[go: up one dir, main page]

CN109025087A - It is a kind of heat preservation, mat formation rain water on roof pipe drainage arrangement and construction method - Google Patents

It is a kind of heat preservation, mat formation rain water on roof pipe drainage arrangement and construction method Download PDF

Info

Publication number
CN109025087A
CN109025087A CN201810871558.5A CN201810871558A CN109025087A CN 109025087 A CN109025087 A CN 109025087A CN 201810871558 A CN201810871558 A CN 201810871558A CN 109025087 A CN109025087 A CN 109025087A
Authority
CN
China
Prior art keywords
outer tube
roof
heat preservation
inner tube
rain water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810871558.5A
Other languages
Chinese (zh)
Inventor
弭维国
何彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201810871558.5A priority Critical patent/CN109025087A/en
Publication of CN109025087A publication Critical patent/CN109025087A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
    • E04D13/04Roof drainage; Drainage fittings in flat roofs, balconies or the like
    • E04D13/0404Drainage on the roof surface
    • E04D13/0445Drainage channels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
    • E04D13/16Insulating devices or arrangements in so far as the roof covering is concerned, e.g. characterised by the material or composition of the roof insulating material or its integration in the roof structure
    • E04D13/1687Insulating devices or arrangements in so far as the roof covering is concerned, e.g. characterised by the material or composition of the roof insulating material or its integration in the roof structure the insulating material having provisions for roof drainage

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The present invention provide it is a kind of heat preservation, mat formation rain water on roof pipe drainage arrangement and construction method, including roof construction layer, it further include waterproof built-in fitting, the waterproof built-in fitting is fixedly connected on the side wall of roof construction layer, the upper end of the waterproof built-in fitting is nested with outer tube, and the tube wall surface of the outer tube circumferentially offers the equidistant drainage hole of 2~4 rows, and the outer tube is embedded to be cased with inner tube, the top of said inner tube is fixedly connected with snap ring, and the lateral wall of the snap ring is fixedly connected on the top of outer tube.Structure of the invention is simple, easy to operate, and screed and insulating layer ponding are discharged from rain pipe using duct wall aperture, to reduce roofing infiltration probability, solves the problems, such as that current rain pipe cannot exclude screed and insulating layer internal water accumulation.

Description

It is a kind of heat preservation, mat formation rain water on roof pipe drainage arrangement and construction method
Technical field
The present invention relates to technical field of building construction, specially a kind of heat preservation is mated formation and rain water on roof pipe drainage arrangement and is applied Work method.
Background technique
Building roof is generally provided with insulating layer using flat roof deck form at present, and part accessible roof, which is additionally provided with, mats formation Layer.
With the increase for using the time, rainwater, and concrete cover and waterproof can be put aside in the mortar of mating formation of roofing Layer can also seep water, so as to cause insulating layer ponding.
But since current rain pipe laying is all that pvc pipe mouth leads to roofing, the ponding in screed and insulating layer without Method excludes, and accumulating over a long period will lead to waterproof damage layer and then lead to roof leakage.
Summary of the invention
It cannot exclude asking for screed and insulating layer internal water accumulation to solve current rain pipe mentioned above in the background art Topic, the present invention provide it is a kind of heat preservation, mat formation rain water on roof pipe drainage arrangement and construction method:
A kind of heat preservation, rain water on roof pipe drainage arrangement of mating formation, including roof construction layer further includes waterproof built-in fitting, described Waterproof built-in fitting is fixedly connected on the side wall of roof construction layer, and the upper end of the waterproof built-in fitting is nested with outer tube, the outer tube Tube wall surface circumferentially offer the equidistant drainage hole of 2~4 rows, the outer tube is embedded to be cased with inner tube, and the top of said inner tube is solid Surely it is connected with snap ring, the lateral wall of the snap ring is fixedly connected on the top of outer tube.
Preferably, it is coated with marine glue between the outer tube and snap ring, marine glue is coated between said inner tube and snap ring.
Preferably, the outer tube wall most descends the drainage hole of row and the upper surface of roof construction layer to be in the same plane.
Preferably, the length of said inner tube is 10cm longer than outer length of tube, and the caliber of the outer tube is bigger than the caliber of inner tube 1cm。
Preferably, the aperture of the drainage hole is 2~3mm.
Preferably, it is a kind of heat preservation, rain water on roof pipe drainage arrangement of mating formation construction method, comprising the following steps:
Step 1 buries waterproof built-in fitting in the side wall of roof construction layer;
Step 2, the different PVC mouthpiece of two root canal diameters of interception, as outer tube and inner tube;
Step 3 opens up the equidistant drainage hole of 2~4 rows in the side wall of outer tube;
Inner tube is nested in the inside of outer tube by step 4, installs snap ring on the top of inner and outer tubes, and with waterproof gluing It connects;
Outer tube, is nested in the top of waterproof built-in fitting by step 5, and with waterproof glue sticking.
Preferably, in step 2, PVC mouthpiece caliber needed for intercepting outer tube is than PVC interface needed for interception inner tube The big 1cm of pipe caliber, and the length of the inner tube intercepted is than outer pipe range 10cm.
Preferably, in step 3, it most descends the row of row after the drainage hole of the outer tube wall opens up position satisfaction installation Water hole is flushed with the upper surface of roof construction layer.
It is compared with prior art, the present invention having the following advantages and benefits:
1) heat preservation, mat formation rain water on roof pipe drainage arrangement and construction method, the draining aperture opened up by outer tube wall Screed and insulating layer internal water accumulation is discharged.
2) roofing water is discharged to rain pipe by inner tube by the heat preservation, mat formation rain water on roof pipe drainage arrangement and construction method It is interior, it can prevent roofing water from penetrating into insulating layer when being discharged.
Structure of the invention is simple, easy to operate, using duct wall aperture by screed and insulating layer ponding from rain pipe Discharge solves the problems, such as that current rain pipe cannot exclude screed and insulating layer internal water accumulation to reduce roofing infiltration probability.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention;
Fig. 2 is the structural schematic diagram of outer tube of the invention;
Fig. 3 is the structural schematic diagram of inner tube of the invention;
In figure: 1 outer tube, 2 inner tubes, 3 drainage holes, 4 snap rings, 5 waterproof built-in fittings, 6 roof construction layers.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to embodiments, to the present invention It is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to Limit the present invention.
With reference to the accompanying drawing and specific embodiment is further described application principle of the invention.
Embodiment one
A kind of heat preservation as shown in Figure 1 to Figure 3, rain water on roof pipe drainage arrangement of mating formation, including roof construction layer 6, are also wrapped Waterproof built-in fitting 5 is included, waterproof built-in fitting 5 is fixedly connected on the side wall of roof construction layer 6, and the upper end of waterproof built-in fitting 5 is nested with Outer tube 1, the tube wall surface of outer tube 1 circumferentially offer the equidistant drainage hole 3 of 2~4 rows, and outer tube 1 is embedded to be cased with inner tube 2, inner tube 2 Top is fixedly connected with snap ring 4, and the lateral wall of snap ring 4 is fixedly connected on the top of outer tube 1.
Wherein, it is coated with marine glue between outer tube 1 and snap ring 4, marine glue, outer tube 1 are coated between inner tube 2 and snap ring 4 Side wall most descends the drainage hole 3 of row and the upper surface of roof construction layer 6 to be in the same plane, and the length of inner tube 2 is than 1 length of outer tube The caliber of long 10cm, outer tube 1 are 1cm bigger than the caliber of inner tube 2, and the aperture of drainage hole 3 is 2~3mm.
It is a kind of heat preservation, rain water on roof pipe drainage arrangement of mating formation construction method, comprising the following steps:
Step 1 buries waterproof built-in fitting 5 in the side wall of roof construction layer 6;
Step 2, the different PVC mouthpiece of two root canal diameters of interception intercept needed for outer tube 1 as outer tube 1 and inner tube 2 PVC mouthpiece caliber is 1cm bigger than PVC mouthpiece caliber needed for interception inner tube 2, and the length of the inner tube 2 intercepted is longer than outer tube 1 10cm;
Step 3 opens up the equidistant drainage hole 3 of 2~4 rows in the side wall of outer tube 1, and the drainage hole 3 of 1 side wall of outer tube opens up position It most descends the drainage hole 3 of row to flush with the upper surface of roof construction layer 6 after setting satisfaction installation;
Inner tube 2 is nested in the inside of outer tube 1 by step 4, the top of inner tube 2 and outer tube 1 install snap ring 4, and with prevent Glue bonding;
Outer tube 1, is nested in the top of waterproof built-in fitting 5 by step 5, and with waterproof glue sticking.
It should be noted that, in this document, the terms "include", "comprise" or its any other variant are intended to non-row His property includes, so that the process, method, article or equipment for including a series of elements not only includes those elements, and And further include other elements that are not explicitly listed, or further include for this process, method, article or equipment institute it is intrinsic Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including institute State in the process, method, article or equipment of element that there is also other identical elements.
The above is made skilled artisans appreciate that or realizing this hair in specific embodiment party of the invention It is bright.Various modifications to these embodiments will be apparent to one skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest scope of cause.

Claims (8)

1. a kind of heat preservation, rain water on roof pipe drainage arrangement of mating formation, including roof construction layer (6), which is characterized in that further include waterproof Built-in fitting (5), the waterproof built-in fitting (5) are fixedly connected on the side wall of roof construction layer (6), the waterproof built-in fitting (5) Upper end is nested with outer tube (1), and the tube wall surface of the outer tube (1) circumferentially offers the equidistant drainage hole of 2~4 rows (3), described outer Pipe (1) is embedded to be cased with inner tube (2), and the top of said inner tube (2) is fixedly connected with snap ring (4), and the lateral wall of the snap ring (4) is solid Surely it is connected to the top of outer tube (1).
2. a kind of heat preservation according to claim 1, rain water on roof pipe drainage arrangement of mating formation, which is characterized in that the outer tube (1) it is coated with marine glue between snap ring (4), is coated with marine glue between said inner tube (2) and snap ring (4).
3. a kind of heat preservation according to claim 1, rain water on roof pipe drainage arrangement of mating formation, which is characterized in that the outer tube (1) side wall most descends the drainage hole (3) of row and the upper surface of roof construction layer (6) to be in the same plane.
4. a kind of heat preservation according to claim 1, rain water on roof pipe drainage arrangement of mating formation, which is characterized in that said inner tube (2) length is 10cm longer than outer tube (1) length, and the caliber of the outer tube (1) is 1cm bigger than the caliber of inner tube (2).
5. a kind of heat preservation according to claim 1, rain water on roof pipe drainage arrangement of mating formation, which is characterized in that the draining The aperture in hole (3) is 2~3mm.
6. the construction party of a kind of heat preservation, rain water on roof pipe drainage arrangement of mating formation described in any one according to claim 1~5 Method, which comprises the following steps:
Step 1 buries waterproof built-in fitting (5) in the side wall of roof construction layer (6);
Step 2, the different PVC mouthpiece of two root canal diameters of interception, as outer tube (1) and inner tube (2);
Step 3 opens up the equidistant drainage hole of 2~4 rows (3) in the side wall of outer tube (1);
Inner tube (2) is nested in the inside of outer tube (1) by step 4, installs snap ring (4) on the top of inner tube (2) and outer tube (1), And with waterproof glue sticking;
Outer tube (1), is nested in the top of waterproof built-in fitting (5) by step 5, and with waterproof glue sticking.
7. the construction method of a kind of heat preservation according to claim 6, rain water on roof pipe drainage arrangement of mating formation, feature exist In in step 2, PVC mouthpiece caliber needed for interception outer tube (1) is than PVC mouthpiece caliber needed for interception inner tube (2) Big 1cm, and the length of the inner tube (2) intercepted is 10cm longer than outer tube (1).
8. the construction method of a kind of heat preservation according to claim 6, rain water on roof pipe drainage arrangement of mating formation, feature exist In in step 3, it most descends the drainage hole (3) of row after the drainage hole (3) of outer tube (1) side wall opens up position satisfaction installation It is flushed with the upper surface of roof construction layer (6).
CN201810871558.5A 2018-08-02 2018-08-02 It is a kind of heat preservation, mat formation rain water on roof pipe drainage arrangement and construction method Pending CN109025087A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810871558.5A CN109025087A (en) 2018-08-02 2018-08-02 It is a kind of heat preservation, mat formation rain water on roof pipe drainage arrangement and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810871558.5A CN109025087A (en) 2018-08-02 2018-08-02 It is a kind of heat preservation, mat formation rain water on roof pipe drainage arrangement and construction method

Publications (1)

Publication Number Publication Date
CN109025087A true CN109025087A (en) 2018-12-18

Family

ID=64648753

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810871558.5A Pending CN109025087A (en) 2018-08-02 2018-08-02 It is a kind of heat preservation, mat formation rain water on roof pipe drainage arrangement and construction method

Country Status (1)

Country Link
CN (1) CN109025087A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111910946A (en) * 2020-08-18 2020-11-10 厦门顶巢建筑修缮研究院有限公司 Construction method of concrete roof water leakage repairing system
CN114164914A (en) * 2021-12-10 2022-03-11 中国十七冶集团有限公司 Multifunctional connecting pipe for floor drain structural layer
CN115142535A (en) * 2022-07-04 2022-10-04 中国十七冶集团有限公司 A multifunctional ground drainage facility for wet rooms

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3234719A1 (en) * 1982-09-18 1984-03-22 Jens Ing.(grad.) 6458 Rodenbach Drefahl METHOD AND DEVICE FOR PRODUCING A ROOF CONSTRUCTION
CN201695582U (en) * 2010-04-30 2011-01-05 唐山德生防水材料有限公司 Double-layer waterproof and double-layer water draining structure for heat-insulating roof
CN201972324U (en) * 2010-12-30 2011-09-14 唐山德生防水材料有限公司 Double-layer drainage floor drain
CN203583797U (en) * 2013-11-04 2014-05-07 深圳市建工集团股份有限公司 Invisible drainage connecting device in decorative heat-preserving layer of roof
CN203716414U (en) * 2014-02-25 2014-07-16 中铁建工集团有限公司 Straight double-layer drainage device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3234719A1 (en) * 1982-09-18 1984-03-22 Jens Ing.(grad.) 6458 Rodenbach Drefahl METHOD AND DEVICE FOR PRODUCING A ROOF CONSTRUCTION
CN201695582U (en) * 2010-04-30 2011-01-05 唐山德生防水材料有限公司 Double-layer waterproof and double-layer water draining structure for heat-insulating roof
CN201972324U (en) * 2010-12-30 2011-09-14 唐山德生防水材料有限公司 Double-layer drainage floor drain
CN203583797U (en) * 2013-11-04 2014-05-07 深圳市建工集团股份有限公司 Invisible drainage connecting device in decorative heat-preserving layer of roof
CN203716414U (en) * 2014-02-25 2014-07-16 中铁建工集团有限公司 Straight double-layer drainage device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111910946A (en) * 2020-08-18 2020-11-10 厦门顶巢建筑修缮研究院有限公司 Construction method of concrete roof water leakage repairing system
CN111910946B (en) * 2020-08-18 2022-04-05 厦门顶巢建筑修缮研究院有限公司 Construction method of concrete roof water leakage repairing system
CN114164914A (en) * 2021-12-10 2022-03-11 中国十七冶集团有限公司 Multifunctional connecting pipe for floor drain structural layer
CN115142535A (en) * 2022-07-04 2022-10-04 中国十七冶集团有限公司 A multifunctional ground drainage facility for wet rooms

Similar Documents

Publication Publication Date Title
CN109025087A (en) It is a kind of heat preservation, mat formation rain water on roof pipe drainage arrangement and construction method
KR20100025172A (en) Draining trap for building floor
CN103790181A (en) Daylight illumination device pier base and manufacturing method thereof
KR20210071549A (en) Outside Insulation And Waterproof Member for Underground Structure And Method for Constructing the Same
CN209924297U (en) Breather pipe leak protection subassembly and breather pipe joint
CN113863582A (en) Inverted roof structure and construction method thereof
CN209855082U (en) Water retaining joint of ventilation pipeline
CN110905053A (en) Construction method for indoor drainage pipeline penetrating through floor slab
CN212156084U (en) Pre-buried antiseep PVC drainage sleeve
CN208456124U (en) A kind of drainage pipeline passes through the pre-embedded device of floor
CN211472901U (en) Composite heat insulation system with embedded part
CN112628477A (en) Drain pipe pre-embedding device with stretching and water drainage preventing functions and installation method
CN211058162U (en) Mounting structure of pre-buried electric wire tube in building roof
CN218091374U (en) Anti-leakage device for heat-preservation nail
CN207064863U (en) A kind of new waterproof sleeve pipe
CN113389258A (en) Concealed water collecting and draining structure on floor of shower room
CN210508099U (en) Waterproof node structure of roofing pipe in water
CN102352675B (en) Roofing eave waterproof structure
CN111779157A (en) Underground outdoor wall structure and construction method thereof
CN213233841U (en) Receiving piece for preventing leakage of sewer position
CN204826160U (en) Balcony surface drainage mouth structure
CN109811972B (en) Breather pipe joint and leak-proof assembly
CN210049496U (en) Waterproof improvement node structure of roofing pipe in water
CN105239732A (en) Extension roof pipe for preventing rainwater leakage and construction method thereof
CN219691169U (en) Waterproof light wear-resisting protective layer structure of roofing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181218

RJ01 Rejection of invention patent application after publication