as pipeline blockage, pipeline pressure opens backwash mode when increasing in time;
S4: repeating step S1-S3, realizes more supply unit linkage blowdowns.
Pressure vessel in step S1 is vacuumized including manual underpressure pattern and automatic vacuum mode;It vacuumizes manually
Under mode, the i.e. V1 of discharge Pneumatic gate valve 8-7(is turned off manually) and charging Pneumatic gate valve 8-8(i.e. V3), manually opened Pneumatic gate valve
8-5(, that is, V2) and pneumatic ball valve 8-2(, that is, V4);Under automatic vacuum mode, Pneumatic gate valve 8-8(, that is, V3 is fed) it closes, simultaneously
Feed Pneumatic gate valve 8-8(, that is, V3) itself close to inductive switching signal export, Pneumatic gate valve 8-5(, that is, V2) open, and by itself
Exported close to inductive switching signal, pneumatic ball valve 8-2(, that is, V4) it opens, reservoir pressure reaches discharge gas after certain value
Dynamic gate valve 8-7(, that is, V1) it opens, carry out the continuous underpressure pattern of multistage supply unit;
Backwash mode in step S3 includes 13 backwash mode of discharge of materials pipeline and the recoil mold cleaning of material intake line 14
Formula;When material 14 backwash mode of intake line, pressure vessel vacuumizing phase is in any one supply unit 8 and is started
When, open charging Pneumatic gate valve 8-8(, that is, V3) and aerating pneumatic ball valve 8-12(, that is, V6), last for several seconds, optional 3 ~ 9 seconds, then
Close charging Pneumatic gate valve 8-8(, that is, V3) and aerating pneumatic ball valve 8-12(, that is, V6), it operates repeatedly for several times, can be used 2 ~ 4 times can
Realize that material intake line 14 recoils;When discharge of materials 13 backwash mode of pipeline, pressure is in any one supply unit 8
When the container vacuum-pumping stage starts, discharge Pneumatic gate valve 8-7(, that is, V1 is opened), last for several seconds is optional to continue 3 ~ 9 seconds, then closes
Close the i.e. V1 of discharge Pneumatic gate valve 8-7(), it operates repeatedly for several times, optional 2 ~ 4 achievable discharge of materials pipelines 13 recoil.
In step S1-S4, reclamation pattern is opened according to material situation;When reclamation pattern, additive pneumatic ball valve need to be opened
8-9(, that is, V7), modifying agent or lubricant are added into pressure vessel, and material is improved.
Pressure vessel discharge in step S3 includes manual drain mode and automatic-discharging mode;Under under manual drain mode
First-level transport unit has been carried out after its pressure vessel vacuumizes, and the same level supply unit closes Pneumatic gate valve 8-5(, that is, V2) and
Feed Pneumatic gate valve 8-8(, that is, V3), open discharge Pneumatic gate valve 8-7(, that is, V1), material counterflow-preventing pneumatic conveying is carried out, is vertically mentioned
It needs upper level and next stage to be used in combination when rising, carries out high lift and promote blowdown;Under automatic-discharging mode, next stage is complete in advance
After vacuumizing at tank body, upper level completes vacuum intake, and background controller controls the same level supply unit and closes Pneumatic gate valve 8-5
(i.e. V2) and charging Pneumatic gate valve 8-8(, that is, V3), open discharge Pneumatic gate valve 8-7(, that is, V1), material counterflow-preventing strength can be carried out
Conveying, conveying speed and flow can be realized by adjusting the pressure of pressure reducing valve on the corresponding pipeline of the same level supply unit.Hereafter
Upper and lower two-stage replaces vacuum intake and vacuum mode back and forth, to realize that system carries out continuous pump drainage mode playback, until feeding is complete
Finish, automatically into automatic vacuum mode after discharge mode.
Its structure is same as Example 2.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention
Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.
Claims (10)
1. a kind of vacuum sewerage vertical hoisting system, including air accumulator (3) and air compressor machine (1), it is characterised in that: further include several
A concatenated supply unit (8), air accumulator (3) are connected with air compressor machine (1), supply unit (8) respectively, air accumulator (3) and sky
Filter (2) are equipped between press (1), first manual ball valve (5) and pressure are equipped between air accumulator (3) and supply unit (8)
Flow monitoring device.
2. vacuum sewerage vertical hoisting system according to claim 1, it is characterised in that: the pressure flow monitoring device
Including gas flowmeter (4), pressure sensor (7) and pressure gauge (6), gas flowmeter (4), pressure sensor (7) and pressure
Table (6) is arranged on the pipeline between air accumulator (3) and supply unit (8).
3. vacuum sewerage vertical hoisting system according to claim 1 or 2, it is characterised in that: supply unit (8) packet
Pressure vessel (8-6) and Laval nozzle vacuum generator (8-3) are included, pressure vessel (8-6) and Laval nozzle vacuum occur
Device (8-3) is connected and is equipped with Pneumatic gate valve (8-5) between the two, and pressure vessel (8-6) passes through first pipe (11) and gas storage
Tank (3) is connected, and Laval nozzle vacuum generator (8-3) is connected by second pipe (12) with air accumulator (3), and pressure is held
Device (8-6) is equipped with discharge of materials pipeline (13), material intake line (14) and modifying agent addition pipeline (15).
4. vacuum sewerage vertical hoisting system according to claim 3, it is characterised in that: set on the first pipe (11)
There are pressure reducing valve (8-11) and aerating pneumatic ball valve (8-12), second pipe (12) is equipped with the second manual ball valve (8-1) and pneumatic
Ball valve (8-2) is connected with muffler (8-4) on Laval nozzle vacuum generator (8-3).
5. vacuum sewerage vertical hoisting system according to claim 3 or 4, it is characterised in that: the discharge of materials pipeline
(13) it is equipped with discharge Pneumatic gate valve (8-7), material intake line (14) is equipped with charging Pneumatic gate valve (8-8), and modifying agent adds
Pipeline (15) are added to be equipped with additive pneumatic ball valve (8-9) and check valve (8-10).
6. vacuum sewerage vertical hoisting system according to claim 5, it is characterised in that: the discharge of materials pipeline (13)
It is connected with the material intake line (14) of next stage.
7. vacuum sewerage vertical hoisting system according to claim 6, it is characterised in that: on the pressure vessel (8-6)
Equipped with safety valve (8-15) and pressure monitoring device;Discharge Pneumatic gate valve (8-7), Pneumatic gate valve (8-5), charging Pneumatic gate valve
(8-8) and pneumatic ball valve (8-2) are solenoid valve of the band close to switch.
8. a kind of method for discharging pollution of vacuum sewerage vertical hoisting system as described in claim 1, it is characterised in that: including as follows
Step: S1: pressure vessel vacuumizes: discharge Pneumatic gate valve (8-7) and charging Pneumatic gate valve (8-8) being closed, pneumatic brake is opened
Valve (8-5) and pneumatic ball valve (8-2), air compressor machine and other valves are in running order, vacuumize to form negative pressure to pressure vessel;
S2: pressure vessel charging: pressure vessel opens charging Pneumatic gate valve (8-8) after reaching certain pressure, and material is through material
Intake line (14) is by lasting suction pressure container, until suction finishes;
S3: pressure vessel discharge: supply unit closes Pneumatic gate valve (8-5) and charging Pneumatic gate valve (8-8), and it is pneumatic to open discharge
Gate valve (8-7) carries out material counterflow-preventing pneumatic conveying, and conveying speed and flow can be by adjusting the decompressions on first pipe (11)
The pressure of valve (8-11) is realized;Work as pipeline blockage, pipeline pressure opens backwash mode when increasing in time;
S4: repeating step S1-S3, realizes more supply unit linkage blowdowns.
9. the method for discharging pollution of vacuum sewerage vertical hoisting system according to claim 8, it is characterised in that: the step S1
In pressure vessel vacuumize including manual underpressure pattern and automatic vacuum mode;Under manual underpressure pattern, close manually
Close discharge Pneumatic gate valve (8-7) and charging Pneumatic gate valve (8-8), manually opened Pneumatic gate valve (8-5) and pneumatic ball valve (8-2);
Under automatic vacuum mode, charging Pneumatic gate valve (8-8) is closed, while feeding Pneumatic gate valve (8-8) itself close to inductive switching
Signal output, Pneumatic gate valve (8-5) are opened, and itself is exported close to inductive switching signal, and pneumatic ball valve (8-2) is opened, pressure
Discharge Pneumatic gate valve (8-7) is opened after pressure reaches certain value in force container, carries out continuous underpressure pattern;
Backwash mode in the step S3 includes discharge of materials pipeline (13) backwash mode and material intake line (14)
Backwash mode;When material intake line (14) backwash mode, pressure vessel is in any one supply unit (8) and is taken out very
When the empty stage starts, charging Pneumatic gate valve (8-8) and aerating pneumatic ball valve (8-12) are opened, continues 3 ~ 9 seconds, is then shut off charging
Pneumatic gate valve (8-8) and aerating pneumatic ball valve (8-12) operate 2 ~ 4 achievable material intake line (14) recoils repeatedly;Object
When expecting discharge tube (13) backwash mode, when any one supply unit (8) is in pressure vessel vacuumizing phase and starts,
It opens discharge Pneumatic gate valve (8-7), continues lasting 3 ~ 9 seconds, be then shut off discharge Pneumatic gate valve (8-7), operating 2 ~ 4 times repeatedly can
Realize discharge of materials pipeline (13) recoil.
10. the method for discharging pollution of vacuum sewerage vertical hoisting system according to claim 8, it is characterised in that: the step
In S1-S4, reclamation pattern is opened according to material situation;When reclamation pattern, additive pneumatic ball valve (8-9) need to be opened, to pressure
Modifying agent or lubricant are added in container, and material is improved.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811359028.9A CN109404000B (en) | 2018-11-15 | 2018-11-15 | Vacuum sewage vertical lifting system and sewage method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811359028.9A CN109404000B (en) | 2018-11-15 | 2018-11-15 | Vacuum sewage vertical lifting system and sewage method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109404000A true CN109404000A (en) | 2019-03-01 |
CN109404000B CN109404000B (en) | 2024-05-14 |
Family
ID=65473537
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811359028.9A Active CN109404000B (en) | 2018-11-15 | 2018-11-15 | Vacuum sewage vertical lifting system and sewage method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109404000B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112901564A (en) * | 2021-01-26 | 2021-06-04 | 中国铁建重工集团股份有限公司 | Vacuum deslagging system |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0953391A (en) * | 1995-08-10 | 1997-02-25 | Mitsubishi Heavy Ind Ltd | Transport device of excavation, tunnel excavator, and method of excavating tunnel |
US5634713A (en) * | 1994-12-05 | 1997-06-03 | Endo Co., Ltd. | Pneumatic material transporter and mixer |
WO2005054088A2 (en) * | 2003-12-03 | 2005-06-16 | Loesche Gmbh | Method and device for the pneumatic transport of solid matter |
CN201981644U (en) * | 2011-02-11 | 2011-09-21 | 万若(北京)环境工程技术有限公司 | Secondary vacuum lifting device |
CN202414775U (en) * | 2011-12-30 | 2012-09-05 | 刘海兰 | Mud-sized grain conveying system |
CN107963464A (en) * | 2016-10-20 | 2018-04-27 | 天津碧水源膜材料有限公司 | A kind of equipment and method using vacuum blower positive/negative-pressure conveying solid material |
CN207293578U (en) * | 2017-09-25 | 2018-05-01 | 泽普林固体物料技术(上海)有限公司 | A kind of Geldart-D particle website |
CN108657822A (en) * | 2018-06-29 | 2018-10-16 | 天津市实达电力设备有限公司 | A kind of mud positive pneumatic conveying system |
CN209324369U (en) * | 2018-11-15 | 2019-08-30 | 中铁工程装备集团有限公司 | A kind of vacuum sewerage vertical hoisting system |
-
2018
- 2018-11-15 CN CN201811359028.9A patent/CN109404000B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5634713A (en) * | 1994-12-05 | 1997-06-03 | Endo Co., Ltd. | Pneumatic material transporter and mixer |
JPH0953391A (en) * | 1995-08-10 | 1997-02-25 | Mitsubishi Heavy Ind Ltd | Transport device of excavation, tunnel excavator, and method of excavating tunnel |
WO2005054088A2 (en) * | 2003-12-03 | 2005-06-16 | Loesche Gmbh | Method and device for the pneumatic transport of solid matter |
CN201981644U (en) * | 2011-02-11 | 2011-09-21 | 万若(北京)环境工程技术有限公司 | Secondary vacuum lifting device |
CN202414775U (en) * | 2011-12-30 | 2012-09-05 | 刘海兰 | Mud-sized grain conveying system |
CN107963464A (en) * | 2016-10-20 | 2018-04-27 | 天津碧水源膜材料有限公司 | A kind of equipment and method using vacuum blower positive/negative-pressure conveying solid material |
CN207293578U (en) * | 2017-09-25 | 2018-05-01 | 泽普林固体物料技术(上海)有限公司 | A kind of Geldart-D particle website |
CN108657822A (en) * | 2018-06-29 | 2018-10-16 | 天津市实达电力设备有限公司 | A kind of mud positive pneumatic conveying system |
CN209324369U (en) * | 2018-11-15 | 2019-08-30 | 中铁工程装备集团有限公司 | A kind of vacuum sewerage vertical hoisting system |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112901564A (en) * | 2021-01-26 | 2021-06-04 | 中国铁建重工集团股份有限公司 | Vacuum deslagging system |
Also Published As
Publication number | Publication date |
---|---|
CN109404000B (en) | 2024-05-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101864666B1 (en) | Portable slurry carrying apparatus using compressed air pump | |
TW200938468A (en) | Method and apparatus in a vacuum conveying system of material | |
CN109399213A (en) | A kind of vacuum intake drug delivery pump system | |
US10689192B2 (en) | Method, apparatus and system for handling waste material | |
CN209324369U (en) | A kind of vacuum sewerage vertical hoisting system | |
CN107963464A (en) | A kind of equipment and method using vacuum blower positive/negative-pressure conveying solid material | |
CN111606055A (en) | Vacuum material sucking and conveying pump system and working method thereof | |
KR20160103256A (en) | Sludge collecting device of vaccum suction type and vehicle mounting of the same | |
CN109404000A (en) | A kind of vacuum sewerage vertical hoisting system and its method for discharging pollution | |
CN109110503A (en) | A kind of sludge press filtration conveying device and its application method | |
KR20090000527A (en) | Garbage collection system of automatic garbage collection facility | |
CN104815738B (en) | Kitchen waste batched processing device and use method of same | |
CN209337668U (en) | Feed bin pump and pneumatic transport equipment | |
CN206547663U (en) | A kind of frequency conversion type fishpump based on four-way valve | |
CN109319504A (en) | Pneumatic transport equipment and pneumatic conveying method | |
CN215927939U (en) | Vacuum suction system capable of discharging sewage through pressure | |
CN1019567B (en) | Automatic suction feeding device | |
CN209352219U (en) | Vacuum intake drug delivery pump system | |
CN102852553A (en) | Sludge discharge equipment comprising vacuum pump and sludge discharge tank | |
CN216917746U (en) | Ton bucket continuous discharging device | |
CN208878363U (en) | Activated carbon powder automatic feeding device and system | |
CN218493828U (en) | Self-suction type water delivery system | |
CN208049882U (en) | A kind of powder water treatment agent dispensation apparatus for preventing from blocking pipeline | |
CN210601061U (en) | Conveying system for liquid dangerous waste | |
CN104030043A (en) | Air compressor type large-diameter gravel pump |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |