[go: up one dir, main page]

CN109322319A - Connecting Mechanism of Concrete Precast Pile and Pile Foundation Cap - Google Patents

Connecting Mechanism of Concrete Precast Pile and Pile Foundation Cap Download PDF

Info

Publication number
CN109322319A
CN109322319A CN201811329464.1A CN201811329464A CN109322319A CN 109322319 A CN109322319 A CN 109322319A CN 201811329464 A CN201811329464 A CN 201811329464A CN 109322319 A CN109322319 A CN 109322319A
Authority
CN
China
Prior art keywords
pile
end plate
support table
sleeve
pile foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811329464.1A
Other languages
Chinese (zh)
Inventor
章朝根
申洋
穆保岗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Longxing Construction Engineering Co Ltd
Original Assignee
Jiangsu Longxing Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Longxing Construction Engineering Co Ltd filed Critical Jiangsu Longxing Construction Engineering Co Ltd
Priority to CN201811329464.1A priority Critical patent/CN109322319A/en
Publication of CN109322319A publication Critical patent/CN109322319A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

本发明公开了一种混凝土预制桩与桩基承台的连接机构,包括端板,所述端板设在预制桩顶部,所述端板上设置有锚筋孔,所述端板一侧连接有套筒,所述套筒内壁设置有螺纹,所述预制桩的空心部分设置有钢筋笼。本发明与桩基承台连接稳定,操作方便,有效防止填芯被拔出,套筒直接焊接在端板上桩芯一侧,受力合理,操作简单,不需要重制端板模具,仅需在预制桩端板上开设数个锚筋孔。

The invention discloses a connection mechanism between a concrete prefabricated pile and a pile foundation bearing platform. There is a sleeve, the inner wall of the sleeve is provided with threads, and the hollow part of the prefabricated pile is provided with a steel cage. The invention is stable in connection with the pile foundation cap, easy to operate, effectively prevents the core from being pulled out, the sleeve is directly welded on one side of the pile core on the end plate, the force is reasonable, the operation is simple, and the end plate mold does not need to be remade. It is necessary to open several anchor holes in the prefabricated pile end plate.

Description

The bindiny mechanism of concrete precast pile and pile foundation support table
Technical field
The present invention relates to architectural engineering stakes, and in particular to a kind of bindiny mechanism of concrete precast pile and pile foundation support table.
Background technique
Concrete prefabricated hollow pile is used as uplift pile using more and more extensive in practical projects, but prefabricated pile and cushion cap Connect still problematic presence.Now construction mostly uses concrete to fill out core, is transmitted to buoyancy suffered by cushion cap by wadding weft variation mixed On solidifying soil prefabricated pile.But due to factors such as site operation environment, causes concrete to fill out core quality and be difficult to ensure, exist and fill out core and pulled out Danger out.
In addition, there are also the sides for connecting prefabricated pile main reinforcement and cushion cap anchor rib simultaneously using sleeve for the connection of prefabricated pile and cushion cap Prefabricated pile main reinforcement is located in sleeve by method, this method, is unfavorable for applying prestressing force to prestressed concrete prefabricated pile.And prefabricated pile During stake processed, since main reinforcement is longer, it is more difficult that main reinforcement is located at the construction in sleeve.
Summary of the invention
Goal of the invention: the object of the present invention is to provide the bindiny mechanisms of a kind of concrete precast pile and pile foundation support table, solve The problem of existing prefabricated pile connect inconvenience with pile foundation support table, be easy to cause and fills out core and be pulled out, constructional difficulties.
Technical solution: the bindiny mechanism of concrete precast pile and pile foundation support table of the present invention, including end plate, the end Plate is located at the top of prefabricated pile, is provided with dowel hole and cage bar holes on the end plate, the end plate side is connected with sleeve, the set Cylinder inner wall is provided with screw thread, and the prefabricated pile hollow parts are provided with steel reinforcement cage.
The risk that wadding weft variation is pulled out is effectively reduced, the telescopic screw is connected with anchor bar, the anchoring steel Muscle passes through dowel hole and connect with pile foundation support table.
Facilitate transmitting uplift force and construction, the steel reinforcement cage includes filling out core main reinforcement, fill out core stirrup and filling out core bottom plate, described to fill out Core main reinforcement, which is vertically arranged in, fills out on core bottom plate, it is described fill out core stirrup and be horizontally installed on fill out between core main reinforcement.It is poured in the steel reinforcement cage It has built concrete and has filled out core.
Core is filled out in order to which superstructure uplift force is passed to concrete, core main reinforcement one end stretching prefabricated pile of filling out is anchored in In pile foundation support table.
In order to simple to operate, sleeve alignment dowel hole is welded on end plate by pile body side.
The utility model has the advantages that the present invention and pile foundation support table stable connection, easy to operate, it effectively prevent filling out core and is pulled out, sleeve is straight It connects and is welded on stake core side on end plate, reasonable stress is easy to operate, does not need recasting end plate mold, it is only necessary in prefabricated pile end plate On open up several dowel holes.
Detailed description of the invention
Fig. 1 is attachment structure schematic diagram;
Fig. 2 is square endplate schematic diagram;
Fig. 3 is circular end plate schematic diagram;
Fig. 4 is reinforced bar sleeve sectional view.
Specific embodiment
Invention is further explained with reference to the accompanying drawing.
As shown in Figs 1-4, the bindiny mechanism of concrete precast pile and pile foundation support table includes concrete prefabricated hollow pile 1, is mixed It is equipped with end plate 3 at the top of solidifying soil Prefabricated hollow pile 1, end plate 3 is welded with sleeve 4 in stake core side, 31 He of dowel hole is provided on end plate 3 Cage bar holes 32, pre-buried anchor bar 5 in pile foundation support table 2, anchor bar 5 pass through dowel hole 31 and connect with 4 spiral of sleeve, concrete The hollow parts of Prefabricated hollow pile 1 are provided with steel reinforcement cage 6 and casting concrete fills out core 7, and steel reinforcement cage 6 includes filling out core main reinforcement 61, filling out Core stirrup 62 and fill out core bottom plate 63.Wherein, sleeve lining is helicitic texture, and anchor bar is spiral.
In using the present invention, firstly, opening dowel hole in advance in end plate and in the stake core side welded sleeve of end plate, work as pile foundation It will include filling out at the steel reinforcement cage merging hollow pile hollow parts of core bottom plate, then poured to hollow pile hollow parts after the completion of construction Wadding weft variation will be connected to coagulation with the anchor bar of pile foundation support table connection within the wadding weft variation strength enhancing time On the prefabricated pile end plate of soil in pre-buried sleeve, to realize the connection of part pile cap steel muscle and prefabricated pile, reach to wadding weft variation After some strength, pile foundation support table is poured, the final connection for realizing concrete precast pile and pile foundation support table.

Claims (5)

1. the bindiny mechanism of a kind of concrete precast pile and pile foundation support table, which is characterized in that including end plate (3), the end plate (3) It is located at the top of prefabricated pile (1), dowel hole (31) and cage bar holes (32) is provided on the end plate (3), end plate (3) side connects It is connected to sleeve (4), sleeve (4) inner wall is provided with screw thread, and prefabricated pile (1) hollow parts are provided with steel reinforcement cage (6).
2. the bindiny mechanism of concrete precast pile according to claim 1 and pile foundation support table, which is characterized in that the sleeve (4) spiral is connected with anchor bar (5), and the anchor bar (5) passes through dowel hole (31) and connect with pile foundation support table (2).
3. the bindiny mechanism of concrete precast pile according to claim 1 and pile foundation support table, which is characterized in that the reinforcing bar Cage (6) includes filling out core main reinforcement (61), filling out core stirrup (62) and fill out core bottom plate (63), it is described fill out core main reinforcement (61) and be vertically arranged in fill out On core bottom plate (63), it is described fill out core stirrup (62) and be horizontally installed on fill out between core main reinforcement (61), has been poured in the steel reinforcement cage (6) Wadding weft variation (7).
4. the bindiny mechanism of concrete precast pile according to claim 3 and pile foundation support table, which is characterized in that described to fill out core Main reinforcement (61) one end is stretched out prefabricated pile (1) and is anchored in pile foundation support table (2).
5. the bindiny mechanism of concrete precast pile according to claim 1 and pile foundation support table, which is characterized in that the sleeve (4) alignment dowel hole (31) is welded on end plate (3) by pile body side.
CN201811329464.1A 2018-11-08 2018-11-08 Connecting Mechanism of Concrete Precast Pile and Pile Foundation Cap Pending CN109322319A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811329464.1A CN109322319A (en) 2018-11-08 2018-11-08 Connecting Mechanism of Concrete Precast Pile and Pile Foundation Cap

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811329464.1A CN109322319A (en) 2018-11-08 2018-11-08 Connecting Mechanism of Concrete Precast Pile and Pile Foundation Cap

Publications (1)

Publication Number Publication Date
CN109322319A true CN109322319A (en) 2019-02-12

Family

ID=65261036

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811329464.1A Pending CN109322319A (en) 2018-11-08 2018-11-08 Connecting Mechanism of Concrete Precast Pile and Pile Foundation Cap

Country Status (1)

Country Link
CN (1) CN109322319A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158484A (en) * 2019-07-03 2019-08-23 中铁上海工程局集团有限公司 A kind of high-speed railway packaged type bridges precast assembly structure and construction method
CN112302010A (en) * 2019-07-29 2021-02-02 上海勘测设计研究院有限公司 Anchor plate device for prestressed steel pipe cast-in-place pile
CN114657975A (en) * 2021-11-05 2022-06-24 俞敏芳 Precast pile button head anchor muscle connecting device
CN114775349A (en) * 2022-03-23 2022-07-22 中铁七局集团第二工程有限公司 Prefabricated UHPC pipe confined concrete overhead roadbed pile plate structure and construction process
CN115404900A (en) * 2022-10-14 2022-11-29 国网河南省电力公司经济技术研究院 A kind of pole tower pile foundation of transmission line and its construction method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013253378A (en) * 2012-06-05 2013-12-19 Toyo Asano Found Co Ltd Auxiliary tool for forming pile head space, hollow precast pile having the same, pile head treatment method using the hollow precast pile, and method for forming pile head space
CN103590414A (en) * 2013-11-19 2014-02-19 中铁第四勘察设计院集团有限公司 Structure for connecting concrete tubular pile with bearing platform
CN203701125U (en) * 2014-01-24 2014-07-09 陈家冬 Connection structure of preformed pile and pile cap and pile feeder of connection structure
CN204112354U (en) * 2013-12-10 2015-01-21 江苏建华管桩有限公司 The syndeton of concrete precast pile and pile foundation support table
CN105464073A (en) * 2015-12-25 2016-04-06 苏州汤始建华管桩有限公司 Enhanced solid preformed pile structure and method for connecting and fixing enhanced solid preformed pile structure and foundation
CN205475298U (en) * 2016-01-28 2016-08-17 建华建材投资有限公司 A precast concrete post for photovoltaic engineering
JP2017095888A (en) * 2015-11-19 2017-06-01 大成建設株式会社 Steel column-pile junction structure
CN207194000U (en) * 2017-09-14 2018-04-06 国家电网公司 A kind of transmission line of electricity prefabricated tubular pile cushion cap anchor
CN209243750U (en) * 2018-11-08 2019-08-13 江苏隆兴建设工程有限公司 The bindiny mechanism of concrete precast pile and pile foundation support table

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013253378A (en) * 2012-06-05 2013-12-19 Toyo Asano Found Co Ltd Auxiliary tool for forming pile head space, hollow precast pile having the same, pile head treatment method using the hollow precast pile, and method for forming pile head space
CN103590414A (en) * 2013-11-19 2014-02-19 中铁第四勘察设计院集团有限公司 Structure for connecting concrete tubular pile with bearing platform
CN204112354U (en) * 2013-12-10 2015-01-21 江苏建华管桩有限公司 The syndeton of concrete precast pile and pile foundation support table
CN203701125U (en) * 2014-01-24 2014-07-09 陈家冬 Connection structure of preformed pile and pile cap and pile feeder of connection structure
JP2017095888A (en) * 2015-11-19 2017-06-01 大成建設株式会社 Steel column-pile junction structure
CN105464073A (en) * 2015-12-25 2016-04-06 苏州汤始建华管桩有限公司 Enhanced solid preformed pile structure and method for connecting and fixing enhanced solid preformed pile structure and foundation
CN205475298U (en) * 2016-01-28 2016-08-17 建华建材投资有限公司 A precast concrete post for photovoltaic engineering
CN207194000U (en) * 2017-09-14 2018-04-06 国家电网公司 A kind of transmission line of electricity prefabricated tubular pile cushion cap anchor
CN209243750U (en) * 2018-11-08 2019-08-13 江苏隆兴建设工程有限公司 The bindiny mechanism of concrete precast pile and pile foundation support table

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158484A (en) * 2019-07-03 2019-08-23 中铁上海工程局集团有限公司 A kind of high-speed railway packaged type bridges precast assembly structure and construction method
CN112302010A (en) * 2019-07-29 2021-02-02 上海勘测设计研究院有限公司 Anchor plate device for prestressed steel pipe cast-in-place pile
CN112302010B (en) * 2019-07-29 2025-01-24 上海勘测设计研究院有限公司 Anchor plate device for prestressed steel pipe cast-in-place piles
CN114657975A (en) * 2021-11-05 2022-06-24 俞敏芳 Precast pile button head anchor muscle connecting device
CN114775349A (en) * 2022-03-23 2022-07-22 中铁七局集团第二工程有限公司 Prefabricated UHPC pipe confined concrete overhead roadbed pile plate structure and construction process
CN115404900A (en) * 2022-10-14 2022-11-29 国网河南省电力公司经济技术研究院 A kind of pole tower pile foundation of transmission line and its construction method

Similar Documents

Publication Publication Date Title
CN109322319A (en) Connecting Mechanism of Concrete Precast Pile and Pile Foundation Cap
CN102425310B (en) Assembly-type residential shear wall structural wall body vertical connection construction method
CN107905363B (en) A kind of full assembled concrete nodal point connecting and connection method based on energy consumption with shearing resistance
CN203569582U (en) Connecting structure of concrete pipe pile and bearing platform
CN108560544A (en) A kind of sleeve connection assembled pile foundation and its construction method
CN103590414B (en) A kind of attachment structure of concrete tubular pile and cushion cap
CN107044177A (en) A kind of assembly concrete shear wall fractionation, assembled attachment structure and connection method
CN108678218A (en) Assembly concrete shear wall and its method of construction based on multipurpose thin-wall steel tube
CN107254937A (en) A kind of assembled power consumption girder connection of built-in X-shaped low-yield structural steel connecting member
CN102787595A (en) Double-acting self-stressing combined uplift pile and pile forming method
CN203487664U (en) Suspension type flexible connection for precast concrete infilled wall
CN109914216A (en) A prefabricated large-span ultra-high-performance concrete box girder composite joint and its connection method
CN209243750U (en) The bindiny mechanism of concrete precast pile and pile foundation support table
CN203701125U (en) Connection structure of preformed pile and pile cap and pile feeder of connection structure
CN114922360B (en) Device for prefabricating and cast-in-situ combination of roof cornice structure and construction method thereof
CN210151599U (en) Hollow slab beam
CN108678164A (en) Connect beam type Building block structure
CN110318463A (en) A kind of connection structure and construction method of prefabricated post and beam based on phosphorus magnesium material
CN209669688U (en) A semi-fabricated thin-walled bridge pier
CN108316513A (en) A kind of rapid construction assembly of shear wall structure and its construction method
CN108729541B (en) Connect beam type Building block construction method
CN108729544B (en) Dry-and wet-type composite joint pin-connected panel construction
CN103938871A (en) Method for constructing concrete-filled steel tube column and bonded prestressed frame beam structure adopting reinforced concrete ring beam joints
CN205954675U (en) Prefabricated pipeline concrete buttress
CN207512732U (en) A kind of stake and stake connection structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190212

RJ01 Rejection of invention patent application after publication