[go: up one dir, main page]

CN109209387A - Concrete grout cover construction method under deep water level - Google Patents

Concrete grout cover construction method under deep water level Download PDF

Info

Publication number
CN109209387A
CN109209387A CN201811079362.9A CN201811079362A CN109209387A CN 109209387 A CN109209387 A CN 109209387A CN 201811079362 A CN201811079362 A CN 201811079362A CN 109209387 A CN109209387 A CN 109209387A
Authority
CN
China
Prior art keywords
water level
grouting pipeline
deep water
casing
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811079362.9A
Other languages
Chinese (zh)
Inventor
仇海辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Longkou Mining Group Co Ltd
Original Assignee
Longkou Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Longkou Mining Group Co Ltd filed Critical Longkou Mining Group Co Ltd
Priority to CN201811079362.9A priority Critical patent/CN109209387A/en
Publication of CN109209387A publication Critical patent/CN109209387A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D5/00Lining shafts; Linings therefor
    • E21D5/04Lining shafts; Linings therefor with brick, concrete, stone, or similar building materials
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D5/00Lining shafts; Linings therefor
    • E21D5/06Lining shafts; Linings therefor with iron or steel
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D5/00Lining shafts; Linings therefor
    • E21D5/11Lining shafts; Linings therefor with combinations of different materials, e.g. wood, metal, concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Wood Science & Technology (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The present invention relates to concrete grout cover construction methods under deep water level, the radial grouting pipeline of steel-pipe welding tree root is first used, then is given for grouting and sets φ 108mm casing 5, one group of valve is installed on each casing, assembling finish check it is errorless after, fixed stably rope is slowly put down with stable car, radial grouting pipeline is installed when putting, put into the rubble that 1-2cm and 2-4cm mixture proportion is 1:2, throwing, which is spread, uniformly then to put into the sand bed of 20-30cm thickness, and slip casting forms grout cover.The present invention can quickly and effectively drain water shutoff, guarantee the normal extension of pit shaft.

Description

Concrete grout cover construction method under deep water level
Technical field
The present invention relates to concrete grout cover construction methods under deep water level.
Background technique
Shandong Province's nonmetallic ore main shaft is tunneled to the large-scale prominent watered-out well accident of generation at 162.5 meters, and maximal water*.inrush quality is every 3000 cubes of hour or more, huge loss is caused, without effectively draining water shutoff technology, pit shaft cannot normally extend.
Summary of the invention
To overcome the shortcomings of existing technologies, the present invention provides concrete grout cover construction method under a kind of deep water level, this hair Bright technical solution is:
(1) the radial grouting pipeline of steel-pipe welding tree root is first used, supervisor is located at middle position, and branch pipe is welded direct on supervisor, When manifold portion welds, length is required to arrange in pairs or groups on the same face, and be the lower angle of depression, radial grouting pipeline integral part is most Big outer diameter is φ 3.2m, is highly 2.1m;
(2) it is given for grouting and sets φ 108mm casing 5, casing and radial grouting pipeline are welded into one, radiated Shape grouting pipeline is tilted in middle position, casing to the supervisor of radial grouting pipeline, is formed angle with the borehole wall, is covered at each Manage upper and lower two fragment positions welding guide collar, entire outer diameter 4.3m;
(3) one group of valve is installed on each casing, it is desirable that be DN100/64 slide valve, upper part installs gland, at valve In closed state, then valve group part is all bandaged with old air duct fabric;
(4) assembling finish check it is errorless after, fixed stably rope is slowly put down with stable car, radial grouting pipeline be installed when putting, general The dedicated snap-gauge of the supervisor of radial grouting pipeline and wire rope clamps jail;
It is accurate before decentralization to measure well depth, main rope length and grouting pipeline length are strictly measured in decentralization process, it is cumulative in time Total length out, and perform comparison work;
(5) rubble that investment 1-2cm and 2-4cm mixture proportion is 1:2, throwing is spread will uniformly, and special messenger is measured with plummet surrounding, in time It grasps situation to adjust in time, then puts into the sand bed of 20-30cm thickness;
(6) slip casting is initially injected a certain amount of clear water, reinjects 3-5 cubes 50% of calcium chloride solution, rush under dilute, neutralization pit with And the acid water in grouting pipe forms grout cover according to cement grout is sequentially implanted sequentially from thin to thick;
Slurries injection rate: should pack gravel layer gap, pack portion wall-rock crack as far as possible again, while must be taken into consideration biggish Number of dropouts.Specific calculating is as follows:
V1=1\4Лd2ηHλ
=3.14×4.52÷4×20%×6×1.5=29 m3
V2=λл(D/2+R)2Hηβ/m
=1.5 × 3.14 × (5.5/2+3.0) m3 of 2 × 1.5 × 3% × 0.9/0.85=74
V1+V2=103m3
D-pit shaft net diameter (m), η-rock fracture rate (0.5% -3%), H-slip casting section is high (m), λ-slurries damage It loses coefficient (1.2-1.5), D-pit shaft famine diameter (m), R-grout spreading range (m), β-slurries effectively fill in crack Fill out coefficient, general 0.8-0.9,0.9, m-slurries calculus rate is taken, ratio of mud 1:1 slurries calculus rate is 0.85, is taken here 0.85。
Being converted into cement weight by 1:1 slurries is 103 m3 × 0.75=77.25t
(7) slip casting work enters later stage and must be controlled in strict accordance with dynamic equilibrium standard, the controlling party of dynamic equilibrium Method uses flow control method, and according to grouting serous fluid flow strict control displacement, aequum cannot be less than 20 cubic metres;
(8) after Cementer is made, top is thrown again spreads one layer of protective agent, and forms certain isolated protective layer, and draining makes in time Quickly recover to raw water position.
It is described supervisor use φ 60mm seamless steel pipe, the branch pipe use φ 20mm, the steel pipe of upper cloth φ 8mm small sircle hole, Spacing 200mm is uniformly staggered.
The lower angle of depression is 15.
The angle that step (2) middle sleeve and the borehole wall are formed is 3o, vertical height 6m.
The cement grout uses cement, and 50% LHG solution is added after slurries are soon stirred, and amount accounts for cement weight The 3% of amount, stirs evenly, and cement grout proportion uses 1.5:1,1.25:1,1:1,0.75:1 and 0.6:1.
The invention has the benefit that slip casting terminates pit shaft draining after a week on earth, measuring the total water leakage of pit shaft is 2.1 M3/h, main original shaft wall leak point, water sealing effect (3000-2.1)/3000=99.9% are with the naked eye seen and look into shaft bottom grout cover surface There is no obvious EXIT POINT, can quickly drain water shutoff;Pressure 5.0Mpa is surveyed by casing, water sealing effect and pressure voltage reach design It is required that giving slip casting work for further work face has established successful basis, pit shaft can normally extend.
Detailed description of the invention
Fig. 1 is agent structure schematic diagram of the invention.
Specific embodiment
The invention will now be further described with reference to specific embodiments, the advantages and features of the present invention will be with description and It is apparent.But examples are merely exemplary for these, and it is not intended to limit the scope of the present invention in any way.Those skilled in the art Member it should be understood that without departing from the spirit and scope of the invention can details to technical solution of the present invention and form into Row modifications or substitutions, but these modifications and replacement are fallen within the protection scope of the present invention.
Referring to Fig. 1, the present invention relates to concrete grout cover construction methods under a kind of deep water level:
(1) first use the radial grouting pipeline of steel-pipe welding tree root, supervisor 1 is located at middle position, the supervisor 1 using φ 60mm without Steel pipe is stitched, branch pipe 2 is welded direct on supervisor 1, and the branch pipe 2 uses φ 20mm, the steel pipe of upper cloth φ 8mm small sircle hole, spacing 200mm is uniformly staggered, and when 2 part of branch pipe is welded, requires length to arrange in pairs or groups on the same face, and be the lower angle of depression, angle 15 , it is highly 2.1m that radial grouting pipeline integral part maximum outside diameter, which is φ 3.2m,;
(2) 5 casings 3 for setting φ 108mm are given for grouting, casing 3 and radial grouting pipeline are welded into one, Radial grouting pipeline is tilted in middle position, casing 3 to the supervisor 1 of radial grouting pipeline, forms angle, folder with the borehole wall 5 Angle is 3o, vertical height 6m, welds guide collar, entire outer diameter 4.3m in each upper and lower two fragment position of casing 3;
(3) one group of valve 4 is installed on each casing 3, it is desirable that be DN100/64 slide valve, upper part installs gland, valve 4 It is in close state, is then all bandaged valve group part with old air duct fabric;
(4) assembling finish check it is errorless after, fixed stably rope is slowly put down with stable car, radial grouting pipeline be installed when putting, general The dedicated snap-gauge of the supervisor 1 of radial grouting pipeline and wire rope clamps jail;
It is accurate before decentralization to measure well depth, main rope length and grouting pipeline length are strictly measured in decentralization process, it is cumulative in time Total length out, and perform comparison work;
(5) rubble that investment 1-2cm and 2-4cm mixture proportion is 1:2, throwing is spread will uniformly, and special messenger is measured with plummet surrounding, in time It grasps situation to adjust in time, then puts into the sand bed of 20-30cm thickness;
(6) slip casting is initially injected a certain amount of clear water, reinjects 3-5 cubes 50% of calcium chloride solution, rush under dilute, neutralization pit with And the acid water in grouting pipe forms grout cover 6 according to cement grout is sequentially implanted sequentially from thin to thick;
The cement grout uses cement, and 50% LHG solution is added after slurries are soon stirred, and amount accounts for cement weight 3%, it stirs evenly, cement grout proportion uses 1.5:1,1.25:1,1:1,0.75:1 and 0.6:1;
Slurries injection rate: should pack gravel layer gap, pack portion wall-rock crack as far as possible again, while must be taken into consideration biggish Number of dropouts.Specific calculating is as follows:
V1=1\4Лd2ηHλ
=3.14×4.52÷4×20%×6×1.5=29 m3
V2=λл(D/2+R)2Hηβ/m
=1.5 × 3.14 × (5.5/2+3.0) m3 of 2 × 1.5 × 3% × 0.9/0.85=74
V1+V2=103m3
D-pit shaft net diameter (m), η-rock fracture rate (0.5% -3%), H-slip casting section is high (m), λ-slurries damage It loses coefficient (1.2-1.5), D-pit shaft famine diameter (m), R-grout spreading range (m), β-slurries effectively fill in crack Fill out coefficient, general 0.8-0.9,0.9, m-slurries calculus rate is taken, ratio of mud 1:1 slurries calculus rate is 0.85, is taken here 0.85。
Being converted into cement weight by 1:1 slurries is 103 m3 × 0.75=77.25t;
(7) slip casting work enters later stage and must be controlled in strict accordance with dynamic equilibrium standard, the controlling party of dynamic equilibrium Method uses flow control method, and according to grouting serous fluid flow strict control displacement, aequum cannot be less than 20 cubic metres;
(8) after Cementer is made, top is thrown again spreads one layer of protective agent, and forms certain isolated protective layer, and draining makes in time Quickly recover to raw water position.
The technology can be applied in all kinds of mine construction engineerings, repeatedly effectively solve prominent watered-out well accident.

Claims (5)

1. concrete grout cover construction method under deep water level, it is characterised in that:
(1) the radial grouting pipeline of steel-pipe welding tree root is first used, supervisor is located at middle position, and branch pipe is welded direct on supervisor, When manifold portion welds, length is required to arrange in pairs or groups on the same face, and be the lower angle of depression, radial grouting pipeline integral part is most Big outer diameter is φ 3.2m, is highly 2.1m;
(2) it is given for grouting and sets φ 108mm casing 5, casing and radial grouting pipeline are welded into one, radiated Shape grouting pipeline is tilted in middle position, casing to the supervisor of radial grouting pipeline, is formed angle with the borehole wall, is covered at each Manage upper and lower two fragment positions welding guide collar, entire outer diameter 4.3m;
(3) one group of valve is installed on each casing, it is desirable that be DN100/64 slide valve, upper part installs gland, at valve In closed state, then valve group part is all bandaged with old air duct fabric;
(4) assembling finish check it is errorless after, fixed stably rope is slowly put down with stable car, radial grouting pipeline be installed when putting, general The dedicated snap-gauge of the supervisor of radial grouting pipeline and wire rope clamps jail;
(5) rubble that investment 1-2cm and 2-4cm mixture proportion is 1:2, throwing, which is spread, uniformly then to put into the sand of 20-30cm thickness Layer;
(6) slip casting is initially injected a certain amount of clear water, reinjects 3-5 cubes 50% of calcium chloride solution, rush under dilute, neutralization pit with And the acid water in grouting pipe forms grout cover according to cement grout is sequentially implanted sequentially from thin to thick;
(7) slip casting work enters later stage and must be controlled in strict accordance with dynamic equilibrium standard, the controlling party of dynamic equilibrium Method uses flow control method, and according to grouting serous fluid flow strict control displacement, aequum cannot be less than 20 cubic metres;
(8) after Cementer is made, top is thrown again spreads one layer of protective agent, and forms certain isolated protective layer, and draining makes in time Quickly recover to raw water position.
2. concrete grout cover construction method under deep water level according to claim 1, it is characterised in that: the supervisor uses φ 60mm seamless steel pipe, the branch pipe use φ 20mm, the steel pipe of upper cloth φ 8mm small sircle hole, and spacing 200mm is uniformly staggered.
3. concrete grout cover construction method under deep water level according to claim 1, it is characterised in that: the lower angle of depression is 15˚。
4. concrete grout cover construction method under deep water level according to claim 1, it is characterised in that: set in step (2) The angle that pipe is formed with the borehole wall is 3o, vertical height 6m.
5. concrete grout cover construction method under deep water level according to claim 1, it is characterised in that: the cement grout Using cement, 50% LHG solution is added after slurries are soon stirred, amount accounts for the 3% of cement weight, stirs evenly, Cement grout proportion uses 1.5:1,1.25:1,1:1,0.75:1 and 0.6:1.
CN201811079362.9A 2018-09-17 2018-09-17 Concrete grout cover construction method under deep water level Pending CN109209387A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811079362.9A CN109209387A (en) 2018-09-17 2018-09-17 Concrete grout cover construction method under deep water level

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811079362.9A CN109209387A (en) 2018-09-17 2018-09-17 Concrete grout cover construction method under deep water level

Publications (1)

Publication Number Publication Date
CN109209387A true CN109209387A (en) 2019-01-15

Family

ID=64984079

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811079362.9A Pending CN109209387A (en) 2018-09-17 2018-09-17 Concrete grout cover construction method under deep water level

Country Status (1)

Country Link
CN (1) CN109209387A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4473322A (en) * 1979-05-07 1984-09-25 Echols H Vance Method and system for lining shafts
JPS62153488A (en) * 1985-12-24 1987-07-08 株式会社竹中工務店 Construction of underground vertical cylindrical structure
CN1225974A (en) * 1998-02-09 1999-08-18 山东矿业学院 Technology for quickly resuming normal construction after wellhole submerged by sudden water
CN102536247A (en) * 2010-12-30 2012-07-04 中国华冶科工集团有限公司 Construction method of still-water cement grout pad
CN108868776A (en) * 2018-07-06 2018-11-23 中钢集团马鞍山矿山研究院有限公司 The high pressure-bearing broken rock of deep-well induces pre-pouring grout reinforcement means in advance

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4473322A (en) * 1979-05-07 1984-09-25 Echols H Vance Method and system for lining shafts
JPS62153488A (en) * 1985-12-24 1987-07-08 株式会社竹中工務店 Construction of underground vertical cylindrical structure
CN1225974A (en) * 1998-02-09 1999-08-18 山东矿业学院 Technology for quickly resuming normal construction after wellhole submerged by sudden water
CN102536247A (en) * 2010-12-30 2012-07-04 中国华冶科工集团有限公司 Construction method of still-water cement grout pad
CN108868776A (en) * 2018-07-06 2018-11-23 中钢集团马鞍山矿山研究院有限公司 The high pressure-bearing broken rock of deep-well induces pre-pouring grout reinforcement means in advance

Similar Documents

Publication Publication Date Title
CN102705005B (en) Technology for plugging water bursting in mine by directional diversion grouting
CN110821503B (en) Construction method for main body of ultra-deep shield section air shaft after tunnel advance
CN103821544B (en) Tunneling and underground engineering high-pressure high-flow is dashed forward Water outburst treatment method
CN108119143B (en) A joint grouting method of cement-sodium silicate double liquid and chemical grout double-circle curtain in shaft working face
CN110735653A (en) A deep hole retreat grouting water plugging construction method for igneous rock water-rich faults
CN102108869B (en) Grout stop pad construction method for kilometer vertical shaft grouting for water control
CN104453913A (en) Vertical shaft working face ahead pre-grouting method
CN105736004A (en) Balanced shield mud air-pressure cabin opening pressure maintaining and wall protecting construction method for shield tunneling
CN103835648B (en) One improves rock stratum performance mine shaft rising boring technique by surface grout injection
CN103334770A (en) Construction method of superhigh water pressure water-affluent crushed zones of long-large counter-slope tunnels
CN103573274A (en) Steel sleeve grouting reinforcement device for settlement control over shield tunnel of soft foundation
CN112482415B (en) Consolidation grouting method for underground cavern under high external water pressure and flowing water condition
CN205422815U (en) Big flood underground mine tunnel waterwall
CN108590715B (en) Underground excavation gushing water tunnel reserved rock mass full-section radial grouting construction method
CN106120797B (en) Construction method of foundation grouting for continuous steel structure aqueduct pier in rich water area
CN105422128A (en) Method for preventing goaf gas leakage in deep shaft gob-side entry driving
CN102704936A (en) Caving control method for fully mechanized mining face tip mining road way top plate
CN115787693A (en) Water stopping method for water gushing in deep foundation pit under riverside slow-dip interbed
CN108868827A (en) Km deep-well high-ground stress combination of steel rope injection hole sealing device and method for sealing
CN111946367A (en) A grouting reinforcement method for tunnels crossing water-rich faults
CN111424613A (en) Method for treating through cracks of roller compacted concrete dam
CN102296617A (en) Post-grouting reinforcement construction method of flexible joints of diaphragm walls
CN111946355B (en) A construction method for long-distance rock pipe jacking across water-rich faults
CN108571330A (en) Method for treating leakage water of post-cast strip of subway bottom plate
CN109209387A (en) Concrete grout cover construction method under deep water level

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190115