CN109281924A - Joint of steel structure and its manufacturing method of the outsourcing from closing in - Google Patents
Joint of steel structure and its manufacturing method of the outsourcing from closing in Download PDFInfo
- Publication number
- CN109281924A CN109281924A CN201811378421.2A CN201811378421A CN109281924A CN 109281924 A CN109281924 A CN 109281924A CN 201811378421 A CN201811378421 A CN 201811378421A CN 109281924 A CN109281924 A CN 109281924A
- Authority
- CN
- China
- Prior art keywords
- steel
- stage
- joint
- matrix
- prepares
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 136
- 239000010959 steel Substances 0.000 title claims abstract description 136
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 22
- 238000012946 outsourcing Methods 0.000 title claims abstract description 19
- 238000010276 construction Methods 0.000 claims abstract description 29
- 210000001258 synovial membrane Anatomy 0.000 claims abstract description 21
- 238000007711 solidification Methods 0.000 claims abstract description 9
- 230000008023 solidification Effects 0.000 claims abstract description 9
- 238000004826 seaming Methods 0.000 claims abstract description 8
- 239000011159 matrix material Substances 0.000 claims description 46
- 230000006698 induction Effects 0.000 claims description 30
- 238000000034 method Methods 0.000 claims description 21
- 239000011248 coating agent Substances 0.000 claims description 18
- 238000000576 coating method Methods 0.000 claims description 18
- 239000000463 material Substances 0.000 claims description 18
- 239000007787 solid Substances 0.000 claims description 17
- 238000010438 heat treatment Methods 0.000 claims description 14
- 230000008569 process Effects 0.000 claims description 14
- 238000013461 design Methods 0.000 claims description 11
- 238000004372 laser cladding Methods 0.000 claims description 11
- 239000002994 raw material Substances 0.000 claims description 9
- 238000012545 processing Methods 0.000 claims description 8
- 238000002360 preparation method Methods 0.000 claims description 7
- 238000010791 quenching Methods 0.000 claims description 5
- 230000000171 quenching effect Effects 0.000 claims description 5
- 238000003754 machining Methods 0.000 claims description 4
- 238000005496 tempering Methods 0.000 claims description 4
- MBMLMWLHJBBADN-UHFFFAOYSA-N Ferrous sulfide Chemical compound [Fe]=S MBMLMWLHJBBADN-UHFFFAOYSA-N 0.000 claims description 3
- 238000010000 carbonizing Methods 0.000 claims description 3
- CWQXQMHSOZUFJS-UHFFFAOYSA-N molybdenum disulfide Chemical compound S=[Mo]=S CWQXQMHSOZUFJS-UHFFFAOYSA-N 0.000 claims description 3
- 229910052982 molybdenum disulfide Inorganic materials 0.000 claims description 3
- 229910052709 silver Inorganic materials 0.000 claims description 3
- 239000004332 silver Substances 0.000 claims description 3
- OAICVXFJPJFONN-UHFFFAOYSA-N Phosphorus Chemical compound [P] OAICVXFJPJFONN-UHFFFAOYSA-N 0.000 claims description 2
- 229910052698 phosphorus Inorganic materials 0.000 claims description 2
- 239000011574 phosphorus Substances 0.000 claims description 2
- 238000009628 steelmaking Methods 0.000 claims description 2
- 238000011065 in-situ storage Methods 0.000 abstract description 5
- 230000003044 adaptive effect Effects 0.000 abstract 1
- 230000003139 buffering effect Effects 0.000 abstract 1
- 239000010410 layer Substances 0.000 description 8
- 238000001816 cooling Methods 0.000 description 3
- 239000000843 powder Substances 0.000 description 3
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 2
- BQCADISMDOOEFD-UHFFFAOYSA-N Silver Chemical compound [Ag] BQCADISMDOOEFD-UHFFFAOYSA-N 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000002844 melting Methods 0.000 description 2
- 230000008018 melting Effects 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000005253 cladding Methods 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000010891 electric arc Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000010285 flame spraying Methods 0.000 description 1
- 239000002346 layers by function Substances 0.000 description 1
- 229910000734 martensite Inorganic materials 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000005476 soldering Methods 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16C—SHAFTS; FLEXIBLE SHAFTS; ELEMENTS OR CRANKSHAFT MECHANISMS; ROTARY BODIES OTHER THAN GEARING ELEMENTS; BEARINGS
- F16C11/00—Pivots; Pivotal connections
- F16C11/04—Pivotal connections
- F16C11/06—Ball-joints; Other joints having more than one degree of angular freedom, i.e. universal joints
- F16C11/0614—Ball-joints; Other joints having more than one degree of angular freedom, i.e. universal joints the female part of the joint being open on two sides
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P15/00—Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16C—SHAFTS; FLEXIBLE SHAFTS; ELEMENTS OR CRANKSHAFT MECHANISMS; ROTARY BODIES OTHER THAN GEARING ELEMENTS; BEARINGS
- F16C11/00—Pivots; Pivotal connections
- F16C11/04—Pivotal connections
- F16C11/06—Ball-joints; Other joints having more than one degree of angular freedom, i.e. universal joints
- F16C11/0619—Ball-joints; Other joints having more than one degree of angular freedom, i.e. universal joints the female part comprising a blind socket receiving the male part
- F16C11/0623—Construction or details of the socket member
- F16C11/0628—Construction or details of the socket member with linings
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16C—SHAFTS; FLEXIBLE SHAFTS; ELEMENTS OR CRANKSHAFT MECHANISMS; ROTARY BODIES OTHER THAN GEARING ELEMENTS; BEARINGS
- F16C11/00—Pivots; Pivotal connections
- F16C11/04—Pivotal connections
- F16C11/06—Ball-joints; Other joints having more than one degree of angular freedom, i.e. universal joints
- F16C11/068—Special features relating to lubrication
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16C—SHAFTS; FLEXIBLE SHAFTS; ELEMENTS OR CRANKSHAFT MECHANISMS; ROTARY BODIES OTHER THAN GEARING ELEMENTS; BEARINGS
- F16C11/00—Pivots; Pivotal connections
- F16C11/04—Pivotal connections
- F16C11/06—Ball-joints; Other joints having more than one degree of angular freedom, i.e. universal joints
- F16C11/0685—Manufacture of ball-joints and parts thereof, e.g. assembly of ball-joints
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16C—SHAFTS; FLEXIBLE SHAFTS; ELEMENTS OR CRANKSHAFT MECHANISMS; ROTARY BODIES OTHER THAN GEARING ELEMENTS; BEARINGS
- F16C11/00—Pivots; Pivotal connections
- F16C11/04—Pivotal connections
- F16C11/10—Arrangements for locking
- F16C11/103—Arrangements for locking frictionally clamped
- F16C11/106—Arrangements for locking frictionally clamped for ball joints
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Heat Treatment Of Articles (AREA)
Abstract
The invention discloses a kind of outsourcings from the joint of steel structure and its manufacturing method to close up, the joint of steel structure include cylindrical base, by closing in be wrapped in be provided with the ball rod of bulb and be solidificated in cylindrical base inner surface and solidification stratum synoviale that ball rod matches;The present invention use with cylindrical base shape be adapted and upper end opening and opening by it is outer and in be provided be in that the tubular seaming tool on 30 °, 20 ° and 10 ° inclined-planes carries out three-stage buffering and closes up, and is machined with the escape of adaptive deformation requirement in cylindrical base inner surface bottom in advance before closing in axis respectively.Steel construction permission of the invention is in situ to rotate, prevents from axially pulling, close up certainly, install simple, stable structure.
Description
Technical field
The joint of steel structure and its manufacturing method to close up certainly the present invention relates to field of steel structure more particularly to a kind of outsourcing.
Background technique
It there are three types of the connection type of steel construction is general, is welded to connect, is bolted and rivet interlacement.It is welded to connect because having
Any orientation, angle and the shape of steel can be directly connected to, member section, saving steel, simple structure, system are not weakened
It makes conveniently, the rigidity of connection is big, good seal performance, preferably uses automated job, is widely used the advantages that high production efficiency.
Welded connecting is that the heat generated by electric arc makes welding rod and weldment local melting, weld seam is condensed into through cooling, thus by weldment
It links into an integrated entity.In high-temperature soldering cooling procedure, the steel near weld seam are because of high temperature action formation heat affected area, due to unevenness
Even high temperature and cooling makes structure generate residual stress and residual deformation and become fragile, to the bearing capacity of steel construction, rigidity and use
Performance has certain influence.
For demand property (such as multistage connecting rod, head need to rotate convenient for assembling security framework) steel construction and
Speech, the anti-axial direction of the special requirement of demand pulls but radial rotatable joint structure.
And at present in the related patents applied at home, it does not pull specifically for anti-axial direction but radial direction But rotary joint
The prior art of structure, thus need a kind of permission to rotate in situ in the market, prevent it is axial pull, from close up, installation is simple, knot
The stable joint of steel structure of structure.
Summary of the invention
It rotates the present invention is intended to provide permission is in situ, prevents from axially pulling, close up certainly, simple, stable structure steel is installed
Structural joint and its manufacturing method.
To achieve the goals above, the invention adopts the following technical scheme: the joint of steel structure that a kind of 1, outsourcing is closed up certainly
Manufacturing method, comprising the following steps:
1) prepare before manufacture
1. raw material prepare: prepare phosphorus content not higher than 0.3% steel billet, spherical surface hardness not less than 50HRC ball rod,
Sufficient solid synovial membrane coating material;
2. tooling prepare: prepare with final design base steel shape be adapted upper end opening and opening by outside and in set
Be equipped be in respectively with axis 30 °, 20 ° and 10 ° inclined-planes tubular seaming tool, preparation and final design steel matrix outer circle be adapted
High-frequency induction tooling, the adaptable film layer of preparation and final design steel matrix Inner arc coat tooling;
3. equipment prepares: preparing laser cladding equipment, hydraulic device, baking oven, high-frequency induction device;
2) steel matrix is processed
1. by the stage 1) steel billet that 1. prepares of step is processed into lower end cylinder upper end inversed conical drum and the conical surface is oblique relative to axis
The two-part structure that degree is 30 ° is initial steel construction;
2. basic point burr-drill hole vertically downward, taper hole top angle is in the initial steel construction upper surface center 1. obtained using step
It is 60 °, when horizontal plane locating for hole pointed drill to lower end cylindrical surface top stops, aperture steel construction in acquisition;
3. being located at close to taper hole face lower end away from end face in the middle cone hole face of 2. middle aperture steel construction that step obtains
The position of length 2/3-3/4, using the stage 1) Probe-radius of ball rod that 1. prepares of step as radius of machining, with taper hole face and end
The annulus of face junction is the center of circle of vertical cross-section, processes a circle arc anchor ring, obtains prefabricated base structure;
4. processing depth and remaining conical surface equal length using taper hole tip as matrix to process the process of escape
Escape, obtain needed for steel matrix;
3) it pre-processes
1. by the stage 2) obtain steel matrix use the stage 1) step 2. prepare film layer coating tooling protect and fix,
Using the stage 1) the solid synovial membrane coating material that 2. prepares of step is raw material, using laser cladding equipment to the stage 2) 3. step obtains
The arc anchor ring obtained carries out the processing of coating produced by laser cladding solid synovial membrane, solidifies consolidating for a layer thickness 0.08mm-0.2mm on arc anchor ring
Body stratum synoviale obtains pretreatment steel matrix;
4) closing in jacket
1. by the stage 1) step 1. prepare ball rod, the stage 3) obtain pretreatment steel matrix, the stage 1) step is 2. quasi-
Standby tubular seaming tool is coaxially fixed from top to bottom, using the stage 1) hydraulic device that 3. prepares of step is continuously applied vertical pressure
Clamp force obtains closing in jacket joint of steel structure until ball rod, pretreatment steel matrix are moved to and close up and fix completely;
2. the outer circle of 1. closing in jacket steel construction that step obtains is placed in high-frequency induction tooling, using the stage 1) step
3. the high-frequency induction device prepared carries out induction heating, until raw steel matrix deformed region is heated to the AC of Steel material3Temperature with
Upper 30 DEG C -50 DEG C, then stops heating and standing to deformation terminating, obtain stabilized steel structural joint;
3. repeating step 1. -2. 2 times -3 times, solidification joint of steel structure is obtained;
5) it post-processes
1. by the stage 4) obtain the outer circle for solidifying joint of steel structure be placed in high-frequency induction tooling, using the stage 1) step
3. the high-frequency induction device prepared carries out induction heating, until steel matrix is integrally heated to the AC of Steel material3More than temperature 30 DEG C-
50 DEG C, then hardening to temperature is stablized, using the stage 1) baking oven that 3. prepares of step uses the solidification joint of steel structure of hardening
200 DEG C of -240 DEG C of temperature, 2h-3h time carry out tempering, obtain and strengthen steel construction, which is required outsourcing
From the joint of steel structure of closing in.
From in the manufacturing method of the joint of steel structure to close up, steel matrix uses 10 for above-mentioned outsourcing#Steel making, ball rod are adopted
It is quenched with GCr6 and is obtained after lonneal.
From in the manufacturing method of the joint of steel structure to close up, steel matrix is manufactured using 20Cr for above-mentioned outsourcing, and ball rod is adopted
With the surfaces nitrided rear acquisition of 32Cr3MoV.
Above-mentioned outsourcing is from the manufacturing method of the joint of steel structure to close up, and steel matrix is manufactured using 30CrMnSi, bulb
Bar obtains after using 12CrNi3 case-carbonizing, quenching and lonneal.
Above-mentioned outsourcing from close up joint of steel structure manufacturing method in, solid synovial membrane coating material be silver, iron sulfide,
Any one in molybdenum disulfide.
Compared with prior art, the invention has the following advantages that (1) present invention is realized fair by the simultaneously jacket that closes up
Perhaps in situ to rotate, prevent the functional structure axially pulled, and the setting by solidifying stratum synoviale and the processing of circular arc anchor ring add
The strong applicability and practicability of this structure, improves service life and reduces sliding resistance, while also improving the tight of connector
Conjunction degree.(2) structure design of the invention be it is very outstanding in reasonable, conventional physics closing in technology, be to have no idea
Complete, continuous solid synovial membrane is integrated in Internal Spherical Surface, this is because closing in (the also pole actually applied in routine techniques
It is few) it is only merely the side wing area deformed on the outside of upper surface, make its inside jacket, grasp also relies solely on slight side wing area
Steel structure support, it is often more important that this structure has very big inner arc spherical surface close to (with horizontal plane) parallel with axis,
The side wing that even can be also held stops, and for linear depositional mode (such as laser melting coating, supersonic flame spraying), is
It cannot achieve, the present invention greatly improves the volume of deformed region by reasonable technological design, promptly adds so that providing
Steel construction volume greatly increase, anti-pulling-out force is stronger, at the same make unreefed inner arc spherical surface inclination angle increase, also without physics hinder
Gear can greatly enhance the performance and used life of joint with the cladding of simple realization functional layer.(3) currently preferred
Three kinds of matching materials are all pairings relatively reasonable during existing friction associate research fellow is studied carefully, and are all the materials of lower cost, are easily handled
And be easily achieved, even if reasonably also can guarantee the present invention one with pair in this way in the case where solid synovial membrane falls off or fails
It is operated normally in section of fixing time.(4) the subsequent heat treatment of the present invention is also further to promote deformed region metallographic structure stabilization, turn
Change completely, on the one hand last Low Temperature Heat Treatment plays the role of destressing, on the other hand can also stabilize metallographic structure (quenching horse
Family name's body is changed into tempered martensite), greatly improve joint steel matrix intensity.Therefore joint of steel structure of the invention has
Permission is in situ to rotate, prevents from axially pulling, close up certainly, install simple, stable structure characteristic.
Detailed description of the invention
Fig. 1 is the structural schematic diagram after the present invention is installed;
Fig. 2 is the structural schematic diagram before present invention installation.
In figure: steel matrix 1, escape 2, ball rod 3, solid stratum synoviale 4, tubular seaming tool 5.
Specific embodiment
Embodiment 1:
A kind of manufacturing method of the outsourcing as shown in Figure 1 and Figure 2 from the joint of steel structure to close up, comprising the following steps:
1) prepare before manufacture
1. raw material prepare: preparing 10#Ball rod 3, the enough silver obtained after steel steel billet, GCr6 quenching and lonneal
Powder;
2. tooling prepare: prepare with final design base steel shape be adapted upper end opening and opening by outside and in set
It is equipped with the tubular seaming tool 5 for axis being respectively in 30 °, 20 ° and 10 ° inclined-planes, preparation is mutually fitted with final design steel matrix outer circle
The adaptable film layer coating tooling of high-frequency induction tooling, preparation and the final design steel matrix Inner arc answered;
3. equipment prepares: preparing laser cladding equipment, hydraulic device, baking oven, high-frequency induction device;
2) steel matrix 1 is processed
1. by the stage 1) steel billet that 1. prepares of step is processed into lower end cylinder upper end inversed conical drum and the conical surface is oblique relative to axis
The two-part structure that degree is 30 ° is initial steel construction;
2. basic point burr-drill hole vertically downward, taper hole top angle is in the initial steel construction upper surface center 1. obtained using step
It is 60 °, when horizontal plane locating for hole pointed drill to lower end cylindrical surface top stops, aperture steel construction in acquisition;
3. being located at close to taper hole face lower end away from end face in the middle cone hole face of 2. middle aperture steel construction that step obtains
The position of length 3/4, using the stage 1) Probe-radius of ball rod 3 that 1. prepares of step as radius of machining, with taper hole face and end face
The annulus of junction is the center of circle of vertical cross-section, processes a circle arc anchor ring, obtains prefabricated base structure;
4. processing depth and remaining conical surface equal length using taper hole tip as matrix to process the process of escape
Escape 2, obtain needed for steel matrix 1;
3) it pre-processes
1. by the stage 2) obtain steel matrix 1 use the stage 1) step 2. prepare film layer coating tooling protect and fix
Good, using the stage 1) the solid synovial membrane coating material that 2. prepares of step is raw material, using laser cladding equipment to the stage 2) step
3. the arc anchor ring obtained carries out the processing of coating produced by laser cladding solid synovial membrane, solidify the solid of a layer thickness 0.2mm on arc anchor ring
Stratum synoviale 4 obtains pretreatment steel matrix 1;
4) closing in jacket
1. by the stage 1) step 1. prepare ball rod 3, the stage 3) obtain pretreatment steel matrix 1, the stage 1) step is 2.
The tubular seaming tool 5 of preparation is coaxial fixed from top to bottom, using the stage 1) hydraulic device that 3. prepares of step be continuously applied it is vertical
Vertical compression clamp force obtains closing in jacket joint of steel structure until ball rod 3, pretreatment steel matrix 1 are moved to and close up and fix completely;
2. the outer circle of 1. closing in jacket steel construction that step obtains is placed in high-frequency induction tooling, using the stage 1) step
3. the high-frequency induction device prepared carries out induction heating, until 1 deformed region of raw steel matrix is heated to the AC of Steel material3Temperature with
Upper 50 DEG C, then stops heating and standing to deformation terminating, obtain stabilized steel structural joint;
1. -2. 3 time 3. repeating step, solidification joint of steel structure is obtained;
5) it post-processes
1. by the stage 4) obtain the outer circle for solidifying joint of steel structure be placed in high-frequency induction tooling, using the stage 1) step
3. the high-frequency induction device prepared carries out induction heating, until steel matrix 1 is integrally heated to the AC of Steel material3More than temperature 50
DEG C, then hardening to temperature is stablized, using the stage 1) baking oven that 3. prepares of step by the solidification joint of steel structure of hardening using 240
DEG C temperature, 3h time carry out tempering, obtain and strengthen steel construction, the reinforcing steel construction be needed for outsourcing from the steel knot to close up
Structure connector.
Embodiment 2:
It is whole consistent with embodiment 1, it is in place of difference:
1) prepare before manufacture
1. raw material prepare: preparing ball rod 3, the enough iron sulfide obtained after 20Cr steel billet, 32Cr3MoV are surfaces nitrided
Powder;
2) steel matrix 1 is processed
3. being located at close to taper hole face lower end away from end face in the middle cone hole face of 2. middle aperture steel construction that step obtains
The position of length 2/3, using the stage 1) Probe-radius of ball rod 3 that 1. prepares of step as radius of machining, with taper hole face and end face
The annulus of junction is the center of circle of vertical cross-section, processes a circle arc anchor ring, obtains prefabricated base structure;
3) it pre-processes
1. by the stage 2) obtain steel matrix 1 use the stage 1) step 2. prepare film layer coating tooling protect and fix
Good, using the stage 1) the solid synovial membrane coating material that 2. prepares of step is raw material, using laser cladding equipment to the stage 2) step
3. the arc anchor ring obtained carries out the processing of coating produced by laser cladding solid synovial membrane, solidify the solid of a layer thickness 0.08mm on arc anchor ring
Stratum synoviale 4 obtains pretreatment steel matrix 1;
4) closing in jacket
2. the outer circle of 1. closing in jacket steel construction that step obtains is placed in high-frequency induction tooling, using the stage 1) step
3. the high-frequency induction device prepared carries out induction heating, until 1 deformed region of raw steel matrix is heated to the AC of Steel material3Temperature with
Upper 30 DEG C, then stops heating and standing to deformation terminating, obtain stabilized steel structural joint;
1. -2. 2 time 3. repeating step, solidification joint of steel structure is obtained;
5) it post-processes
1. by the stage 4) obtain the outer circle for solidifying joint of steel structure be placed in high-frequency induction tooling, using the stage 1) step
3. the high-frequency induction device prepared carries out induction heating, until steel matrix 1 is integrally heated to the AC of Steel material3More than temperature 30
DEG C, then hardening to temperature is stablized, using the stage 1) baking oven that 3. prepares of step by the solidification joint of steel structure of hardening using 200
DEG C temperature, 2h time carry out tempering, obtain and strengthen steel construction, the reinforcing steel construction be needed for outsourcing from the steel knot to close up
Structure connector.
Embodiment 3:
It is whole consistent with embodiment 1, it is in place of difference:
1) prepare before manufacture
1. raw material prepare: preparing 30CrMnSi steel billet, obtained after 12CrNi3 case-carbonizing, quenching and lonneal
Ball rod 3, enough molybdenum disulfide powders;
The foregoing description of the disclosed embodiments, only for can be realized professional and technical personnel in the field or use this
Invention.Various modifications to these embodiments will be readily apparent to those skilled in the art, institute herein
The General Principle of definition can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore,
The present invention will not be limited to the embodiments shown herein, and is to fit to special with principles disclosed herein and novelty
The consistent widest scope of point.
Claims (5)
1. a kind of manufacturing method for the joint of steel structure that outsourcing is closed up certainly, it is characterised in that the following steps are included:
1) prepare before manufacture
1. raw material prepare: prepare phosphorus content not higher than 0.3% steel billet, spherical surface hardness not less than 50HRC ball rod (3),
Sufficient solid synovial membrane coating material;
2. tooling prepare: prepare with final design base steel shape be adapted upper end opening and opening by outside and in be provided with
Respectively it is in the tubular seaming tool (5) on 30 °, 20 ° and 10 ° inclined-planes with axis, prepares to be adapted with final design steel matrix outer circle
High-frequency induction tooling, the adaptable film layer of preparation and final design steel matrix Inner arc coat tooling;
3. equipment prepares: preparing laser cladding equipment, hydraulic device, baking oven, high-frequency induction device;
2) steel matrix (1) is processed
1. by the stage 1) steel billet that 1. prepares of step is processed into lower end cylinder upper end inversed conical drum and the conical surface is relative to axis gradient
30 ° of two-part structure is initial steel construction;
2. basic point is in the initial steel construction upper surface center 1. obtained using step, burr-drill hole, taper hole top angle are vertically downward
60 °, when horizontal plane locating for hole pointed drill to lower end cylindrical surface top, stops, aperture steel construction in acquisition;
3. being located at close to taper hole face lower end away from end face length in the middle cone hole face of 2. middle aperture steel construction that step obtains
Position, using the stage 1) Probe-radius of ball rod (3) that 1. prepares of step as radius of machining, with taper hole face and end
The annulus of face junction is the center of circle of vertical cross-section, processes a circle arc anchor ring, obtains prefabricated base structure;
4. processing moving back for depth and remaining conical surface equal length using taper hole tip as matrix to process the process of escape
Cutter groove (2), steel matrix (1) needed for obtaining;
3) it pre-processes
1. by the stage 2) obtain steel matrix (1) use the stage 1) step 2. prepare film layer coating tooling protect and fix,
Using the stage 1) the solid synovial membrane coating material that 2. prepares of step is raw material, using laser cladding equipment to the stage 2) 3. step obtains
The arc anchor ring obtained carries out the processing of coating produced by laser cladding solid synovial membrane, solidifies consolidating for a layer thickness 0.08mm-0.2mm on arc anchor ring
Body stratum synoviale (4) obtains pretreatment steel matrix (1);
4) closing in jacket
1. by the stage 1) step 1. prepare ball rod (3), the stage 3) obtain pretreatment steel matrix (1), the stage 1) step is 2.
The tubular seaming tool (5) of preparation is coaxial fixed from top to bottom, using the stage 1) hydraulic device that 3. prepares of step is continuously applied
Vertical compressive force closes up completely and fixes until ball rod (3), pretreatment steel matrix (1) are moved to, obtains closing in jacket steel construction
Connector;
2. the outer circle of 1. closing in jacket steel construction that step obtains being placed in high-frequency induction tooling, using the stage 1) step is 3. quasi-
Standby high-frequency induction device carries out induction heating, until raw steel matrix (1) deformed region is heated to the AC of Steel material3It is more than temperature
30 DEG C -50 DEG C, then stops heating and standing to deformation terminating, obtain stabilized steel structural joint;
3. repeating step 1. -2. 2 times -3 times, solidification joint of steel structure is obtained;
5) it post-processes
1. by the stage 4) outer circle for solidifying joint of steel structure that obtains is placed in high-frequency induction tooling, using the stage 1) step is 3. quasi-
Standby high-frequency induction device carries out induction heating, until steel matrix (1) is integrally heated to the AC of Steel material3More than temperature 30 DEG C-
50 DEG C, then hardening to temperature is stablized, using the stage 1) baking oven that 3. prepares of step uses the solidification joint of steel structure of hardening
200 DEG C of -240 DEG C of temperature, 2h-3h time carry out tempering, obtain and strengthen steel construction, which is required outsourcing
From the joint of steel structure of closing in.
2. the manufacturing method for the joint of steel structure that outsourcing according to claim 1 is closed up certainly, it is characterised in that: steel matrix
(1) 10 are used#Steel making, ball rod (3) are quenched using GCr6 and are obtained after lonneal.
3. the manufacturing method for the joint of steel structure that outsourcing according to claim 1 is closed up certainly, it is characterised in that: steel matrix
(1) it is manufactured using 20Cr, ball rod (3) is using the surfaces nitrided rear acquisition of 32Cr3MoV.
4. the manufacturing method for the joint of steel structure that outsourcing according to claim 1 is closed up certainly, it is characterised in that: steel matrix
(1) it is manufactured using 30CrMnSi, ball rod (3) obtains after using 12CrNi3 case-carbonizing, quenching and lonneal.
5. the manufacturing method for the joint of steel structure that outsourcing according to claim 1 is closed up certainly, it is characterised in that: solid synovial membrane
Coating material is silver, iron sulfide, any one in molybdenum disulfide.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811378421.2A CN109281924B (en) | 2018-11-19 | 2018-11-19 | Steel structure joint with self-closing outer coating and manufacturing method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811378421.2A CN109281924B (en) | 2018-11-19 | 2018-11-19 | Steel structure joint with self-closing outer coating and manufacturing method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109281924A true CN109281924A (en) | 2019-01-29 |
CN109281924B CN109281924B (en) | 2020-10-23 |
Family
ID=65176146
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811378421.2A Active CN109281924B (en) | 2018-11-19 | 2018-11-19 | Steel structure joint with self-closing outer coating and manufacturing method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109281924B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110693546A (en) * | 2019-09-11 | 2020-01-17 | 丁起武 | Bulb pressure locking device and medical support with same |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS61112813A (en) * | 1984-11-07 | 1986-05-30 | Musashi Seimitsu Kogyo Kk | Preparation of aperture upset ball joint |
CN1352581A (en) * | 2000-03-29 | 2002-06-05 | 株式会社索密克石川 | Method for producing casing of ball joint |
WO2003106851A1 (en) * | 2002-06-17 | 2003-12-24 | ZF Lemförder Metallwaren AG | Two-piece bearing shell for a moulded balljoint |
CN101415960A (en) * | 2006-04-04 | 2009-04-22 | Zf腓特烈港股份公司 | Radial joint, and method for the production of such a radial joint for a motor vehicle |
CN102753847A (en) * | 2010-02-16 | 2012-10-24 | 日本发条株式会社 | Ball joint apparatus |
CN103052516A (en) * | 2010-08-23 | 2013-04-17 | 日本发条株式会社 | Stabilizer link and production method for same |
CN103143891A (en) * | 2013-03-06 | 2013-06-12 | 北京工业大学 | Assembly tool and assembly method for piston shoe assembly for water hydraulic piston pump |
CN104114882A (en) * | 2012-02-16 | 2014-10-22 | 日本发条株式会社 | Stabilizer link and manufacturing method therefor |
CN104948572A (en) * | 2015-06-17 | 2015-09-30 | 哈尔滨工业大学 | Joint ball bearing and processing method thereof |
CN107250578A (en) * | 2014-12-03 | 2017-10-13 | 费德罗-莫格尔汽车配件有限责任公司 | Ball joint assembly |
CN108700105A (en) * | 2016-02-18 | 2018-10-23 | Zf腓特烈斯哈芬股份公司 | ball joint |
-
2018
- 2018-11-19 CN CN201811378421.2A patent/CN109281924B/en active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS61112813A (en) * | 1984-11-07 | 1986-05-30 | Musashi Seimitsu Kogyo Kk | Preparation of aperture upset ball joint |
CN1352581A (en) * | 2000-03-29 | 2002-06-05 | 株式会社索密克石川 | Method for producing casing of ball joint |
WO2003106851A1 (en) * | 2002-06-17 | 2003-12-24 | ZF Lemförder Metallwaren AG | Two-piece bearing shell for a moulded balljoint |
CN101415960A (en) * | 2006-04-04 | 2009-04-22 | Zf腓特烈港股份公司 | Radial joint, and method for the production of such a radial joint for a motor vehicle |
CN102753847A (en) * | 2010-02-16 | 2012-10-24 | 日本发条株式会社 | Ball joint apparatus |
CN103052516A (en) * | 2010-08-23 | 2013-04-17 | 日本发条株式会社 | Stabilizer link and production method for same |
CN104114882A (en) * | 2012-02-16 | 2014-10-22 | 日本发条株式会社 | Stabilizer link and manufacturing method therefor |
CN103143891A (en) * | 2013-03-06 | 2013-06-12 | 北京工业大学 | Assembly tool and assembly method for piston shoe assembly for water hydraulic piston pump |
CN107250578A (en) * | 2014-12-03 | 2017-10-13 | 费德罗-莫格尔汽车配件有限责任公司 | Ball joint assembly |
CN104948572A (en) * | 2015-06-17 | 2015-09-30 | 哈尔滨工业大学 | Joint ball bearing and processing method thereof |
CN108700105A (en) * | 2016-02-18 | 2018-10-23 | Zf腓特烈斯哈芬股份公司 | ball joint |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110693546A (en) * | 2019-09-11 | 2020-01-17 | 丁起武 | Bulb pressure locking device and medical support with same |
CN110693546B (en) * | 2019-09-11 | 2023-07-21 | 丁起武 | Ball head pressure locking device and medical bracket with same |
Also Published As
Publication number | Publication date |
---|---|
CN109281924B (en) | 2020-10-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6452139B1 (en) | Method of joining metal components | |
KR102278376B1 (en) | Process for producing a multilayer pipe having a metallurgical bond by drawing, and multilayer pipe produced by this process | |
CN106103958B (en) | Monobloc piston featuring an additionally machined combustion bowl rim and internal cooling gallery | |
JP5411308B2 (en) | Piston and method of manufacturing a piston | |
AU2008222845A1 (en) | Fracture resistant friction stir welding tool | |
US9365077B2 (en) | Lightweight hub bearing assembly and processes for assembling it | |
KR102495661B1 (en) | Hybrid induction welding process applied to piston manufacturing | |
CN109281924A (en) | Joint of steel structure and its manufacturing method of the outsourcing from closing in | |
CA2554662A1 (en) | Ring gear and manufacturing method for such a ring gear | |
US20180065205A1 (en) | Method for producing a camshaft | |
US20090239095A1 (en) | Composite rods and processes for forming composite rods | |
WO2020057835A1 (en) | Self-piercing rivet | |
US20150043854A1 (en) | Method and Component | |
CN113909323B (en) | Method for manufacturing hot extrusion tube | |
US20150361728A1 (en) | Cold Forming and Heat Treatment Process for Tubulars | |
JP4774228B2 (en) | Pressure vessel and method for manufacturing the same | |
CN112958769A (en) | Manufacturing method for producing bimetallic sliding bearing by utilizing radial rolling mode | |
EP4007665B1 (en) | A method of making a fluid conduit | |
CN209243924U (en) | Joint of steel structure of the outsourcing from closing in | |
US10265798B2 (en) | Magnetic pulse welding of engine components | |
RU2564324C1 (en) | Drilling pipe structure and method of its production | |
US9239076B2 (en) | Method of making a bearing ring, a bearing ring and a bearing | |
JP2002263858A (en) | Liquid phase diffusion bonding machine parts assembly method | |
US20180292006A1 (en) | Bimetallic piston pin | |
CN112935248A (en) | Manufacturing method of powder metallurgy bimetal sliding bearing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |