CN109213106A - A kind of unified platform production scheduling intellectual analysis decision control system and method - Google Patents

A kind of unified platform production scheduling intellectual analysis decision control system and method Download PDF

Info

Publication number
CN109213106A
CN109213106A CN201811231961.8A CN201811231961A CN109213106A CN 109213106 A CN109213106 A CN 109213106A CN 201811231961 A CN201811231961 A CN 201811231961A CN 109213106 A CN109213106 A CN 109213106A
Authority
CN
China
Prior art keywords
unit
response time
control system
booting
production scheduling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811231961.8A
Other languages
Chinese (zh)
Inventor
赵英宏
孙广春
杨琳
伍英伟
张继承
李建豪
冯肖荣
方显能
李凯
王中成
吕坤
刘青丽
乔延坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Laurel Electric Ltd By Share Ltd
Datang Yantan Hydropower Co Ltd
Original Assignee
Guangxi Laurel Electric Ltd By Share Ltd
Datang Yantan Hydropower Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Laurel Electric Ltd By Share Ltd, Datang Yantan Hydropower Co Ltd filed Critical Guangxi Laurel Electric Ltd By Share Ltd
Priority to CN201811231961.8A priority Critical patent/CN109213106A/en
Publication of CN109213106A publication Critical patent/CN109213106A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32252Scheduling production, machining, job shop
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of unified platform production scheduling intellectual analysis decision control system and methods, its components of system as directed includes data processing terminal, automatic hydrological system, host on-line monitoring system, electric energy system, display unit, production scheduling intellectual analysis decision control system, unit booting response time statistical analysis module, unit working efficiency monitors module on-line, unit operating condition monitors analysis module on-line, unit booting executive component safeguards aid decision unit, unit starting procedure response optimization aid decision unit, unit response time priority acccess control guide unit, unit efficiency preferentially regulates and controls guidance list and unit operating condition preferentially regulates and controls guide unit.The present invention can reduce the investment of manpower, reduce the working strength of staff, reduce the difficulty of electric power station operation and management, facilitate the ageing information for controlling unit components, reduce the set grid-connection time, reduce waste of the unit starting process to water resource.

Description

A kind of unified platform production scheduling intellectual analysis decision control system and method
Technical field
The present invention relates to intelligent hydroelectric power plant's technology, specifically a kind of unified platform production scheduling intellectual analysis Decision Control System and method.
Background technique
Water power many places in remote districts and with basin distributed quantity it is numerous, along with power station and unit it is large number of, cause It needs to arrange a large amount of technical staff to carry out crew check work in each power station, not only increases the investment of human cost, and And also increase difficulty to power management;On the other hand can not effectively grasp booting corresponding time of unit, operational efficiency and The information such as operating conditions cause effectively enable the unit that the available machine time is fast, operational efficiency is high, operating condition is good, do not only result in machine The group grid-connected time extends, wastes a large amount of water, and cannot effectively enable the unit that operational efficiency is high, working condition is good.
Patent No. CN201410813102.5 discloses a kind of integrated information platform system based on intelligent hydroelectric power plant, The advantageous effect of the invention is to make multiple independent automation subsystem connections, constitutes real-time, organic unity entirety, is conducive to The intelligent construction of hydroelectric power plant is promoted, realizes hydroelectric power plant's informationization and intelligence, but the invention does not propose to solve above-mentioned ask The method or framework of topic.
Summary of the invention
In view of the deficiencies of the prior art, the present invention proposes one kind can reduce human input, and it is difficult to reduce electric power station operation and management Degree reduces the set grid-connection time, reduces unit starting process to the unified platform production scheduling intellectual analysis of water resource waste Decision control system and method.
To achieve the goals above, the invention adopts the following technical scheme:
A kind of unified platform production scheduling intellectual analysis decision control system, including data processing terminal, automatic hydrological system, Host on-line monitoring system, electric energy system, display unit, production scheduling intellectual analysis decision control system, unit booting are rung Statistical analysis module, unit working efficiency on-line monitoring module, unit operating condition on-line monitoring analysis module, unit booting between seasonable Executive component maintenance aid decision unit, unit starting procedure response optimization aid decision unit, unit response time are preferentially controlled Guide unit processed, unit efficiency preferentially regulate and control to instruct list and unit operating condition preferentially to regulate and control guide unit;
The data processing terminal, automatic hydrological system, host on-line monitoring system, electric energy system, display unit, unit Response time statistical analysis module, unit working efficiency on-line monitoring module, the unit operating condition of being switched on monitor analysis module, machine on-line Group booting executive component safeguards aid decision unit, unit starting procedure response optimization aid decision unit, unit response time Priority acccess control guide unit, unit efficiency preferentially regulate and control guide unit, unit operating condition preferentially regulate and control guide unit respectively with it is described Production scheduling intellectual analysis decision control system be connected;
The unit booting response time statistical analysis module is used to record the booting response time of each power station unit, and right The unit booting response time is ranked up from short to long;
The unit working efficiency on-line monitoring module is used to record the working efficiency of each power station unit, and to each unit Working efficiency is ranked up from high to low;
The unit operating condition on-line monitoring analysis module records the floor data of each power station unit Oscillation Amplitude, and to each machine The floor data of group is ranked up from small to large;
The unit booting executive component maintenance aid decision unit opens and closes the opening and closing response time of each element and history Time compares, and judges the aging and defect situation of element;
The unit starting procedure response optimization aid decision unit is according to prefabricated starting procedure model, binding member Response time adjusts the opening sequence of starting procedure, opens the new journal unit new booting response time according to element, New, the old booting response time for comparing unit booting, it is suitable to record new element unlatching if the new booting response time is shorter Sequence process;
The booting response time order information of unit is delivered to production by the unit response time priority acccess control guide unit Intellectual analysis decision control system is dispatched, then feeds back to data processing terminal, and preferentially opens booting response time short unit;
The unit efficiency preferentially regulates and controls guide unit and the working efficiency order information of unit is delivered to production scheduling intelligence Analysis decision control system, then data processing terminal is fed back to, and preferentially open the unit that work efficiency is high;
The unit operating condition preferentially regulates and controls guide unit and the floor data order information of unit is delivered to production scheduling intelligence Analysis decision control system, then data processing terminal is fed back to, and preferentially open the good unit of operating condition;
The data processing terminal presets the load of unit, and screens response time of unit, working efficiency or operating condition Priority level, it is preferential to enable the unit that the response time is short, work efficiency is high or operating condition is good;Data processing terminal monitors in real time simultaneously Unit load, working efficiency, operating condition automatically generate grid-connected unit load adjust automatically data in real time;
The display unit show height of water level, guide vane opening rate, Oscillation Amplitude numerical value, rotor speed numerical value, reactive power, Active power, water-head, generated output, generating flow, the aging of element, booting response time shorter element opening sequence stream The floor data sequence information data of journey, the booting response time sequence of unit, the working efficiency sequence and unit of unit.
As further technological improvement, unit booting the response time statistical analysis module, unit working efficiency On-line monitoring module, unit operating condition on-line monitoring analysis module, unit booting executive component maintenance aid decision unit, unit are opened Machine process response optimization aid decision unit, unit response time priority acccess control guide unit, unit efficiency preferentially regulate and control guidance Single and unit operating condition preferentially regulates and controls guide unit and is integrated on production scheduling intellectual analysis decision control system respectively.
As a further explanation of the present invention, the automatic hydrological system includes ultrasonic water level gauge and rainfall detection dress It sets;The rainfall detection device includes water inlet pipe, drainpipe and cylinder, and cylinder includes upper shell and lower shell;Described is upper Cylinder and lower shell inside top are mounted on optical fiber water-level gauge, and the side at the top of upper shell and lower shell is mounted on into water The side of pipe, exhaust pipe, upper shell and lower shell bottom is mounted on drainpipe;The upper end of the water inlet pipe is equipped with leakage Bucket;Solenoid valve I is installed on the water inlet pipe at the funnel;Water pump is also equipped on the water inlet pipe;Described Netted spheroid is fixed in funnel.
It is mounted on ultrasonic water level gauge in dam two sides, ultrasonic water level gauge is used to detect reservoir upstream and downstream water level, and It will test reservoir upstream and downstream water level value and feed back to production scheduling intellectual analysis decision control system;The setting of rainfall detection device The place of surrounding spaciousness in power station;
Upper shell and lower shell are hollow, enclosure space;Website sphere diameter is smaller than funnel upper end opening diameter and netted Sphere is raised at funnel openings;During raining, solenoid valve I, the water pump being connected with upper shell are first opened, funnel can will be received Collecting the rainwater vertically fallen, netted spheroid collects the rainwater for tilting and falling into funnel, and then water pump extracts the product rain in funnel, And be stored in upper shell, when the height of water level value that light pricker water-level gauge feeds back to production scheduling intellectual analysis decision control system is big When preset value, production scheduling intellectual analysis decision control system records the water level value in current upper shell, and controls closing Solenoid valve I and water pump in upper shell, while opening the solenoid valve II of upper shell, solenoid valve I and water pump on lower shell, electromagnetism Valve II is opened, so that the rainwater in upper shell is discharged, and lower shell starts to collect rainwater, until the light pricker water in lower shell The height of water level value that position meter feeds back to production scheduling intellectual analysis decision control system is greater than preset value, then re-uses upper shell Rainwater is collected, walks the rainwater in lower shell side by side, production scheduling intellectual analysis decision control system can recorde twenty four hours Interior rainfall situation.
As a further explanation of the present invention, the host on-line monitoring system includes guide vane opening instrument, vibrating sensing Device, power transducer and speed probe.Guide vane opening instrument, vibrating sensor, power transducer, speed probe with production Scheduling intellectual analysis decision control system is electrically connected;Vibrating sensor is installed in the unit, vibrating sensor real-time detection unit Oscillation Amplitude numerical value;Power transducer is mounted on the cable output end of unit, the output of power transducer real-time detection unit Active power and reactive power numerical value;Speed probe is arranged in the unit, speed probe real-time detection unit rotor revolving speed Situation;Guide vane opening instrument is arranged in power station unit, and guide vane opening instrument is able to detect the guide vane opening rate of unit.
As a further explanation of the present invention, the electric energy system is electric energy meter or Source of Gateway Meter.Electric energy meter or Source of Gateway Meter is mounted in the output cord of unit, and electric energy meter or Source of Gateway Meter are capable of the electric flux number that real-time detection unit exports Value.
As a further explanation of the present invention, the production scheduling intellectual analysis decision control system is host.Host It is mainly responsible for and carries out data processing and data interaction.Production scheduling intellectual analysis decision control system is arranged in power station general headquarters computer room In.
As a further explanation of the present invention, the display unit is display.Display unit is arranged in power station general headquarters In computer room.
As a further explanation of the present invention, the data processing terminal is server;The host and server Data interaction is carried out by communication network;Intelligent management cloud platform is established in the server;
The intelligent management cloud platform can sufficiently excavate creation data, counted, reported to real-time production data Alert and storage is analyzed historical data and is handled, operation and maintenance production report is automatic using analysis software and strategy It generates, running trend of the equipment automatically analyzes, and equipment runs intelligent early-warning and anticipation.Data processing terminal is arranged in power station general headquarters machine Fang Zhong.
A kind of unified platform production scheduling intellectual analysis Decision Control method, comprising the following steps:
Step 1, the height of water level of automatic hydrological system real-time monitoring reservoir upstream and downstream trip, and the height of water level value that will test Feed back to production scheduling intellectual analysis decision control system;The guide vane opening rate of host on-line monitoring system real-time monitoring unit, Oscillation Amplitude numerical value, the reactive power of rotor speed numerical value and output and active power numerical value simultaneously feed back to production scheduling intelligence It can analysis decision control system;Electric energy system real-time monitoring unit output electric energy numerical quantity simultaneously feeds back to production scheduling intelligence point Analyse decision control system;
Step 2, production scheduling intellectual analysis decision control system are swum according to the upstream and downstream that automatic hydrological system feedback comes Height of water level calculates water-head;Production scheduling intellectual analysis decision control system feeds back the electric energy to come according to electric energy system Numerical quantity obtains the generated output of unit;Production scheduling intellectual analysis decision control system passes through the generating flow of unit, power generation Power and water-head data operation go out the working efficiency of unit;
Step 3, unit booting response time statistical analysis module are used to record the booting response time of each power station unit, and The unit booting response time is ranked up from short to long, then feeds back to production scheduling intellectual analysis decision control system;Unit Working efficiency on-line monitoring module is used to record the working efficiency of each power station unit, and to the working efficiency of each unit by height to It is low to be ranked up, then feed back to production scheduling intellectual analysis decision control system;Unit operating condition monitors analysis module record on-line The floor data of the Oscillation Amplitude of each power station unit, and the floor data of each unit is ranked up from small to large, then Feed back to production scheduling intellectual analysis decision control system;
Step 4, unit booting executive component maintenance aid decision unit open and close the opening and closing response time of each element and history Time compares, and judges the aging and defect situation of element, and the ageing information of element is shown by display unit; Unit starting procedure response optimization aid decision unit adjusts the opening sequence of each element, and new journal is opened according to element The unit new booting response time, comparison unit booting new, the old booting response time, if the new booting response time compared with It is short, then new element opening sequence process is recorded, and the shorter element unlatching of booting response time is shown by display unit Sequence flow;
Step 5, unit response time priority acccess control guide unit are preferentially opened according to the booting response time sequence of unit Machine response time short unit;Unit efficiency preferentially regulates and controls guide unit according to the working efficiency sequence of unit, preferentially opens work Make high-efficient unit;Unit operating condition preferentially regulates and controls guide unit according to the floor data sequence of unit, and preferential unlatching operating condition is good Unit;
Step 6 when instructing when data processing terminal assigns stationary power generation load, presets unit by data processing terminal Load, and preferentially regulate and control to refer to by the response time of unit response time priority acccess control guide unit screening unit, unit efficiency The priority level that the singly working efficiency of screening unit, unit operating condition preferentially regulate and control guide unit screening unit operating condition is led, then through life The unit that the response time is short, work efficiency is high or operating condition is good can preferentially be enabled by producing scheduling intellectual analysis decision control system.
As a further explanation of the present invention, in step 2 unit working efficiency operation mode specifically:
It is wherein the working efficiency of unit;N is the generated output of unit, unit KW;H is water-head, and unit m, Q are power generation Flow, unit m3/s;
The discharge record that high, medium and low water level is screened from the field data in a period, according to the water-head of record, generator Generated output on power transducer, the working efficiency of unit is calculated by the operational formula of working efficiency, then is put and drawn scatter plot, is led to Guo Dian group center opening relationships curve;
Using the water-head and generated output observed, looks into relation curve and obtain the working efficiency of unit.
As a further explanation of the present invention, by H, N, bring the working efficiency calculation formula of unit into:
Generating flow (generating flow at this time be instantaneous electric flow) can be obtained, by instantaneous electric flow can calculate day, The moon, year generating flow.
Compared with prior art, the present invention have the utility model has the advantages that
1. the present invention monitors the state in power station by automatic hydrological system and host on-line monitoring system, the throwing of manpower can be reduced Enter, reduces the working strength of staff, and pass through data processing terminal and production scheduling intellectual analysis decision control system It is controlled, can reduce the difficulty of electric power station operation and management.
2. the present invention can effectively grasp the information such as booting corresponding time, operational efficiency and the operating conditions of unit, and The unit for opening that the available machine time is fast, operational efficiency is high or operating condition is good can be screened, on the one hand can facilitate and control unit components On the other hand ageing information can reduce the set grid-connection time and reduce waste of the unit starting process to water resource.
Detailed description of the invention
Fig. 1 is present system structure chart.
Fig. 2 is flow chart of the invention.
Fig. 3 is the structural schematic diagram of moderate rain amount detecting device of the present invention.
Appended drawing reference: 1- funnel, 2- solenoid valve I, 3- water inlet pipe, 4- water pump, 5- netted spheroid, 6- light pricker water-level gauge, 7- Cylinder, 8- exhaust pipe, 9- solenoid valve II, 10- drainpipe.
Specific embodiment
The following further describes the present invention with reference to the drawings.
Embodiment:
A kind of unified platform production scheduling intellectual analysis decision control system, including data processing terminal, automatic hydrological system, Host on-line monitoring system, electric energy system, display unit, production scheduling intellectual analysis decision control system, unit booting are rung Statistical analysis module, unit working efficiency on-line monitoring module, unit operating condition on-line monitoring analysis module, unit booting between seasonable Executive component maintenance aid decision unit, unit starting procedure response optimization aid decision unit, unit response time are preferentially controlled Guide unit processed, unit efficiency preferentially regulate and control to instruct list and unit operating condition preferentially to regulate and control guide unit;
The data processing terminal, automatic hydrological system, host on-line monitoring system, electric energy system, display unit, unit Response time statistical analysis module, unit working efficiency on-line monitoring module, the unit operating condition of being switched on monitor analysis module, machine on-line Group booting executive component safeguards aid decision unit, unit starting procedure response optimization aid decision unit, unit response time Priority acccess control guide unit, unit efficiency preferentially regulate and control guide unit, unit operating condition preferentially regulate and control guide unit respectively with it is described Production scheduling intellectual analysis decision control system be connected;
The unit booting response time statistical analysis module is used to record the booting response time of each power station unit, and right The unit booting response time is ranked up from short to long;
The unit working efficiency on-line monitoring module is used to record the working efficiency of each power station unit, and to each unit Working efficiency is ranked up from high to low;
The unit operating condition on-line monitoring analysis module records the floor data of each power station unit Oscillation Amplitude, and to each machine The floor data of group is ranked up from small to large;
The unit booting executive component maintenance aid decision unit opens and closes the opening and closing response time of each element and history Time compares, and judges the aging and defect situation of element;
The unit starting procedure response optimization aid decision unit is according to prefabricated starting procedure model, binding member Response time adjusts the opening sequence of starting procedure, opens the new journal unit new booting response time according to element, New, the old booting response time for comparing unit booting, it is suitable to record new element unlatching if the new booting response time is shorter Sequence process;
The booting response time order information of unit is delivered to production by the unit response time priority acccess control guide unit Intellectual analysis decision control system is dispatched, then feeds back to data processing terminal, and preferentially opens booting response time short unit;
The unit efficiency preferentially regulates and controls guide unit and the working efficiency order information of unit is delivered to production scheduling intelligence Analysis decision control system, then data processing terminal is fed back to, and preferentially open the unit that work efficiency is high;
The unit operating condition preferentially regulates and controls guide unit and the floor data order information of unit is delivered to production scheduling intelligence Analysis decision control system, then data processing terminal is fed back to, and preferentially open the good unit of operating condition;
The data processing terminal presets the load of unit, and screens response time of unit, working efficiency or operating condition Priority level, it is preferential to enable the unit that the response time is short, work efficiency is high or operating condition is good;Data processing terminal monitors in real time simultaneously Unit load, working efficiency, operating condition automatically generate grid-connected unit load adjust automatically data in real time.
The automatic hydrological system includes ultrasonic water level gauge and rainfall detection device;The rainfall detection device packet Water inlet pipe 3, drainpipe 10 and cylinder 7 are included, cylinder 7 includes upper shell and lower shell;The upper shell and lower shell medial roof Portion is mounted on optical fiber water-level gauge, and the side at the top of upper shell and lower shell is mounted on water inlet pipe 3, exhaust pipe 8, upper shell Drainpipe 10 is mounted on the side of lower shell bottom;The upper end of the water inlet pipe 3 is equipped with funnel 1;In the leakage It struggles against and solenoid valve I 2 is installed on the water inlet pipe at 1;Water pump 4 is also equipped on the water inlet pipe 3;It is solid in the funnel 1 Surely it is equipped with netted spheroid 5.
It is mounted on ultrasonic water level gauge in dam two sides, ultrasonic water level gauge is used to detect reservoir upstream and downstream water level, and It will test reservoir upstream and downstream water level value and feed back to production scheduling intellectual analysis decision control system;
Upper shell and lower shell are hollow, enclosure space;Website sphere diameter is smaller than 1 upper end opening diameter of funnel, and net Shape sphere 5 is in funnel 1 opening protrusion;During raining, solenoid valve I 2, the water pump 4 being connected with upper shell, funnel 1 are first opened The rainwater that collection can be vertically fallen, netted spheroid 5 collect the rainwater for tilting and falling into funnel 1, and then water pump 4 extracts leakage Product rain in bucket 1, and be stored in upper shell, when light pricker water-level gauge 6 feeds back to production scheduling intellectual analysis decision control system Height of water level value be greater than preset value when, production scheduling intellectual analysis decision control system records the water level in current upper shell Value, and the solenoid valve I 2 and water pump 4 closed in upper shell are controlled, while opening the solenoid valve II 9 of upper shell, on lower shell Solenoid valve I 2 and water pump 4, solenoid valve II 9 is opened, so that the rainwater in upper shell is discharged, and lower shell starts to collect rain Water, until the height of water level value that the light pricker water-level gauge 6 in lower shell feeds back to production scheduling intellectual analysis decision control system is big In preset value, then re-uses upper shell and collect rainwater, walk the rainwater in lower shell, production scheduling intellectual analysis decision control side by side System processed can recorde the rainfall situation in twenty four hours.
The described unit booting response time statistical analysis module, unit working efficiency monitor module, unit operating condition on-line On-line monitoring analysis module, unit booting executive component maintenance aid decision unit, unit starting procedure response optimization auxiliary are determined Plan unit, unit response time priority acccess control guide unit, unit efficiency preferentially regulate and control to instruct list and unit operating condition preferentially to regulate and control Guide unit is integrated in respectively on production scheduling intellectual analysis decision control system.
The host on-line monitoring system includes guide vane opening instrument, vibrating sensor, power transducer and revolution speed sensing Device.
The electric energy system is electric energy meter or Source of Gateway Meter.
The production scheduling intellectual analysis decision control system is host.
The display unit is display.
The data processing terminal is server;The host and server carries out data friendship by communication network Mutually.
A kind of unified platform production scheduling intellectual analysis Decision Control method, comprising the following steps:
Step 1, the height of water level of automatic hydrological system real-time monitoring reservoir upstream and downstream trip, and the height of water level value that will test Feed back to production scheduling intellectual analysis decision control system;The guide vane opening rate of host on-line monitoring system real-time monitoring unit, Oscillation Amplitude numerical value, the reactive power of rotor speed numerical value and output and active power numerical value simultaneously feed back to production scheduling intelligence It can analysis decision control system;Electric energy system real-time monitoring unit output electric energy numerical quantity simultaneously feeds back to production scheduling intelligence point Analyse decision control system;
Step 2, production scheduling intellectual analysis decision control system are swum according to the upstream and downstream that automatic hydrological system feedback comes Height of water level calculates water-head;Production scheduling intellectual analysis decision control system feeds back the electric energy to come according to electric energy system Numerical quantity obtains the generated output of unit;Production scheduling intellectual analysis decision control system passes through the generating flow of unit, power generation Power and water-head data operation go out the working efficiency of unit;
Step 3, unit booting response time statistical analysis module are used to record the booting response time of each power station unit, and The unit booting response time is ranked up from short to long, then feeds back to production scheduling intellectual analysis decision control system;Unit Working efficiency on-line monitoring module is used to record the working efficiency of each power station unit, and to the working efficiency of each unit by height to It is low to be ranked up, then feed back to production scheduling intellectual analysis decision control system;Unit operating condition monitors analysis module record on-line The floor data of the Oscillation Amplitude of each power station unit, and the floor data of each unit is ranked up from small to large, then Feed back to production scheduling intellectual analysis decision control system;
Step 4, unit booting executive component maintenance aid decision unit open and close the opening and closing response time of each element and history Time compares, and judges the aging and defect situation of element, and the ageing information of element is shown by display unit; Unit starting procedure response optimization aid decision unit adjusts the opening sequence of each element, and new journal is opened according to element The unit new booting response time, comparison unit booting new, the old booting response time, if the new booting response time compared with It is short, then new element opening sequence process is recorded, and the shorter element unlatching of booting response time is shown by display unit Sequence flow;
Step 5, unit response time priority acccess control guide unit are preferentially opened according to the booting response time sequence of unit Machine response time short unit;Unit efficiency preferentially regulates and controls guide unit according to the working efficiency sequence of unit, preferentially opens work Make high-efficient unit;Unit operating condition preferentially regulates and controls guide unit according to the floor data sequence of unit, and preferential unlatching operating condition is good Unit;
Step 6 when instructing when data processing terminal assigns stationary power generation load, presets unit by data processing terminal Load, and preferentially regulate and control to refer to by the response time of unit response time priority acccess control guide unit screening unit, unit efficiency The priority level that the singly working efficiency of screening unit, unit operating condition preferentially regulate and control guide unit screening unit operating condition is led, then through life The unit that the response time is short, work efficiency is high or operating condition is good can preferentially be enabled by producing scheduling intellectual analysis decision control system.

Claims (9)

1. a kind of unified platform production scheduling intellectual analysis decision control system, it is characterised in that: including data processing terminal, Automatic hydrological system, host on-line monitoring system, electric energy system, display unit, production scheduling intellectual analysis Decision Control system System, unit booting response time statistical analysis module, unit working efficiency on-line monitoring module, the on-line monitoring analysis of unit operating condition Module, unit booting executive component maintenance aid decision unit, unit starting procedure response optimization aid decision unit, unit are rung Priority acccess control guide unit, unit efficiency preferentially regulate and control to instruct list and unit operating condition preferentially to regulate and control guide unit between seasonable;
The data processing terminal, automatic hydrological system, host on-line monitoring system, electric energy system, display unit, unit Response time statistical analysis module, unit working efficiency on-line monitoring module, the unit operating condition of being switched on monitor analysis module, machine on-line Group booting executive component safeguards aid decision unit, unit starting procedure response optimization aid decision unit, unit response time Priority acccess control guide unit, unit efficiency preferentially regulate and control guide unit, unit operating condition preferentially regulate and control guide unit respectively with it is described Production scheduling intellectual analysis decision control system be connected;
The unit booting response time statistical analysis module is used to record the booting response time of each power station unit, and right The unit booting response time is ranked up from short to long;
The unit working efficiency on-line monitoring module is used to record the working efficiency of each power station unit, and to each unit Working efficiency is ranked up from high to low;
The unit operating condition on-line monitoring analysis module records the floor data of each power station unit Oscillation Amplitude, and to each machine The floor data of group is ranked up from small to large;
The unit booting executive component maintenance aid decision unit opens and closes the opening and closing response time of each element and history Time compares, and judges the aging and defect situation of element;
The unit starting procedure response optimization aid decision unit is according to prefabricated starting procedure model, binding member Response time adjusts the opening sequence of starting procedure, opens the new journal unit new booting response time according to element, New, the old booting response time for comparing unit booting, it is suitable to record new element unlatching if the new booting response time is shorter Sequence process;
The booting response time order information of unit is delivered to production by the unit response time priority acccess control guide unit Intellectual analysis decision control system is dispatched, then feeds back to data processing terminal, and preferentially opens booting response time short unit;
The unit efficiency preferentially regulates and controls guide unit and the working efficiency order information of unit is delivered to production scheduling intelligence Analysis decision control system, then data processing terminal is fed back to, and preferentially open the unit that work efficiency is high;
The unit operating condition preferentially regulates and controls guide unit and the floor data order information of unit is delivered to production scheduling intelligence Analysis decision control system, then data processing terminal is fed back to, and preferentially open the good unit of operating condition;
The data processing terminal presets the load of unit, and screens response time of unit, working efficiency or operating condition Priority level, it is preferential to enable the unit that the response time is short, work efficiency is high or operating condition is good;Data processing terminal monitors in real time simultaneously Unit load, working efficiency, operating condition automatically generate grid-connected unit load adjust automatically data in real time.
2. a kind of unified platform production scheduling intellectual analysis decision control system according to claim 1, feature exist In: the automatic hydrological system includes ultrasonic water level gauge and rainfall detection device;The rainfall detection device include into Water pipe (3), drainpipe (10) and cylinder (7), cylinder (7) includes upper shell and lower shell;In the upper shell and lower shell Lateral roof is mounted on optical fiber water-level gauge, and the side at the top of upper shell and lower shell is mounted on water inlet pipe (3), exhaust pipe (8), the side of upper shell and lower shell bottom is mounted on drainpipe (10);The upper end of the water inlet pipe (3) is equipped with leakage It struggles against (1);Solenoid valve I (2) is installed on the water inlet pipe at the funnel (1);Water is also equipped on the water inlet pipe (3) It pumps (4);Netted spheroid (5) are fixed in the funnel (1).
3. a kind of unified platform production scheduling intellectual analysis decision control system according to claim 1, feature exist In: the host on-line monitoring system includes guide vane opening instrument, vibrating sensor, power transducer and speed probe.
4. a kind of unified platform production scheduling intellectual analysis decision control system according to claim 1, feature exist In: the electric energy system is electric energy meter or Source of Gateway Meter.
5. a kind of unified platform production scheduling intellectual analysis decision control system according to claim 1, feature exist In: the production scheduling intellectual analysis decision control system is host.
6. a kind of unified platform production scheduling intellectual analysis decision control system according to claim 1, feature exist In: the display unit is display.
7. a kind of unified platform production scheduling intellectual analysis decision control system according to claim 5, feature exist In: the data processing terminal is server;The host and server carries out data interaction by communication network;Institute Intelligent management cloud platform is established in the server stated;
The intelligent management cloud platform can sufficiently excavate creation data, counted, reported to real-time production data Alert and storage is analyzed historical data and is handled, operation and maintenance production report is automatic using analysis software and strategy It generates, running trend of the equipment automatically analyzes, and equipment runs intelligent early-warning and anticipation.
8. a kind of unified platform production scheduling intellectual analysis decision control system according to claim 1, feature exist In: the unit is switched on, and response time statistical analysis module, unit working efficiency monitor module on-line, unit operating condition is supervised online Survey analysis module, unit booting executive component maintenance aid decision unit, unit starting procedure response optimization aid decision unit, Unit response time priority acccess control guide unit, unit efficiency preferentially regulate and control to instruct list and unit operating condition preferentially to regulate and control guide unit It is integrated on production scheduling intellectual analysis decision control system respectively.
9. a kind of unified platform production scheduling intellectual analysis Decision Control method, which comprises the following steps:
Step 1, the height of water level of automatic hydrological system real-time monitoring reservoir upstream and downstream trip, and the height of water level value that will test Feed back to production scheduling intellectual analysis decision control system;The guide vane opening rate of host on-line monitoring system real-time monitoring unit, Oscillation Amplitude numerical value, the reactive power of rotor speed numerical value and output and active power numerical value simultaneously feed back to production scheduling intelligence It can analysis decision control system;Electric energy system real-time monitoring unit output electric energy numerical quantity simultaneously feeds back to production scheduling intelligence point Analyse decision control system;
Step 2, production scheduling intellectual analysis decision control system are swum according to the upstream and downstream that automatic hydrological system feedback comes Height of water level calculates water-head;Production scheduling intellectual analysis decision control system feeds back the electric energy to come according to electric energy system Numerical quantity obtains the generated output of unit;Production scheduling intellectual analysis decision control system passes through the generating flow of unit, power generation Power and water-head data operation go out the working efficiency of unit;
Step 3, unit booting response time statistical analysis module are used to record the booting response time of each power station unit, and The unit booting response time is ranked up from short to long, then feeds back to production scheduling intellectual analysis decision control system;Unit Working efficiency on-line monitoring module is used to record the working efficiency of each power station unit, and to the working efficiency of each unit by height to It is low to be ranked up, then feed back to production scheduling intellectual analysis decision control system;Unit operating condition monitors analysis module record on-line The floor data of the Oscillation Amplitude of each power station unit, and the floor data of each unit is ranked up from small to large, then Feed back to production scheduling intellectual analysis decision control system;
Step 4, unit booting executive component maintenance aid decision unit open and close the opening and closing response time of each element and history Time compares, and judges the aging and defect situation of element, and the ageing information of element is shown by display unit; Unit starting procedure response optimization aid decision unit adjusts the opening sequence of each element, and new journal is opened according to element The unit new booting response time, comparison unit booting new, the old booting response time, if the new booting response time compared with It is short, then new element opening sequence process is recorded, and the shorter element unlatching of booting response time is shown by display unit Sequence flow;
Step 5, unit response time priority acccess control guide unit are preferentially opened according to the booting response time sequence of unit Machine response time short unit;Unit efficiency preferentially regulates and controls guide unit according to the working efficiency sequence of unit, preferentially opens work Make high-efficient unit;Unit operating condition preferentially regulates and controls guide unit according to the floor data sequence of unit, and preferential unlatching operating condition is good Unit;
Step 6 when instructing when data processing terminal assigns stationary power generation load, presets unit by data processing terminal Load, and preferentially regulate and control to refer to by the response time of unit response time priority acccess control guide unit screening unit, unit efficiency The priority level that the singly working efficiency of screening unit, unit operating condition preferentially regulate and control guide unit screening unit operating condition is led, then through life The unit that the response time is short, work efficiency is high or operating condition is good can preferentially be enabled by producing scheduling intellectual analysis decision control system.
CN201811231961.8A 2018-10-22 2018-10-22 A kind of unified platform production scheduling intellectual analysis decision control system and method Pending CN109213106A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811231961.8A CN109213106A (en) 2018-10-22 2018-10-22 A kind of unified platform production scheduling intellectual analysis decision control system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811231961.8A CN109213106A (en) 2018-10-22 2018-10-22 A kind of unified platform production scheduling intellectual analysis decision control system and method

Publications (1)

Publication Number Publication Date
CN109213106A true CN109213106A (en) 2019-01-15

Family

ID=64979527

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811231961.8A Pending CN109213106A (en) 2018-10-22 2018-10-22 A kind of unified platform production scheduling intellectual analysis decision control system and method

Country Status (1)

Country Link
CN (1) CN109213106A (en)

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201449459U (en) * 2009-06-23 2010-05-05 南京信息工程大学 a rain sensor
CN201576103U (en) * 2009-12-22 2010-09-08 南宁强国科技有限公司 Binocular Weighing Rain Gauge
CN103412526A (en) * 2013-07-12 2013-11-27 国家电网公司 Scheduling method of heat supply unit online load and system
CN104318323A (en) * 2014-10-13 2015-01-28 华南理工大学 Quick dispatching method for unit commitment considering reliability constraint
CN104331631A (en) * 2014-11-21 2015-02-04 国家电网公司 Remote diagnosis and decision method for running state of hydroelectric generating set
CN104460635A (en) * 2014-12-24 2015-03-25 四川谊田集群科技有限公司 Integrated information platform system based on intelligent hydraulic power plant
CN105372591A (en) * 2015-09-28 2016-03-02 国家电网公司 A transient process-based hydroelectric generating set health status quantitative evaluation method
CN205103424U (en) * 2015-10-24 2016-03-23 湖南北斗星空检测科技有限公司 Intelligence storage capacitive gate formula hyetometer
CN106733147A (en) * 2016-12-29 2017-05-31 中国神华能源股份有限公司 The startup method and device of automatic Recognition Applied in Coal Preparation System
CN106899237A (en) * 2015-12-21 2017-06-27 施耐德电气美国股份有限公司 Improved motor switch on delay timer
CN107035602A (en) * 2017-06-14 2017-08-11 衢州市江氏电子科技有限公司 A kind of turbine state monitoring and fault diagnosis system
CN107403245A (en) * 2017-09-12 2017-11-28 本溪钢铁(集团)信息自动化有限责任公司 Generating efficiency optimization method and device
CN107732958A (en) * 2017-09-15 2018-02-23 国网浙江省电力公司温州供电公司 The independent micro-capacitance sensor black starting-up optimization method that a kind of meter and the collaboration of source lotus recover
CN108193653A (en) * 2018-01-16 2018-06-22 河南创辉水利水电工程有限公司 A kind of plant without storage's Automatic Optimal system
CN207847849U (en) * 2017-12-07 2018-09-11 国家电网公司 Kaplan turbine water-saving and synergistic regulating system

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201449459U (en) * 2009-06-23 2010-05-05 南京信息工程大学 a rain sensor
CN201576103U (en) * 2009-12-22 2010-09-08 南宁强国科技有限公司 Binocular Weighing Rain Gauge
CN103412526A (en) * 2013-07-12 2013-11-27 国家电网公司 Scheduling method of heat supply unit online load and system
CN104318323A (en) * 2014-10-13 2015-01-28 华南理工大学 Quick dispatching method for unit commitment considering reliability constraint
CN104331631A (en) * 2014-11-21 2015-02-04 国家电网公司 Remote diagnosis and decision method for running state of hydroelectric generating set
CN104460635A (en) * 2014-12-24 2015-03-25 四川谊田集群科技有限公司 Integrated information platform system based on intelligent hydraulic power plant
CN105372591A (en) * 2015-09-28 2016-03-02 国家电网公司 A transient process-based hydroelectric generating set health status quantitative evaluation method
CN205103424U (en) * 2015-10-24 2016-03-23 湖南北斗星空检测科技有限公司 Intelligence storage capacitive gate formula hyetometer
CN106899237A (en) * 2015-12-21 2017-06-27 施耐德电气美国股份有限公司 Improved motor switch on delay timer
CN106733147A (en) * 2016-12-29 2017-05-31 中国神华能源股份有限公司 The startup method and device of automatic Recognition Applied in Coal Preparation System
CN107035602A (en) * 2017-06-14 2017-08-11 衢州市江氏电子科技有限公司 A kind of turbine state monitoring and fault diagnosis system
CN107403245A (en) * 2017-09-12 2017-11-28 本溪钢铁(集团)信息自动化有限责任公司 Generating efficiency optimization method and device
CN107732958A (en) * 2017-09-15 2018-02-23 国网浙江省电力公司温州供电公司 The independent micro-capacitance sensor black starting-up optimization method that a kind of meter and the collaboration of source lotus recover
CN207847849U (en) * 2017-12-07 2018-09-11 国家电网公司 Kaplan turbine water-saving and synergistic regulating system
CN108193653A (en) * 2018-01-16 2018-06-22 河南创辉水利水电工程有限公司 A kind of plant without storage's Automatic Optimal system

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
中华人民共和国水利部: "水电站实测流量率定效率系数", 《水文资料整编规范SL247-2012》, pages 43 - 44 *
叶发祥: "磨子潭水文站发电功率与效率系数关系单值化分析", 《安徽水利水电职业技术学院学报》, vol. 16, no. 1, pages 17 - 19 *
杨伟: "多机组集中控制技术在克拉玛依电厂的应用", vol. 19, no. 7, pages 34 - 36 *

Similar Documents

Publication Publication Date Title
CN201236680Y (en) Automatic intermittent oil pumping control device
CN104635571B (en) Gate tele-control system and its long-range control method
CN107798462A (en) A kind of wind power plant wind power generating set operation exception monitor and performance evaluation system
CN103104416A (en) Wind power generation system
CN108599724A (en) A kind of photovoltaic module on-line monitoring system and monitoring method
CN107559153A (en) A kind of double-fed fan motor unit impeller imbalance detection system
CN103543697A (en) Clustered intelligent control method for traffic tunnel devices
CN106762453B (en) Wind power generation intelligent network and control method with power generation forecast and tracking control
CN110429914A (en) Intelligent positioning system and method of photovoltaic array based on Internet of things technology
CN118232312A (en) Wind power plant generating capacity prediction method and system based on AI algorithm
CN206651133U (en) Greenhouse regulation device and system
CN117424556A (en) Photovoltaic power generation dispatching system based on station loss analysis
CN116698977A (en) Coal gangue recognition sensor and recognition method based on sound signals
CN106012986A (en) Solar-powered intelligent gate remote measurement and control system
CN112462649A (en) Cloud platform remote monitoring flood control and drought control device and method based on wind and light hybrid power supply
CN109146338A (en) A kind of power station Production Scheduling System and method
CN109213106A (en) A kind of unified platform production scheduling intellectual analysis decision control system and method
CN104460713B (en) Unit output and floodgate linkage water compensating control method
CN118539613B (en) An electric power supply monitoring and early warning system based on information feedback analysis
CN119420021A (en) A smart management and control system and method for a water-based sodium ion battery energy storage power station
CN118868406A (en) An intelligent power plant management system and method based on wind, solar and storage
CN117770105B (en) Intelligent irrigation control method for gardens based on rainfall conditions
CN118050051A (en) Outdoor environment information acquisition method, system and device based on solar energy
CN112068511A (en) Small hydropower station automatic control water level and pressure signal data identification and screening method
CN205491997U (en) Tertiary control system of automatic water -saving irrigation of many fields of large area piece

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190115