CN109281386A - Construction method of rapid partition wall for water-containing structures and pipe culverts - Google Patents

Construction method of rapid partition wall for water-containing structures and pipe culverts Download PDF

Info

Publication number
CN109281386A
CN109281386A CN201811115779.6A CN201811115779A CN109281386A CN 109281386 A CN109281386 A CN 109281386A CN 201811115779 A CN201811115779 A CN 201811115779A CN 109281386 A CN109281386 A CN 109281386A
Authority
CN
China
Prior art keywords
water
partition wall
construction method
quick
face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811115779.6A
Other languages
Chinese (zh)
Other versions
CN109281386B (en
Inventor
李梦琼
彭鹏
阮康华
朱海明
王娇娇
赵林辉
管海军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN201811115779.6A priority Critical patent/CN109281386B/en
Publication of CN109281386A publication Critical patent/CN109281386A/en
Application granted granted Critical
Publication of CN109281386B publication Critical patent/CN109281386B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F7/00Other installations or implements for operating sewer systems, e.g. for preventing or indicating stoppage; Emptying cesspools
    • E03F7/02Shut-off devices
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F5/00Draining the sub-base, i.e. subgrade or ground-work, e.g. embankment of roads or of the ballastway of railways or draining-off road surface or ballastway drainage by trenches, culverts, or conduits or other specially adapted means
    • E01F5/005Culverts ; Head-structures for culverts, or for drainage-conduit outlets in slopes

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Sewage (AREA)

Abstract

The present invention relates to the construction methods of a kind of structure containing water and the quick partition wall of pipe culvert, it is characterised in that the construction method includes: that production meets water faceplate panels and wall body structure reinforcing bar, reinforcing construction between panel, wall seal approach, quick partition wall installation.For the present invention using quickly partition wall technology, it can efficiently and safely reduce the influence to the water processing establishments normal operation such as existing waterworks, sewage treatment plant, reduce halt production, the underproduction time, avoid the confined space, poisonous and harmful operation.

Description

A kind of construction method of the quick partition wall of structure containing water and pipe culvert
Technical field
The present invention relates to the construction methods of a kind of structure containing water and the quick partition wall of pipe culvert, it can be efficiently and safely The influence to the water processing establishments normal operation such as existing waterworks, sewage treatment plant is reduced, is reduced and is stopped production, the underproduction time, keeps away Exempt from the confined space, poisonous and harmful operation.
Background technique
Each city, regional municipal water treatment plants construction step into peak, and water processing establishment reorganization and expansion dynamics constantly increases Greatly.Connection, the partition for being related to existing buildings and new construction of structures are more and more, and the partition of the structures such as pump house, pond, pipe culvert is applied The difficulty that work industry is implemented continues to increase, and is increasingly stringenter to operation construction period requirement, quality requirement, safety requirements.It is all these Factors drive structure separating technology continue to develop, one of be exactly using quick partition wall technology.
Intend water flow in partition-type structures according to conventional concrete technology, cabinet water level must be for a long time in static low Water level or anhydrous state, with the expansion for each road working procedure.Its disadvantage is exactly: to existing waterworks, sewage treatment The water processing establishments normal operation such as factory is affected, and will cause the influence to ambient enviroment and resident living when serious, causes Social adverse effect;Construction belongs to the confined space, poisonous and harmful operation in structure simultaneously, and security risk is larger, security risk compared with It is more, it is less favorable to the career safety & health of worker.
Using quick partition wall technology, it can efficiently and safely be reduced to water such as existing waterworks, sewage treatment plants The influence for the treatment of facility normal operation reduces halt production, the underproduction time, avoids the confined space, poisonous and harmful operation.
Summary of the invention
The purpose of the present invention is to provide the construction methods of a kind of structure containing water and the quick partition wall of pipe culvert, reduce Influence to water processing establishments normal operations such as existing waterworks, sewage treatment plant, water flowing pipe culverts, it is ensured that the occupation of worker It is healthy and safe.
To achieve the goals above, technical scheme is as follows: the quick partition of a kind of structure containing water and pipe culvert The construction method of wall, it is characterised in that the construction method includes
A, meet water faceplate panels and wall body structure reinforcing bar are made, erosion resistant coating is arranged in upstream face panel surface;
B, wall body structure reinforcing bar is met water between faceplate panels placing two sides, and met water in two sides by reinforcing construction between panel Pre-filled concrete between faceplate panels, it is reserved to pouring area in pre-filled concrete base and two sides, it meets water to pouring area two sides It is reinforced between faceplate panels using Screw arbor with nut at both-ends;
C, wall seal approach is located at bottom in upstream face panel surface and both sides of the edge inner side installation flexibility is stopped Water measure, lays multiple holes grouting pipe on the outside of flexible measures of preventing water, and ring seal pressing plate is arranged in upstream face upper panel;
D, quick partition wall installation, original structures are interior to blocking position aperture, the quick partition wall are put into original In structures after blocking position, rubber water-proof pad is arranged in ring seal pressing plate bottom, and it is original to use bolt presses to be fixed on Structures top plate face, so that Grouting Pipe is in meet water faceplate panels and original structures contact surface after mounting, to pour in pouring area Concrete is built, so that the quick partition wall is connected with original structures.
The ring seal pressing plate material can be metal, concrete, quick hardening cement or other materials, it is ensured that panel with The leakproofness of original structure.Further, the ring seal pressing plate includes around the angle of the quick partition wall top setting Steel, angle steel side wing plate open up hole, are connect using Screw arbor with nut at both-ends with the faceplate panels that meet water, angle steel bottom surface apertured hole, using bolt It is connect with original structures top plate face, and set rubber water-proof pad between angle steel bottom surface and original structures top plate face.
Further, the flexible measures of preventing water includes rubber fastening band, expelling water cloth, flexible water partition plate or other sealings Measure, it is ensured that the faceplate panels that meet water fit closely original structures.
Further, for the faceplate panels that meet water using strong concrete, erosion resistant coating uses polyurethane or inorganic salts sand Slurry.
Further, pre-buried lifting bolt in the pre-filled concrete in quick partition wall top.
Using quickly partition wall technology, it can efficiently and safely be reduced to existing waterworks, sewage treatment the present invention The influence of the water processing establishments normal operation such as factory reduces halt production, the underproduction time, avoids the confined space, poisonous and harmful operation, especially Its application during the water processing establishments such as waterworks, sewage treatment plant, water flowing pipe culvert are in its reorganization and expansion quite has latent Power has sizable economic benefit, social benefit and environmental benefit.The present invention has a characteristic that
1. also serving as structure exterior sheathing as upstream face panel material using steel, concrete system or other high-intensitive materials Plate, integral strength height, simple installation, in use process without secondary assembled and secondary demoulding, optimized construction procedure;
Depending on 2. anti-corrosion material requires depending on the site environment, have well by the prefabricated erosion resistant coating faceplate panels that can make to meet water Rotproofness, also can avoid carrying out secondary anticorrosive construction again after the completion of partition-type structures;
3. wall segment structure and structure reinforcing bars use preformed patterns, integrated member is formed in conjunction with the faceplate panels that meet water, together When be arranged lifting measure reinforcing bar, realize integral hoisting, compress the construction time;
4. the pre-filled concrete strengthening connection in part between the faceplate panels that meet water, to casting area using default Screw arbor with nut at both-ends It is in reinforcement connection, reduces cast-in-place concrete and pour workload, reduction pours the time;
5. flexible antipriming is arranged in the faceplate panels surrounding that meets water and original structures junction, original structure is fitted closely Object is built, seam areas pre-buried multiple holes grouting pipe carries out slip casting filling, the setting of upstream face upper panel after the completion of cast-in-place concrete Ring seal pressing plate, so that it is guaranteed that the leakproofness of panel and original structure.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the faceplate panels that meet water of the invention, wall body structure reinforcing bar.
Fig. 2 is the explosion figure of the quick partition wall of the present invention.
Fig. 3 is the installation diagram of the quick partition wall of the present invention.
Include: in figure meet water faceplate panels 1, erosion resistant coating 2, wall body structure reinforcing bar 3, lifting bolt 4, pre-filled concrete 5, Screw arbor with nut at both-ends 6, flexible measures of preventing water 7, multiple holes grouting pipe 8, ring seal pressing plate 9.
Specific embodiment
The content of present invention is further illustrated below by way of specific embodiment.
A kind of quick partition wall of structure containing water and pipe culvert, it is characterised in that the quick partition wall include be located at it is fast The faceplate panels 1 that meet water of fast partition wall two sides, two sides meet water and set wall body structure reinforcing bar 3 and pre-filled concrete 5 between faceplate panels, Two sides, which meet water, is located at the region of pre-filled concrete base and two sides between faceplate panels there are to pouring area, to pouring area two sides It meets water and is reinforced using Screw arbor with nut at both-ends 6 between faceplate panels, ring seal pressing plate 9 is arranged in upstream face upper panel, and meet water faceplate panels position Flexible measures of preventing water 7 is set in bottom and both sides of the edge inner side.
Further, the ring seal pressing plate includes the angle steel around the quick partition wall top setting, angle steel side Face wing plate opens up hole, is connect using Screw arbor with nut at both-ends with the faceplate panels that meet water.
Further, the flexible measures of preventing water 7 includes rubber fastening band, expelling water cloth, flexible water partition plate or other sealings Measure, it is ensured that the faceplate panels that meet water fit closely original structures.
Further, the faceplate panels that meet water are using strong concrete, 1 surface of the faceplate panels setting anti-corrosion that meets water Layer 2.
Further, pre-buried lifting bolt 4 at the top of quick partition wall and in fill concrete.
Further, multiple holes grouting pipe 8 is laid on the outside of flexible measures of preventing water 7, is met so that Grouting Pipe is in after mounting Water surface panel and original structures contact surface.
Further, when the quick partition wall is placed into original structures after blocking position, ring seal pressing plate Rubber water-proof pad is arranged in bottom, and is fixed on original structures top plate face using bolt presses, to pour coagulation in pouring area Soil, so that the quick partition wall is connected with original structures.
Specific embodiment is that clear water reserviors are discharged channel partition work.
(1) project profile
Certain city waterworks extension project includes that former clear water reserviors water outlet channel separates work:
It is 2.7m × 2.7m, bottom absolute altitude 0.3m, the high 3.35m of top mark that status, which is discharged channel cross dimensions, and pool wall and top plate are thick 0.35m.Design requirement blocks up this water outlet channel permanent envelope, and flow direction is redirected to other routes.
(2) products application
In conjunction with above-mentioned project profile, design scheme can be optimized using this product, using quick partition wall, Ke Yi Rapidity, construction period, safe and environment-friendly benefit etc. effectively improve.
(3) application scheme
1. meet water faceplate panels
1) panel material selects
Material: strong concrete.
2) panel-shaped, specification, Intensity Design and checking computations
Size: (original structures box culvert clear height 2700mm+ top plate thickness 350mm+ is turned over high 3250mm × wide 2650mm 200mm), bottom chamfer size 250mm*350mm (more bigger than practical).
Thickness: 63mm.
Concrete strength: with original structures concrete strength, i.e. C30.
3) panel manufactures
2. panel preservative treatment
1) anti-corrosion material selects
Material: inorganic salts mortar anti-corrosion, 300 μm of thickness.
2) panel is handled
3. wall body structure reinforcing bar
1) reinforcement fabrication and installation between panel
Steel bar arrangement: precast plant's processing, hot rolling worm steel, 16@150mm of double-layer double-direction;
2) lifting and other measures reinforcement fabrication and installation
Four lifting 20 bolts of φ are installed in advance among hole 2700*500 to be linked up with.
4. reinforcing construction between panel
1) pre-filled concrete surrounding template is installed and is poured
High 3000mm (staying 250mm to wait for pouring area in bottom) × wide 2350mm (left and right Ge Liu 150mm waits for pouring area) uses C30 concrete, formwork erection pour, i.e. demoulding after intensity reaches.
2) it is reinforced to pouring area Screw arbor with nut at both-ends
Reinforcement measure: using Screw arbor with nut at both-ends form, and one of horizontal space 3150mm is respectively arranged (altogether in three row of point upper, middle and lower Three) one of Screw arbor with nut at both-ends, horizontal space 440mm is arranged in, the Screw arbor with nut at both-ends (totally three) of vertical spacing 1500mm, bottom.
5. wall seal approach
1) flexible measures of preventing water is set with former structures junction
Rubber water-proof item (template embedded nut+press strip+is bolted) is installed in the inside on panel left and right, lower three sides, Flexible using rubber water-proof item guarantees that panel is close to box culvert contact surface.
2) the pre-buried multiple holes grouting pipe of seam areas
8mm multiple holes grouting pipe is laid on the outside of rubber water-proof item, so that Grouting Pipe is in panel after mounting and connects with box culvert Contacting surface.
3) annular pressing plate is arranged in upstream face upper panel
Panel top opening short side places sizing angle steel (200mm*200mm*14mm) length 448mm, angle steel side wing plate It opens up two circular cavities (spacing 463mm, diameter 16mm) and is connect with panel using Screw arbor with nut at both-ends.Panel top opening short side long side Same size is formed angle steel, length 2650mm, and steel plate bottom surface is arranged 3mm rubber water-proof pad, and using bolt presses it is fixed with Box culvert top plate face.
6. in-site installation
After quick partition wall reaches live and integral hoisting, is installed, carry out to pouring area concreting.Maintenance Partition is realized after the completion, observes leakage scenarios two days later, does not find obvious breakthrough without slip casting.
(4) scheme index analysis
1 scheme index analysis table of table

Claims (5)

1. a kind of construction method of the quick partition wall of structure containing water and pipe culvert, it is characterised in that the construction method includes
A, meet water faceplate panels and wall body structure reinforcing bar are made, erosion resistant coating is arranged in upstream face panel surface;
B, reinforcing construction between panel meets water wall body structure reinforcing bar between faceplate panels, and in two sides upstream face face placing two sides Pre-filled concrete between plate, it is reserved to pouring area in pre-filled concrete base and two sides, to pouring area two sides upstream face face It is reinforced between plate using Screw arbor with nut at both-ends;
C, it is located at bottom in upstream face panel surface and both sides of the edge inner side installs flexible measures of preventing water, is arranged along flexible sealing It applies outside and lays multiple holes grouting pipe, ring seal pressing plate is arranged in upstream face upper panel;
D, the quick partition wall is put into original structures to blocking position to blocking position aperture in original structures Afterwards, rubber water-proof pad is arranged in ring seal pressing plate bottom, and is fixed on original structures top plate face using bolt presses, so that note Slurry pipe is after mounting in faceplate panels and the original structures contact surface of meeting water, to casting concrete in pouring area, so that described fast Fast partition wall is connected with original structures.
2. the construction method of quick partition wall according to claim 1, which is characterized in that the ring seal pressing plate includes Around the angle steel of the quick partition wall top setting, angle steel side wing plate opens up hole, using Screw arbor with nut at both-ends and upstream face face Plate connection, angle steel bottom surface apertured hole are connect using bolt with original structures top plate face, and in angle steel bottom surface and original structures Rubber water-proof pad is set between top plate face.
3. the construction method of quick partition wall according to claim 1, which is characterized in that it is described flexibility measures of preventing water include Rubber fastening band, expelling water cloth or flexible water partition plate.
4. the construction method of quick partition wall according to claim 1, which is characterized in that the faceplate panels that meet water are using high Strength concrete, erosion resistant coating use polyurethane or inorganic salts mortar.
5. the construction method of quick partition wall according to claim 1, which is characterized in that pre-filled at the top of quick partition wall Pre-buried lifting bolt in concrete.
CN201811115779.6A 2018-09-25 2018-09-25 A construction method for a rapid partition wall of a water-containing structure and a pipe culvert Active CN109281386B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811115779.6A CN109281386B (en) 2018-09-25 2018-09-25 A construction method for a rapid partition wall of a water-containing structure and a pipe culvert

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811115779.6A CN109281386B (en) 2018-09-25 2018-09-25 A construction method for a rapid partition wall of a water-containing structure and a pipe culvert

Publications (2)

Publication Number Publication Date
CN109281386A true CN109281386A (en) 2019-01-29
CN109281386B CN109281386B (en) 2025-04-04

Family

ID=65181342

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811115779.6A Active CN109281386B (en) 2018-09-25 2018-09-25 A construction method for a rapid partition wall of a water-containing structure and a pipe culvert

Country Status (1)

Country Link
CN (1) CN109281386B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110701421A (en) * 2019-08-29 2020-01-17 中国二冶集团有限公司 Method for plugging water source of large-diameter pipeline

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1121860A (en) * 1997-07-04 1999-01-26 Fujita Corp Construction method for wall-form concrete structure
JP2000064794A (en) * 1998-08-26 2000-02-29 Penta Ocean Constr Co Ltd Receiving block for partition inside shield tunnel, partition using the receiving block and construction method
JP2007071019A (en) * 2006-11-08 2007-03-22 Furukawa Electric Co Ltd:The Rainwater storage facilities
CN203347315U (en) * 2013-06-21 2013-12-18 中国水电顾问集团华东勘测设计研究院 Building water pool additionally provided with partition wall
CN103556749A (en) * 2013-10-10 2014-02-05 南京工业大学 Suspension type flexible connection for precast concrete infilled wall
CN104234305A (en) * 2013-06-20 2014-12-24 刘念芝 Reinforced concrete prefabricated part plate with reserved holes in vertical and transverse directions
WO2015152592A1 (en) * 2014-04-01 2015-10-08 주식회사 이엔시스템 Assemblable block for septic tank and various water treatment facilities, and method for installing same
CN207878715U (en) * 2018-01-26 2018-09-18 中信建筑设计研究总院有限公司 One kind exempting from mould overlapped shear wall

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1121860A (en) * 1997-07-04 1999-01-26 Fujita Corp Construction method for wall-form concrete structure
JP2000064794A (en) * 1998-08-26 2000-02-29 Penta Ocean Constr Co Ltd Receiving block for partition inside shield tunnel, partition using the receiving block and construction method
JP2007071019A (en) * 2006-11-08 2007-03-22 Furukawa Electric Co Ltd:The Rainwater storage facilities
CN104234305A (en) * 2013-06-20 2014-12-24 刘念芝 Reinforced concrete prefabricated part plate with reserved holes in vertical and transverse directions
CN203347315U (en) * 2013-06-21 2013-12-18 中国水电顾问集团华东勘测设计研究院 Building water pool additionally provided with partition wall
CN103556749A (en) * 2013-10-10 2014-02-05 南京工业大学 Suspension type flexible connection for precast concrete infilled wall
WO2015152592A1 (en) * 2014-04-01 2015-10-08 주식회사 이엔시스템 Assemblable block for septic tank and various water treatment facilities, and method for installing same
CN207878715U (en) * 2018-01-26 2018-09-18 中信建筑设计研究总院有限公司 One kind exempting from mould overlapped shear wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110701421A (en) * 2019-08-29 2020-01-17 中国二冶集团有限公司 Method for plugging water source of large-diameter pipeline

Also Published As

Publication number Publication date
CN109281386B (en) 2025-04-04

Similar Documents

Publication Publication Date Title
CN201280725Y (en) Post-casting construction precast slab for basement of buildings
WO2016062224A1 (en) Integrated column-equipped heat insulation wallboard, manufacturing and building processes and corollary equipment thereof
CN212129251U (en) Advanced sealing structure of post-cast strip subsides
CN203625942U (en) Basement outer wall post-cast strip ahead water stopping structure
CN206693363U (en) Assembled plastics municipal drainage inspection shaft
CN105862928B (en) A kind of post-cast strip exterior wall advanced water-stopping processing structure and its construction technology
AU4388901A (en) Pre-fabricated bathroom
CN209723052U (en) The prefabricated plate advanced water-stopping of poured band of outer wall of basement backfills structure
CN109826239B (en) Basement outer wall post-pouring strip structure and construction method thereof
CN110439036A (en) A kind of poured band of outer wall of basement advance water stop construction method
CN108643133B (en) Detachable arch dam and construction and dismantling method thereof
CN108894242B (en) Prefabricated plate for foundation membrane of platform and construction method of foundation membrane of platform
CN110158762A (en) Prefabricated steel structure frame supports room
CN207568169U (en) Suitable for the deep basal pit outer wall of basement PC template systems under the conditions of null field ground
CN209989847U (en) Shear force wall post-cast strip prefabricated plate closing device
CN209339301U (en) A kind of quick partition wall of structure containing water and pipe culvert
CN109281386A (en) Construction method of rapid partition wall for water-containing structures and pipe culverts
CN108360573B (en) Device for preventing post-cast strip of basement floor from leaking and construction method thereof
CN205954707U (en) Leading enclosed construction in basement outer wall post -cast strip
CN107916727A (en) A kind of prefabricated composite wallboard in underground and the waterproofing node structure of cast in place frame column seam crossing
CN207749657U (en) A kind of waterproofing node structure of the prefabricated composite wallboard in underground and cast in place frame column seam crossing
CN109281387A (en) A rapid partition wall for water-containing structures and pipe culverts
CN204753639U (en) Prefabricated well of batch production modular concrete extrusion
CN219973299U (en) Prefabricated assembled basement roof post-cast strip advanced sealing structure
CN115324249A (en) Construction method of integral pouring of fully prefabricated kitchen and bathroom floors and anti-sills

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant