CN109322311A - Assembled support construction technique based on coercion underground continuous wall structure - Google Patents
Assembled support construction technique based on coercion underground continuous wall structure Download PDFInfo
- Publication number
- CN109322311A CN109322311A CN201811183193.3A CN201811183193A CN109322311A CN 109322311 A CN109322311 A CN 109322311A CN 201811183193 A CN201811183193 A CN 201811183193A CN 109322311 A CN109322311 A CN 109322311A
- Authority
- CN
- China
- Prior art keywords
- wall
- underground continuous
- continuous wall
- grooving
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The invention discloses the assembled support construction techniques based on coercion underground continuous wall structure, belong to support construction technical field, assembled support construction technique based on coercion underground continuous wall structure, the following steps are included: leading wall channel excavation, it builds branch and protects and lead wall, supporting trenching construction, coercion underground continuous wall plate, prefabricated panel is hung, the side slip casting of toe of wall wall, coercion underground continuous wall plate may be implemented, it is supported using assembled supporting construction, the form of construction work for being easy to use diaphram wall to engage as supporting construction and foundation structure, Groundwater infiltration is prevented simultaneously, circulating mud forms one layer of very low mudcake of water penetration on cell wall, it can prevent cell wall from peeling off, after the completion of the side slip casting of toe of wall wall, under the pressure of circulating mud after forming, at solid state, fill up the junction gap of underground continuous wall plate, Simultaneously under forming pressure, the moisture of silicon substrate growth bead consumption gap fixes circulating mud adhesion.
Description
Technical field
The present invention relates to support construction technical fields, more specifically to based on coercion underground continuous wall structure
Assembled support construction technique.
Background technique
Assembled supporting construction is to be assembled at the scene based on molding prefabricated components by various technological means
Supporting construction.Compared with conventional supporting means, which has the characteristics that low cost, short time limit, quality are easily controllable, from
And greatly reduce energy consumption, reduce building waste, have higher social and economic benefits and environmental-protection function, currently, in the market compared with
Have for mature assembled supporting construction: prefabricated pile, coercion underground continuous wall structure, prestressing force fish belly sill support construction, tool
Formula combines inner support etc., and prefabricated pile is as foundation pit supporting construction in use, mainly using conventional construction of prefabricated piles method, such as
Static pressure or hammer-impact construction, can also use borrowing cement mixing method, and TRD stirs wall or the stirring of CSM Double-wheel milling shape within the walls
At continuous soil cement composite supporting construction.When prestressing force prefabricated pile is used for supporting construction, it should be noted that prevent prestressing force prefabricated pile
Brittle break occurs and ensures the construction quality of connector.
Existing supporting construction is drawn using the support of short column diaphragm plate, the support of interim retaining wall, batter post support, anchor mostly
Method for protecting support, the scope of application very littles of these supporting construction such as support only can be suitably used for cutting depth less than seven meters, and without special
It is required that foundation pit, and ten meters are greater than for cutting depth, and the foundation pit one of Nearby Structure, critical facility within cutting depth
As using part supporting construction and foundation structure unification form of construction work, mostly using diaphram wall as supporting construction
The construction work of main body, but this construction work using diaphram wall as supporting construction main body is in some special geology items
Under part, such as very soft muck soil, the alluvium containing erratic boulder and superhard rock, difficulty of construction is very big, is not available, and easily go out
Existing adjacent wall section cannot be aligned and the problem of leak.
1. technical problems to be solved
Aiming at the problems existing in the prior art, the purpose of the present invention is to provide based on coercion underground continuous wall structure
Assembled support construction technique, coercion underground continuous wall plate may be implemented in it, is supported, is convenient for using assembled supporting construction
The form of construction work for using diaphram wall to engage as supporting construction and foundation structure, while by special circulating mud, it supports
The anti-soil lateral pressure and water pressure acted on cell wall, prevents cell wall from collapsing and peeling off, while preventing Groundwater infiltration, recycles
Mud forms one layer of very low mudcake of water penetration on cell wall, can prevent cell wall from peeling off, after the completion of the side slip casting of toe of wall wall, circulation
Under the pressure of mud after forming, at solid state, the junction gap of underground continuous wall plate is filled up, while in forming pressure
Under, the moisture of silicon substrate growth bead consumption gap fixes circulating mud adhesion.
2. technical solution
To solve the above problems, the present invention adopts the following technical scheme that.
Assembled support construction technique based on coercion underground continuous wall structure, comprising the following steps:
Step 1: leading wall channel excavation, and staff is excavated using mini-excavator, to leading wall ditch with construction worker
Slot carries out clear bottom, will lead the compacting of wall groove substrate;
Step 2: it builds branch and protects and lead wall, seven cm thick cement mortars are laid in guide wall groove, in concreting process
In, it is supported using plank sheathing, leads wall top face and be made into level, after form removable, add twice one up and down every two meters along its longitudinal direction
The square meter lumps of wood does inner support, and two panels is led wall and is supported;
Step 3: supporting trenching construction is parallel to chute forming machine grab bucket and leads wall, the center line of grab bucket and the center line for leading wall
It is overlapped, grooving is excavated by chute forming machine;
Step 4: coercion underground continuous wall plate, by technical staff according to transport and lifting appliance ability, construction site road
With stacking site condition, rationally determine that the framing and preform length of diaphram wall, wall framing width meet grooving simultaneously
Stability requirement;
Step 5: prefabricated panel is hung, and by underground continuous wall plate by hoisting machine vertical lifting, is prolonged into groove groove wall and is put downwards
It sets;
Step 6: the side slip casting of toe of wall wall, after prefabricated panel is placed in grooving, the slip casting into grooving be may be implemented pre-
Underground continuous wall plate processed is supported using assembled supporting construction, is easy to use diaphram wall as supporting construction and basis knot
The form of construction work of structure engagement, while passing through special circulating mud, soil lateral pressure and water pressure of the resistant function on cell wall,
It prevents cell wall from collapsing and peeling off, while preventing Groundwater infiltration, circulating mud forms one layer of very low mud of water penetration on cell wall
Skin can prevent cell wall from peeling off, and after the completion of the side slip casting of toe of wall wall, under the pressure of circulating mud after forming, at solid state, fill out
The junction gap of underground continuous wall plate is mended, while under forming pressure, the moisture of silicon substrate growth bead consumption gap will follow
Ring mud adhesion is fixed.
Further, during the hanging of the step 5 prefabricated panel, before wallboard is lifted by crane from hoisting machine into grooving,
Suitable rubble is launched to grooving slot bottom, prefabricated panel is slowly lifted by crane, prefabricated panel is made to be compacted into the rubble of trench bottom, convenient for subtracting
Pressure of the light prefabricated panel to grooving slot bottom.
Further, it during the step 2 build branch protects and lead wall, after the completion of concreting, is set around wall leading
Vertical maintenance rack, and construction of guide wall seam is staggered with subterranean wall seam, damages convenient for reducing other construction personnel to supporting enclosure wall.
Further, during the step 2 build branch protects and lead wall, branch protects and lead wall section construction, and section length is according to mould
Plate length and code requirement control at 40 meters, the distance of wall are protected and led convenient for control branch.
Further, during the step 3 supporting trenching construction, after chute forming machine excavates grooving, technical staff uses super
Sonic wave detector checks grooving quality, convenient for checking grooving inside, finds convenient for technical staff into groove groove wall defect.
Further, during the step 4 coercion underground continuous wall plate, the production method of underground continuous wall plate is folded
Layer production, and lamination number is two layers, is easy to use the very fast production underground continuous wall plate of lamination production.
Further, during the step 3 supporting trenching construction, before chute forming machine excavates grooving, in guide wall groove
Circulating mud is injected, and as chute forming machine constantly excavates downwards, circulating mud is constantly injected into unfashioned grooving, convenient for supporting
The anti-soil lateral pressure and water pressure acted on cell wall.
Further, the detail parameters of the circulating mud used during the step 3 supporting trenching construction are mud
Specific gravity 1.05-1.25, viscosity 22s-40s, colloidity are greater than 98%, and mudcake thickness is less than 3mm, pH value 8-11, and sand factor is less than
7%, convenient for preventing cell wall from collapsing and peeling off, while preventing Groundwater infiltration.
Further, the main component of the circulating mud is that bentonite and water add bentonite and water in mixed mud sump
Afterwards, it is stirred mixing, it is fine that chemical fibre melt, lignosulfonates, composite phosphate, carboxymethyl are added batch-wise in whipping process
Dimension element, heavy weight additive and leak preventive, are convenient for after the completion of the side slip casting of toe of wall wall, under the pressure of circulating mud after forming, at solid
State.
Further, bead is grown filled with silicon substrate in the circulating mud, the silicon substrate growth bead is in circulating mud
Interior densely arranged, the silicon substrate grows small ectosphere and is equipped with gel film, is filled with silicon substrate lubricating grease, institute in the gel film
It states in gel film filled with production flocculant strain ball and silicon hydrocarbon chemical combination strain ball, the production flocculant strain ball and silicon hydrocarbon
Chemical combination strain ball is uniformly arranged in silicon substrate lubricating grease, convenient under forming pressure, silicon substrate grows the moisture of bead consumption gap
Circulating mud adhesion is fixed.
3. beneficial effect
Compared with the prior art, the present invention has the advantages that
(1) coercion underground continuous wall plate may be implemented in this programme, is supported using assembled supporting construction, is easy to use underground
The form of construction work that diaphragm wall is engaged as supporting construction and foundation structure, while by special circulating mud, resistant function exists
Soil lateral pressure and water pressure on cell wall, prevent cell wall from collapsing and peeling off, while preventing Groundwater infiltration, circulating mud is in slot
Form the very low mudcake of one layer of water penetration on wall, can prevent cell wall from peeling off, after the completion of the side slip casting of toe of wall wall, circulating mud at
Under pressure after shape, at solid state, the junction gap of underground continuous wall plate is filled up, while under forming pressure, silicon substrate is raw
The moisture of long bead consumption gap fixes circulating mud adhesion.
(2) during the hanging of step 5 prefabricated panel, before wallboard is lifted by crane from hoisting machine into grooving, to grooving slot bottom
Suitable rubble is launched, prefabricated panel is slowly lifted by crane, prefabricated panel is made to be compacted into the rubble of trench bottom, convenient for mitigating prefabricated panel
To the pressure of grooving slot bottom.
(3) during step 2 build branch protects and lead wall, after the completion of concreting, maintenance rack is set up around wall leading,
And construction of guide wall seam is staggered with subterranean wall seam, damages convenient for reducing other construction personnel to supporting enclosure wall.
(4) during step 2 build branch protects and lead wall, branch protects and lead wall section construction, and section length is according to template length and rule
Model requirement controls at 40 meters, the distance of wall is protected and led convenient for control branch.
(5) during step 3 supporting trenching construction, after chute forming machine excavates grooving, technical staff uses ultrasonic detector
It checks grooving quality, convenient for checking grooving inside, finds convenient for technical staff into groove groove wall defect.
(6) during step 4 coercion underground continuous wall plate, the production method of underground continuous wall plate is lamination production, and folded
The number of plies is two layers, is easy to use the very fast production underground continuous wall plate of lamination production.
(7) during step 3 supporting trenching construction, before chute forming machine excavates grooving, injection circulation mud in guide wall groove
Slurry, and as chute forming machine constantly excavates downwards, circulating mud is constantly injected into unfashioned grooving, convenient for resistant function in slot
Soil lateral pressure and water pressure on wall.
(8) detail parameters of the circulating mud used during step 3 supporting trenching construction are mud balance 1.05-
1.25, viscosity 22s-40s, colloidity are greater than 98%, and mudcake thickness is less than 3mm, and pH value 8-11, sand factor is less than 7%, convenient for anti-
Only cell wall collapses and peels off, while preventing Groundwater infiltration.
(9) main component of circulating mud is that bentonite and water after adding bentonite and water, are stirred in mixed mud sump
Mixing is mixed, chemical fibre melt, lignosulfonates, composite phosphate, carboxymethyl cellulose, exacerbation are added batch-wise in whipping process
Agent and leak preventive are convenient for after the completion of the side slip casting of toe of wall wall, under the pressure of circulating mud after forming, at solid state.
(10) bead is grown filled with silicon substrate in circulating mud, silicon substrate growth bead is densely arranged in circulating mud, silicon
The small ectosphere of basal growth is equipped with gel film, and silicon substrate lubricating grease is filled in gel film, is filled in gel film and produces flocculation
It is uniform in silicon substrate lubricating grease to produce flocculant strain ball and silicon hydrocarbon chemical combination strain ball for agent strain ball and silicon hydrocarbon chemical combination strain ball
Arrangement, convenient under forming pressure, the moisture of silicon substrate growth bead consumption gap fixes circulating mud adhesion.
Detailed description of the invention
Fig. 1 is technical process figure of the invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description;Obviously, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments, is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that the instruction such as term " on ", "lower", "inner", "outside", " top/bottom end "
Orientation or positional relationship be based on the orientation or positional relationship shown in the drawings, be merely for convenience of description the present invention and simplification retouch
It states, rather than the device or element of indication or suggestion meaning must have a particular orientation, be constructed and operated in a specific orientation,
Therefore it is not considered as limiting the invention.In addition, term " first ", " second " are used for description purposes only, and cannot understand
For indication or suggestion relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation " " is set
Be equipped with ", " be arranged/connect ", " connection " etc., shall be understood in a broad sense, such as " connection ", may be a fixed connection, be also possible to removable
Connection is unloaded, or is integrally connected, can be mechanical connection, is also possible to be electrically connected, can be directly connected, it can also be in
Between medium be indirectly connected, can be the connection inside two elements, for the ordinary skill in the art, can be specific
Situation understands the concrete meaning of above-mentioned term in the present invention.
Embodiment 1:
Referring to Fig. 1, the assembled support construction technique based on coercion underground continuous wall structure, including following step
It is rapid:
Step 1: leading wall channel excavation, and staff is excavated using mini-excavator, to leading wall ditch with construction worker
Slot carries out clear bottom, will lead the compacting of wall groove substrate;
Step 2: it builds branch and protects and lead wall, seven cm thick cement mortars are laid in guide wall groove, in concreting process
In, it is supported using plank sheathing, leads wall top face and be made into level, after form removable, add twice one up and down every two meters along its longitudinal direction
The square meter lumps of wood does inner support, and two panels is led wall and is supported, and after the completion of concreting, maintenance rack is set up around wall leading,
And construction of guide wall seam is staggered with subterranean wall seam, damages convenient for reducing other construction personnel to supporting enclosure wall, step 2 is repaired
It builds during branch protects and lead wall, branch protects and lead wall section construction, and section length is controlled according to template length and code requirement 40
Rice protects and lead the distance of wall convenient for control branch;
Step 3: supporting trenching construction is parallel to chute forming machine grab bucket and leads wall, the center line of grab bucket and the center line for leading wall
It being overlapped, grooving is excavated by chute forming machine, after chute forming machine excavates grooving, technical staff checks grooving quality using ultrasonic detector,
Convenient for checking grooving inside, convenient for technical staff's discovery at groove groove wall defect, before chute forming machine excavates grooving, guide wall
Circulating mud is injected in groove, and as chute forming machine constantly excavates downwards, constantly injects circulating mud into unfashioned grooving,
Convenient for soil lateral pressure and water pressure of the resistant function on cell wall;
Step 4: coercion underground continuous wall plate, by technical staff according to transport and lifting appliance ability, construction site road
With stacking site condition, rationally determine that the framing and preform length of diaphram wall, wall framing width meet grooving simultaneously
Stability requirement, during step 4 coercion underground continuous wall plate, the production method of underground continuous wall plate is lamination production, and folded
The number of plies is two layers, is easy to use the very fast production underground continuous wall plate of lamination production;
Step 5: prefabricated panel is hung, and by underground continuous wall plate by hoisting machine vertical lifting, is prolonged into groove groove wall and is put downwards
It sets, during the hanging of step 5 prefabricated panel, before wallboard is lifted by crane from hoisting machine into grooving, is launched to grooving slot bottom appropriate
Rubble, slowly lift by crane prefabricated panel, prefabricated panel made to be compacted into the rubble of trench bottom, convenient for mitigate prefabricated panel to grooving slot
The pressure at bottom;
Step 6: the side slip casting of toe of wall wall, after prefabricated panel is placed in grooving, the slip casting into grooving be may be implemented pre-
Underground continuous wall plate processed is supported using assembled supporting construction, is easy to use diaphram wall as supporting construction and basis knot
The form of construction work of structure engagement, while passing through special circulating mud, soil lateral pressure and water pressure of the resistant function on cell wall,
It prevents cell wall from collapsing and peeling off, while preventing Groundwater infiltration, circulating mud forms one layer of very low mud of water penetration on cell wall
Skin can prevent cell wall from peeling off, and after the completion of the side slip casting of toe of wall wall, under the pressure of circulating mud after forming, at solid state, fill out
The junction gap of underground continuous wall plate is mended, while under forming pressure, the moisture of silicon substrate growth bead consumption gap will follow
Ring mud adhesion is fixed.
The detail parameters of the circulating mud used during step 3 supporting trenching construction are mud balance 1.05-
1.25, viscosity 22s-40s, colloidity are greater than 98%, and mudcake thickness is less than 3mm, and pH value 8-11, sand factor is less than 7%, convenient for anti-
Only cell wall collapses and peels off, while preventing Groundwater infiltration.
The main component of circulating mud is that bentonite and water after adding bentonite and water, are stirred mixed in mixed mud sump
Close, be added batch-wise in whipping process chemical fibre melt, lignosulfonates, composite phosphate, carboxymethyl cellulose, heavy weight additive and
Leak preventive is convenient for after the completion of the side slip casting of toe of wall wall, under the pressure of circulating mud after forming, at solid state, circulating mud
Interior to grow bead filled with silicon substrate, silicon substrate growth bead is densely arranged in circulating mud, and silicon substrate grows small ectosphere equipped with solidifying
Glue film, gel film is interior to be filled with silicon substrate lubricating grease, is filled in gel film and produces flocculant strain ball and silicon hydrocarbon chemical combination
Strain ball, produces flocculant strain ball and silicon hydrocarbon chemical combination strain ball is uniformly arranged in silicon substrate lubricating grease, is convenient under forming pressure,
The moisture of silicon substrate growth bead consumption gap fixes circulating mud adhesion.
Coercion underground continuous wall plate may be implemented in the present invention, is supported using assembled supporting construction, and underground is easy to use to connect
The form of construction work that continuous wall is engaged as supporting construction and foundation structure, while by special circulating mud, resistant function is in slot
Soil lateral pressure and water pressure on wall, prevent cell wall from collapsing and peeling off, while preventing Groundwater infiltration, circulating mud is in cell wall
It is upper to form the very low mudcake of one layer of water penetration, it can prevent cell wall from peeling off, after the completion of the side slip casting of toe of wall wall, circulating mud is shaping
Under pressure afterwards, at solid state, the junction gap of underground continuous wall plate is filled up, while under forming pressure, silicon substrate growth
The moisture of bead consumption gap fixes circulating mud adhesion.
The foregoing is intended to be a preferred embodiment of the present invention;But scope of protection of the present invention is not limited thereto.
Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its
It improves design and is subject to equivalent substitution or change, should be covered by the scope of protection of the present invention.
Claims (10)
1. the assembled support construction technique based on coercion underground continuous wall structure, it is characterised in that: the following steps are included:
Step 1: leading wall channel excavation, and staff is excavated using mini-excavator, with construction worker to lead wall groove into
The clear bottom of row will lead the compacting of wall groove substrate;
Step 2: building branch and protect and lead wall, be laid with seven cm thick cement mortars in guide wall groove, in concreting process,
It is supported using plank sheathing, leads wall top face and be made into level, after form removable, add one square meter of twice up and down every two meters along its longitudinal direction
The lumps of wood does inner support, and two panels is led wall and is supported;
Step 3: supporting trenching construction is parallel to chute forming machine grab bucket and leads wall, the center line of grab bucket and the center line weight for leading wall
It closes, grooving is excavated by chute forming machine;
Step 4: coercion underground continuous wall plate, by technical staff according to transport and lifting appliance ability, construction site road and heap
Site condition is put, rationally determines that the framing and preform length of diaphram wall, wall framing width meet grooving simultaneously and stablize
Property require;
Step 5: prefabricated panel is hung, and by underground continuous wall plate by hoisting machine vertical lifting, is prolonged into groove groove wall and is placed downwards;
Step 6: the side slip casting of toe of wall wall, after prefabricated panel is placed in grooving, the slip casting into grooving.
2. the assembled support construction technique according to claim 1 based on coercion underground continuous wall structure, special
Sign is: during the hanging of the step 5 prefabricated panel, before wallboard is lifted by crane from hoisting machine into grooving, to grooving slot bottom
Suitable rubble is launched, prefabricated panel is slowly lifted by crane, prefabricated panel is made to be compacted into the rubble of trench bottom.
3. the assembled support construction technique according to claim 1 based on coercion underground continuous wall structure, special
Sign is: during the step 2 build branch protects and lead wall, after the completion of concreting, maintenance rack is set up around wall leading,
And construction of guide wall seam is staggered with subterranean wall seam.
4. the assembled support construction technique according to claim 1 based on coercion underground continuous wall structure, special
Sign is: during the step 2 build branch protects and lead wall, branch protects and lead wall section construction, and section length is according to template length and rule
Model requirement, controls at 40 meters.
5. the assembled support construction technique according to claim 1 based on coercion underground continuous wall structure, special
Sign is: during the step 3 supporting trenching construction, after chute forming machine excavates grooving, technical staff uses ultrasonic detector
Check grooving quality.
6. the assembled support construction technique according to claim 1 based on coercion underground continuous wall structure, special
Sign is: during the step 4 coercion underground continuous wall plate, the production method of underground continuous wall plate is lamination production, and folded
The number of plies is two layers.
7. the assembled support construction technique according to claim 1 based on coercion underground continuous wall structure, special
Sign is: during the step 3 supporting trenching construction, before chute forming machine excavates grooving, and injection circulation mud in guide wall groove
Slurry, and as chute forming machine constantly excavates downwards, circulating mud is constantly injected into unfashioned grooving.
8. the assembled support construction technique according to claim 7 based on coercion underground continuous wall structure, special
Sign is: the detail parameters of the circulating mud used during the step 3 supporting trenching construction are mud balance 1.05-
1.25, viscosity 22s-40s, colloidity are greater than 98%, and mudcake thickness is less than 3mm, and pH value 8-11, sand factor is less than 7%.
9. the assembled support construction technique according to claim 8 based on coercion underground continuous wall structure, special
Sign is: the main component of the circulating mud is that bentonite and water after adding bentonite and water, are stirred in mixed mud sump
Mixing is mixed, chemical fibre melt, lignosulfonates, composite phosphate, carboxymethyl cellulose, exacerbation are added batch-wise in whipping process
Agent and leak preventive.
10. the assembled support construction technique according to claim 9 based on coercion underground continuous wall structure, special
Sign is: bead is grown filled with silicon substrate in the circulating mud, the silicon substrate growth bead is densely arranged in circulating mud,
The silicon substrate grows small ectosphere and is equipped with gel film, is filled with silicon substrate lubricating grease, the gel film in the gel film
Interior be filled with produces flocculant strain ball and silicon hydrocarbon chemical combination strain ball, the production flocculant strain ball and silicon hydrocarbon chemical combination strain ball
It uniformly arranges in silicon substrate lubricating grease.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811183193.3A CN109322311B (en) | 2018-10-11 | 2018-10-11 | Prefabricated underground continuous wall structure-based assembled supporting structure construction process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811183193.3A CN109322311B (en) | 2018-10-11 | 2018-10-11 | Prefabricated underground continuous wall structure-based assembled supporting structure construction process |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109322311A true CN109322311A (en) | 2019-02-12 |
CN109322311B CN109322311B (en) | 2021-03-26 |
Family
ID=65261849
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811183193.3A Active CN109322311B (en) | 2018-10-11 | 2018-10-11 | Prefabricated underground continuous wall structure-based assembled supporting structure construction process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109322311B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111827331A (en) * | 2020-08-14 | 2020-10-27 | 上海智平基础工程有限公司 | Supporting structure with seepage-proofing structure combined with underground continuous wall and construction method thereof |
CN111844358A (en) * | 2020-06-12 | 2020-10-30 | 上海市基础工程集团有限公司 | Method for manufacturing cement test block in cement continuous wall construction |
CN114960620A (en) * | 2021-02-26 | 2022-08-30 | 中能(厦门)智慧科技有限公司 | Construction method of underground continuous hollow wall |
CN115094911A (en) * | 2022-07-29 | 2022-09-23 | 深圳大学 | Intermittent construction method of prefabricated underground diaphragm wall |
-
2018
- 2018-10-11 CN CN201811183193.3A patent/CN109322311B/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111844358A (en) * | 2020-06-12 | 2020-10-30 | 上海市基础工程集团有限公司 | Method for manufacturing cement test block in cement continuous wall construction |
CN111827331A (en) * | 2020-08-14 | 2020-10-27 | 上海智平基础工程有限公司 | Supporting structure with seepage-proofing structure combined with underground continuous wall and construction method thereof |
CN114960620A (en) * | 2021-02-26 | 2022-08-30 | 中能(厦门)智慧科技有限公司 | Construction method of underground continuous hollow wall |
CN115094911A (en) * | 2022-07-29 | 2022-09-23 | 深圳大学 | Intermittent construction method of prefabricated underground diaphragm wall |
Also Published As
Publication number | Publication date |
---|---|
CN109322311B (en) | 2021-03-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107938676B (en) | Pile foundation construction method for penetrating through full-filling karst cave | |
CN106545005B (en) | A kind of reinforcing body and reinforcement means of subway tunnel shield end | |
CN105275381B (en) | Impact drill drilling construction method in rich water pebble layer | |
CN108894214B (en) | Karst cave geological environment cast-in-place pile and pile-forming construction method thereof | |
CN112323823B (en) | Filling device and method for waste air-raid shelter of pile foundation construction site | |
CN105951711A (en) | Enclosing construction method of underground continuous wall of seashore power station | |
CN109322311A (en) | Assembled support construction technique based on coercion underground continuous wall structure | |
CN108797598A (en) | The construction technology of pre-loaded support struts in a kind of deep basal pit | |
CN104612179B (en) | Through the construction method of the diaphram wall of super thick silty sand ground | |
CN108797569A (en) | A kind of control method that drilled pile novel energy-conserving pile crown is superfilled | |
CN103015429A (en) | Long auger rotary-jet mixing steel reinforced cement-soil pile foundation pit water-resisting and supporting method | |
CN104153371A (en) | Grouting-to-stop-water construction method of underwater rubble bed | |
CN111119128B (en) | Danger-removing, reinforcing and seepage-proofing method for natural rock-fill dam of barrier lake | |
CN111705786A (en) | Method for vertical combination construction of composite stratum underground continuous wall and cast-in-situ bored pile | |
CN105714769A (en) | Construction method for anti-sliding cast-in-place pile | |
CN114108649A (en) | Foundation pit reinforcing construction method for mucky soil layer | |
CN102383442B (en) | Water inlet pump chamber construction method | |
CN109610473A (en) | A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration | |
CN118110193A (en) | The whole process construction method of large diameter caisson in complex geological conditions | |
CN107587502B (en) | Construction method for rotary drilling hole-forming pressure-grouting cement soil occlusion curtain pile | |
CN112575794A (en) | Deep silt geological foundation pit support structure and construction method thereof | |
CN112144514A (en) | Simple method for forming hole and pile in sand and pebble stratum easy to collapse during rotary drilling machine | |
CN107956220A (en) | A kind of prefabricated construction method for diaphragm walls based on TRD grooving | |
CN103866787B (en) | A kind of spacious reverse masonry method concrete cut that digs builds construction technology | |
CN213897154U (en) | Soft soil foundation pit bottom curing structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20190930 Address after: 528300 East Office Building 201-11, No. 11 Junye East Road, Beijiao Town, Shunde District, Foshan City, Guangdong Province Applicant after: Guangdong Bozhilin Robot Co., Ltd. Address before: Room 105-46536, No. 6 Baohua Road, Hengqin New District, Zhuhai City, Guangdong Province Applicant before: Dingchen Construction Management Co., Ltd. |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |