CN109386014A - Assembled ballast box for engineering pile foundation detection ballast platform - Google Patents
Assembled ballast box for engineering pile foundation detection ballast platform Download PDFInfo
- Publication number
- CN109386014A CN109386014A CN201811351462.2A CN201811351462A CN109386014A CN 109386014 A CN109386014 A CN 109386014A CN 201811351462 A CN201811351462 A CN 201811351462A CN 109386014 A CN109386014 A CN 109386014A
- Authority
- CN
- China
- Prior art keywords
- reinforcement
- support column
- support columns
- ballast
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000001514 detection method Methods 0.000 title claims abstract description 28
- 230000002787 reinforcement Effects 0.000 claims abstract description 55
- 210000000481 breast Anatomy 0.000 claims abstract description 48
- 230000004308 accommodation Effects 0.000 claims abstract description 15
- 230000001154 acute effect Effects 0.000 claims description 6
- 230000004323 axial length Effects 0.000 claims description 3
- 238000005452 bending Methods 0.000 claims description 3
- 229920003023 plastic Polymers 0.000 claims description 3
- 238000012360 testing method Methods 0.000 abstract description 12
- 238000000034 method Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 5
- 230000003014 reinforcing effect Effects 0.000 description 2
- 230000003068 static effect Effects 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000034994 death Effects 0.000 description 1
- 231100000517 death Toxicity 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D33/00—Testing foundations or foundation structures
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Measurement Of Radiation (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The invention discloses a kind of assembled ballast boxs for engineering pile foundation detection ballast platform, comprising: bearing plate is horizontally disposed with;Multiple reinforcements, multiple reinforcement levels are installed on bearing plate, and multiple reinforcements surround an accommodation space around bearing plate;Multiple breast boards, multiple breast boards are hinged on bearing plate, and multiple breast boards attach multiple reinforcement settings to increase the depth of accommodation space when being vertically arranged, multiple breast boards are accommodated in accommodation space when horizontally disposed;Multiple support columns, multiple support columns are arranged around multiple reinforcement intervals, one end of each support column can be rotatably set on reinforcement, when multiple support columns are vertically arranged, the other end of multiple support columns is flushed with bearing plate, when multiple support columns are horizontally disposed with, multiple support columns and multiple reinforcements are in same level.The present invention can be assembled in the light assembly and disassembly in detection scene convenient for ballast carrier handling, improved the safety coefficient during disassembly and detection test, greatly improved working efficiency.
Description
Technical field
The present invention relates to engineering pile foundation detection technique field, specifically a kind of dress for engineering pile foundation detection ballast platform
With formula ballast box.
Background technique
Used method is in ballast carrier mostly when at present to the pile foundation progress dead-load detection test in construction project field
It is stacked on bearing platform after multiple large-sized concrete blocks constitute jointly a ballast carrier and dead-load detection test is carried out to pile foundation.Due to
The prior art is that concrete block carrys out ballast in pile foundation, so that handling assembling and disassembly cost are high, lifting and detection are tested
Process is extremely dangerous, effectively goes along with sb. to guard him especially with the concrete block of large volume because lacking, so that in detection test process
In often occur concrete block slide and ballast carrier total Collapse phenomenon, cause the work safety accidents such as testing staff's injures and deaths, together
When there is also each component installing and dismounting, detection test the implementation process time it is long the problems such as.
Summary of the invention
It is an object of the invention to solve at least the above problems, and provide the advantages of at least will be described later.
It is a still further object of the present invention to provide it is a kind of for engineering pile foundation detection ballast platform assembled ballast box,
The light assembly and disassembly in scene can be being detected, it is simple to operate, while the cost during transport and handling can be reduced, just
It is assembled in ballast carrier handling, improves the safety coefficient during disassembly and detection test, greatly improve working efficiency.
In order to realize these purposes and other advantages according to the present invention, provide a kind of for engineering pile foundation detection ballast
The assembled ballast box of platform, comprising:
Bearing plate is horizontally disposed with;
Multiple reinforcements, multiple reinforcement levels are installed on the bearing plate, and multiple reinforcements are around the bearing plate
Surround an accommodation space;
Multiple breast boards, multiple breast boards are hinged on the bearing plate, and multiple breast boards attach multiple reinforcings when being vertically arranged
Beam is arranged to increase the depth of the accommodation space, and multiple breast boards are accommodated in the accommodation space when horizontally disposed;
Multiple support columns, multiple support columns are arranged around multiple reinforcement intervals, and one end of each support column is rotatably
It is arranged on reinforcement, when multiple support columns are vertically arranged, the other end of multiple support columns is flushed with the bearing plate, Duo Gezhi
When dagger is horizontally disposed with, multiple support columns and multiple reinforcements are in same level.
Preferably, drainage hole is equipped on each breast board or on each reinforcement, the drainage hole is equipped with plugging valve.
Preferably, axial one end of the support column is equipped with groove, the other end is equipped with the convex block to match with groove.
Preferably, the reinforcement is set as four, and the breast board is also configured as four, and the support column is also configured as
Four, one end of four support columns is rotatably set up separately on two reinforcements being oppositely arranged, and when four support column levels
When setting, the reinforcement where the other end of every two support column can attach it is oppositely arranged or is disposed opposite to each other.
Preferably, the support column can be rotatably set in the concrete mode on the reinforcement are as follows:
The reinforcement is equipped with multiple first fixation kits, and each first fixation kit includes setting towards the support column
Four location holes, a fixation hole, four sliding slots set, the two of them location hole of four location holes are located at vertical direction, remain
Two location holes of remaininging are located at horizontal direction, and four location holes are centrosymmetric distribution about the fixation hole, two neighboring positioning
One sliding slot is set between hole, four location holes and four sliding slots be in using the fixation hole as the center of circle, with the fixation hole with
Spacing between one of location hole is on the circle of radius, and the depth of four sliding slots is respectively less than the depth of four location holes;
The support column is equipped with the second fixation kit, and second fixation kit includes shaft and positioning pin, and described turn
Axis is fixed close to one end of the support column, and the shaft is inserted into the fixation hole after being arranged bearing, and the positioning pin can be taken out
Ground is drawn to run through the support column, one end of the positioning pin is equipped with knob, the other end is equipped with the positioning column that can protrude into location hole, institute
It states positioning column and the positioning pin is coaxially disposed, and the diameter of the positioning column is greater than the diameter of the positioning pin;
Wherein, the inner wall of the location hole is equipped with internal screw thread, and the positioning column is equipped with the outer spiral shell to match with internal screw thread
Line, the depth of sliding slot is equal to the axial length of the positioning column, when the support column is rotated by the shaft, the positioning
Column slides along the chute.
Preferably, the positioning column is hollow cylinder, and one end of location hole described in face is transparent plastic tab,
Infrared detector is equipped in the positioning column, the positioning hole is equipped with infrared lamp, and the reinforcement is equipped with switch, the branch
The side wall of dagger is equipped with alarm, and the alarm is electrically connected with the infrared detector, the infrared lamp and the switch
Electrical connection, when the support column is rotated around the shaft to location hole described in the positioning column face, the infrared sensing
Device receives the infrared ray from the infrared lamp, and feeds back to alarm, and the positioning pin is inserted by the alarm equipment alarm
The positioning hole.
Preferably, it is equipped with a pair of of fixed ring at the top of each reinforcement, a pair of of spring is equipped on each breast board, often
One end of a spring is hinged on the breast board where it, the other end is equipped with hook, is equipped with a locking assembly on each breast board,
The locking assembly includes sliding rail, sliding block, jam plate, wedge-shaped fixture block, and the sliding rail is horizontally disposed, and the sliding block is slidably arranged in institute
It states on sliding rail, the jam plate is the bending plate with a right angle and an acute angle, one end far from its acute angle of the jam plate
It being pivotally connected with the sliding block, the wedge shape fixture block is identical as the setting height of the sliding rail, when multiple breast boards are vertically arranged, one
The hook of spring is hung in a fixed ring, and the jam plate on a breast board is fastened on the wedge-shaped fixture block on breast board adjacent thereto
On.
The present invention is include at least the following beneficial effects:
The present invention can detect the light assembly and disassembly in scene, simple to operate, can significantly improve static load of pile foundation detection
The working efficiency of test and safety.The cost during transport and handling can be reduced simultaneously, assembled convenient for ballast carrier handling,
The safety coefficient during disassembly and detection test is improved, working efficiency is greatly improved.
Further advantage, target and feature of the invention will be partially reflected by the following instructions, and part will also be by this
The research and practice of invention and be understood by the person skilled in the art.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of one of technical solution of the invention;
Fig. 2 is the structural schematic diagram of one of technical solution of the invention;
Fig. 3 is the partial structure diagram of the reinforcement of one of technical solution of the invention;
Fig. 4 is the partial structure diagram of the support column of one of technical solution of the invention;
Fig. 5 is the partial structure diagram of the breast board of one of technical solution of the invention.
Specific embodiment
The present invention is described in further detail with reference to the accompanying drawings and examples, to enable those skilled in the art's reference
Specification word can be implemented accordingly.
It should be appreciated that such as " having ", "comprising" and " comprising " term used herein do not allot one or more
The presence or addition of a other elements or combinations thereof.In the description of the present invention, term " transverse direction ", " longitudinal direction ", " axial direction ", " diameter
To ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", the instructions such as "outside" side
Position or positional relationship are to be based on the orientation or positional relationship shown in the drawings, and are merely for convenience of description of the present invention and simplification of the description,
It is not that the device of indication or suggestion meaning or element must have a particular orientation, be constructed and operated in a specific orientation, because
This is not considered as limiting the invention.
As shown in Figs. 1-2, the present invention provides a kind of assembled ballast box for engineering pile foundation detection ballast platform, packets
It includes:
Bearing plate 1 is horizontally disposed with;
Multiple reinforcements 2, multiple 2 levels of reinforcement are installed on the bearing plate 1, and multiple reinforcements 2 are held around described
Weight plate 1 surrounds an accommodation space;
Multiple breast boards 3, multiple breast boards 3 are hinged on the bearing plate 1, and multiple breast boards 3 attach multiple when being vertically arranged
Reinforcement 2 is arranged to increase the depth of the accommodation space, and multiple breast boards 3 are accommodated in the accommodation space when being horizontally disposed with;
Multiple support columns 4, around the setting of multiple reinforcements 2 interval, one end of each support column 4 can revolve multiple support columns 4
Turn ground to be arranged on reinforcement 2, when multiple support columns 4 are vertically arranged, the other end of multiple support columns 4 and the bearing plate 1 are neat
Flat, when multiple support columns 4 are horizontally disposed with, multiple support columns 4 are in same level with multiple reinforcements 2.
In the use of the present invention, multiple breast boards 3 are vertically arranged, weight can be packed into accommodation space, for example, building site with
Locate visible soil, sand, stone, water body etc., after filling, the present invention is placed on the ballast platform of engineering pile foundation, pile foundation is carried out
Dead-load detection test.When the weight needed for needing to increase ballast, multiple support columns 4 can be rotated into vertical state, then go one
A assembled ballast box of the present invention is filled above the ballast box before being superimposed upon after weight, so that the ballast being located above
The support column 4 of case is vertically aligned with the support column 4 of underlying ballast box, and so on, it may gradually increase the weight of ballast,
The support column 4 being located above preferably has the structure of similar Tenon with the end face of underlying support column 4, whole after reinforced assembly
The stability of body and safety.When the bearing requirements of engineering pile foundation are far longer than an assembled ballast box of the present invention
When weight ability, can by more than two assembled ballast boxs, left, right, front and rear are mutually spliced in the horizontal direction, then vertical
Direction superposition.Support column 4 can be horizontally disposed with by the present invention when not applicable, and be accommodated in 2 side of reinforcement, by breast board 3
It is horizontally disposed to be accommodated in accommodation space, it is readily transported and stores.
Bearing plate 1 of the invention is smooth hard plate, can carry weight.When assembled ballast box is after being packed into weight,
Breast board 3 plays the role of going along with sb. to guard him to weight, can further increase safety coefficient of the assembled ballast box after being packed into weight.Breast board
3 hinged can be realized by way of loose-leaf, 9 represent loose-leaf as shown in figure 1.Support column 4 is settable, convenient fast when carrying out the work
Speed rotation erect expansion and complete work after quickly rotation recycling, when support column 4 when not in use, can rotate to reinforcement 2 one
The height of sample reduces stacking and the transportation volume of multiple assembled ballast boxs.
The present invention can detect the light assembly and disassembly in scene, simple to operate, can significantly improve static load of pile foundation detection
The working efficiency of test and safety.The cost during transport and handling can be reduced simultaneously, assembled convenient for ballast carrier handling,
The safety coefficient during disassembly and detection test is improved, working efficiency is greatly improved.
In another technical solution, drainage hole 5 is equipped on each breast board 3 or on each reinforcement 2, drainage hole 5 is reinforced
Beam 2, the drainage hole 5 are equipped with plugging valve.When weight is water, after completing work, convenient for draining, labor intensity is reduced,
Improve working efficiency.
In another technical solution, axial one end of the support column 4 is equipped with groove 41, the other end is equipped with and 41 phase of groove
Matched convex block 42, the assembled ballast box convenient for being located above tightly are nested in underlying assembled ballast box, improve
Whole security performance.It is preferred that the side of groove 41 be equipped with fastener, fastener can through-going recess 41 be inserted into convex block 42, such as scheme
8 represent fastener in 1.
In another technical solution, the reinforcement 2 is set as four, and the breast board 3 is also configured as four, the support
Column 4 is also configured as four, and one end of four support columns 4 is rotatably set up separately on two reinforcements 2 being oppositely arranged, and when four
When a support column 4 is horizontally disposed with, the reinforcement 2 where the other end of every two support column 4 can attach it is oppositely arranged or phase
Back setting, when not in use, the reinforcement 2 where the other end of every two support column 4 can attach it is oppositely arranged, and works as needs
When horizontal cross is spliced, the reinforcement 2 where the other end of every two support column 4 can attach it is disposed opposite to each other.Practice process
In be preferably provided with parameter.
In another technical solution, as shown in Figure 3-4, the support column 4 be can be rotatably set on the reinforcement 2
Concrete mode are as follows:
The reinforcement 2 is equipped with multiple first fixation kits, and each first fixation kit includes towards the support column 4
The sliding slot 23 of fixation hole 22, four of four location holes being arranged 21, one, the two of them location hole 21 of four location holes 21 are located at
Vertical direction, remaining two location holes 21 are located at horizontal direction, and four location holes 21 are centrosymmetric about the fixation hole 22
It is distributed, a sliding slot 23 is set between two neighboring location hole 21, four location holes 21 and four sliding slots 23 are in described solid
Determining hole 22 is the center of circle, using the spacing between the fixation hole 22 and one of location hole 21 as on the circle of radius, four sliding slots
23 depth is respectively less than the depth of four location holes 21;
The support column 4 is equipped with the second fixation kit, and second fixation kit includes shaft 41 and positioning pin 42, institute
It is fixed close to one end of the support column 4 to state shaft 41, the shaft 41 is inserted into the fixation hole 22 after being arranged bearing, described
Positioning pin 42 pullably runs through the support column 4, and one end of the positioning pin 42 is equipped with that knob 421, the other end is equipped with to stretch
Enter the positioning column 422 of location hole 21, the positioning column 422 is coaxially disposed with the positioning pin 42, and the positioning column 422 is straight
Diameter is greater than the diameter of the positioning pin 42;
Wherein, the inner wall of the location hole 21 is equipped with internal screw thread, and the positioning column 422 is equipped with to match with internal screw thread
External screw thread, the depth of sliding slot 23 is equal to the axial length of the positioning column 422, when the support column 4 passes through 41 turns of the shaft
When dynamic, the positioning column 422 23 sliding along the chute.
In this technical solution, support column 4 is forced in, support column 4 can be made to be rotated with shaft 41, when rotation,
23 sliding along the chute of positioning column 422 presses dynamic rotation knob 421, so that positioning pin 42 when sliding at a location hole 21
Positioning column 422 is moved to close to support column 4 to screw in location hole 21, and support column 4 is fixed on the location hole 21 and fixation hole 22
The direction of line be convenient for and other ballast boxs to realize support column 4 in temporary fixation vertically and horizontally
Carry out assembly or convenient for storage.
In another technical solution, the positioning column 422 is hollow cylinder, and one end of location hole 21 described in face is
Bright plastic tab, the positioning column 422 is interior to be equipped with infrared detector, is equipped with infrared lamp, the reinforcing in the location hole 21
Beam 2 is equipped with switch, and the side wall of the support column 4 is equipped with alarm, and the alarm is electrically connected with the infrared detector,
The infrared lamp is electrically connected with the switch, when the support column 4 is rotated around the shaft 41 to 422 face of positioning column
When the location hole 21, the infrared sensor receives the infrared ray from the infrared lamp, and feeds back to alarm, the report
Alert device alarm, the positioning pin 42 is inserted into the location hole 21.
In this technical solution, the infrared lamp in a location hole 21 has a switch, infrared in four location holes 21
Lamp is simultaneously connected after putting on record with alarm, when needing for support column 4 to be fixed at some location hole 21, opens the location hole 21
Interior infrared lamp rotates support column 4, when hearing alarm equipment alarm, dynamic rotation knob 421 is pressed, so that positioning pin 42 is close
Support column 4 moves to positioning column 422 and screws in location hole 21, convenient for being accurately positioned, improves working efficiency.
In another technical solution, as shown in figure 5, the top of each reinforcement 2 is equipped with a pair of of fixed ring, each breast board
It is equipped with a pair of of spring 31 on 3, one end of each spring 31 is hinged on the breast board 3 where it, the other end is equipped with hook 32, often
It is equipped with a locking assembly on a breast board 3, the locking assembly includes sliding rail 33, sliding block 34, jam plate 35, wedge-shaped fixture block 36,
The sliding rail 33 is horizontally disposed, and the sliding block 34 is slidably arranged on the sliding rail 33, and the jam plate 35 is with a right angle
It is pivotally connected with one end far from its acute angle of the bending plate of an acute angle, the jam plate 35 with the sliding block 34, the wedge shape fixture block
36 is identical as the setting height of the sliding rail 33, and when multiple breast boards 3 are vertically arranged, the hook 32 of a spring 31 is hung on one
In a fixed ring, the jam plate 35 on a breast board 3 is fastened on the wedge-shaped fixture block 36 on breast board 3 adjacent thereto.
In this technical solution, when breast board 3 is vertically arranged, it can further ensure that it is vertically arranged by spring 31, in addition, logical
It crosses jam plate 35 and is connected and fixed two neighboring breast board 3 close to the position of upper end, further ensure that breast board 3 is vertically arranged, and formed
Leak-free accommodation space.
Although the embodiments of the present invention have been disclosed as above, but its is not only in the description and the implementation listed
With it can be fully applied to various fields suitable for the present invention, for those skilled in the art, can be easily
Realize other modification, therefore without departing from the general concept defined in the claims and the equivalent scope, the present invention is simultaneously unlimited
In specific details and legend shown and described herein.
Claims (7)
1. the assembled ballast box for engineering pile foundation detection ballast platform characterized by comprising
Bearing plate is horizontally disposed with;
Multiple reinforcements, multiple reinforcement levels are installed on the bearing plate, and multiple reinforcements are surrounded around the bearing plate
One accommodation space;
Multiple breast boards, multiple breast boards are hinged on the bearing plate, and multiple breast boards attach multiple reinforcements and set when being vertically arranged
It sets to increase the depth of the accommodation space, multiple breast boards are accommodated in the accommodation space when horizontally disposed;
Multiple support columns, multiple support columns are arranged around multiple reinforcement intervals, and one end of each support column is rotatably arranged
On reinforcement, when multiple support columns are vertically arranged, the other end of multiple support columns is flushed with the bearing plate, multiple support columns
When horizontally disposed, multiple support columns and multiple reinforcements are in same level.
2. the assembled ballast box for engineering pile foundation detection ballast platform as described in claim 1, which is characterized in that each
Drainage hole is equipped on breast board or on each reinforcement, the drainage hole is equipped with plugging valve.
3. the assembled ballast box for engineering pile foundation detection ballast platform as described in claim 1, which is characterized in that described
Axial one end of support column is equipped with groove, the other end is equipped with the convex block to match with groove.
4. the assembled ballast box for engineering pile foundation detection ballast platform as described in claim 1, which is characterized in that described
Reinforcement is set as four, and the breast board is also configured as four, and the support column is also configured as four, one end of four support columns
Rotatably set up separately on two reinforcements being oppositely arranged, and when four support columns are horizontally disposed, every two support column
Reinforcement where the other end can attach it is oppositely arranged or is disposed opposite to each other.
5. the assembled ballast box for engineering pile foundation detection ballast platform as described in claim 1, which is characterized in that described
Support column can be rotatably set in the concrete mode on the reinforcement are as follows:
The reinforcement is equipped with multiple first fixation kits, and each first fixation kit includes being arranged towards the support column
Four location holes, a fixation hole, four sliding slots, the two of them location hole of four location holes are located at vertical direction, residue two
A location hole is located at horizontal direction, and four location holes are centrosymmetric distribution about the fixation hole, two neighboring location hole it
Between a sliding slot is set, four location holes and four sliding slots be in using the fixation hole as the center of circle, with the fixation hole with wherein
Spacing between one location hole is on the circle of radius, and the depth of four sliding slots is respectively less than the depth of four location holes;
The support column is equipped with the second fixation kit, and second fixation kit includes shaft and positioning pin, and the shaft is leaned on
One end of the nearly support column is fixed, and the shaft is inserted into the fixation hole after being arranged bearing, and the positioning pin is pullably
Through the support column, one end of the positioning pin is equipped with knob, the other end is equipped with the positioning column that can protrude into location hole, described fixed
Position column and the positioning pin are coaxially disposed, and the diameter of the positioning column is greater than the diameter of the positioning pin;
Wherein, the inner wall of the location hole is equipped with internal screw thread, and the positioning column is equipped with the external screw thread to match with internal screw thread, sliding
The depth of slot is equal to the axial length of the positioning column, when the support column is rotated by the shaft, the positioning column edge
Sliding slot sliding.
6. the assembled ballast box for engineering pile foundation detection ballast platform as claimed in claim 5, which is characterized in that described
Positioning column is hollow cylinder, and one end of location hole described in face is transparent plastic tab, is equipped in the positioning column infrared
Detector, the positioning hole are equipped with infrared lamp, and the reinforcement is equipped with switch, and the side wall of the support column is equipped with alarm
Device, the alarm are electrically connected with the infrared detector, and the infrared lamp is electrically connected with the switch, when the support column encloses
When rotating around the shaft to location hole described in the positioning column face, the infrared sensor is received from the infrared lamp
Infrared ray, and alarm is fed back to, the positioning pin is inserted into the positioning hole by the alarm equipment alarm.
7. the assembled ballast box for engineering pile foundation detection ballast platform as described in claim 1, which is characterized in that each
It is equipped with a pair of of fixed ring at the top of reinforcement, a pair of of spring is equipped on each breast board, one end of each spring is hinged on it
On the breast board at place, the other end be equipped with hook, a locking assembly is equipped on each breast board, the locking assembly includes sliding
Rail, sliding block, jam plate, wedge-shaped fixture block, the sliding rail is horizontally disposed, and the sliding block is slidably arranged on the sliding rail, the jam plate
One end far from its acute angle for the bending plate with a right angle and an acute angle, the jam plate is pivotally connected with the sliding block, institute
It is identical as the setting height of the sliding rail to state wedge-shaped fixture block, when multiple breast boards are vertically arranged, the hook of a spring is hung on
In one fixed ring, the jam plate on a breast board is fastened on the wedge-shaped fixture block on breast board adjacent thereto.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811351462.2A CN109386014B (en) | 2018-11-14 | 2018-11-14 | Assembled ballast tank for engineering pile foundation detection ballast platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811351462.2A CN109386014B (en) | 2018-11-14 | 2018-11-14 | Assembled ballast tank for engineering pile foundation detection ballast platform |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109386014A true CN109386014A (en) | 2019-02-26 |
CN109386014B CN109386014B (en) | 2024-04-30 |
Family
ID=65428683
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811351462.2A Active CN109386014B (en) | 2018-11-14 | 2018-11-14 | Assembled ballast tank for engineering pile foundation detection ballast platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109386014B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111123400A (en) * | 2019-12-30 | 2020-05-08 | 北京城乡中昊建设有限责任公司 | Working platform for pile bottom karst cave detection |
CN112502201A (en) * | 2020-11-24 | 2021-03-16 | 江西省赣湘建筑服务有限公司 | Pile foundation bearing capacity detection device |
CN114000549A (en) * | 2021-11-10 | 2022-02-01 | 陆剑 | Assembled ballast water tank specially used for engineering pile foundation inspection ballast platform |
CN114000549B (en) * | 2021-11-10 | 2025-07-29 | 陆剑 | Assembled ballast water tank special for engineering pile foundation detection ballast platform |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100709269B1 (en) * | 2005-10-19 | 2007-04-23 | 주식회사 한국항만기술단 | Soft ground plate loading tester with reinforcement |
CN204626475U (en) * | 2015-04-16 | 2015-09-09 | 陆剑 | A kind of load box being exclusively used in engineering pile foundation detection ballasting system |
CN204849856U (en) * | 2015-08-05 | 2015-12-09 | 陆剑 | Counter weight device of experimental usefulness of engineering pile foundation detection ballast is exclusively used in |
CN207228178U (en) * | 2017-07-26 | 2018-04-13 | 上海东亚地球物理勘查有限公司 | A kind of combined type pile foundation dead load detects ballast water tank water |
CN207829029U (en) * | 2017-04-19 | 2018-09-07 | 王建宏 | A kind of preloading formula static load of pile foundation experimental provision |
CN108502205A (en) * | 2018-05-29 | 2018-09-07 | 沈阳飞机工业(集团)有限公司 | It is a kind of for the rotation of rotating frame, stop device and application method |
CN209412879U (en) * | 2018-11-14 | 2019-09-20 | 陆剑 | Assembled ballast box for engineering pile foundation detection ballast platform |
-
2018
- 2018-11-14 CN CN201811351462.2A patent/CN109386014B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100709269B1 (en) * | 2005-10-19 | 2007-04-23 | 주식회사 한국항만기술단 | Soft ground plate loading tester with reinforcement |
CN204626475U (en) * | 2015-04-16 | 2015-09-09 | 陆剑 | A kind of load box being exclusively used in engineering pile foundation detection ballasting system |
CN204849856U (en) * | 2015-08-05 | 2015-12-09 | 陆剑 | Counter weight device of experimental usefulness of engineering pile foundation detection ballast is exclusively used in |
CN207829029U (en) * | 2017-04-19 | 2018-09-07 | 王建宏 | A kind of preloading formula static load of pile foundation experimental provision |
CN207228178U (en) * | 2017-07-26 | 2018-04-13 | 上海东亚地球物理勘查有限公司 | A kind of combined type pile foundation dead load detects ballast water tank water |
CN108502205A (en) * | 2018-05-29 | 2018-09-07 | 沈阳飞机工业(集团)有限公司 | It is a kind of for the rotation of rotating frame, stop device and application method |
CN209412879U (en) * | 2018-11-14 | 2019-09-20 | 陆剑 | Assembled ballast box for engineering pile foundation detection ballast platform |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111123400A (en) * | 2019-12-30 | 2020-05-08 | 北京城乡中昊建设有限责任公司 | Working platform for pile bottom karst cave detection |
CN111123400B (en) * | 2019-12-30 | 2022-04-12 | 北京城乡中昊建设有限责任公司 | Working platform for pile bottom karst cave detection |
CN112502201A (en) * | 2020-11-24 | 2021-03-16 | 江西省赣湘建筑服务有限公司 | Pile foundation bearing capacity detection device |
CN114000549A (en) * | 2021-11-10 | 2022-02-01 | 陆剑 | Assembled ballast water tank specially used for engineering pile foundation inspection ballast platform |
CN114000549B (en) * | 2021-11-10 | 2025-07-29 | 陆剑 | Assembled ballast water tank special for engineering pile foundation detection ballast platform |
Also Published As
Publication number | Publication date |
---|---|
CN109386014B (en) | 2024-04-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109162274B (en) | Template support detection frame of manual hole digging pile and using method thereof | |
CN209412879U (en) | Assembled ballast box for engineering pile foundation detection ballast platform | |
CN109386014A (en) | Assembled ballast box for engineering pile foundation detection ballast platform | |
CN109357592A (en) | Artificial digging pile stake diameter and testing apparatus for verticality | |
CN104674854A (en) | Ballasting system for detecting engineering pile foundation | |
CN114108607A (en) | Construction method of cast-in-place pile penetrating through karst cave | |
CN207144017U (en) | Integral movable type loading platform applied to dead load test on pile foundation | |
US20070166111A1 (en) | Poured concrete column alignment and plumbing tool | |
CN107476498B (en) | A kind of sleeve is vertically in the milk special fixture | |
CN104196063A (en) | Device for controlling drilling grouting pile top elevation and application method thereof | |
CN204920938U (en) | Drilling detector of drilling bored concrete pile | |
CN107702693A (en) | A kind of geological section measurement apparatus and measuring method | |
KR200494594Y1 (en) | Structures for support | |
CN205860958U (en) | Overhead caving construction verifying device | |
CN106049523B (en) | Land blower foundation, foundation construction method and blower | |
CN107764249B (en) | How to use a mobile tripod leveling platform device | |
CN107190788B (en) | A kind of pile foundation self-balanced static-load testing displacement observation device | |
CN101762719B (en) | Portable laser indicator used in galleries | |
CN106195801B (en) | A kind of Lawn lamp location structure | |
CN203866869U (en) | Ballasting system for detecting engineering pile foundation | |
CN203740864U (en) | Core internal barrel recycling hoisting bracket | |
CN207351927U (en) | Scanning imagery equipment | |
CN114592505A (en) | Low-clearance foundation pit reverse construction method steel pipe column first-inserting positioning construction method | |
JPS5939010B2 (en) | Preset positioning construction method for structural pillars in the structural pillar reverse driving method | |
CN213389635U (en) | Engineering is managed with bituminous paving thickness measurement equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |