CN109296135A CN201810989525.0A CN201810989525A CN109296135A CN 109296135 A CN109296135 A CN 109296135A CN 201810989525 A CN201810989525 A CN 201810989525A CN 109296135 A CN109296135 A CN 109296135A
Authority
CN
China
Prior art keywords
sleeve
grout
grouting
pressure
machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810989525.0A
Other languages
Chinese (zh)
Other versions
CN109296135B (en
Inventor
查晓雄
刘家文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810989525.0A priority Critical patent/CN109296135B/en
Publication of CN109296135A publication Critical patent/CN109296135A/en
Application granted granted Critical
Publication of CN109296135B publication Critical patent/CN109296135B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/162Connectors or means for connecting parts for reinforcements
    • E04C5/163Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
    • E04C5/165Coaxial connection by means of sleeves
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The present invention provides a kind of half grout sleeve grout construction methods, comprising the following steps: S1, will there is the sleeve of grouting mouth, grout outlet to connect with lower member, carries out seat slurry, form the seat pulp layer for sealing the sleeve lower end in the lower end of the sleeve;S2, the sleeve is connect with upper component, and cleans grouting mouth, the grout outlet of the sleeve, grouting mouth, the grout outlet of the sleeve are mounted on valve;S3, by high-pressure blast by the sleeve moisture and impurity blow out;S4, evacuator is connect with the grout outlet, pressure grouting machine is connect with the grouting mouth.The beneficial effects of the present invention are: on the one hand by vacuumizing the condition fundamentally cut off grouting material and formed air cavity, to ensure that Grouted density;On the other hand, after grouting negative pressure pressure maintaining certain time also compensate for vacuum degree may deficiency cause generate air chamber.

Description

A kind of half grout sleeve grout construction method
Technical field
The present invention relates to grout construction methods, more particularly to a kind of half grout sleeve grout construction method.
Background technique
Existing assembled architecture node sleeve connection construction method (i.e. reinforced bar sleeve grouting connection construction method) cannot Guarantee grouting density well.
Summary of the invention
It in order to solve the problems in the prior art, can be with the present invention provides a kind of half grout sleeve grout construction method Guarantee grouting density well.
The present invention provides a kind of half grout sleeve grout construction methods, comprising the following steps:
S1, will there is the sleeve of grouting mouth, grout outlet to connect with lower member, carries out seat slurry, is formed in the lower end of the sleeve Seal the seat pulp layer of the sleeve lower end;
S2, the sleeve is connect with upper component, and cleans grouting mouth, the grout outlet of the sleeve, the grouting of the sleeve Mouth, grout outlet are mounted on valve;
S3, by high-pressure blast by the sleeve moisture and impurity blow out;
S4, evacuator is connect with the grout outlet, pressure grouting machine is connect with the grouting mouth;
S5, the valve for closing the grouting mouth, open the valve of the grout outlet, start the evacuator, make described take out very Empty machine is sucked by vacuum the sleeve by the grout outlet, when the negative pressure in the sleeve reaches predetermined threshold, closes The evacuator is closed, and the evacuator is removed and removes the grout outlet;
S6, the valve for opening the grouting mouth, start the pressure grouting machine, the pressure grouting machine are made to pass through the grouting mouth Mud jacking is carried out to the sleeve, until having filled slurry, pressure maintaining certain time in the sleeve;
S7, the pressure grouting machine is closed.
As a further improvement of the present invention, the upper component, lower member are reinforcing bar.
As a further improvement of the present invention, the grouting mouth of the sleeve, be mounted on O-shaped rubber seal in grout outlet Circle.
As a further improvement of the present invention, in step s 5, it when the negative pressure in the sleeve reaches -0.1MPa, closes The vacuum machine.
As a further improvement of the present invention, the pressure grouting machine is piston type pneumatic mortar machine, the piston type pneumatic mortar machine Without using compressed air pneumatic mortar machine.
As a further improvement of the present invention, in step s 6, when the pulp of the grout outlet and the grouting mouth enter When slurry is consistent, then it is assumed that filled slurry in the sleeve.
As a further improvement of the present invention, in step s 6, the pressure 0.7MPa of the pressure grouting machine is kept, and is protected Pressure one minute.
The beneficial effects of the present invention are: through the above scheme, on the one hand fundamentally having cut off grouting material by vacuumizing The condition for forming air cavity, to ensure that Grouted density;On the other hand, negative pressure pressure maintaining certain time also makes up after grouting Vacuum degree may deficiency lead to the air chamber generated.
Detailed description of the invention
Fig. 1 is a kind of schematic diagram of half grout sleeve grout construction method of the invention.
Specific embodiment
The invention will be further described for explanation and specific embodiment with reference to the accompanying drawing.
As shown in Figure 1, a kind of half grout sleeve grout construction method, comprising the following steps:
S1, will there is the sleeve 1 of grouting mouth, grout outlet to connect with lower rebar 2, seat slurry is carried out, in the lower end shape of the sleeve 1 At the seat pulp layer 4 for sealing 1 lower end of sleeve, elder generation's seat is starched when placing upper component, it can be ensured that 1 lower end leakproofness of sleeve is prevented Spillage when only taking out slurry;
S2, the sleeve 1 is connect with upper reinforcement 3, and cleans grouting mouth, the grout outlet of the sleeve 1, the filling of the sleeve Slurry mouth, grout outlet are mounted on valve 5,6, and the mounting O-shaped rubber seal 8 in the grouting mouth, grout outlet of the sleeve 1 is used In seal sleeve 1 and building;
S3, by high-pressure blast by the sleeve 1 moisture and impurity blow out;
S4, evacuator 10 is connect with the grout outlet, pressure grouting machine 9 is connect with the grouting mouth, the pressure fills Pulp grinder 9 can use piston type pneumatic mortar machine, and the piston type pneumatic mortar machine 9 does not use compressed air pneumatic mortar machine;
S5, the valve 5 for closing the grouting mouth, open the valve 6 of the grout outlet, start the evacuator 10, make described Evacuator 10 is sucked by vacuum the sleeve 1 by the grout outlet, when the negative pressure in the sleeve 1 reaches- 0.1MPa closes the evacuator 10, and the evacuator 10 is removed and removes the grout outlet;
S6, the valve 5 for opening the grouting mouth, start the pressure grouting machine 9, the pressure grouting machine 9 are made to pass through the filling It starches mouth and mud jacking is carried out to the sleeve 1, i.e., grouting material 7 is pressed into sleeve 1, until slurry has been filled in the sleeve 1, when described The pulp of grout outlet and the entering when slurry is consistent for mouth of grouting (pour into that how many slurry go out that how many slurry illustrate in sleeve 1 Fill slurry), then it is assumed that slurry has been filled in the sleeve 1, has then kept the pressure 0.7MPa of the pressure grouting machine 9, and pressure maintaining (or holding pressure) one minute;
S7, the pressure grouting machine 9 is closed.
On the one hand a kind of half grout sleeve grout construction method provided by the invention is fundamentally cut off by vacuumizing The condition for forming air cavity, to ensure that Grouted density;On the other hand, negative pressure is held pressure and is also compensated for for one minute after grouting The possible deficiency of vacuum degree leads to the air chamber generated.
A kind of half grout sleeve grout construction method provided by the invention is not free after taking out slurry processes using vacuum in sleeve 1 Gas forms cavity, and the good grouting material 7 of mobility will not form the cavity of vacuum, while the negative pressure after grouting holds pressure process meeting The problem of making up the vacuum degree deficiency being likely to occur, grouting plumpness have dual guarantee.
The above content is a further detailed description of the present invention in conjunction with specific preferred embodiments, and it cannot be said that Specific implementation of the invention is only limited to these instructions.For those of ordinary skill in the art to which the present invention belongs, exist Under the premise of not departing from present inventive concept, a number of simple deductions or replacements can also be made, all shall be regarded as belonging to of the invention Protection scope.

Claims (7)

1. a kind of half grout sleeve grout construction method, which comprises the following steps:
S1, will there is the sleeve of grouting mouth, grout outlet to connect with lower member, carries out seat slurry, is formed in the lower end of the sleeve Seal the seat pulp layer of the sleeve lower end;
S2, the sleeve is connect with upper component, and cleans grouting mouth, the grout outlet of the sleeve, the grouting of the sleeve Mouth, grout outlet are mounted on valve;
S3, by high-pressure blast by the sleeve moisture and impurity blow out;
S4, evacuator is connect with the grout outlet, pressure grouting machine is connect with the grouting mouth;
S5, the valve for closing the grouting mouth, open the valve of the grout outlet, start the evacuator, make described take out very Empty machine is sucked by vacuum the sleeve by the grout outlet, when the negative pressure in the sleeve reaches predetermined threshold, closes The evacuator is closed, and the evacuator is removed and removes the grout outlet;
S6, the valve for opening the grouting mouth, start the pressure grouting machine, the pressure grouting machine are made to pass through the grouting mouth Mud jacking is carried out to the sleeve, until having filled slurry, pressure maintaining certain time in the sleeve;
S7, the pressure grouting machine is closed.
2. half grout sleeve grout construction method according to claim 1, it is characterised in that: the upper component, lower part Component is reinforcing bar.
3. half grout sleeve grout construction method according to claim 1, it is characterised in that: the grouting mouth of the sleeve, O-shaped rubber seal is mounted in grout outlet.
4. half grout sleeve grout construction method according to claim 1, it is characterised in that: in step s 5, when described Negative pressure in sleeve reaches -0.1MPa, closes the vacuum machine.
5. half grout sleeve grout construction method according to claim 1, it is characterised in that: the pressure grouting machine is to live Plug pneumatic mortar machine, the piston type pneumatic mortar machine do not use compressed air pneumatic mortar machine.
6. half grout sleeve grout construction method according to claim 1, it is characterised in that: in step s 6, when described The pulp of grout outlet and when entering slurry and being consistent of the grouting mouth, then it is assumed that slurry has been filled in the sleeve.
7. half grout sleeve grout construction method according to claim 1, it is characterised in that: in step s 6, keep institute State the pressure 0.7MPa of pressure grouting machine, and pressure maintaining one minute.
CN201810989525.0A 2018-08-28 2018-08-28 Grouting construction method for semi-grouting sleeve Active CN109296135B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810989525.0A CN109296135B (en) 2018-08-28 2018-08-28 Grouting construction method for semi-grouting sleeve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810989525.0A CN109296135B (en) 2018-08-28 2018-08-28 Grouting construction method for semi-grouting sleeve

Publications (2)

Publication Number Publication Date
CN109296135A true CN109296135A (en) 2019-02-01
CN109296135B CN109296135B (en) 2021-04-20

Family

ID=65165571

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810989525.0A Active CN109296135B (en) 2018-08-28 2018-08-28 Grouting construction method for semi-grouting sleeve

Country Status (1)

Country Link
CN (1) CN109296135B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130584A (en) * 2019-04-29 2019-08-16 河海大学 Pressure grouting sleeve device suitable for steel bar connection of prefabricated concrete structure
CN110700589A (en) * 2019-10-22 2020-01-17 武汉合创炬盛科技有限公司 Method for improving compactness of assembly type concrete grouting connection node
CN111101714A (en) * 2019-12-31 2020-05-05 山东泰安建筑工程集团有限公司 Grouting connection construction method for prefabricated components of fabricated building
CN111270859A (en) * 2020-01-21 2020-06-12 中国建筑股份有限公司 Air exhaust system for assembled concrete grouting sleeve and construction method of air exhaust system
CN112983006A (en) * 2021-01-25 2021-06-18 侯金林 Vacuum grouting device for fabricated building structure and construction method thereof
CN114166409A (en) * 2021-11-15 2022-03-11 北京建筑大学 Grouting sleeve grouting pressure detection plug, grouting equipment and grouting method
WO2024079666A1 (en) * 2022-10-12 2024-04-18 Cementos Argos S.A. Connection system for connecting prefabricated modules
CN118346001A (en) * 2024-05-08 2024-07-16 中建路桥集团有限公司 Self-locking type grouting-preventing half-grouting sleeve and grouting construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07279315A (en) * 1994-04-13 1995-10-27 Tokyo Tekko Co Ltd Joint execution method for precast structure
US5902939A (en) * 1996-06-04 1999-05-11 U.S. Army Corps Of Engineers As Represented By The Secretary Of The Army Penetrometer sampler system for subsurface spectral analysis of contaminated media
CN201666000U (en) * 2010-03-23 2010-12-08 陕西建工集团第二建筑工程有限公司 Vacuum auxiliary grouting system used for prestressed post-tensioned frame beam
CN105178516A (en) * 2015-09-28 2015-12-23 中国建筑股份有限公司 Extruded semi-grouting reinforced sleeve with built-in casing, connective structure, and construction method
CN108442614A (en) * 2018-05-08 2018-08-24 北京榆构有限公司 Precast concrete bar connecting grout sleeve device and its grouting method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07279315A (en) * 1994-04-13 1995-10-27 Tokyo Tekko Co Ltd Joint execution method for precast structure
US5902939A (en) * 1996-06-04 1999-05-11 U.S. Army Corps Of Engineers As Represented By The Secretary Of The Army Penetrometer sampler system for subsurface spectral analysis of contaminated media
CN201666000U (en) * 2010-03-23 2010-12-08 陕西建工集团第二建筑工程有限公司 Vacuum auxiliary grouting system used for prestressed post-tensioned frame beam
CN105178516A (en) * 2015-09-28 2015-12-23 中国建筑股份有限公司 Extruded semi-grouting reinforced sleeve with built-in casing, connective structure, and construction method
CN108442614A (en) * 2018-05-08 2018-08-24 北京榆构有限公司 Precast concrete bar connecting grout sleeve device and its grouting method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130584A (en) * 2019-04-29 2019-08-16 河海大学 Pressure grouting sleeve device suitable for steel bar connection of prefabricated concrete structure
CN110700589A (en) * 2019-10-22 2020-01-17 武汉合创炬盛科技有限公司 Method for improving compactness of assembly type concrete grouting connection node
CN111101714A (en) * 2019-12-31 2020-05-05 山东泰安建筑工程集团有限公司 Grouting connection construction method for prefabricated components of fabricated building
CN111270859A (en) * 2020-01-21 2020-06-12 中国建筑股份有限公司 Air exhaust system for assembled concrete grouting sleeve and construction method of air exhaust system
CN112983006A (en) * 2021-01-25 2021-06-18 侯金林 Vacuum grouting device for fabricated building structure and construction method thereof
CN114166409A (en) * 2021-11-15 2022-03-11 北京建筑大学 Grouting sleeve grouting pressure detection plug, grouting equipment and grouting method
WO2024079666A1 (en) * 2022-10-12 2024-04-18 Cementos Argos S.A. Connection system for connecting prefabricated modules
CN118346001A (en) * 2024-05-08 2024-07-16 中建路桥集团有限公司 Self-locking type grouting-preventing half-grouting sleeve and grouting construction method thereof

Also Published As

Publication number Publication date
CN109296135B (en) 2021-04-20

Similar Documents

Publication Publication Date Title
CN109296135A (en) A kind of half grout sleeve grout construction method
CN101251030B (en) Secondary hole sealing method capable of improving coal bed drilling firedamp sucking concentration
CN107724704A (en) The method for repairing and constructing of terrace hollowing cracking
CN203940129U (en) Wall, board back-patch waterproof sleeve plugging structure
CN105545250B (en) A kind of method for sealing of depth envelope type hole packer
CN105696967A (en) Mining hole packer and hole packing method
CN102900396A (en) Method for integrally sealing and separating gas extraction drilled hole in coal seam
CN105239789A (en) Construction process for plugging and consolidating concrete crack through chemical grouting
CN108798026A (en) A kind of the benefit pulp grinder and its benefit paste-making method of grout sleeve
CN104963324B (en) Diversion tunnel plugging head exhaust structure and exhaust method thereof
CN102704984A (en) Borehole high-concentration gas extraction and drainage method and device thereof
CN108915291A (en) A kind of repairing concrete crack syringe needle and its application method
CN103924577B (en) Monitoring pipe and vacuum diaphragm syndeton and connection construction method in a kind for the treatment of of soft foundation
CN103046513A (en) Method for coating and sealing fracture of bed rock in uncovered heavy consolidation grouting
CN104449609A (en) Active pressure maintaining and hole sealing material for gas extraction drill hole and hole sealing process thereof
CN104847984A (en) Pipeline bell-and-spigot joint technology
CN108716405B (en) Constructing tunnel dual slurry grouting construction method
CN108104865A (en) A kind of concordant drilling Anti-air-leakage gas pumping method
CN107700440A (en) A kind of diversion tunnel concrete plug and its construction method
CN204320755U (en) The wind power ganged flusher in a kind of mortar delivery pipe road
CN107676055B (en) A Gas Drainage Borehole Plugging Method Using S-shaped Structure Plugging Bayonet
CN106939700A (en) The vacuum aided sealing off and covering anchorage construction method of back-off anchor recess
CN204991168U (en) Feeding tube entrance pull throughs under radioactive waste liquid cement solidification
CN204781026U (en) Mashed root treatment facility of concrete retaining wall
CN203430466U (en) Drill hole sealing device for gas extraction of coal mine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant