Detailed description of the invention
Fig. 1 is the frame 4-1 for forming waggon 4, jacking switching device 4-2, hoisting apparatus 4-3, erecting by overhang 4-4 and row
The structural schematic diagram of walking apparatus 8, and the cross track 5X and long rails 5Y of composition goods yard track 5 are fixed on column component 6
The structural schematic diagram of top;
Fig. 2 is that the A direction view of Fig. 1 and hoisting apparatus 4-3 are hung the container 2 below frame 4-1 by erecting by overhang 4-4
It hangs to the structural schematic diagram in frame 4-1;
Fig. 3 is the B direction view of Fig. 1, and by the structural schematic diagram of two cross slide way 5-1X cross track 5X formed, and
By the structural schematic diagram of two longitudinal rail 5-1Y long rails 5Y formed;
Fig. 4 is I partial enlarged view of Fig. 1, and the longitudinal direction bottom running gear 8Y jacking switching device 4-2 stretch out when, indulge
The structural schematic diagram walked in the longitudinal rail 5-1Y of flute profile to traveling wheel 8Y-1 and directive wheel 8-2, and laterally walking
When the jacking switching device 4-2 of the bottom device 8X is retracted, lateral traveling wheel 8X-1 and directive wheel 8-2 are detached from cross slide way 5-1X's
Structural schematic diagram;
Fig. 5 is two of II partial enlarged view of Fig. 2 and the structural schematic diagram of directive wheel 8-2 and channled rail 5-1
The structural schematic diagram of rib 5-1-1;
Fig. 6 is shown by the structure of A cross track 5XA, A long rails 5YA and A track notch 5-2A goods yard A track 5A formed
It is intended to;
The upper figure of Fig. 7 is the A-A view of Fig. 6, and the upper figure of Fig. 7 is also the structure of the A horizontal cut 5-2AX on A cross track 5XA
Schematic diagram, the upper figure of Fig. 7 are also the structural schematic diagram for being located at the A structure of sustained height to track 5X and long rails 5Y, Fig. 7
The following figure be Fig. 6 B-B view, the following figure of Fig. 7 is also the structural schematic diagram of the A longitudinal breach 5-2AY on A long rails 5YA;
Fig. 8 is by high cross track 5XB, low long rails 5YB and high traverse rod road notch the 5-2BX goods yard the B track 5B's formed
Structural schematic diagram;
The upper figure of Fig. 9 is the A-A view of Fig. 8, and the upper figure of Fig. 9 is also the structural schematic diagram of high traverse rod road notch 5-2BX, Fig. 9's
The following figure is the B-B view of Fig. 8, and the following figure of Fig. 9 is also the structural schematic diagram that high cross track 5XB is higher than low long rails 5YB;
Figure 10 is by low cross track 5XC, high long rails 5YC and high vertical track notch the 5-2CY goods yard the C track 5C's formed
Structural schematic diagram;
The upper figure of Figure 11 is the A-A view of Figure 10, and the upper figure of Figure 11 is also that high long rails 5YC is higher than low cross track 5XC
Structural schematic diagram, the following figure of Figure 11 are the B-B views of Figure 10, and the following figure of Figure 11 is also that the structure of high vertical track notch 5-2CY is shown
It is intended to;
Figure 12 by four-wheel horizontal walking device 8XA and four-wheel longitudinal direction running gear 8YA the A waggon 4A formed structural representation
Figure;
Figure 13 is the A direction view of Figure 12, and the four-wheel lateral line being made of 4 transverse direction traveling wheel 8X-1 and 8 directive wheel 8-2
The structural schematic diagram of walking apparatus 8XA;
Figure 14 is the four-wheel longitudinally walking of the B direction view and 4 longitudinal direction traveling wheel 8Y-1 and 8 directive wheel 8-2 compositions of Figure 12
The structural schematic diagram of device 8YA;
Figure 15 forms the structural schematic diagram of the B waggon 4B and B goods yard track 5B of B conveying device 3B, and by eight wheel lateral lines
The structural schematic diagram of the B waggon 4B of walking apparatus 8XB and four-wheel longitudinal direction running gear 8YA composition;
The A direction view of Figure 16 Figure 15, and the eight wheels laterally walking being made of 8 transverse direction traveling wheel 8X-1 and 4 directive wheel 8-2
The structural schematic diagram of device 8XB;
Figure 17 is the four-wheel longitudinally walking of the B direction view and 4 longitudinal direction traveling wheel 8Y-1 and 4 directive wheel 8-2 compositions of Figure 15
The structural schematic diagram of device 8YA;
Figure 18 by the C waggon 4C and C goods yard track 5C C conveying device 3C formed structural schematic diagram, and by four-wheel cross
The structural schematic diagram of the C waggon 4C formed to the wheel of running gear 8XA and eight longitudinal direction running gear 8YB;
Figure 19 is the A direction view of Figure 18, and laterally walking fills the four-wheel being made of 4 transverse direction traveling wheel 8X-1 and 4 directive wheel 8-2
Set the structural schematic diagram of 8XA;
Figure 20 is the longitudinal walking of eight wheels of the B direction view and 8 longitudinal direction traveling wheel 8Y-1 and 4 directive wheel 8-2 compositions of Figure 18
The structural schematic diagram of device 8YB;
Figure 21 is by the collection loading place 10 of railway container vehicle 9, the truck loading place 12 of container truck 11 and container
The part plan layout drawing of the composition railway goods yard 1 of laydown area 13;
Figure 22 is the A-A view of Figure 21 and locomotive crane 6 is the conveyer for collecting 7 top of a loading place 10 and interface arrangement
Structural schematic diagram and waggon 4 be truck loading place 12, container stacking area 13 and the top of interface arrangement 7 conveyer
Structural schematic diagram;
Figure 23 is crane cross track 6-X, Gantry Crane 6-1, the crane horizontal walking device for forming locomotive crane 6
6-2, crane long rails 6-Y, crane longitudinal direction running gear 6-3, crane longitudinal direction walked frame 6-4, suspender crane
The structural schematic diagram of 6-5 and suspender 6-6;
Figure 24 is the crane longitudinal direction rail of 16 top of the interface track 15 for forming interface arrangement 7, interface platform 16 and interface platform
The structural schematic diagram of the end crane long rails 6-Y-1 of road one end 6-Y;
Figure 25 is the ground structure schematic diagram of railway goods yard 1 after removing waggon 4 and goods yard track 5;
Figure 26 is the structural schematic diagram of railway goods yard 1 aerial goods yard track 5 and locomotive crane 6;
Figure 27 is that one end of cantilever crane 6A is located at the top of collection loading place 10, and the other end is located at 16 top of interface platform
Structural schematic diagram;
Figure 28 be gantry 6B the bottom Gantry Crane 6-1 two sets of crane horizontal walking device 6-2 respectively two
The structural schematic diagram run on the gantry cross track 6B-X of side;
Figure 29 is the A direction view of Figure 28;
Figure 30 is Gantry Crane 6C-1, crane longitudinal direction running gear 6C-3, the crane longitudinally walking for forming crane 6C
The structural schematic diagram of rack 6C-4, rack cross track 6C-4X, suspender crane 6C-5 and crane cross sliding machine 6C-5-1;
Figure 31 is interface track 15 and end crane long rails 6-Y-1 is overlapping in the Y direction, is the knot being staggered in height
Structure schematic diagram;
Figure 32 is interface track 15 and end crane long rails 6-Y-1 is nonoverlapping structural schematic diagram in the Y direction, and is moved
The structural schematic diagram of moving platform 16-2A
Figure 33 is to be carried out by the power receiving device 17 on electric waggon 4E by the contact net for power supplying 18 being fixed on column component 14
The structural schematic diagram of power supply;
Figure 34 is the A direction view of Figure 33;
Figure 35 is that horizontal walking device 8X does not jack function, and longitudinal running gear 8Y has single jacking waggon 4F of jacking function
Structural schematic diagram, and single jacking frame 4F-1 reduces with the retraction of longitudinal running gear 8Y jacking switching device 4-2
The structural schematic diagram of height and the structural schematic diagram of power receiving device 4F-1-1;
Figure 36 is that the structure for the Double Tops liter waggon 4G for all having jacking function to running gear 8X and longitudinal direction running gear 8Y is shown
It is intended to;
Figure 37 is to run container waggon 4 on the cross track 5X of different height by lateral fluctuating orbit 5HX
Structural schematic diagram and screw rod 5H-1 drive the structural schematic diagram that is gone up and down of crane 5H-2;
Figure 38 is to run container waggon 4 on the long rails 5Y of different height by longitudinal fluctuating orbit 5HY
Structural schematic diagram;
Figure 39 is the structural representation to be linked into an integrated entity by the container stacking area 13 for making different angle of lateral rotation track 5RX
Figure;
Figure 40 is the structural representation to be linked into an integrated entity by the container stacking area 13 for making different angle of longitudinal rotary track 5RY
Figure;
Figure 41 is to integrate a track 51 as the structural schematic diagram of double-layer track, also in the collection of 9 top of railway container vehicle
The structural schematic diagram of upper layer cross track 51XA sum aggregate lower layer cross track 51XB;
1 in figure is railway container yard;2 be container;3 be conveying device;3A is A conveying device;3B is B conveying dress
It sets;3C is C conveying device;4 be waggon, including frame 4-1, jacking switching device 4-2, hoisting apparatus 4-3, erecting by overhang 4-
4 and running gear 8;4-1 is frame;4-2 is jacking switching device;4-3 is hoisting apparatus;4-4 is erecting by overhang;4A is A defeated
Send vehicle;4B is B waggon;4C is C waggon;4D is onboard battery powered battery waggon;4D1 is battery conveying
The battery of vehicle 4D;4E is by contact net for power supplying by electric waggon;4F is single jacking waggon;4F-1 is single jacking frame
Frame;4F-1-1 is the power receiving device with elevating function;4G is that Double Tops rise waggon;4G-1 is that Double Tops rise frame;5 be goods yard rail
The long rails 5Y of road, the cross track 5X including X-direction and Y-direction;5X is the cross track of X-direction, is led by two transverse directions
Rail 5-1X composition;5Y is the long rails of Y-direction, is made of two longitudinal rail 5-1Y;5-1 is channled rail;5-1-1 is
Two ribs of channled rail;5-1X is cross slide way;5-1Y is longitudinal rail;5-2 is track notch;5A is the goods yard A track;
5XA is A cross track;5YA is A long rails;5-2AX is A horizontal cut;5-2AY is A longitudinal breach;5B is B goods
Field track;5XB is high cross track;5YB is low long rails;5-2BX is the high traverse rod road notch on high cross track 5XB;
5C is the goods yard C track;5XC is low cross track;5YC is high long rails;5-2CY is the Gao Zong on high long rails 5YC
Track notch;5D is the goods yard D track;51 be collection track, is fixed on the top of railway column component 6A, including collection transverse direction
Track 51X sum aggregate long rails 51Y;51X is collection cross track;51Y is collection long rails;51XA is collection upper layer cross
To track;51XB is Ji Liang lower layer cross track;5H is fluctuating orbit, and screw rod 5H-1 drives crane 5H-2 to be gone up and down, and is wrapped
Include lateral fluctuating orbit 5HX and longitudinal fluctuating orbit 5HY;5H-1 is screw rod;5H-2 is crane;5HX is lateral fluctuating orbit;
5HY is longitudinal fluctuating orbit;5RX is lateral rotation track;5RY is longitudinal rotary track;6 be collection loading place 10 and interface dress
Set the locomotive crane of 7 tops, including crane cross track 6-X, Gantry Crane 6-1, crane horizontal walking device 6-
2, crane long rails 6-Y, crane longitudinal direction running gear 6-3, crane longitudinal direction walked frame 6-4, suspender crane 6-5
With suspender 6-6;6-X is affixed to the crane cross track arranged in X direction on ground or column component 14;6-Y has been
Heavy-duty machine long rails;6-1 is Gantry Crane;The crane that 6-2 is affixed to the bottom Gantry Crane 6-1, which is laterally walked, to be filled
It sets;6-3 is the crane longitudinal direction running gear for being fixed on the crane longitudinal direction both ends walked frame 6-4;6-4 is crane lengthwise rows
Walk rack;6-5 is the suspender crane on the walked frame 6-4 of crane longitudinal direction;6-6 is suspender;6-Y-1 is that end crane is longitudinal
Track;6C is crane;6C-1 is Gantry Crane;6C-3 is crane longitudinal direction running gear;6C-4 is crane lengthwise rows
Walk rack;6C-4X is rack cross track;6C-5 is suspender crane;6C-5-1 is crane cross sliding machine;6A is cantilever lifting
Machine;6B is gantry;6B-X is the gantry cross track of two sides;7 be interface arrangement, including interface track 15,
The end crane long rails 6-Y-1 of one end crane long rails 6-Y of 16 top of interface platform 16 and interface platform;8 are
Running gear;8-1 is traveling wheel;8X-1 is lateral traveling wheel;8Y-1 is longitudinal traveling wheel;8-2 is directive wheel;8X is lateral line
Walking apparatus;8XA is four-wheel horizontal walking device;8Y is longitudinal running gear;8XB is eight wheel horizontal walking devices;8YA is four-wheel
Longitudinal running gear;8YB is eight wheel longitudinal direction running gears;9 be railway container vehicle;10 be collection loading place, including several
Railroad track 10-1, collection track 51 and the railway column component 14 that railway container vehicle 9 is run;10-1 is rail
Road;11 be container truck;12 be truck loading place;13 be container stacking area;13-1 is packaging chest stockyard;14 be column
Component 15 is interface track, including horizontal interface track 15X and longitudinal interface track 15Y;15X is horizontal interface track;15Y is
Longitudinal interface track;16 be interface platform, including platform rack 16-1 and platform 16-2;16-1 is platform rack;16-2 is flat
Platform;16-2A is mobile platform;17 be power receiving device;18 be contact net for power supplying.
Specific implementation
The conveying device 3 of container 2 in railway container yard 1 includes the goods yard of container waggon 4, the operation of waggon 4
Track 5, locomotive crane 6 and interface arrangement 7, if the railroad track length direction in goods yard 1 is X-direction, the length of waggon 4
Direction is the length direction of container 2, and the width direction of waggon 4 is the width direction of container 2, and waggon 4 includes frame
4-1, jacking switching device 4-2, hoisting apparatus 4-3, erecting by overhang 4-4 and running gear 8, frame 4-1 are the skies of bottom opening
Chamber, running gear 8 are located at the bottom of frame 4-1, and hoisting apparatus 4-3 is located at the top of frame 4-1, and hoisting apparatus 4-3 is by hanging
Container 2 below frame 4-1 is hung to frame 4-1, or the container 2 in frame 4-1 is placed on frame by hang device 4-4
The bottom of the lower section of frame 4-1, running gear 8 is equipped with traveling wheel 8-1 and directive wheel 8-2, including horizontal walking device 8X and longitudinal direction
Running gear 8Y;
Goods yard track 5 is that overhead rail is made of two channled rail 5-1, and traveling wheel 8-1 and directive wheel 8-2 are in channel suspending rail
Middle walking, directive wheel 8-2 are oriented to by two rib 5-1-1 of channled rail 5-1, the cross track 5X including X-direction
It is made of with the long rails 5Y of Y-direction, cross track 5X two cross slide way 5-1X, long rails 5Y is by two longitudinal rails
5-1Y composition, the spacing of two longitudinal rail 5-1Y are greater than the length of container 2, do not influence to be located at the conveying above long rails 5Y
Vehicle 4 or locomotive crane 6, which are realized, picks and places the container 2 being located at below long rails 5Y, when waggon 4 or locomotive crane
6 when needing to pick and place the container 2 below cross track 5X, and the spacing of two cross slide way 5-1X is greater than the width of container 2;It is horizontal
Traveling wheel 8-1, the knot of cross track 5X and long rails 5Y are designed with to the bottom of running gear 8X and longitudinal running gear 8Y
Conjunction portion is equipped with track notch 5-2, and goods yard track 5 includes that cross track 5X and long rails 5Y is located at the A structure of sustained height, cross
The C-structure of B structure, cross track 5X lower than long rails 5Y and mixing D structure to track 5X higher than long rails 5Y:
A structure, goods yard track 5 are the goods yard A track 5A, and the goods yard A track 5A includes A cross track 5XA, A long rails 5YA and A
Track notch 5-2A, A track notch 5-2A includes on the A horizontal cut 5-2AX and A long rails 5YA on A cross track 5XA
The length of A longitudinal breach 5-2AY, A horizontal cut 5-2AX and A longitudinal breach 5-2AY be equal to the width of channled rail 5-1, it is deep
Degree is equal to the height of rib 5-1-1;
B structure, goods yard track 5 be the goods yard B track 5B, the goods yard B track 5B include high cross track 5XB, low long rails 5YB and
High traverse rod road notch 5-2BX length on high traverse rod road notch 5-2BX, high cross track 5XB is equal to the width of channled rail 5-1
Degree;
C-structure, goods yard track 5 be the goods yard C track 5C, the goods yard C track 5C include low cross track 5XC, high long rails 5YC and
The length of the vertical track notch 5-2CY of height, the vertical track notch 5-2CY of height are equal to the width of channled rail 5-1;
D structure, goods yard track 5 are the goods yard D track 5D, and the goods yard D track 5D includes the goods yard the A goods yard track 5A, B track 5B and C goods
At least two among the track 5C of field;
Running gear 8 is realized by horizontal walking device 8X in cross track 5X upper operation in X direction, and longitudinal running gear is passed through
8Y is run on long rails 5Y along Y-direction, and traveling wheel 8-1 includes the lateral traveling wheel positioned at the bottom horizontal walking device 8X
8X-1 and longitudinal traveling wheel 8Y-1 positioned at the bottom longitudinal running gear 8Y is changed by jacking liter and the contracting of switching device 4-2
Difference in height between lateral traveling wheel 8X-1 and longitudinal traveling wheel 8Y-1, realize running gear 8 run on cross track 5X with
The switching run on long rails 5Y, horizontal walking device 8X include A structure and B structure:
A structure, horizontal walking device 8X are four-wheel horizontal walking device 8XA, and four-wheel horizontal walking device 8XA includes 4 transverse directions
Traveling wheel 8X-1 and 8 directive wheels 8-2, every 2 directive wheel 8-2 and a transverse direction traveling wheel 8X-1 are one group, four-wheel lateral line
Walking apparatus 8XA is run on A cross track 5XA or unnotched low cross track 5XC;B structure, horizontal walking device 8X are eight
Taking turns horizontal walking device 8XB, eight wheel horizontal walking device 8XB include 8 transverse direction traveling wheel 8X-1 and 8 directive wheel 8-2, and every 2
A transverse direction traveling wheel 8X-1 and 2 directive wheel 8-2 is one group, and eight wheel horizontal walking device 8XB are transported on high cross track 5XB
Row, the center of every group of transverse direction traveling wheel 8X-1 is away from the width for being greater than channled rail 5-1;Longitudinal running gear 8Y includes A structure and B
Structure:
A structure, longitudinal direction running gear 8Y are four-wheel longitudinal direction running gear 8YA, and four-wheel longitudinal direction running gear 8YA includes 4 longitudinal directions
Traveling wheel 8Y-1 and 8 directive wheels 8-2, every 2 directive wheel 8-2 and a transverse direction traveling wheel 8X-1 are one group, four-wheel lengthwise rows
Walking apparatus 8YA is run on the low long rails 5YB of A long rails 5YA or unnotched;B structure, longitudinal direction running gear 8Y are
Eight take turns longitudinal running gear 8YB, and eight wheel longitudinal direction running gear 8YB include 8 longitudinal direction traveling wheel 8Y-1 and 8 directive wheel 8-2, often
Two longitudinal direction traveling wheel 8Y-1 and 2 directive wheel 8-2 are one group, and eight wheel longitudinal direction running gear 8YB are transported on high long rails 5YB
Row, the center of every group of longitudinal direction traveling wheel 8Y-1 is away from the width for being greater than channled rail 5-1;Railway goods yard 1 includes railway container vehicle
9 collection loading place 10, the truck loading place 12 of container truck 11 and container laydown area 13 and column component 14, collection
Loading place 10 includes the railroad track 10-1 of several railway container vehicles 9 operation, and goods yard track 5 is fixed on column component 14
Top, the top of truck loading place 12 is equipped with goods yard track 5, and container stacking area 13 includes several packaging chest stockyards
The two sides of 13-1, packaging chest stockyard 13-1 are column component 14, and top is long rails 5Y, and each packaging chest stockyard 13-1 is logical
Cross track 5X is crossed to link into an integrated entity;Locomotive crane 6 is the conveyer for collecting 7 top of a loading place 10 and interface arrangement, is passed through
Locomotive crane 6 is realized to container 2 carries out handling operation on railway container vehicle 9 in collection loading place 10;Waggon 4 is
The conveyer of 7 top of truck loading place 12, container stacking area 13 and interface arrangement, is realized by waggon 4 and is loaded and unloaded to truck
Container 2 in area 12 on container truck 11 carries out handling operation, and locomotive crane 6 includes crane cross track 6-X, rises
Heavy-duty machine rack 6-1, it crane horizontal walking device 6-2, crane long rails 6-Y, crane longitudinal direction running gear 6-3, rises
Heavy-duty machine longitudinal direction walked frame 6-4, suspender crane 6-5 and suspender 6-6, the crane cross track 6-X arranged in X direction are fixed
In on ground or column component 14, crane horizontal walking device 6-2 is fixed on the bottom of Gantry Crane 6-1, in crane
It is run in X direction on cross track 6-X;The crane long rails arranged along Y-direction are equipped in the top of Gantry Crane 6-1
6-Y is fixed on the crane longitudinal direction running gear 6-3 at the crane longitudinal direction both ends walked frame 6-4 in crane long rails 6-Y
Upper operation, crane longitudinal direction walked frame 6-4 are equipped with suspender crane 6-5, and the lower section of suspender crane 6-5 is equipped with suspender 6-
6;Locomotive crane 6 is run in the X direction by crane horizontal walking device 6-2, and crane longitudinal direction walked frame 6-4 passes through
Crane longitudinal direction running gear 6-3 is run in the Y direction, makes the container 2 below suspender 6-6 alignment Gantry Crane 6-1, iron
Road crane 6 realizes the handling operation of container 2 by suspender crane 6-5, collects railway container vehicle 9 in a loading place 10
Discrepancy operation, do not influence the dress of container 2 of the locomotive crane 6 on other railroad track 10-1 railway container vehicles 9
Operation is unloaded, i.e., bottom surface height when locomotive crane 6 carries 2 level run of container is greater than the collection on railway container vehicle 9
Level in vanning 2;Interface arrangement 7 includes that the crane of 16 top of interface track 15, interface platform 16 and interface platform is vertical
To the end crane long rails 6-Y-1 of the one end track 6-Y, interface platform 16 is lower than interface track 15, including platform rack 16-
1 and platform 16-2, interface track 15 and platform rack 16-1 are fixed on the top of column component 14, are the compositions of goods yard track 5
Part, including horizontal interface track 15X and longitudinal interface track 15Y, interface track 15 are connected with goods yard track 5;Railway lifting
Machine 6 will collect railway container in a loading place 10 below crane long rails 6-2 by suspender 6-6 and suspender crane 6-5
Container 2 on vehicle 9 is sling, then container 2 is placed on platform 16-2 by vertical shift machine 6-3, or will be on platform 16-2
Container 2 be hoisted on railway container vehicle 9;Waggon 4 realizes container 2 in truck loading place by goods yard track 5
12, the conversion between container stacking area 13 and platform 16-2, waggon 4 are run by interface track 15 to platform 16-2
Side, the container 2 in frame 4-1 is placed on platform 16-2, or the container 2 on platform 16-2 is hoisted to frame 4-1
It inside transports, conversion of the container 2 between locomotive crane 6 and waggon 4 is realized by platform 16-2.
The conveying device 3 includes A conveying device 3A, the cross that cross track 5X and long rails 5Y is located at sustained height
B conveying device 3B and cross track 5X to track 5X higher than long rails 5Y are lower than tri- kinds of conveying device 3C of long rails 5Y
Structure:
A conveying device 3A includes A waggon 4A and A goods yard track 5A, A waggon 4A include four-wheel horizontal walking device 8XA and
Four-wheel longitudinal direction running gear 8YA, A cross track 5XA and A long rails 5YA are in engaging portion without rib 5-1-1;
B conveying device 3B includes B waggon 4B and B goods yard track 5B, B waggon 4B include eight wheel horizontal walking device 8XB and
Four-wheel longitudinal direction running gear 8YA, high cross track 5XB are equipped with high traverse rod road notch 5-2BX, low long rails 5YB non-notch;
C conveying device 3C includes C waggon 4C and C goods yard track 5C, and C waggon 4C includes four-wheel wheel horizontal walking device 8XA
Longitudinal running gear 8YB is taken turns with eight, high long rails 5YC is equipped with high vertical track notch 5-2CY, nothing on low cross track 5XC
Notch.
The locomotive crane 6 includes cantilever crane 6A and gantry 6B, one end position of cantilever crane 6A
In the top of collection loading place 10, the other end is located at the top of platform 16-2, and gantry 6B is collecting the two of a loading place 10
Side is equipped with the crane cross track 6-X arranged in X direction, and two sets of cranes for being fixed on the bottom Gantry Crane 6-1 are horizontal
It is run on the gantry cross track 6B-X of two sides respectively to running gear 6-2.
The locomotive crane 6 is crane 6C, and crane 6C is equipped with machine on the walked frame 6C-4 of crane longitudinal direction
Frame cross track 6C-4X, suspender crane 6C-5 is equipped with crane cross sliding machine 6C-5-1, in the feelings that Gantry Crane 6C-1 is motionless
Under condition, suspender crane 6C-5 is run on rack cross track 6C-4X in X direction by crane cross sliding machine 6C-5-1, is risen
The operation of heavy-duty machine longitudinal direction running gear 6C-3 in the Y direction makes the container below suspender 6-6 alignment crane cross sliding machine 6C-5-1
2 carry out handling operation;When the crane long rails 6C-Y of crane 6C is equipped with more suspender crane 6C-5, and railway collection
Vehicle 9 case when being located at different positions on the railroad track 10-1 for collecting different in a loading place 10, in Gantry Crane 6C-
In the case that 1 is motionless, run in X direction on rack cross track 6C-4X by respective crane cross sliding machine 6C-5-1, it is real
Now more suspender crane 6C-5 operations simultaneously.
Interface track 15 and end crane long rails 6-Y-1 in the interface arrangement are overlapping in the Y direction,
It is staggered in height, i.e., interface track 15 is higher or lower than end crane long rails 6-Y-1, and platform 16-2, which is located at, laterally to be connect
The underface of mouthful track 15X, locomotive crane 6 by end crane long rails 6-Y-1 to the container 2 on platform 16-2 into
Row picks and places operation, and waggon 4 carries out pick-and-place operation to the container 2 on platform 16-2 by horizontal interface track 15X, realizes collection
Conversion of the vanning 2 between locomotive crane 6 and waggon 4.
Interface track 15 in the interface arrangement and end crane long rails 6-Y-1 be in the Y direction it is nonoverlapping,
Platform 16-2 is mobile platform 16-2A, lower section and end crane long rails 6-Y- of the mobile platform 16-2A in interface track 15
It is run between 1 lower section, conversion of the container 2 between locomotive crane 6 and waggon 4 is realized by mobile platform 16-2A.
The waggon 4 include onboard battery powered battery waggon 4D and by contact net for power supplying by
Two kinds of structures of electric waggon 4E.
The waggon 4 includes single jacking waggon 4F and Double Tops rise two kinds of structures of waggon 4G, single to jack waggon
4F includes a set of jacking switching device 4-2, i.e. when horizontal walking device 8X has the function of jacking, longitudinal running gear 8Y is not pushed up
Function is risen, or when i.e. horizontal walking device 8X does not jack function, longitudinal running gear 8Y has the function of that jacking, single jacking convey
Single jacking frame 4F-1 of vehicle 4F is gone up and down with the lifting of jacking switching device 4-2, when list jacking waggon 4F is using contact
When net power supply, power receiving device 4F-1-1 has elevating function;It includes two sets of jacking switching device 4-2 that Double Tops, which rise waggon 4G,
That is the longitudinal direction horizontal walking device 8X running gear 8Y has the function of jacking, and the height that Double Tops rise frame 4G-1 remains unchanged, i.e.,
The movement of jacking switching device 4-2 does not influence the height that Double Tops rise frame 4G-1.
The goods yard track 5 includes fluctuating orbit 5H and your rotary track 5R, and fluctuating orbit 5H includes lateral lift rail
Road 5HX and longitudinal fluctuating orbit two kinds of structures of 5HY, rotary track 5R include lateral rotation track 5RX and longitudinal rotary track 5RY
Two kinds of structures make the collection loading place 10 of different height and different angle, collection by going up and down fluctuating orbit 5H and rotary track 5R
Card loading place 12 and container laydown area 13 link into an integrated entity.
Collection track 51 in the collection loading place 10 is double-layer track, including is located on railway container vehicle 9
The collection upper layer cross track 51XA sum aggregate lower layer cross track 51XB of side collects a upper layer cross track 51XA sum aggregate lower layer
Cross track 51XB connects into rail network by fluctuating orbit 5H, several waggons 4 in collection upper layer cross track 51XA and
The quick despatch to the container 2 on railway container vehicle 9 is realized in operation on Ji Liang lower layer cross track 51XB.
The present invention is further described with reference to the accompanying drawing
As shown in fig. 1~fig. 5, the conveying device 3 of the container 2 in railway container yard 1 includes container waggon 4, defeated
Goods yard track 5, locomotive crane 6 and the interface arrangement 7 for sending vehicle 4 to run, if the railroad track length direction in goods yard 1 is the side X
To, the length direction of waggon 4 is the length direction of container 2, and the width direction of waggon 4 is the width direction of container 2,
Waggon 4 includes frame 4-1, jacking switching device 4-2, hoisting apparatus 4-3, erecting by overhang 4-4 and running gear 8, frame 4-1
It is the cavity of bottom opening, running gear 8 is located at the bottom of frame 4-1, and hoisting apparatus 4-3 is located at the top of frame 4-1, lifting
Device 4-3 by erecting by overhang 4-4 by the hanging of container 2 below frame 4-1 in frame 4-1, or by the collection in frame 4-1
Vanning 2 is placed on the lower section of frame 4-1, and the bottom of running gear 8 is equipped with traveling wheel 8-1 and directive wheel 8-2, including lateral walking
Device 8X and longitudinal running gear 8Y;Goods yard track 5 is that overhead rail is made of two channled rail 5-1, traveling wheel 8-1 and is led
It walks in channel suspending rail to wheel 8-2, directive wheel 8-2 is oriented to by two rib 5-1-1 of channled rail 5-1, packet
It includes the cross track 5X of X-direction and the long rails 5Y of Y-direction, cross track 5X is made of two cross slide way 5-1X, it is longitudinal
Track 5Y is made of two longitudinal rail 5-1Y, and the spacing of two longitudinal rail 5-1Y is greater than the length of container 2, does not influence to be located at
Waggon 4 or locomotive crane 6 above long rails 5Y, which are realized, picks and places the container 2 being located at below long rails 5Y,
When waggon 4 or locomotive crane 6 need to pick and place the container 2 below cross track 5X, between two cross slide way 5-1X
Away from the width for being greater than container 2;The bottom of horizontal walking device 8X and longitudinal running gear 8Y are designed with traveling wheel 8-1.
As shown in Fig. 6~Figure 11, the engaging portion of cross track 5X and long rails 5Y are equipped with track notch 5-2, goods yard rail
Road 5 includes the B that cross track 5X and long rails 5Y is located at the A structure of sustained height, cross track 5X is higher than long rails 5Y
The C-structure of structure, cross track 5X lower than long rails 5Y and mixing D structure:
A structure, goods yard track 5 are the goods yard A track 5A, and the goods yard A track 5A includes A cross track 5XA, A long rails 5YA and A
Track notch 5-2A, A track notch 5-2A includes on the A horizontal cut 5-2AX and A long rails 5YA on A cross track 5XA
The length of A longitudinal breach 5-2AY, A horizontal cut 5-2AX and A longitudinal breach 5-2AY be equal to the width of channled rail 5-1, it is deep
Degree is equal to the height of rib 5-1-1;
B structure, goods yard track 5 be the goods yard B track 5B, the goods yard B track 5B include high cross track 5XB, low long rails 5YB and
High traverse rod road notch 5-2BX length on high traverse rod road notch 5-2BX, high cross track 5XB is equal to the width of channled rail 5-1
Degree;
C-structure, goods yard track 5 be the goods yard C track 5C, the goods yard C track 5C include low cross track 5XC, high long rails 5YC and
The length of the vertical track notch 5-2CY of height, the vertical track notch 5-2CY of height are equal to the width of channled rail 5-1;
D structure, goods yard track 5 are the goods yard D track 5D, and the goods yard D track 5D includes the goods yard the A goods yard track 5A, B track 5B and C goods
At least two among the track 5C of field.
As shown in Figure 12~Figure 20, running gear 8 by horizontal walking device 8X realize cross track 5X in X direction on
Operation is run on long rails 5Y along Y-direction by longitudinal running gear 8Y, and traveling wheel 8-1 includes being located at laterally walking dress
The lateral traveling wheel 8X-1 of the bottom 8X and longitudinal traveling wheel 8Y-1 positioned at the bottom longitudinal running gear 8Y are set, is switched by jacking
The liter of device 4-2 and contracting change the difference in height between transverse direction traveling wheel 8X-1 and longitudinal traveling wheel 8Y-1, realize running gear 8
The switching for running on cross track 5X and running on long rails 5Y, horizontal walking device 8X includes A structure and B structure:
A structure, horizontal walking device 8X are four-wheel horizontal walking device 8XA, and four-wheel horizontal walking device 8XA includes 4 transverse directions
Traveling wheel 8X-1 and 8 directive wheels 8-2, every 2 directive wheel 8-2 and a transverse direction traveling wheel 8X-1 are one group, four-wheel lateral line
Walking apparatus 8XA is run on A cross track 5XA or unnotched low cross track 5XC;B structure, horizontal walking device 8X are
Eight wheel horizontal walking device 8XB, eight wheel horizontal walking device 8XB include 8 transverse direction traveling wheel 8X-1 and 8 directive wheel 8-2, often
2 transverse direction traveling wheel 8X-1 and 2 directive wheel 8-2 are one group, and eight wheel horizontal walking device 8XB are transported on high cross track 5XB
Row, the center of every group of transverse direction traveling wheel 8X-1 is away from the width for being greater than channled rail 5-1;Longitudinal running gear 8Y includes A structure and B
Structure:
A structure, longitudinal direction running gear 8Y are four-wheel longitudinal direction running gear 8YA, and four-wheel longitudinal direction running gear 8YA includes 4 longitudinal directions
Traveling wheel 8Y-1 and 8 directive wheels 8-2, every 2 directive wheel 8-2 and a transverse direction traveling wheel 8X-1 are one group, four-wheel lengthwise rows
Walking apparatus 8YA is run on the low long rails 5YB of A long rails 5YA or unnotched;B structure, longitudinal direction running gear 8Y are
Eight take turns longitudinal running gear 8YB, and eight wheel longitudinal direction running gear 8YB include 8 longitudinal direction traveling wheel 8Y-1 and 8 directive wheel 8-2, often
Two longitudinal direction traveling wheel 8Y-1 and 2 directive wheel 8-2 are one group, and eight wheel longitudinal direction running gear 8YB are transported on high long rails 5YB
Row, the center of every group of longitudinal direction traveling wheel 8Y-1 is away from the width for being greater than channled rail 5-1.
As shown in Figure 21~Figure 27, railway goods yard 1 includes the collection loading place 10 of railway container vehicle 9, container card
The truck loading place 12 of vehicle 11 and container laydown area 13 and column component 14, collection loading place 10 include several railway packagings
The railroad track 10-1 that boxcar 9 is run, goods yard track 5 are fixed on the top of column component 14, the top of truck loading place 12
Equipped with goods yard track 5, container stacking area 13 includes several packaging chests stockyard 13-1, the two sides of packaging chest stockyard 13-1
For column component 14, top is long rails 5Y, and each packaging chest stockyard 13-1 is linked into an integrated entity by cross track 5X;Railway
Crane 6 is the conveyer for collecting 7 top of a loading place 10 and interface arrangement, is realized by locomotive crane 6 to collection loading place
Container 2 carries out handling operation on railway container vehicle 9 in 10;Waggon 4 is truck loading place 12, container stacking area 13
With the conveyer of 7 top of interface arrangement, realized by waggon 4 to the container on container truck 11 in truck loading place 12
2 carry out handling operation, and locomotive crane 6 includes crane cross track 6-X, Gantry Crane 6-1, crane laterally walking dress
Set 6-2, crane long rails 6-Y, crane longitudinal direction running gear 6-3, crane longitudinal direction walked frame 6-4, suspender lifting
Machine 6-5 and suspender 6-6, the crane cross track 6-X arranged in X direction are fixed on ground or column component 14, crane
Horizontal walking device 6-2 is fixed on the bottom of Gantry Crane 6-1, runs in X direction on crane cross track 6-X;?
The top of Gantry Crane 6-1 is equipped with the crane long rails 6-Y arranged along Y-direction, is fixed on crane longitudinal direction vehicle with walking machine
The crane longitudinal direction running gear 6-3 at the both ends frame 6-4 is run on crane long rails 6-Y, crane longitudinal direction walked frame
6-4 is equipped with suspender crane 6-5, and the lower section of suspender crane 6-5 is equipped with suspender 6-6;Locomotive crane 6 passes through crane cross
It is run in the X direction to running gear 6-2, crane longitudinal direction walked frame 6-4 is by crane longitudinal direction running gear 6-3 in Y
Side is run up, and makes the container 2 below suspender 6-6 alignment Gantry Crane 6-1, and locomotive crane 6 passes through suspender crane
6-5 realizes the handling operation of container 2, collects the discrepancy operation of railway container vehicle 9 in a loading place 10, does not influence railway and rise
The handling operation of container 2 of the heavy-duty machine 6 on other railroad track 10-1 railway container vehicles 9, i.e. locomotive crane 6 carry
Bottom surface height when 2 level run of container is greater than level on the container 2 on railway container vehicle 9;Interface arrangement 7
The end crane of one end crane long rails 6-Y including 16 top of interface track 15, interface platform 16 and interface platform is vertical
To track 6-Y-1, interface platform 16 is lower than interface track 15, including platform rack 16-1 and platform 16-2,15 He of interface track
Platform rack 16-1 is fixed on the top of column component 14, is the component part of goods yard track 5, including horizontal interface track 15X
With longitudinal interface track 15Y, interface track 15 is connected with goods yard track 5;Locomotive crane 6 passes through suspender 6-6 and suspender lifting
Machine 6-5 slings the container 2 below crane long rails 6-2 in collection loading place 10 on railway container vehicle 9, then leads to
It crosses vertical shift machine 6-3 container 2 is placed on platform 16-2, or the container 2 on platform 16-2 is hoisted to railway container
On vehicle 9;Waggon 4 realizes container 2 in truck loading place 12, container stacking area 13 and platform 16- by goods yard track 5
Conversion between 2, waggon 4 are run to platform 16-2 by interface track 15, the container 2 in frame 4-1 are placed
On platform 16-2, or the container 2 on platform 16-2 is hoisted in frame 4-1 and is transported, packaging is realized by platform 16-2
Conversion of the case 2 between locomotive crane 6 and waggon 4.
As shown in Figure 12, Figure 15 and Figure 18, conveying device 3 includes that cross track 5X and long rails 5Y is located at sustained height
A conveying device 3A, cross track 5X higher than long rails 5Y B conveying device 3B and cross track 5X be lower than long rails 5Y
Tri- kinds of structures of conveying device 3C:
A conveying device 3A includes A waggon 4A and A goods yard track 5A, A waggon 4A include four-wheel horizontal walking device 8XA and
Four-wheel longitudinal direction running gear 8YA, A cross track 5XA and A long rails 5YA are in engaging portion without rib 5-1-1;
B conveying device 3B includes B waggon 4B and B goods yard track 5B, B waggon 4B include eight wheel horizontal walking device 8XB and
Four-wheel longitudinal direction running gear 8YA, high cross track 5XB are equipped with high traverse rod road notch 5-2BX, low long rails 5YB non-notch;
C conveying device 3C includes C waggon 4C and C goods yard track 5C, and C waggon 4C includes four-wheel wheel horizontal walking device 8XA
Longitudinal running gear 8YB is taken turns with eight, high long rails 5YC is equipped with high vertical track notch 5-2CY, nothing on low cross track 5XC
Notch.
As shown in Figure 27~Figure 29, locomotive crane 6 includes cantilever crane 6A and gantry 6B, cantilever crane
One end of 6A is located at the top of collection loading place 10, and the other end is located at the top of platform 16-2, and gantry 6B is in collection dress
The two sides for unloading area 10 are equipped with the crane cross track 6-X arranged in X direction, are fixed on the two of the bottom Gantry Crane 6-1
Set crane horizontal walking device 6-2 is run on the gantry cross track 6B-X of two sides respectively.
As shown in figure 30, locomotive crane 6 is crane 6C, and crane 6C is set on the walked frame 6C-4 of crane longitudinal direction
Organic frame cross track 6C-4X, suspender crane 6C-5 is equipped with crane cross sliding machine 6C-5-1, motionless in Gantry Crane 6C-1
In the case where, suspender crane 6C-5 is transported on rack cross track 6C-4X in X direction by crane cross sliding machine 6C-5-1
Row, the operation of crane longitudinal direction running gear 6C-3 in the Y direction make below suspender 6-6 alignment crane cross sliding machine 6C-5-1
Container 2 carries out handling operation;When crane 6C crane long rails 6C-Y be equipped with more suspender crane 6C-5, and
Railway container vehicle 9 is when being located at different positions on the railroad track 10-1 for collecting different in a loading place 10, in crane
In the case that rack 6C-1 is motionless, by respective crane cross sliding machine 6C-5-1 on rack cross track 6C-4X in X direction
More suspender crane 6C-5 operation simultaneously is realized in operation.
As shown in figure 31, the interface track 15 in interface arrangement and end crane long rails 6-Y-1 are overlapping in the Y direction
, it is staggered in height, i.e., interface track 15 is higher or lower than end crane long rails 6-Y-1, and platform 16-2 is located at
The underface of horizontal interface track 15X, locomotive crane 6 is by end crane long rails 6-Y-1 to the collection on platform 16-2
Vanning 2 carries out pick-and-place operation, and waggon 4 carries out pick-and-place work to the container 2 on platform 16-2 by horizontal interface track 15X
Industry realizes conversion of the container 2 between locomotive crane 6 and waggon 4.
As shown in figure 32, the interface track 15 in interface arrangement and end crane long rails 6-Y-1 are not heavy in the Y direction
Folded, platform 16-2 is mobile platform 16-2A, lower section and end crane longitudinal direction rail of the mobile platform 16-2A in interface track 15
It is run between the lower section of road 6-Y-1, realizes container 2 between locomotive crane 6 and waggon 4 by mobile platform 16-2A
Conversion.
As shown in Figure 33~Figure 34, waggon 4 includes onboard battery powered battery waggon 4D and passes through confession
Electrical contact net by two kinds of structures of electric waggon 4E.
As shown in Figure 35~Figure 36, waggon 4 includes single jacking waggon 4F and Double Tops rise two kinds of structures of waggon 4G, single
Jacking waggon 4F includes a set of jacking switching device 4-2, i.e. when horizontal walking device 8X has the function of jacking, longitudinal walking dress
It setting 8Y and does not jack function, or when i.e. horizontal walking device 8X does not jack function, longitudinal running gear 8Y has the function of jacking,
Single jacking frame 4F-1 of list jacking waggon 4F is gone up and down with the lifting of jacking switching device 4-2, when list jacks waggon
When 4F is powered using contact net, power receiving device 4F-1-1 has elevating function;It includes that two sets of jackings are cut that Double Tops, which rise waggon 4G,
Changing device 4-2, the i.e. longitudinal direction horizontal walking device 8X running gear 8Y have the function of jacking, and the height that Double Tops rise frame 4G-1 is protected
Hold it is constant, i.e., jacking switching device 4-2 movement do not influence Double Tops liter frame 4G-1 height.
As shown in Figure 37~Figure 40, goods yard track 5 includes including fluctuating orbit 5H and your rotary track 5R, fluctuating orbit 5H
Lateral fluctuating orbit 5HX and longitudinal fluctuating orbit two kinds of structures of 5HY, rotary track 5R includes lateral rotation track 5RX and longitudinal direction
Two kinds of structures of rotary track 5RY make the collection of different height and different angle by going up and down fluctuating orbit 5H and rotary track 5R
Loading place 10, truck loading place 12 and container laydown area 13 link into an integrated entity.
As shown in figure 41, the collection track 51 collected in a loading place 10 is double-layer track, including is located at railway container vehicle
The collection upper layer cross track 51XA sum aggregate lower layer cross track 51XB of 9 tops, collects a upper layer cross track 51XA sum aggregate
Lower layer cross track 51XB connects into rail network by fluctuating orbit 5H, and several waggons 4 are in collection upper layer cross track
The quick despatch to the container 2 on railway container vehicle 9 is realized in operation on 51XA sum aggregate lower layer cross track 51XB.