CN109025277A - Secondary frame and its pre-buried structure and method - Google Patents
Secondary frame and its pre-buried structure and method Download PDFInfo
- Publication number
- CN109025277A CN109025277A CN201810987962.9A CN201810987962A CN109025277A CN 109025277 A CN109025277 A CN 109025277A CN 201810987962 A CN201810987962 A CN 201810987962A CN 109025277 A CN109025277 A CN 109025277A
- Authority
- CN
- China
- Prior art keywords
- frame
- wall
- window
- sub
- window opening
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G15/00—Forms or shutterings for making openings, cavities, slits, or channels
- E04G15/02—Forms or shutterings for making openings, cavities, slits, or channels for windows, doors, or the like
-
- E—FIXED CONSTRUCTIONS
- E06—DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
- E06B—FIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
- E06B1/00—Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
- E06B1/02—Base frames, i.e. template frames for openings in walls or the like, provided with means for securing a further rigidly-mounted frame; Special adaptations of frames to be fixed therein
-
- E—FIXED CONSTRUCTIONS
- E06—DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
- E06B—FIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
- E06B1/00—Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
- E06B1/56—Fastening frames to the border of openings or to similar contiguous frames
- E06B1/60—Fastening frames to the border of openings or to similar contiguous frames by mechanical means, e.g. anchoring means
- E06B1/6015—Anchoring means
- E06B1/6038—Anchoring means specially adapted for being embedded in the wall
Landscapes
- Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Door And Window Frames Mounted To Openings (AREA)
Abstract
本发明涉及一种副框及其预埋结构和方法,该副框预埋于窗洞口处的墙体上,所述副框包括:呈长条状的方形框体,内部中空形成腔体;立设于所述方形框体底部、且供埋设于所述墙体内的锚固板;以及垂直连接于所述方形框体两侧部并向所述方形框体外侧延伸设置的定位挡板,所述定位挡板的上表面与所述方形框体底部的下表面相平齐设置。本发明的副框可与墙体一同施工,通过定位挡板能够与窗洞口处的窗洞模板定位安装,通过窗洞模板夹持副框,副框与窗洞模板一起作为窗洞口的模板,实现了在模板安装阶段就完成副框定位安装,解决了传统副框的现场进行洞口测量和安装的问题,减少了施工工序和交叉作业的工作量。
The invention relates to a sub-frame and its pre-embedded structure and method. The sub-frame is pre-embedded on the wall at the window opening, and the sub-frame includes: a long strip-shaped square frame with a hollow inside to form a cavity; An anchoring plate erected at the bottom of the square frame and embedded in the wall; and a positioning baffle vertically connected to both sides of the square frame and extending to the outside of the square frame, The upper surface of the positioning baffle is flush with the lower surface of the bottom of the square frame. The subframe of the present invention can be constructed together with the wall, and can be positioned and installed with the window formwork at the window opening through the positioning baffle, and the subframe is clamped by the window formwork, and the subframe and the window formwork are used as the formwork of the window opening, which realizes The positioning and installation of the sub-frame is completed at the formwork installation stage, which solves the problem of on-site hole measurement and installation of the traditional sub-frame, and reduces the workload of construction procedures and cross operations.
Description
技术领域technical field
本发明涉及窗结构工程领域,特指一种副框及其预埋结构和方法。The invention relates to the field of window structure engineering, in particular to an auxiliary frame and its pre-embedded structure and method.
背景技术Background technique
在建筑领域,外墙渗水和窗户被损坏、污染是一个较难解决的质量通病,也是业主投诉较多的质量问题之一。为避免窗户被损坏、污染,现在窗户安装多采用干法安装,即在洞口墙体成型后二次安装副框,并进行洞口表面防水、保温和装饰处理,完成后再在副框上安装窗户。In the field of construction, water seepage of exterior walls, damage and pollution of windows is a common quality problem that is difficult to solve, and it is also one of the quality problems that owners complain more about. In order to prevent the windows from being damaged and polluted, most of the windows are installed by the dry method now, that is, the secondary frame is installed after the wall of the opening is formed, and the surface of the hole is waterproofed, heat-preserved and decorated, and then the window is installed on the secondary frame after completion .
此类安装方法虽然方便了窗户的安装,提高了洞口安装精度,避免了成品窗户被施工污染。但二次安装的副框增加了副框和墙体之间的渗漏问题,且二次安装增加了作业工序,加大了质量问题的出现率。Although this type of installation method facilitates the installation of the window, improves the installation accuracy of the opening, and prevents the finished window from being polluted by construction. However, the secondary installation of the sub-frame increases the leakage problem between the sub-frame and the wall, and the secondary installation increases the operation process and increases the occurrence rate of quality problems.
发明内容Contents of the invention
本发明的目的在于克服现有技术的缺陷,提供一种副框及其预埋结构和方法,解决现有的先施工墙体后安装副框带来的作业工序增加,容易产生渗漏并加大质量问题的出现率的问题。The purpose of the present invention is to overcome the defects of the prior art, to provide a sub-frame and its pre-embedded structure and method, to solve the problem of increasing the operating procedures caused by the existing construction of the wall first and then installing the sub-frame, which is prone to leakage and increases The problem of the occurrence rate of large quality problems.
实现上述目的的技术方案是:The technical scheme for realizing the above-mentioned purpose is:
本发明提供了一种副框,预埋于窗洞口处的墙体上,所述副框包括:The present invention provides a sub-frame, which is pre-embedded on the wall at the window opening, and the sub-frame includes:
呈长条状的方形框体,内部中空形成腔体;A rectangular frame with a hollow interior to form a cavity;
立设于所述方形框体底部、且供埋设于所述墙体内的锚固板;以及an anchor plate erected at the bottom of the square frame and embedded in the wall; and
垂直连接于所述方形框体两侧部并向所述方形框体外侧延伸设置的定位挡板,所述定位挡板的上表面与所述方形框体底部的下表面相平齐设置,所述定位挡板、所述锚固板以及所述方形框体一体成型。A positioning baffle vertically connected to both sides of the square frame and extending to the outside of the square frame, the upper surface of the positioning baffle is flush with the lower surface of the bottom of the square frame, so The positioning baffle, the anchor plate and the square frame are integrally formed.
本发明的副框可预埋于墙体上,从而与墙体一同施工,且副框通过定位挡板能够与窗洞口处的窗洞模板定位安装,且通过窗洞模板夹持副框,副框与窗洞模板一起作为窗洞口的模板,实现了在模板安装阶段就完成副框定位安装,解决了传统副框的现场进行洞口测量和安装的问题,减少了施工工序和交叉作业的工作量。副框通过埋设于墙体内的锚固板与墙体连接,且锚固板竖向设置,能够起到防水作用,实现无渗漏结构,解决了先施工墙体后安装副框而容易产生渗漏的问题。本发明的副框实现了窗户安装的快速施工,提升现场施工效率,加快施工进度,并降低了施工成本。The sub-frame of the present invention can be pre-embedded on the wall, so as to be constructed together with the wall, and the sub-frame can be positioned and installed with the window formwork at the window opening through the positioning baffle, and the sub-frame is clamped by the window formwork, and the sub-frame and The window opening formwork is used as the formwork of the window opening, which realizes the positioning and installation of the sub-frame at the formwork installation stage, solves the problem of on-site measurement and installation of the traditional sub-frame, and reduces the workload of the construction process and cross-operation. The auxiliary frame is connected to the wall through the anchor plate embedded in the wall, and the anchor plate is vertically arranged, which can play a waterproof role and realize a leak-free structure, which solves the problem of easy leakage caused by first constructing the wall and then installing the auxiliary frame The problem. The auxiliary frame of the present invention realizes rapid construction of window installation, improves on-site construction efficiency, speeds up construction progress, and reduces construction cost.
本发明副框的进一步改进在于,所述锚固板为两个,且对应所述方形框体的两侧部设置,所述锚固板还与对应的定位挡板固定连接。A further improvement of the sub-frame of the present invention is that there are two anchor plates, which are arranged corresponding to the two sides of the square frame body, and the anchor plates are also fixedly connected to the corresponding positioning baffles.
本发明副框的进一步改进在于,所述锚固板的底端垂直连接有底板。A further improvement of the sub-frame of the present invention is that the bottom end of the anchor plate is vertically connected with a bottom plate.
本发明还提供了一种副框的预埋结构,包括:The present invention also provides a sub-frame pre-embedded structure, including:
如权利要求1所述的副框,置于待形成的窗洞口处;以及The sub-frame according to claim 1, placed at the window hole to be formed; and
设于待形成的窗洞口处的窗洞模板,所述窗洞模板的一侧部贴设于对应的副框的侧部,所述窗洞模板的另一侧部与对应的墙体模板连接固定;所述窗洞模板的底部部分置于对应的定位挡板上,位于所述副框两侧的窗洞模板通过销钉和销片紧固连接并夹紧所述副框,从而通过所述窗洞模板和所述副框围合形成窗洞口,且所述副框的锚固板置于所述墙体模板之间的浇筑空间内。The window formwork provided at the opening of the window to be formed, one side of the window formwork is attached to the side of the corresponding sub-frame, and the other side of the window formwork is connected and fixed with the corresponding wall formwork; The bottom part of the window hole template is placed on the corresponding positioning baffle, and the window hole templates located on both sides of the sub-frame are fastened and connected by pins and pins to clamp the sub-frame, so that the window hole template and the The sub-frame encloses and forms the window opening, and the anchor plate of the sub-frame is placed in the pouring space between the wall formworks.
本发明副框的预埋结构的进一步改进在于,所述锚固板的底端垂直连接有底板,且所述底板贴设于所述墙体模板内侧的钢筋。A further improvement of the pre-embedded structure of the sub-frame in the present invention lies in that the bottom end of the anchor plate is vertically connected with a bottom plate, and the bottom plate is attached to the reinforcement inside the wall formwork.
本发明副框的预埋结构的进一步改进在于,所述浇筑空间内浇筑混凝土形成墙体,且所述墙体内通过所述副框和所述窗洞模板形成有对应的窗洞口,所述方形框体底部与所述窗洞口处的墙体表面相接触,所述定位挡板和所述锚固板埋设于对应的墙体内。The further improvement of the pre-embedded structure of the sub-frame of the present invention lies in that concrete is poured in the pouring space to form a wall, and corresponding window openings are formed in the wall through the sub-frame and the window opening formwork, and the square The bottom of the frame is in contact with the wall surface at the window opening, and the positioning baffle and the anchor plate are embedded in the corresponding wall.
本发明还提供了一种副框的预埋方法,包括如下步骤:The present invention also provides a method for pre-embedding a sub-frame, comprising the following steps:
施工墙体模板,并于所述墙体模板上留设与待形成的窗洞口对应的开口;Construction of the wall formwork, and leaving an opening corresponding to the window hole to be formed on the wall formwork;
提供如权利要求1所述的副框,将所述副框置于待形成的窗洞口处;providing the sub-frame according to claim 1, placing the sub-frame at the window hole to be formed;
提供窗洞模板,将所述窗洞模板设于待形成的窗洞口处,并将所述窗洞模板的一侧部贴设于对应的副框的侧部且所述窗洞模板的底部部分置于对应的定位挡板上,将所述窗洞模板的另一侧部与对应的墙体模板连接固定;A window hole template is provided, the window hole template is arranged at the window hole to be formed, and one side of the window hole template is attached to the side of the corresponding sub-frame and the bottom part of the window hole template is placed on the corresponding On the positioning baffle, connect and fix the other side of the window formwork with the corresponding wall formwork;
将位于所述副框两侧的两个窗洞模板通过销钉和销片紧固连接从而夹紧所述副框;fastening the two window templates located on both sides of the sub-frame through pins and pins so as to clamp the sub-frame;
将位于待形成的窗洞口周缘的窗洞模板依次对接连接,将位于待形成的窗洞口周缘的副框依次对接连接,从而所述窗洞模板和所述副框围合形成窗洞口;以及butt-connecting the window templates located at the periphery of the window opening to be formed sequentially, and sequentially butt-connecting the sub-frames located at the periphery of the window opening to be formed, so that the window-hole template and the sub-frame enclose the window opening; and
于所述墙体模板之间的浇筑空间内浇筑混凝土以形成墙体,且所述锚固板埋设于所述墙体内。Concrete is poured in the pouring space between the wall templates to form a wall, and the anchor plate is embedded in the wall.
本发明预埋方法的进一步改进在于,将位于待形成的窗洞口周缘的副框依次对接连接,包括:The further improvement of the pre-embedding method of the present invention is to sequentially butt connect the sub-frames located at the periphery of the window hole to be formed, including:
将所述副框的端部切割形成一斜口;cutting the end of the sub-frame to form a bevel;
提供连接角码,将所述连接角码设于相邻的两个副框的连接处,并将所述连接角码的端部插设于对应的副框内;Provide the connection angle code, set the connection angle code at the joint of two adjacent sub-frames, and insert the end of the connection angle code into the corresponding sub-frame;
从所述斜口处向所述副框的腔体内注胶以固定所述连接角码的端部,并将相邻的两个副框的斜口对接,从而完成了相邻的两个副框的连接。Glue is injected into the cavity of the sub-frame from the slant to fix the end of the connecting corner, and the slant of the adjacent two sub-frames is butted, thus completing the two adjacent sub-frames. box connections.
本发明预埋方法的进一步改进在于,还包括:The further improvement of the pre-embedding method of the present invention is to also include:
于所述锚固板的底端垂直连接一底板,在设置副框时,将所述底板贴设于所述墙体模板内对应的钢筋。A base plate is vertically connected to the bottom of the anchor plate, and when the sub-frame is set, the base plate is attached to the corresponding steel bar in the wall formwork.
附图说明Description of drawings
图1为本发明副框的结构示意图。Fig. 1 is a schematic structural diagram of the subframe of the present invention.
图2为本发明副框的预埋结构的结构示意图。Fig. 2 is a structural schematic diagram of the pre-embedded structure of the sub-frame of the present invention.
图3为本发明副框应用于窗洞口处并安装窗户的结构示意图。Fig. 3 is a structural schematic diagram of the sub-frame of the present invention applied to a window opening and installed with a window.
具体实施方式Detailed ways
下面结合附图和具体实施例对本发明作进一步说明。The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
参阅图1,本发明提供了一种副框及其预埋结构和方法,副框通过夹持方式在窗洞口处的窗洞模板之间拼接固定,与窗洞模板一起构成窗洞口处的模板,在浇筑墙体后,窗洞模板拆除则副框预埋于墙体上。副框通过埋设于墙体内的锚固板与墙体牢固连接,副框还设置了定位挡板,在拼装时,方便与窗洞模板进行定位夹持。副框的方形框体内部形成的腔体,能够方便相邻的副框间的角部连接,另外还方便后续窗户通过自攻钉连接固定,整体提高了窗户的安装精度,缩短了安装工期。下面结合附图对本发明副框及其预埋结构和方法进行说明。Referring to Fig. 1, the present invention provides a sub-frame and its pre-embedded structure and method. The sub-frame is spliced and fixed between the window formwork at the window opening by clamping, and forms the formwork at the window opening together with the window formwork. After the wall is poured, the window formwork is removed and the auxiliary frame is pre-embedded on the wall. The sub-frame is firmly connected to the wall through the anchor plate embedded in the wall, and the sub-frame is also equipped with a positioning baffle, which is convenient for positioning and clamping with the window formwork during assembly. The cavity formed inside the square frame of the sub-frame can facilitate the corner connection between adjacent sub-frames, and it also facilitates the subsequent windows to be connected and fixed by self-tapping screws, which improves the installation accuracy of the windows as a whole and shortens the installation period. The sub-frame and its pre-embedded structure and method of the present invention will be described below in conjunction with the accompanying drawings.
参阅图1,显示了本发明副框的结构示意图。下面结合图1,对本发明副框的结构进行说明。Referring to Fig. 1, it shows a schematic structural diagram of the subframe of the present invention. The structure of the subframe of the present invention will be described below with reference to FIG. 1 .
如图1所示,本发明的副框20预埋于窗洞口处的墙体上,该副框20包括方形框体21、锚固板22以及定位挡板23,方形框体21呈长条状,方形框体21的内部中空形成腔体211,该方形框体21的长度取决于所施工的窗洞口的长度和宽度。锚固板22立设于方形框体21的底部,该锚固板22用于埋设在墙体内,从而将副框20的方向框体21牢固地安装在墙体上了。定位挡板23垂直连接于方形框体21的两侧部并向方形框体21外侧延伸设置,定位挡板23的上表面与方形框体21的底部的下表面相平齐设置,即定位挡板23设于方形框体21侧部的底部处,定位挡板23、锚固板22以及方形框体21一体成型。As shown in Figure 1, the sub-frame 20 of the present invention is pre-embedded on the wall at the window opening. The sub-frame 20 includes a square frame body 21, an anchor plate 22 and a positioning baffle plate 23. The square frame body 21 is in the shape of a strip , the cavity 211 is formed in the hollow of the square frame body 21, and the length of the square frame body 21 depends on the length and width of the window opening constructed. The anchor plate 22 is erected on the bottom of the square frame body 21, and the anchor plate 22 is used to be embedded in the wall, so that the direction frame body 21 of the sub-frame 20 is firmly installed on the wall body. The positioning baffle 23 is vertically connected to both sides of the square frame body 21 and extends to the outside of the square frame 21. The upper surface of the positioning baffle 23 is flush with the lower surface of the bottom of the square frame 21, i.e. the positioning baffle The plate 23 is arranged at the bottom of the side of the square frame body 21 , and the positioning baffle plate 23 , the anchor plate 22 and the square frame body 21 are integrally formed.
较佳地,副框20采用挤压成型工艺制成,从而定位挡板23、锚固板22以及方形框体21制成一体结构。Preferably, the sub-frame 20 is made by extrusion molding, so that the positioning baffle 23 , the anchoring plate 22 and the square frame 21 are made into an integral structure.
本发明的副框20在方形框体21的底部立设锚固板22,且在固定副框20时,将锚固板22埋设在墙体内,从而锚固板22一方面为副框20提供了牢固的连接基础,另一方面为副框20提供了防水功能,形成无渗漏结构,避免了副框20的安装处产成漏水的问题。In the subframe 20 of the present invention, an anchoring plate 22 is erected at the bottom of the square frame body 21, and when the subframe 20 is fixed, the anchoring plate 22 is embedded in the wall, so that the anchoring plate 22 provides a firm support for the subframe 20 on the one hand. On the other hand, it provides a waterproof function for the sub-frame 20, forming a non-leakage structure, and avoiding the problem of water leakage caused by the installation of the sub-frame 20.
本发明的副框20在方形框体21的两侧设置定位挡板23,用于定位夹持副框20的方形框体21的窗洞模板,副框20与墙体模板一起安装,在浇筑好墙体后,该副框20就留在了墙体上,从而就完成了副框20的安装固定。利用窗洞模板夹持住副框20的方形框体21,且方形框体21也作为窗洞口的模板,使得副框20可与模板连接牢固稳定,提高了副框20的埋设效果及质量,还减少了现有后安装副框的多道施工工序,减少了交叉作业的工作量。The sub-frame 20 of the present invention is provided with positioning baffles 23 on both sides of the square frame body 21, which are used to position the window formwork of the square frame body 21 clamping the sub-frame 20. The sub-frame 20 is installed together with the wall formwork. After the wall, the sub-frame 20 is left on the wall, thereby completing the installation and fixing of the sub-frame 20 . The square frame body 21 of the subframe 20 is clamped by the window hole formwork, and the square frame body 21 is also used as a template for the window opening, so that the subframe 20 can be firmly and stably connected with the formwork, improving the embedding effect and quality of the subframe 20, and It reduces the multi-channel construction process of the existing post-installation sub-frame, and reduces the workload of cross-operation.
本发明的副框20的方形框体21内形成有腔体211,一方面方便相邻的两个副框20的方形框体21间通过连接角码连接,另一方面还能够方便窗户的安装。A cavity 211 is formed in the square frame body 21 of the sub-frame 20 of the present invention. On the one hand, it is convenient to connect the square frame bodies 21 of two adjacent sub-frames 20 through connecting corners, and on the other hand, it can also facilitate the installation of windows. .
本发明的副框20实现了窗户的快速施工,提升现场施工效率,加快施工进度,降低施工成本。The sub-frame 20 of the present invention realizes rapid construction of windows, improves on-site construction efficiency, speeds up construction progress, and reduces construction costs.
作为本发明的一较佳实施方式,锚固板22为两个,且对应方形框体21的两侧部设置,锚固板22还与对应的定位挡板23固定连接。较佳地,该锚固板22垂直连接对应的定位挡板23,锚固板22与对应的方形框体21的侧板相对齐设置,锚固板22的外表面与方形框体21的侧板的外表面相平齐设置。As a preferred embodiment of the present invention, there are two anchoring plates 22 , which are arranged corresponding to the two sides of the square frame body 21 , and the anchoring plates 22 are also fixedly connected to the corresponding positioning baffles 23 . Preferably, the anchor plate 22 is vertically connected to the corresponding positioning baffle plate 23, the anchor plate 22 is aligned with the side plate of the corresponding square frame body 21, and the outer surface of the anchor plate 22 is aligned with the outer surface of the side plate of the square frame body 21. Face flush setting.
进一步地,锚固板22的底端垂直连接有底板221。较佳地,底板221的中部与锚固板22的底端垂直连接。利用设置的底板221可提高副框20设置的稳定性,该底板221在设置副框20时,可抵靠于对应的墙体钢筋上,为副框20提供一定的支撑力。又佳地,底板221与对应的墙体钢筋固定连接。Further, the bottom end of the anchor plate 22 is vertically connected with a bottom plate 221 . Preferably, the middle portion of the bottom plate 221 is vertically connected to the bottom end of the anchor plate 22 . The stability of the sub-frame 20 can be improved by using the bottom plate 221 . When the sub-frame 20 is set, the bottom plate 221 can lean against the corresponding wall reinforcement to provide a certain supporting force for the sub-frame 20 . Also preferably, the bottom plate 221 is fixedly connected to the corresponding wall reinforcement.
较佳地,副框20采用铝合金制成。副框20的锚固板22的长度为15mm,底板221伸出锚固板22侧部的长度为2mm,定位挡板23伸出方形框体21侧部的长度为5mm。Preferably, the sub-frame 20 is made of aluminum alloy. The length of the anchor plate 22 of the sub-frame 20 is 15 mm, the length of the bottom plate 221 protruding from the side of the anchor plate 22 is 2 mm, and the length of the positioning baffle 23 protruding from the side of the square frame body 21 is 5 mm.
本发明的副框20在使用时,与墙体模板一起施工,在支设墙体模板时,将副框20拼装于对应的窗洞口处,并利用窗洞口处的窗洞模板夹持住副框20,利用定位挡板23可快速定位窗洞模板和方形框体21,模板支设好后,副框20的锚固板22位于墙体的浇筑空间内,向浇筑空间内浇筑混凝土以形成墙体,待墙体达到拆除要求,拆除墙体模板和窗洞模板,副框20通过锚固板22就固定在墙体的窗洞口处了,从而完成墙体施工的同时也完成了副框20的安装。When the subframe 20 of the present invention is used, it is constructed together with the wall formwork. When the wall formwork is supported, the subframe 20 is assembled at the corresponding window opening, and the subframe is clamped by the window formwork at the window opening. 20. Use the positioning baffle plate 23 to quickly locate the window formwork and the square frame body 21. After the formwork is supported, the anchor plate 22 of the subframe 20 is located in the pouring space of the wall, and concrete is poured into the pouring space to form the wall. When the wall reaches the removal requirements, the wall formwork and the window formwork are removed, and the subframe 20 is fixed on the window opening of the wall through the anchor plate 22, thereby completing the installation of the subframe 20 while the wall construction is completed.
本发明还提供了一种副框的预埋结构。下面对本发明提供的一种副框的预埋结构进行说明The invention also provides a pre-embedded structure of the sub-frame. The pre-embedded structure of a sub-frame provided by the present invention will be described below
如图2所示,本发明的副框的预埋结构包括副框20和窗洞模板30,窗洞模板30包括模面板31和垂直设于模面板31外侧端部处的边框32,窗洞模板30拼装时,通过边框32进行拼接连接,模面板31的内表面处形成墙体的浇筑空间。As shown in Figure 2, the pre-embedded structure of the sub-frame of the present invention includes a sub-frame 20 and a window formwork 30, the window formwork 30 includes a formwork panel 31 and a frame 32 vertically arranged at the outer end of the formwork panel 31, and the window formwork 30 is assembled When the frame 32 is spliced and connected, the inner surface of the formwork panel 31 forms a pouring space for the wall.
副框20置于待形成的窗洞口处,且副框20的设置位置根据需要进行定位测量。窗洞模板30设于待形成的窗洞口处,窗洞模板30的一侧部贴设于对应的副框21的侧部,窗洞模板30的另一侧部与对应的墙体模板连接固定,在图2中未示出墙体模板,窗洞口为设置在墙体上的供安装窗户的洞口,窗洞模板30和副框20设于待形成的窗洞口的顶部、底部以及两侧部,从而利用窗洞模板30和副框20在浇筑形成墙体上形成了对应的窗洞口。窗洞模板30的底部部分置于对应的定位挡板23上,通过定位挡板23可快速定位安装窗洞模板30,位于副框20两侧的窗洞模板30通过销钉51和销片52紧固连接并夹紧副框20,从而通过窗洞模板30和副框20围合形成窗洞口,且副框20的锚固板22置于墙体模板之间的浇筑空间内。The sub-frame 20 is placed at the opening of the window to be formed, and the location of the sub-frame 20 is positioned and measured as required. The window hole template 30 is arranged at the window opening to be formed, one side of the window hole template 30 is pasted on the side of the corresponding sub-frame 21, and the other side of the window hole template 30 is connected and fixed with the corresponding wall template, as shown in Fig. 2 does not show the wall formwork, the window hole is the hole provided on the wall for installing windows, the window hole template 30 and the sub-frame 20 are arranged on the top, bottom and both sides of the window hole to be formed, so that the window hole can be used The template 30 and the sub-frame 20 form corresponding window openings on the poured wall. The bottom part of the window formwork 30 is placed on the corresponding positioning baffle 23, and the window formwork 30 can be quickly positioned and installed by the positioning baffle 23. The window formwork 30 on both sides of the subframe 20 is fastened and connected by pins 51 and pin pieces 52. The sub-frame 20 is clamped so that the window opening is formed by enclosing the window formwork 30 and the sub-frame 20, and the anchor plate 22 of the sub-frame 20 is placed in the pouring space between the wall formworks.
较佳地,窗洞模板30采用铝模板,在边框32上设置有供销钉51穿过的销钉孔,将两个窗洞模板30对应贴设于副框21的方形框体21的两侧部,且窗洞模板30的底部部分置于定位挡板23上,就完成了窗洞模板30和副框20的定位,而后将销钉51穿过副框20两侧的窗洞模板30的边框32上的销钉孔,再将销片52插入到销钉51上的销片孔内,从而将两个窗洞模板30连接紧固,且两个窗洞模板30将对应的副框20夹紧固定。Preferably, the window formwork 30 is an aluminum formwork, and the frame 32 is provided with pin holes for the pins 51 to pass through, and the two window formworks 30 are correspondingly attached to the two sides of the square frame body 21 of the subframe 21, and The bottom part of the window formwork 30 is placed on the positioning baffle 23, and the positioning of the window formwork 30 and the subframe 20 is completed, and then the pins 51 are passed through the pin holes on the frame 32 of the window formwork 30 on both sides of the subframe 20, Then insert the pin piece 52 into the pin piece hole on the pin 51 , so as to connect and fasten the two window hole templates 30 , and the two window hole templates 30 clamp and fix the corresponding sub-frame 20 .
这样的预埋结构使得副框20的固定牢固,安装便捷,且不会缠绕污染及损坏等的问题。Such a pre-embedded structure makes the fixing of the sub-frame 20 firm, easy to install, and will not cause problems such as pollution and damage.
作为本发明的一较佳实施方式,锚固板22的底端垂直连接有底板221。较佳地,底板221的中部与锚固板22的底端垂直连接。底板221贴设于墙体模板内侧的钢筋,从而为副框20提供了支撑力,使得副框20的安装更为稳定牢固。As a preferred embodiment of the present invention, the bottom end of the anchor plate 22 is vertically connected with a bottom plate 221 . Preferably, the middle portion of the bottom plate 221 is vertically connected to the bottom end of the anchor plate 22 . The bottom plate 221 is attached to the steel bars inside the wall formwork, thereby providing support for the sub-frame 20 and making the installation of the sub-frame 20 more stable and firm.
作为本发明的另一较佳实施方式,在墙体模板内的浇筑空间内浇筑混凝土形成墙体,且墙体内通过副框20和窗洞模板30形成有对应的窗洞口,方形框体21底部与窗洞口处的墙体表面相接触,定位挡板23和锚固板22埋设于对应的墙体内。利用露出于墙体的方形框体21作为窗户的安装基础,方便了窗户的安装。As another preferred embodiment of the present invention, concrete is poured in the pouring space in the wall formwork to form a wall, and a corresponding window opening is formed in the wall through the sub-frame 20 and the window opening formwork 30, and the bottom of the square frame body 21 In contact with the wall surface at the window opening, the positioning baffle plate 23 and the anchor plate 22 are embedded in the corresponding wall. The installation of the window is facilitated by using the square frame body 21 exposed on the wall as the installation base of the window.
作为本发明的又一较佳实施方式,在窗洞口处设置副框20和窗洞模板30时,将窗洞口侧部、顶部以及底部的副框20之间依次对接连接,将窗洞口侧部、顶部以及底部的窗洞模板30之间依次对接连接,在窗洞模板30的连接处可设置加固结构,以防止对接处产生漏浆。副框20间的对接连接,可通过连接角码来实现,副框20的端部斜切形成一45°的斜口,将连接角码设于两个副框20的连接处,令连接角码的一端插入到对应的副框20内的腔体211内,并从斜口处向腔体211注胶,通过注入的胶将连接角码的端部与副框20连接在一起,注胶后将两个副框20的斜口对接,从而完成了两个副框20的对接连接。As another preferred embodiment of the present invention, when the sub-frame 20 and the window template 30 are arranged at the window opening, the sub-frames 20 on the side, top and bottom of the window opening are sequentially butted and connected, and the side parts of the window opening, The top and bottom window hole formworks 30 are butt-connected sequentially, and a reinforcement structure may be provided at the joints of the window hole formworks 30 to prevent grout leakage at the joints. The butt connection between the subframes 20 can be realized by connecting the corners. The ends of the subframes 20 are obliquely cut to form a 45° bevel, and the connection corners are set at the junction of the two subframes 20 so that the connection angle One end of the code is inserted into the cavity 211 in the corresponding sub-frame 20, and glue is injected into the cavity 211 from the bevel, and the end of the connecting corner code is connected with the sub-frame 20 through the injected glue, and the glue is injected Finally, the oblique openings of the two sub-frames 20 are connected, thereby completing the butt connection of the two sub-frames 20 .
下面对本发明提供的副框的预埋方法进行说明。The pre-embedding method of the sub-frame provided by the present invention will be described below.
如图3所示,本发明副框的预埋方法,包括如下步骤:As shown in Figure 3, the pre-embedding method of the sub-frame of the present invention comprises the following steps:
施工墙体模板,并于墙体模板上留设与待形成的窗洞口12对应的开口;Construction of the wall formwork, and leaving an opening corresponding to the window opening 12 to be formed on the wall formwork;
提供上述的副框20,将副框20置于待形成的窗洞口12处;Provide the above-mentioned sub-frame 20, place the sub-frame 20 at the window opening 12 to be formed;
结合图2所示,提供窗洞模板30,将窗洞模板30设于待形成的窗洞口处,并将窗洞模板30的一侧部贴设于对应的副框20的侧部且窗洞模板30的底部部分置于对应的定位挡板23上,将窗洞模板30的另一侧部与对应的墙体模板连接固定;As shown in Fig. 2, a window hole template 30 is provided, the window hole template 30 is arranged at the window opening to be formed, and one side of the window hole template 30 is attached to the side of the corresponding sub-frame 20 and the bottom of the window hole template 30 Place partly on the corresponding positioning baffle plate 23, and connect and fix the other side of the window formwork 30 with the corresponding wall formwork;
将位于副框20两侧的两个窗洞模板30通过销钉51和销片52紧固连接从而夹紧副框20;Fasten and connect the two window templates 30 located on both sides of the sub-frame 20 through pins 51 and pins 52 to clamp the sub-frame 20;
将位于待形成的窗洞口12周缘的窗洞模板30依次对接连接,将位于待形成的窗洞口12周缘的副框20依次对接连接,从而窗洞模板30和副框20围合形成窗洞口;以及The window hole formwork 30 positioned at the periphery of the window hole 12 to be formed is sequentially butt-connected, and the sub-frames 20 positioned at the periphery of the window hole 12 to be formed are sequentially butt-connected, so that the window hole template 30 and the sub-frame 20 enclose the window hole; and
于墙体模板之间的浇筑空间内浇筑混凝土以形成墙体11,且锚固板22埋设于墙体11内。Concrete is poured in the pouring space between the wall templates to form the wall 11 , and the anchor plate 22 is embedded in the wall 11 .
本发明的预埋方法中的锚固板22一方面为副框20提供了牢固的连接基础,另一方面为副框20提供了防水功能,形成无渗漏结构,避免了副框20的安装处产成漏水的问题。定位挡板23,用于定位夹持副框20的方形框体21的窗洞模板,副框20与墙体模板一起安装,在浇筑好墙体后,该副框20就留在了墙体上,从而就完成了副框20的安装固定。利用窗洞模板夹持住副框20的方形框体21,且方形框体21也作为窗洞口的模板,使得副框20可与模板连接牢固稳定,提高了副框20的埋设效果及质量,还减少了现有后安装副框的多道施工工序,减少了交叉作业的工作量。腔体211一方面方便相邻的两个副框20的方形框体21间通过连接角码连接,另一方面还能够方便窗户的安装。The anchor plate 22 in the pre-embedding method of the present invention provides a firm connection foundation for the subframe 20 on the one hand, and provides a waterproof function for the subframe 20 on the other hand, forming a leak-free structure, avoiding the installation of the subframe 20 The problem of water leakage. The positioning baffle 23 is used to position the window formwork of the square frame body 21 holding the subframe 20. The subframe 20 is installed together with the wall formwork. After the wall is poured, the subframe 20 is left on the wall , thereby completing the installation and fixing of the sub-frame 20. The square frame body 21 of the subframe 20 is clamped by the window hole formwork, and the square frame body 21 is also used as a template for the window opening, so that the subframe 20 can be firmly and stably connected with the formwork, improving the embedding effect and quality of the subframe 20, and It reduces the multi-channel construction process of the existing post-installation sub-frame, and reduces the workload of cross-operation. On the one hand, the cavity 211 facilitates the connection between the square frame bodies 21 of two adjacent sub-frames 20 through connecting corners, and on the other hand, it also facilitates the installation of windows.
作为本发明的一较佳实施方式,将位于待形成的窗洞口周缘的副框依次对接连接,包括:As a preferred embodiment of the present invention, the sub-frames located at the periphery of the window hole to be formed are butt-connected sequentially, including:
将副框20的端部切割形成一斜口;Cutting the end of the sub-frame 20 to form a bevel;
提供连接角码,将连接角码设于相邻的两个副框20的连接处,并将连接角码的端部插设于对应的副框20内;Provide the connection angle code, set the connection angle code at the junction of two adjacent sub-frames 20, and insert the end of the connection angle code into the corresponding sub-frame 20;
从斜口处向副框20的腔体211内注胶以固定连接角码的端部,并将相邻的两个副框20的斜口对接,从而完成了相邻的两个副框的连接。Inject glue into the cavity 211 of the sub-frame 20 from the bevel to fix the ends of the connecting corners, and connect the bevels of the adjacent two sub-frames 20, thus completing the two adjacent sub-frames. connect.
作为本发明的另一较佳实施方式,还包括:As another preferred embodiment of the present invention, it also includes:
于锚固板22的底端垂直连接一底板221,在设置副框20时,将底板221贴设于墙体模板内对应的钢筋。A base plate 221 is vertically connected to the bottom of the anchor plate 22, and when the sub-frame 20 is installed, the base plate 221 is attached to the corresponding steel bars in the wall formwork.
利用设置的底板221可提高副框20设置的稳定性,该底板221在设置副框20时,抵靠于对应的墙体钢筋上,为副框20提供一定的支撑力。又佳地,底板221与对应的墙体钢筋固定连接。The stability of the sub-frame 20 can be improved by using the provided bottom plate 221 . When the sub-frame 20 is installed, the bottom plate 221 leans against the corresponding wall reinforcement to provide a certain supporting force for the sub-frame 20 . Also preferably, the bottom plate 221 is fixedly connected to the corresponding wall reinforcement.
本发明的预埋方法还包括:待墙体达到设计强度后,拆除墙体模板和窗洞模板,副框20留在墙体11上。接着在副框20的方形框体21上安装窗户41,窗户41的主框通过自攻钉42紧固连接在副框20的方形框体21上,在主框和副框20之间填设有聚氨酯泡沫剂43。然后在窗洞口12四周的墙体11上设置抹灰层13和保温层14,将抹灰层13设于墙体11的室内侧,该抹灰层13设于窗洞口12的顶部、底部以及侧部的墙体11上,将保温层14设于墙体11的室外侧,该保温层14设于窗洞口12的顶部、底部以及侧部的墙体11上,保温层14做防水坡度处理。抹灰层13和保温层14的厚度均大于副框20的方形框体的厚度,在抹灰层13和主框的连接处设置密封胶进行密封,在保温层14和主框的连接处设置密封胶进行密封。The pre-embedded method of the present invention also includes: after the wall body reaches the designed strength, the wall formwork and the window opening formwork are removed, and the sub-frame 20 remains on the wall body 11 . Then install window 41 on the square frame body 21 of subframe 20, the main frame of window 41 is fastened on the square frame body 21 of subframe 20 by self-tapping screw 42, fills between main frame and subframe 20 There is polyurethane foam 43. Then on the body of wall 11 around the window opening 12, a plastering layer 13 and an insulating layer 14 are set, and the plastering layer 13 is located on the indoor side of the body of wall 11, and the plastering layer 13 is located on the top, the bottom and the top of the window opening 12. On the body of wall 11 of the side portion, an insulation layer 14 is arranged on the outdoor side of the body of wall 11, and the insulation layer 14 is arranged on the top, bottom, and body of wall 11 of the side portion of the window opening 12, and the insulation layer 14 is treated with a waterproof gradient. . The thicknesses of the plastering layer 13 and the insulation layer 14 are all greater than the thickness of the square frame of the subframe 20, and a sealant is provided at the junction of the plastering layer 13 and the main frame for sealing, and a sealant is provided at the junction of the insulation layer 14 and the main frame. Sealant to seal.
以上结合附图实施例对本发明进行了详细说明,本领域中普通技术人员可根据上述说明对本发明做出种种变化例。因而,实施例中的某些细节不应构成对本发明的限定,本发明将以所附权利要求书界定的范围作为本发明的保护范围。The present invention has been described in detail above with reference to the embodiments of the accompanying drawings, and those skilled in the art can make various changes to the present invention according to the above description. Therefore, some details in the embodiments should not be construed as limiting the present invention, and the present invention will take the scope defined by the appended claims as the protection scope of the present invention.
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810987962.9A CN109025277B (en) | 2018-08-28 | 2018-08-28 | Auxiliary frame and pre-buried structure and method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810987962.9A CN109025277B (en) | 2018-08-28 | 2018-08-28 | Auxiliary frame and pre-buried structure and method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109025277A true CN109025277A (en) | 2018-12-18 |
CN109025277B CN109025277B (en) | 2021-08-10 |
Family
ID=64624835
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810987962.9A Active CN109025277B (en) | 2018-08-28 | 2018-08-28 | Auxiliary frame and pre-buried structure and method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109025277B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112196406A (en) * | 2020-11-18 | 2021-01-08 | 中铁十四局集团建筑工程有限公司 | Aluminum alloy door and window with embedded square cushion frame and construction method |
CN114382381A (en) * | 2022-01-11 | 2022-04-22 | 深圳市九易建筑科技有限公司 | Pre-embedded window frame fixing part and window frame structure |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1108725A (en) * | 1994-01-11 | 1995-09-20 | 庄永川 | The Mold and Construction Method of Integrated Pouring Concrete to Seal the Window Frame |
KR200402211Y1 (en) * | 2005-09-13 | 2005-11-29 | 박준석 | Gate guide fabrication synthetic resin door frame structure |
CN203879215U (en) * | 2014-05-21 | 2014-10-15 | 江苏省华建建设股份有限公司 | Aluminium alloy door-window frame component with auxiliary frame |
CN204590355U (en) * | 2015-05-11 | 2015-08-26 | 中亿丰建设集团股份有限公司 | LED flood lighting and curtain wall integral system |
CN204850891U (en) * | 2015-03-23 | 2015-12-09 | 杭州美市门窗科技有限公司 | Door and window for exempt from nail installation |
CN106088927A (en) * | 2016-08-02 | 2016-11-09 | 武汉中建幕墙有限公司 | Integrated door and window system and installation method thereof on prefabricated buildings PC component |
CN106837060A (en) * | 2017-04-05 | 2017-06-13 | 上海中建东孚投资发展有限公司 | A kind of auxiliary frame combined system of bridge insulation thermal resistance window frame |
CN206477740U (en) * | 2017-01-20 | 2017-09-08 | 江苏远翔装饰工程有限公司 | Assembled architecture door and window installation structure |
CN107620543A (en) * | 2017-11-20 | 2018-01-23 | 中建二局第二建筑工程有限公司 | A kind of door-window opening waterproofing node structure and outer door and window pre-buried steel pair frame construction method |
-
2018
- 2018-08-28 CN CN201810987962.9A patent/CN109025277B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1108725A (en) * | 1994-01-11 | 1995-09-20 | 庄永川 | The Mold and Construction Method of Integrated Pouring Concrete to Seal the Window Frame |
KR200402211Y1 (en) * | 2005-09-13 | 2005-11-29 | 박준석 | Gate guide fabrication synthetic resin door frame structure |
CN203879215U (en) * | 2014-05-21 | 2014-10-15 | 江苏省华建建设股份有限公司 | Aluminium alloy door-window frame component with auxiliary frame |
CN204850891U (en) * | 2015-03-23 | 2015-12-09 | 杭州美市门窗科技有限公司 | Door and window for exempt from nail installation |
CN204590355U (en) * | 2015-05-11 | 2015-08-26 | 中亿丰建设集团股份有限公司 | LED flood lighting and curtain wall integral system |
CN106088927A (en) * | 2016-08-02 | 2016-11-09 | 武汉中建幕墙有限公司 | Integrated door and window system and installation method thereof on prefabricated buildings PC component |
CN206477740U (en) * | 2017-01-20 | 2017-09-08 | 江苏远翔装饰工程有限公司 | Assembled architecture door and window installation structure |
CN106837060A (en) * | 2017-04-05 | 2017-06-13 | 上海中建东孚投资发展有限公司 | A kind of auxiliary frame combined system of bridge insulation thermal resistance window frame |
CN107620543A (en) * | 2017-11-20 | 2018-01-23 | 中建二局第二建筑工程有限公司 | A kind of door-window opening waterproofing node structure and outer door and window pre-buried steel pair frame construction method |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112196406A (en) * | 2020-11-18 | 2021-01-08 | 中铁十四局集团建筑工程有限公司 | Aluminum alloy door and window with embedded square cushion frame and construction method |
CN114382381A (en) * | 2022-01-11 | 2022-04-22 | 深圳市九易建筑科技有限公司 | Pre-embedded window frame fixing part and window frame structure |
Also Published As
Publication number | Publication date |
---|---|
CN109025277B (en) | 2021-08-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6738252B2 (en) | Attachment frame, window having attachment frame, precast wall body, and method of manufacturing and assembling them | |
CN100582421C (en) | Formwork method for concrete pillar | |
CN110284704A (en) | A kind of Assembled Building board post poured band formwork edge joint structure and its construction method | |
CN108000689B (en) | Combined template for concrete member with window frame, pouring method of combined template and concrete member | |
CN210622306U (en) | Assembly type floor post-cast strip template splicing structure | |
CN112942812A (en) | Positioning device for shear wall template and method for mounting template by using same | |
JPH11505900A (en) | Continuous formwork system for concrete buildings | |
CN109025277A (en) | Secondary frame and its pre-buried structure and method | |
CN114856181A (en) | Building pouring formwork support and construction method thereof | |
CN109868923B (en) | Construction method of bare concrete of loose-spliced wood formwork | |
CN212224608U (en) | Section bar for aluminum frame wood formwork, aluminum frame wood formwork and aluminum frame wood formwork assembly component | |
US20090095878A1 (en) | Multi-storey insulated concrete form structure having openings and method of construction | |
CN214942388U (en) | Frame post template structure | |
CN109057056B (en) | Fixing method for filling foam boards between expansion joints of shear wall | |
CN114809380A (en) | Full concrete outer wall construction process | |
CN214995933U (en) | Scaffold wall connecting piece wood formwork structure | |
CN208236013U (en) | The airtight cracking structure of biosecurity laboratory | |
CN220377578U (en) | Hollow prefabricated wallboard | |
JP6190002B2 (en) | Composite panel and method for manufacturing composite panel | |
JP2016104965A (en) | Construction method for heat insulation foundation and heat insulation form support used for constructing the same | |
CN114293657B (en) | Assembled building frame and assembling method thereof | |
CN111576638A (en) | Complete construction method for wallboard embedded part | |
CN110185170A (en) | A kind of wall modular tile | |
CN222745686U (en) | Wallboard installation template for assembled building | |
CN210177943U (en) | Formwork mechanism of assembled boundary beam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |