CN109083663A - 一种用于煤矿井下综采工作面的拆除装置 - Google Patents
一种用于煤矿井下综采工作面的拆除装置 Download PDFInfo
- Publication number
- CN109083663A CN109083663A CN201810970287.9A CN201810970287A CN109083663A CN 109083663 A CN109083663 A CN 109083663A CN 201810970287 A CN201810970287 A CN 201810970287A CN 109083663 A CN109083663 A CN 109083663A
- Authority
- CN
- China
- Prior art keywords
- shield support
- mechanized mining
- mining working
- tunnel
- fully
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D15/00—Props; Chocks, e.g. made of flexible containers filled with backfilling material
- E21D15/60—Devices for withdrawing props or chocks
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
本发明公开了一种用于煤矿井下综采工作面的拆除装置,包括位于巷道的综采工作面,巷道的顶部设有顶板,所述的巷道的一端具有机巷另一端为风巷,巷道的一侧为煤壁,另一侧为老塘,靠近老塘一侧的顶板依次并列设有第一掩护支架、第二掩护支架和第三掩护支架;采用本发明的技术方案,煤矿井下综采工作面采用三掩护支架方式支撑综采工作面的顶板,确保迎头调架时,调架空间有足够的支护强度,避免了迎头调架处的顶板坍塌,保证了综采工作面支架拆除安全。
Description
技术领域
本发明属于煤矿开采领域,更具体地说,本发明涉及一种用于煤矿井下综采工作面的拆除装置。
背景技术
煤矿开采过程中,综采工作面支架拆除时,迎头调架空间一般采用π型钢梁配合单体液压支柱打挑棚进行支护,迎头待调支架一旦降柱调架时,顶板压力迅速增加,迎头调架空间内原支护瞬间受压变形,迎头调架处的顶板可能会快速坍塌,迎头回棚因此存在较大的安全隐患。
发明内容
本发明所要解决的技术问题是提供一种避免了迎头调架处的顶板坍塌保证了综采工作面支架拆除安全的用于煤矿井下综采工作面的拆除装置。
为了实现上述目的,本发明采取的技术方案为:所提供的一种用于煤矿井下综采工作面的拆除装置,包括位于巷道的综采工作面,巷道的顶部设有顶板,所述的巷道的一端具有机巷另一端为风巷,巷道的一侧为煤壁,另一侧为老塘,靠近老塘一侧的顶板依次并列设有第一掩护支架、第二掩护支架和第三掩护支架。
本发明公开的一种用于煤矿井下综采工作面的拆除装置,第一掩护支架为底部可移动的框架体,框架体靠近老塘一侧的外侧设有多个支护单体,支护单体沿巷道均布,其中,支护单体通过横向的钢梁与第一掩护支架连接。
本发明公开的一种用于煤矿井下综采工作面的拆除装置,第二掩护支架为底部可移动的框架体,第二掩护支架紧邻第一掩护支架。
本发明公开的一种用于煤矿井下综采工作面的拆除装置,钢梁的另一端横向延伸至第二掩护支架,钢梁的端部置于第二掩护支架顶部的中部。
本发明公开的一种用于煤矿井下综采工作面的拆除装置,第三掩护支架为固定的框架体,第三掩护支架靠近煤壁的一侧紧邻巷道具有的锚索纵梁。
本发明还公开了一种使用煤矿井下综采工作面拆除支架的拆除方法,包括如下步骤:巷道煤壁和老塘之间设支撑综采工作面顶板的第一掩护支架、第二掩护支架和第三掩护支架,第一掩护支架靠近老塘一侧的外侧设置多个支护单体,支护单体沿巷道均布,支护单体通过横向的钢梁与第一掩护支架连接,钢梁的另一端横向延伸至第二掩护支架,第三掩护支架为固定,综采工作面拆除时,第一掩护支架和第二掩护支架交替向风巷方向前移。
采用本发明的技术方案,煤矿井下综采工作面采用三掩护支架方式支撑综采工作面的顶板,确保迎头调架时,调架空间有足够的支护强度,避免了迎头调架处的顶板坍塌,保证了综采工作面支架拆除安全;综采工作面拆除时,第一掩护支架和第二掩护支架交替向风巷方向前移,迎头顶板自然垮落,第三掩护支架靠近煤壁的一侧紧邻巷道具有的锚索纵梁,第三掩护支架支撑起靠近巷道煤壁的锚索纵梁进而支撑起顶板,避免了顶板下沉造成支柱严重变形现象,确保了该工作面安全快速拆除,减少了挑棚和替柱次数,降低了拆除的劳动强度。
以下将结合附图和实施例,对本发明进行较为详细的说明。
附图说明
下面对本说明书各幅附图所表达的内容及图中的标记作简要说明:
图1为本发明一种用于煤矿井下综采工作面的拆除装置的示意图。
图中标记为:1、煤壁;2、风巷;3、机巷;4、老塘;5、第一掩护支架;6、第二掩护支架;7、第三掩护支架;8、支护单体;9、钢梁。
具体实施方式
下面对照附图,通过对实施例的描述,对本发明的具体实施方式如所涉及的各构件的形状、构造、各部分之间的相互位置及连接关系、各部分的作用及工作原理、制造工艺及操作使用方法等,作进一步详细的说明,以帮助本领域的技术人员对本发明的发明构思、技术方案有更完整、准确和深入的理解。
图1为本发明一种用于煤矿井下综采工作面的拆除装置的示意图;如图所示的本发明一种用于煤矿井下综采工作面的拆除装置,包括位于巷道的综采工作面,巷道的顶部设有顶板,巷道的一端具有机巷3另一端为风巷2,巷道的一侧为煤壁1,另一侧为老塘4,靠近老塘4一侧的顶板依次并列设有第一掩护支架5、第二掩护支架6和第三掩护支架7;第一掩护支架5为底部可移动的框架体,框架体靠近老塘4一侧的外侧设有多个支护单体8,支护单体8沿巷道均布,其中,支护单体8通过横向的钢梁9与第一掩护支架5连接;第二掩护支架6为底部可移动的框架体,第二掩护支架6紧邻第一掩护支架5;钢梁9的另一端横向延伸至第二掩护支架6,钢梁9的端部置于第二掩护支架6顶部的中部;第三掩护支架7为固定的框架体,第三掩护支架7靠近煤壁1的一侧紧邻巷道具有的锚索纵梁。
本发明还公开了一种使用煤矿井下综采工作面拆除支架的拆除方法,包括如下步骤:巷道煤壁1和老塘4之间设支撑综采工作面顶板的第一掩护支架5、第二掩护支架6和第三掩护支架7,第一掩护支架5靠近老塘4一侧的外侧设置多个支护单体8,支护单体8沿巷道均布,支护单体8通过横向的钢梁9与第一掩护支架5连接,钢梁9的另一端横向延伸至第二掩护支架6,第三掩护支架7为固定,综采工作面拆除时,第一掩护支架5和第二掩护支架6交替向风巷方向前移。
采用本发明的技术方案,煤矿井下综采工作面采用三掩护支架方式支撑综采工作面的顶板,确保迎头调架时,调架空间有足够的支护强度,避免了迎头调架处的顶板坍塌,保证了综采工作面支架拆除安全;综采工作面拆除时,第一掩护支架5和第二掩护支架6交替向风巷方向前移,迎头顶板自然垮落,第三掩护支架7靠近煤壁的一侧紧邻巷道具有的锚索纵梁,第三掩护支架7支撑起靠近巷道煤壁的锚索纵梁进而支撑起顶板,避免了顶板下沉造成支柱严重变形现象,确保了该工作面安全快速拆除,减少了挑棚和替柱次数,降低了拆除的劳动强度。
上面结合附图对本发明进行了示例性描述,显然本发明具体实现并不受上述方式的限制,只要采用了本发明的方法构思和技术方案进行的各种非实质性的改进,或未经改进将本发明的构思和技术方案直接应用于其它场合的,均在本发明的保护范围之内。
Claims (6)
1.一种用于煤矿井下综采工作面的拆除装置,包括位于巷道的综采工作面,巷道的顶部设有顶板,其特征在于:所述的巷道的一端具有机巷另一端为风巷,巷道的一侧为煤壁,另一侧为老塘,靠近老塘一侧的顶板依次并列设有第一掩护支架、第二掩护支架和第三掩护支架。
2.按照权利要求1所述的一种用于煤矿井下综采工作面的拆除装置,其特征在于:所述的第一掩护支架为底部可移动的框架体,框架体靠近老塘一侧的外侧设有多个支护单体,支护单体沿巷道均布,其中,支护单体通过横向的钢梁与第一掩护支架连接。
3.按照权利要求1所述的一种用于煤矿井下综采工作面的拆除装置,其特征在于:所述的第二掩护支架为底部可移动的框架体,第二掩护支架紧邻第一掩护支架。
4.按照权利要求2或3所述的一种用于煤矿井下综采工作面的拆除装置,其特征在于:所述的钢梁的另一端横向延伸至第二掩护支架,钢梁的端部置于第二掩护支架顶部的中部。
5.按照权利要求1所述的一种用于煤矿井下综采工作面的拆除装置,其特征在于:所述的第三掩护支架为固定的框架体,第三掩护支架靠近煤壁的一侧紧邻巷道具有的锚索纵梁。
6.一种按照权利要求1~5所述的使用煤矿井下综采工作面拆除支架的拆除方法,其特征在于:包括如下步骤:巷道煤壁和老塘之间设支撑综采工作面顶板的第一掩护支架、第二掩护支架和第三掩护支架,第一掩护支架靠近老塘一侧的外侧设置多个支护单体,支护单体沿巷道均布,支护单体通过横向的钢梁与第一掩护支架连接,钢梁的另一端横向延伸至第二掩护支架,第三掩护支架为固定,综采工作面拆除时,第一掩护支架和第二掩护支架交替向风巷方向前移。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810970287.9A CN109083663A (zh) | 2018-08-24 | 2018-08-24 | 一种用于煤矿井下综采工作面的拆除装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810970287.9A CN109083663A (zh) | 2018-08-24 | 2018-08-24 | 一种用于煤矿井下综采工作面的拆除装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109083663A true CN109083663A (zh) | 2018-12-25 |
Family
ID=64794533
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810970287.9A Pending CN109083663A (zh) | 2018-08-24 | 2018-08-24 | 一种用于煤矿井下综采工作面的拆除装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109083663A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110130926A (zh) * | 2019-05-24 | 2019-08-16 | 翟文 | 一种煤矿综采工作面综合支护方法 |
Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2543953A1 (de) * | 1975-10-02 | 1977-04-14 | Ruhrkohle Ag | Vorrichtung zum rauben von einheiten des schreitenden hydraulischen strebausbaues |
DE3641544C1 (en) * | 1986-12-05 | 1988-03-03 | Nlw Foerdertechnik Gmbh | Method and apparatus for withdrawing the shields from a face in coal mines |
RU1790682C (ru) * | 1990-06-04 | 1993-01-23 | Всесоюзный Научно-Исследовательский И Проектно-Конструкторский Угольный Институт (Кузниуи) | Щитова механизированна крепь дл отработки пластов крутого и наклонного залегани |
WO2009103306A1 (de) * | 2008-02-19 | 2009-08-27 | Rag Aktiengesellschaft | Verfahren zur stabilisierung der schildsäule bei einem im flözeinfallen geführten strebbetrieb |
CN101975072A (zh) * | 2010-09-13 | 2011-02-16 | 山西晋城无烟煤矿业集团有限责任公司 | 普通综采工作面液压支架回收方法 |
CN104895592A (zh) * | 2015-05-26 | 2015-09-09 | 神华集团有限责任公司 | 综采综放工作面支架回撤支护方法 |
CN204921004U (zh) * | 2015-08-12 | 2015-12-30 | 山西晋城无烟煤矿业集团有限责任公司 | 综采工作面撤架通道锚索支护体系 |
CN105569702A (zh) * | 2016-01-11 | 2016-05-11 | 安徽理工大学 | 综采面收作时液压支架无坑木回撤方法 |
CN105863691A (zh) * | 2016-05-04 | 2016-08-17 | 淮南矿业(集团)有限责任公司 | 一种综采工作面支架回撤顶板支护施工方法 |
CN205532650U (zh) * | 2016-02-29 | 2016-08-31 | 内蒙古伊泰煤炭股份有限公司 | 一种顶板支护结构及具有该结构的井工煤矿回撤工作面 |
US20170138194A1 (en) * | 2014-06-25 | 2017-05-18 | China University Of Mining And Technology | Method for removing hydraulic support for solid filling coal mining |
CN107130990A (zh) * | 2017-06-09 | 2017-09-05 | 淮南矿业(集团)有限责任公司 | 一种大采高工作面拆架方法 |
CN107387139A (zh) * | 2017-07-31 | 2017-11-24 | 淮南矿业(集团)有限责任公司 | 大倾角回撤工作面支架下行拆除工艺 |
CN108150206A (zh) * | 2017-11-16 | 2018-06-12 | 大同煤矿集团有限责任公司 | 一种通过综采工作面顺槽高冒区的方法 |
US20180187548A1 (en) * | 2015-06-24 | 2018-07-05 | Manchao He | Equipment system for no-roadway no-coal-pillar retained roadway mining method |
-
2018
- 2018-08-24 CN CN201810970287.9A patent/CN109083663A/zh active Pending
Patent Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2543953A1 (de) * | 1975-10-02 | 1977-04-14 | Ruhrkohle Ag | Vorrichtung zum rauben von einheiten des schreitenden hydraulischen strebausbaues |
DE3641544C1 (en) * | 1986-12-05 | 1988-03-03 | Nlw Foerdertechnik Gmbh | Method and apparatus for withdrawing the shields from a face in coal mines |
RU1790682C (ru) * | 1990-06-04 | 1993-01-23 | Всесоюзный Научно-Исследовательский И Проектно-Конструкторский Угольный Институт (Кузниуи) | Щитова механизированна крепь дл отработки пластов крутого и наклонного залегани |
WO2009103306A1 (de) * | 2008-02-19 | 2009-08-27 | Rag Aktiengesellschaft | Verfahren zur stabilisierung der schildsäule bei einem im flözeinfallen geführten strebbetrieb |
CN101975072A (zh) * | 2010-09-13 | 2011-02-16 | 山西晋城无烟煤矿业集团有限责任公司 | 普通综采工作面液压支架回收方法 |
US20170138194A1 (en) * | 2014-06-25 | 2017-05-18 | China University Of Mining And Technology | Method for removing hydraulic support for solid filling coal mining |
CN104895592A (zh) * | 2015-05-26 | 2015-09-09 | 神华集团有限责任公司 | 综采综放工作面支架回撤支护方法 |
US20180187548A1 (en) * | 2015-06-24 | 2018-07-05 | Manchao He | Equipment system for no-roadway no-coal-pillar retained roadway mining method |
CN204921004U (zh) * | 2015-08-12 | 2015-12-30 | 山西晋城无烟煤矿业集团有限责任公司 | 综采工作面撤架通道锚索支护体系 |
CN105569702A (zh) * | 2016-01-11 | 2016-05-11 | 安徽理工大学 | 综采面收作时液压支架无坑木回撤方法 |
CN205532650U (zh) * | 2016-02-29 | 2016-08-31 | 内蒙古伊泰煤炭股份有限公司 | 一种顶板支护结构及具有该结构的井工煤矿回撤工作面 |
CN105863691A (zh) * | 2016-05-04 | 2016-08-17 | 淮南矿业(集团)有限责任公司 | 一种综采工作面支架回撤顶板支护施工方法 |
CN107130990A (zh) * | 2017-06-09 | 2017-09-05 | 淮南矿业(集团)有限责任公司 | 一种大采高工作面拆架方法 |
CN107387139A (zh) * | 2017-07-31 | 2017-11-24 | 淮南矿业(集团)有限责任公司 | 大倾角回撤工作面支架下行拆除工艺 |
CN108150206A (zh) * | 2017-11-16 | 2018-06-12 | 大同煤矿集团有限责任公司 | 一种通过综采工作面顺槽高冒区的方法 |
Non-Patent Citations (2)
Title |
---|
石渊: "三掩护架拆除工艺在张集矿1215(1)工作面的应用", 河南科技, vol. 1, no. 14, pages 113 - 114 * |
石长坤,顾新泽: "复杂条件综采面重型装备机械化回撤实践", 煤矿开采, vol. 20, no. 6, pages 41 - 43 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110130926A (zh) * | 2019-05-24 | 2019-08-16 | 翟文 | 一种煤矿综采工作面综合支护方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2017063370A1 (zh) | 一种基于并联机构的自移式端头液压支架及其应用 | |
CN105370299B (zh) | 千米深埋厚煤层窄煤柱沿空护巷工艺 | |
CN105545334A (zh) | 连续作业可变截面式临时支护支架及其操作方法 | |
CA2860980A1 (en) | Tunnelling or extraction machine | |
CN206625858U (zh) | 一种带侧护板的自移式超前支护液压支架 | |
CN103061792B (zh) | 一种煤矿用车式液压支架 | |
CN106761874A (zh) | 一种带侧护板的自移式超前支护液压支架 | |
CN104047627A (zh) | 回采巷道框架式超前支护支架 | |
CN105178987A (zh) | 新型隧道防水板铺挂台车 | |
CN101936172A (zh) | 采动期间巷道底鼓治理方法 | |
CN109083663A (zh) | 一种用于煤矿井下综采工作面的拆除装置 | |
CN104389627A (zh) | 支架安装平台 | |
CN201314239Y (zh) | 巷道放顶煤端头支架 | |
CN203097919U (zh) | 一种煤矿用车式液压支架 | |
CN207144988U (zh) | 沿空留巷挡矸系统 | |
CN103362511A (zh) | 急倾斜中厚煤层台阶式无煤柱采煤法 | |
CN105715289A (zh) | 沿空留巷端头支架 | |
CN209444353U (zh) | 一种用于煤矿井下综采工作面的拆除装置 | |
CN203925556U (zh) | 循环式掘进及时支护装置 | |
CN104018868A (zh) | 门式整体超前支架 | |
CN205591951U (zh) | 一种支护回采巷道超前段自移式液压设备 | |
CN203756207U (zh) | 一种用于综放面运输顺槽近采空区段支护及放煤的支架装置 | |
CN105927256A (zh) | 液压支架用跨机头机尾支护结构 | |
RU2021520C1 (ru) | Агрегатная штрековая крепь | |
CN216007884U (zh) | 一种土建工程施工用洞口防护安全支撑装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181225 |
|
RJ01 | Rejection of invention patent application after publication |