[go: up one dir, main page]

CN109184692A - A kind of critical pseudo- oblique angle comprehensive mechanical mining method of half-edge coal seam - Google Patents

A kind of critical pseudo- oblique angle comprehensive mechanical mining method of half-edge coal seam Download PDF

Info

Publication number
CN109184692A
CN109184692A CN201811345944.7A CN201811345944A CN109184692A CN 109184692 A CN109184692 A CN 109184692A CN 201811345944 A CN201811345944 A CN 201811345944A CN 109184692 A CN109184692 A CN 109184692A
Authority
CN
China
Prior art keywords
pseudo
working face
coal
angle
critical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811345944.7A
Other languages
Chinese (zh)
Inventor
伍永平
郎丁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Science and Technology
Original Assignee
Xian University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Science and Technology filed Critical Xian University of Science and Technology
Priority to CN201811345944.7A priority Critical patent/CN109184692A/en
Publication of CN109184692A publication Critical patent/CN109184692A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C29/00Propulsion of machines for slitting or completely freeing the mineral from the seam
    • E21C29/22Propulsion of machines for slitting or completely freeing the mineral from the seam by wheels, endless tracks or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/0004Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor along the working face
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions
    • E21F13/04Transport of mined material in gravity inclines; in staple or inclined shafts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Remote Sensing (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明涉及急倾斜煤层临界伪斜角综合机械化开采方法,包括以下步骤:1)煤层倾角α≥55°时,临界伪斜角的确定为45°;2)临界伪倾斜工作面的布置:回风巷道端头超前运输巷道端头的距离与伪俯斜工作面真倾斜方向的长度l相等,形成伪俯斜工作面与煤层走向方向呈45°布置;3)在伪俯斜工作面布置工作面支护装置及采煤设备,进行综合机械化开采。本发明解决了开采设备的倒滑及煤壁片帮问题本发明是针对现行急倾斜煤层长壁综合机械化开采的工作面伪斜布置方式及工作面设备的弊端进行的改进。

The invention relates to a comprehensive mechanized mining method for a critical pseudo-inclined angle of a steeply inclined coal seam, comprising the following steps: 1) when the inclination angle α of the coal seam is greater than or equal to 55°, the critical pseudo-inclined angle is determined to be 45°; 2) the arrangement of the critical pseudo-inclined working face: back to The distance from the end of the wind tunnel ahead of the end of the transport tunnel is equal to the length l of the true inclination direction of the pseudo-depression working face, forming a 45° arrangement between the pseudo-depression working face and the direction of the coal seam strike; 3) Layout work on the pseudo-depression working face Surface support device and coal mining equipment for comprehensive mechanized mining. The invention solves the problems of backslip of mining equipment and coal wall slats. The invention is an improvement for the current pseudo-inclined arrangement of working face and the drawbacks of working face equipment for comprehensive mechanized mining of long walls in steeply inclined coal seams.

Description

A kind of critical pseudo- oblique angle comprehensive mechanical mining method of half-edge coal seam
Technical field
The present invention is specific to technical field of coal exploitation, and in particular to a kind of critical pseudo- angle recovery method of half-edge coal seam.
Background technique
The pseudo- tiltedly arrangement of steeply pitching seam coal working face, can be changed steeply pitching seam is " slow oblique " or " inclination " working face mining, is mentioned The self-stability energy of height working face supporting and winning apparatus improves operating environment, improves working face efficiency and safety benefit.
The pseudo- tiltedly arrangement of working face, is one of common method of steeply-inclined seam mining, its advantage is that the pseudo- tiltedly arrangement of working face Working face inclination angle can be slowed down, be conducive to working face equipment anti-skid.Pseudo- tiltedly arrangement is divided into puppet and faces upward tiltedly arrangement (air inlet end is super Preceding return air end) and puppet bow tiltedly arrangement two kinds of (entering the wind end in advance in return air end), wherein puppet tiltedly arrangement of bowing is particularly conducive to prevent Only coal wall caving.Under normal circumstances, working face puppet bow rake angle be 3 ° -5 °, working face arrangement bracket, coalcutter and scraper plate it is defeated Machine is sent to be all made of the conventional equipment with anti-skid function.Up to now, only has Sichuan Guang Neng group plum a strip of land between hills coal both at home and abroad Mine is reequiped the top beam of conventional hydraulic support, and the working face puppet that repacking after-poppet adapts to bows oblique angle maximum up to 12 °, Chongqing Song Zao group meets spring ore mining so that working face puppet oblique angle of bowing has been reached 17 °, but coal seam with the shaped hydraulic bracket specially designed Thickness only has 1.3m.
But when seam inclination is greater than 55 ° and coal seam thickness is greater than 2.0m, if still using working face tendency arrangement trend The longwall mining method of propulsion, existing lesser pseudo- rake angle just can not effectively solve working face equipment back skating and coal wall caving etc. Safety in production problem.
Summary of the invention
Existing inclination angle is tiltedly arranged greater than the half-edge coal seam of 2.0m using traditional working face is pseudo- greater than 55 °, coal seam thickness When mode is exploited, the back skating of winning apparatus and coal wall caving problem not can effectively solve, in order to solve the technical problem, this Invention provides a kind of critical pseudo- oblique angle comprehensive mechanical mining method of half-edge coal seam and equipment, and the present invention be directed to existing urgency to incline The improvement that the drawbacks of pseudo- tiltedly arrangement of the working face of oblique coal seam longwell fully-mechanized mining and working face equipment carries out.
Technical solution of the invention are as follows:
A kind of critical pseudo- oblique angle comprehensive mechanical mining method of half-edge coal seam, is characterized in that including following step It is rapid:
1) when seam inclination α >=55 °, the determination at critical puppet oblique angle
Space geometry relationship between seam inclination α and puppet oblique angle γ are as follows:
l1Sin β=l1cosγ·sinα (1)
Wherein l1For working face puppet tilt length, β is the true dip angle of pseudo- slanting face of bowing;
Guarantee that the coal that coalcutter is cut off slips certainly, then the true dip angle β of pseudo- slanting face of bowing should meet
β > sin35 °=0.574 sin (2)
The natural repose angle of loose coal is 35 °:
(1) is substituted into (2) to obtain:
cosγ·sin55°>0.574 (3)
It solves: when γ >=45 °, it is thus determined that the size at critical puppet oblique angle is 45 °;
2) arrangement of critical pseudo- inclined cut:
Return aircourse and haulage drift, the advanced haulage drift end in return aircourse end are tunneled respectively along seam inclination direction Then head will hole-through to form puppet and bow slanting face between return aircourse end and haulage drift end, guarantee return aircourse end The distance of advanced haulage drift end is equal with the pseudo- length l in slanting face true dip direction that bows, formed puppet bow slanting face and Bearing direction is in 45 ° of arrangements;
3) it bows slanting face arrangement face timbering device and coal excavation apparatus in puppet, carries out fully-mechanized mining.
Further, the face timbering device includes top beam, pedestal, guided way and push rod, and coalcutter is along guiding Rail walking, the guided way are fixed on the base by push rod, and the pseudo- tilted direction of the base bottom and pseudo- slanting face of bowing is flat Coal channel is slipped in row, the bottom plate free space formation between pedestal and coal wall.
Further, the guided way and puppet slanting face puppet tilted direction of bowing are parallel.
Further, the face timbering device further includes the cantilever directional wheel being arranged on coalcutter, and setting Suspention guided way on top beam, the cantilever directional wheel are adapted with suspention guided way.
Further, the pedestal is in 45 ° of angles close to the side of coal wall and haulage drift.
Further, cantilever directional wheel is telescopic.
Further, step 3) specifically: in exploitation process, coalcutter is along guided way walking coal cutting, while cantilever orients Edge slips coal channel from slipping to transport end to broken coal body of the wheel under suspention guided way walking, coalcutter cutting under the effect of gravity And it transports.
The invention has the benefit that
1) present invention improves at the pseudo- oblique angle of high-dipping pseudo discrete state model to 45 ° by maximum 17 ° at present, is greatly reduced The true dip angle of such working face, can effectively prevent the back skating of working equipment, while pseudo discrete state model can effectively prevent coal wall piece Side.
2) the present invention provides a kind of suspension device for the critical pseudo- oblique angle exploitation of half-edge coal seam, by by top beam with Pedestal is adjusted to irregular parallelogram, realizes the good fit of top beam and coal wall, solves conventional stent pseudo- oblique Sky top area big problem in end face present in recovery process.
3) present invention eliminates middle part chutes, but still realize the gravity haulage of broken coal body, fundamentally solve The problem of pseudo discrete state model pushing and sliding difficulty, while having saved the energy consumption of mining face equipment expense and winning apparatus.
4) method that the present invention is combined using coalcutter walking track with set cap suspention guided way, realizes coal mining Steady safety walking of the machine in working face.
Detailed description of the invention
The critical pseudo- oblique angle exploitation working face arrangement signal of Fig. 1 half-edge coal seam;
Fig. 2 face timbering and Mining Equipment signal;
In figure, 1- coalcutter walking guided way, 2- walking guided way push rod 3- coalcutter suspention guided way 4- coalcutter hangs Hang guide pulley mechanism, 5- coalcutter, 6- pedestal, 7- top beam, 8- hydraulic cylinder, 9- stretches mandril.
Specific embodiment
Embodiment 1: a kind of critical pseudo- oblique angle comprehensive mechanical mining method of half-edge coal seam,
1) critical pseudo- inclination angle working face arrangement
1.1) working face across strike is arranged, across pitch promotes, and the crossover distance of return air end is equal to working face in true dip The projected length in direction, i.e. puppet bow rake angle as 45 ° (being defined as critical pseudo- oblique angle);
1.2) when seam inclination is greater than 55 °, working face puppet oblique angle design of bowing should meet: guarantee that working face slips coal channel and inclines Angle is greater than the natural repose angle (natural repose angle of granular media coal is 35 °) of loose coal, and the coal body of coal mining crusher machine can slip certainly To transport end, therefore the conveyer of chute in the middle part of working face can be cancelled.It is computed, it is pseudo- oblique when seam inclination is greater than 55 ° As long as angle perseverance, which is greater than 45 °, can guarantee that break up coal bodies edge slips coal channel and slips certainly.
2) in the arrangement suspension device and coalcutter for coal working face
2.1) face timbering device includes top beam, pedestal, guided way and push rod, and coalcutter is walked along guided way, institute It states guided way to be fixed on the base by push rod, base bottom is parallel with the pseudo- pseudo- tilted direction of slanting face of bowing, base bottom shape At slipping coal channel.In order to ensure what the puppet of 55 ° or more half-edge coal seams bowed slanting face slips coal channel inclination angle greater than granular media coal 35 ° of natural repose angle, the critical pseudo- oblique angle size of working face should be set as 45 °, i.e. the crossover distance of return air end is equal to work Projected length of the face in true dip direction.The top beam and pedestal of force piece are abnormity by rectangle improvement, close to coal wall one The bevel edge and haulage drift of side are in 45 ° of angles;In order to keep set cap and pedestal parallel with coal wall, do not generated in end face Big non-support gap, transform set cap and pedestal as abnormal shape by traditional rectangle, i.e. set cap and pedestal is close The bevel edge and haulage drift of coal wall side are in 45 ° of angles;2.2) bracket base passes through push rod and dedicated coalcutter walking track It is connected, walking track is parallel with working face puppet tilted direction;
2.3) in order to guarantee not slide down in coalcutter walking process, set cap is equipped with suspention guided way, is arranged and is adopting Cantilever directional wheel and suspention Slidway lap on coal machine, guarantee the stability of coalcutter.
3) coalcutter by working face upper end chamfer feed, coalcutter along walking the coal cutting of track uplink, single rack successively sequence Formula moves frame, immediate support, and broken coal body is slipped certainly to transport end under the effect of gravity and transported.It is loose due to coal mining crusher machine Coal body may be implemented from slipping, therefore can cancel chute in the middle part of working face, and it is tired fundamentally to solve puppet slanting face pushing and sliding of bowing Difficult problem;Cancelling in the middle part of working face after chute, for the walk problem for solving coalcutter, the dedicated walking rail of coalcutter is set Road is connected by push rod with bracket base, and coalcutter can walk on walking track along the direction parallel with coal wall.
Embodiment 2: as shown in Fig. 1 (a), critical puppet bow oblique angle working face arrangement: tunnel air return lane respectively along bearing The distance of road and haulage drift, the advanced haulage drift end in return aircourse end is equal with the length l in working face true dip direction, Hole-through open-off cut between tailentry road end and haulage drift end, the puppet of formation is bowed slanting face and bearing side To in 45 ° of angles (critical puppet oblique angle).Pseudo- slanting face true dip angle is greater than 35 ° of natural repose angle of broken bastard coal, coal mining machine cut Under broken coal body can be realized along floor undulation from slipping, transported without drag conveyor, therefore drag conveyor can be cancelled, Entire working face section is substantially formed one and slips coal channel.
Embodiment 3: as shown in Fig. 1 (b), puppet bow slanting face true dip angle β and seam inclination α and critical puppet oblique angle γ it Between space geometry relationship are as follows:
l1Sin β=l1cosγ·sinα (1)
When seam inclination α is 55 °, it is ensured that the coal that coalcutter is cut off can slip certainly, then the true of pseudo- slanting face of bowing inclines Angle should be greater than 35 ° (natural repose angles of loose coal), it may be assumed that
β > sin35 °=0.574 sin (2)
(1) is substituted into (2) to obtain:
cosγ·sin55°>0.574 (3)
Solve: when γ=45 ° and α >=55 °, the true dip angle β perseverance of working face is greater than 35 °, it is thus determined that critical pseudo- oblique The size at angle is 45 °.
In exploitation process, coalcutter is along guided way walking coal cutting, while cantilever directional wheel is mined along suspention guided way walking Broken coal body under machine cutting is under the effect of gravity along slipping coal channel from slipping to transport end and transport.
Embodiment 4: as shown in Figure 2 a, face timbering and coal excavation apparatus: bracket is special-shaped hydraulic support, top beam and pedestal Bevel edge and haulage drift close to coal wall side are in 45 ° of angles;Hydraulic support foundation passes through walking guided way push rod 2 and coalcutter Walking guided way 1 is connected, and coalcutter 5, which is ridden, to be seated on coalcutter walking guided way 1, and walk back and forth coal cutting.
Embodiment 5: it is further, as shown in Figure 2 b, since the stability of coalcutter is difficult to through single walking track It is controlled, therefore suspention guided way, then the orientation of the telescopic boom by installing on coalcutter is set in set cap lower part Wheel and suspention guided way overlap joint, guarantee the stability of coalcutter.In order to guarantee the stability of coalcutter in the process of walking without To sliding down, coalcutter suspention leading block 4 is each side set at the coalcutter back side, and adopting on the downside of set cap is set Coal machine suspends guided way overlap joint 3 in midair, plays the walking of coalcutter auxiliary and guiding role.

Claims (7)

1.一种急倾斜煤层临界伪斜角综合机械化开采方法,其特征在于包括以下步骤:1. a comprehensive mechanized mining method for steeply inclined coal seam critical pseudo-oblique angle, is characterized in that comprising the following steps: 1)1) 煤层倾角α≥55°时,临界伪斜角的确定Determination of critical pseudo-incline angle when coal seam dip angle α≥55° 煤层倾角α及伪斜角γ之间的空间几何关系为:The spatial geometric relationship between the coal seam dip angle α and the pseudo-bevel angle γ is: l1sinβ=l1cosγ·sinα (1)l 1 sinβ=l 1 cosγ·sinα (1) 其中l1为工作面伪倾斜长度,β为伪俯斜工作面的真倾角;where l 1 is the pseudo-slope length of the working face, and β is the true tilt angle of the pseudo-slope working face; 要保证采煤机割下的煤自溜,则伪俯斜工作面的真倾角β应满足:To ensure that the coal cut by the shearer slips freely, the true inclination angle β of the pseudo-slope working face should satisfy: sinβ>sin35°=0.574 (2)sinβ>sin35°=0.574 (2) 松散煤体的自然安息角为35°:The natural angle of repose of a loose coal body is 35°: 将(1)代入(2)得:Substitute (1) into (2) to get: cosγ·sin55°>0.574 (3)cosγ·sin55°>0.574 (3) 求解得:当γ≥45°,因此确定临界伪斜角的大小为45°;Solved: when γ≥45°, the size of the critical pseudo-oblique angle is determined to be 45°; 2)临界伪倾斜工作面的布置:2) Arrangement of critical pseudo-inclined working face: 沿煤层倾斜方向分别掘进回风巷道与运输巷道,回风巷道端头超前运输巷道端头,然后将回风巷道端头与运输巷道端头之间掘通形成伪俯斜工作面,保证回风巷道端头超前运输巷道端头的距离与伪俯斜工作面真倾斜方向的长度l相等,形成伪俯斜工作面与煤层走向方向呈45°布置;The return air roadway and the transport roadway are excavated respectively along the inclination direction of the coal seam, the end of the return air roadway is ahead of the end of the transportation roadway, and then the dug between the end of the return air roadway and the end of the transportation roadway forms a pseudo-slope working face to ensure the return air The distance between the end of the roadway leading to the end of the transport roadway is equal to the length l of the true inclination direction of the pseudo-depression working face, forming a 45° arrangement between the pseudo-depression working face and the direction of the coal seam strike; 3)在伪俯斜工作面布置工作面支护装置及采煤设备,进行综合机械化开采。3) Arrange working face support devices and coal mining equipment on the pseudo-slope working face for comprehensive mechanized mining. 2.根据权利要求1所述的急倾斜煤层临界伪斜角综合机械化开采方法,其特征在于:所述工作面支护装置包括顶梁、底座、导向轨、以及推杆,采煤机沿导向轨行走,所述导向轨通过推杆固定在底座上,所述底座底部与伪俯斜工作面的伪斜方向平行,底座与煤壁间的底板自由空间形成溜煤通道。2. The comprehensive mechanized mining method for steeply inclined coal seam critical pseudo-bevel angle according to claim 1, characterized in that: the working face support device comprises a top beam, a base, a guide rail, and a push rod, and the shearer is guided along the The guide rail is fixed on the base through the push rod, the bottom of the base is parallel to the pseudo-inclined direction of the pseudo-slope working surface, and the free space of the bottom plate between the base and the coal wall forms a coal sliding channel. 3.根据权利要求2所述的急倾斜煤层临界伪斜角综合机械化开采方法,其特征在于:所述导向轨与伪俯斜工作面伪斜方向平行。3 . The comprehensive mechanized mining method for critical pseudo-inclined angle of steeply inclined coal seam according to claim 2 , wherein the guide rail is parallel to the pseudo-inclined direction of the pseudo-depressing working face. 4 . 4.根据权利要求3所述的急倾斜煤层临界伪斜角综合机械化开采方法,其特征在于:所述工作面支护装置还包括设置在采煤机上的悬臂定向轮,以及设置在顶梁上的悬吊导向轨,所述悬臂定向轮与悬吊导向轨相适配。4 . The comprehensive mechanized mining method for steeply inclined coal seam critical pseudo-bevel angle according to claim 3 , wherein the working face support device further comprises a cantilever directional wheel arranged on the shearer, and a cantilever directional wheel arranged on the top beam. 5 . The suspension guide rail, the cantilever directional wheel is adapted to the suspension guide rail. 5.根据权利要求4所述的急倾斜煤层临界伪斜角综合机械化开采方法,其特征在于:所述底座靠近煤壁的一侧与运输巷道呈45°夹角。5 . The comprehensive mechanized mining method for critical pseudo-oblique angle of steeply inclined coal seam according to claim 4 , wherein the side of the base close to the coal wall forms an included angle of 45° with the transport roadway. 6 . 6.根据权利要求5所述的急倾斜煤层临界伪斜角综合机械化开采方法,其特征在于:悬臂定向轮为伸缩式。6 . The comprehensive mechanized mining method of critical pseudo-oblique angle of steeply inclined coal seam according to claim 5 , wherein the cantilever directional wheel is of a telescopic type. 7 . 7.根据权利要求1-6之任一所述的急倾斜煤层临界伪斜角综合机械化开采方法,其特征在于:步骤3)具体为:7. The comprehensive mechanized mining method for steeply inclined coal seam critical pseudo-bevel angle according to any one of claims 1-6, is characterized in that: step 3) is specifically: 回采过程中,采煤机沿导向轨行走割煤,同时悬臂定向轮沿悬吊导向轨行走,采煤机截割下的破碎煤体在重力作用下沿溜煤通道自溜至运输端头并运出。During the mining process, the shearer walks along the guide rail to cut coal, and at the same time the cantilever directional wheel walks along the suspension guide rail. export.
CN201811345944.7A 2018-11-13 2018-11-13 A kind of critical pseudo- oblique angle comprehensive mechanical mining method of half-edge coal seam Pending CN109184692A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811345944.7A CN109184692A (en) 2018-11-13 2018-11-13 A kind of critical pseudo- oblique angle comprehensive mechanical mining method of half-edge coal seam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811345944.7A CN109184692A (en) 2018-11-13 2018-11-13 A kind of critical pseudo- oblique angle comprehensive mechanical mining method of half-edge coal seam

Publications (1)

Publication Number Publication Date
CN109184692A true CN109184692A (en) 2019-01-11

Family

ID=64939542

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811345944.7A Pending CN109184692A (en) 2018-11-13 2018-11-13 A kind of critical pseudo- oblique angle comprehensive mechanical mining method of half-edge coal seam

Country Status (1)

Country Link
CN (1) CN109184692A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112483091A (en) * 2020-12-30 2021-03-12 中国矿业大学(北京) Mining system and mining method for steeply inclined coal seam mining area pseudo-dip-inclined arrangement
CN112682082A (en) * 2021-01-26 2021-04-20 西安科技大学 Mechanized mining system and method for flexible shield support of steep coal seam
CN112855156A (en) * 2021-01-12 2021-05-28 西安科技大学 Steeply inclined coal seam special-shaped support strike long-wall depression pseudo-inclined working face comprehensive mechanical coal mining equipment and coal mining method using same
CN114483030A (en) * 2022-01-14 2022-05-13 西安科技大学 Planing and transporting equipment for mining steep inclined thin and medium coal seam
CN114483031A (en) * 2022-01-14 2022-05-13 西安科技大学 A mining equipment suitable for mechanized mining of steeply inclined thin and medium-thick coal seams

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110001348A1 (en) * 2008-02-19 2011-01-06 Rag Aktiengesellschaft Method for Controlling Longwall Operations Using Boundary Layer Recognition
CN102562113A (en) * 2012-03-15 2012-07-11 重庆市能源投资集团科技有限责任公司 Anti-skidding structure of three-machine matched equipment for fully mechanized coal face of steep seam
CN102587913A (en) * 2012-03-15 2012-07-18 重庆市能源投资集团科技有限责任公司 Steeply inclined seam dip oblique strike longwall comprehensive mechanical coal mining method
CN105134215A (en) * 2015-09-25 2015-12-09 西安科技大学 Local filling mining method for longwall face along strike of steeply dipping seam
CN106523012A (en) * 2016-12-08 2017-03-22 四川航天电液控制有限公司 Scraper conveyor pushing structure for pitching oblique mining way of fully-mechanized coal mining face of sharp-inclined coal seam

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110001348A1 (en) * 2008-02-19 2011-01-06 Rag Aktiengesellschaft Method for Controlling Longwall Operations Using Boundary Layer Recognition
CN102562113A (en) * 2012-03-15 2012-07-11 重庆市能源投资集团科技有限责任公司 Anti-skidding structure of three-machine matched equipment for fully mechanized coal face of steep seam
CN102587913A (en) * 2012-03-15 2012-07-18 重庆市能源投资集团科技有限责任公司 Steeply inclined seam dip oblique strike longwall comprehensive mechanical coal mining method
CN105134215A (en) * 2015-09-25 2015-12-09 西安科技大学 Local filling mining method for longwall face along strike of steeply dipping seam
CN106523012A (en) * 2016-12-08 2017-03-22 四川航天电液控制有限公司 Scraper conveyor pushing structure for pitching oblique mining way of fully-mechanized coal mining face of sharp-inclined coal seam

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
冯坤等: "急倾斜煤层俯伪斜综采工作面布置层面角研究", <<矿业工程研究>> *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112483091A (en) * 2020-12-30 2021-03-12 中国矿业大学(北京) Mining system and mining method for steeply inclined coal seam mining area pseudo-dip-inclined arrangement
CN112483091B (en) * 2020-12-30 2022-03-15 中国矿业大学(北京) Mining system and mining method for steeply inclined coal seam mining area pseudo-dip-inclined arrangement
CN112855156A (en) * 2021-01-12 2021-05-28 西安科技大学 Steeply inclined coal seam special-shaped support strike long-wall depression pseudo-inclined working face comprehensive mechanical coal mining equipment and coal mining method using same
CN112855156B (en) * 2021-01-12 2023-08-11 西安科技大学 Mechanized coal mining equipment and method for steeply inclined coal seam
CN112682082A (en) * 2021-01-26 2021-04-20 西安科技大学 Mechanized mining system and method for flexible shield support of steep coal seam
CN112682082B (en) * 2021-01-26 2025-06-06 西安科技大学 Mechanized mining system and method for flexible shielding support of steeply inclined coal seams
CN114483030A (en) * 2022-01-14 2022-05-13 西安科技大学 Planing and transporting equipment for mining steep inclined thin and medium coal seam
CN114483031A (en) * 2022-01-14 2022-05-13 西安科技大学 A mining equipment suitable for mechanized mining of steeply inclined thin and medium-thick coal seams

Similar Documents

Publication Publication Date Title
CN109184692A (en) A kind of critical pseudo- oblique angle comprehensive mechanical mining method of half-edge coal seam
CN101307692B (en) Sharply inclined coal seam mining method
CN104088643B (en) A kind of high-dipping point blank coal seam Sub-Level Caving coal-mining method
CN207004567U (en) Tunnel is exploited with the coal mine filling that gob side entry retaining is combined
CN108150172A (en) A kind of single method of mining coal from heavy pitch thick coal seam
CN104500070B (en) Continuous coal mining machine paste filling mining method
CN104500069B (en) Continuous coal mining machine top-coal mining process for extremely-thick coal seam bound coal
CN101942999A (en) Coal mining method for high-dipping low seam
CN103485786B (en) A kind of half-edge coal seam moves towards longwall machinery and melts mining method
CN105003268A (en) Steeply inclined coal seam strike advancing false dipping fully-mechanized coal mining
CN105464678A (en) Rapid roadway tunneling method and system
CN109209382A (en) No coal column is without pick lane Z-type working face extraction method
CN105134212B (en) A kind of method that three soft high seam tunnel ensures the rate of extraction along top driving longwall top coal caving
CN102536229A (en) Tunneling, protecting and anchoring parallel work system and construction technology
CN104265291A (en) Comprehensive mechanized coal mining method of steeply inclined and extremely thick coal seam planing conveyor
CN115478858A (en) Underground Bauxite Mining Method with Double Mining Machines in High Dip Angle and Medium Thick Ore Seam
CN205277431U (en) Coal road tunnelling apparatus
CN115012958B (en) A fast excavation method based on flexible continuous transportation system
CN109268013B (en) Rotary mining process for fully mechanized coal mining face with unequal long and large angles
CN105401951A (en) Common gangue removal method and system for dual rock roadways of coal mine
CN111119896A (en) Bauxite mining method
CN112901170B (en) Coal-aluminum joint mining method for shared working face
CN105422098B (en) A kind of very thin coal rock layer slide saw formula mechanical mining method
CN115163189B (en) Double tunnel layout auxiliary tunnel to &#34;negative coal pillar&#34; single tunnel continuous and sequential mining method
CN115163187B (en) Integrated support for gob-side tunneling with double tunnel arrangement and multi-purpose mining method for one tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190111

RJ01 Rejection of invention patent application after publication