CN109022743A - A kind of processing technology of steel level oil bushing - Google Patents
A kind of processing technology of steel level oil bushing Download PDFInfo
- Publication number
- CN109022743A CN109022743A CN201810917135.2A CN201810917135A CN109022743A CN 109022743 A CN109022743 A CN 109022743A CN 201810917135 A CN201810917135 A CN 201810917135A CN 109022743 A CN109022743 A CN 109022743A
- Authority
- CN
- China
- Prior art keywords
- quenching
- processing technology
- steel
- level oil
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 54
- 239000010959 steel Substances 0.000 title claims abstract description 54
- 238000012545 processing Methods 0.000 title claims abstract description 32
- 238000005516 engineering process Methods 0.000 title claims abstract description 23
- 238000010791 quenching Methods 0.000 claims abstract description 51
- 230000000171 quenching effect Effects 0.000 claims abstract description 51
- 239000003208 petroleum Substances 0.000 claims abstract description 19
- 238000005496 tempering Methods 0.000 claims abstract description 18
- 238000009413 insulation Methods 0.000 claims abstract description 10
- 238000000034 method Methods 0.000 claims abstract description 9
- 238000004513 sizing Methods 0.000 claims abstract description 7
- 238000009785 tube rolling Methods 0.000 claims abstract description 7
- 238000004519 manufacturing process Methods 0.000 claims description 17
- 230000002262 irrigation Effects 0.000 claims description 11
- 238000003973 irrigation Methods 0.000 claims description 11
- 230000008901 benefit Effects 0.000 abstract description 4
- 238000012797 qualification Methods 0.000 abstract description 4
- 238000010438 heat treatment Methods 0.000 abstract description 2
- 230000009466 transformation Effects 0.000 abstract description 2
- 238000001816 cooling Methods 0.000 abstract 1
- 238000007493 shaping process Methods 0.000 abstract 1
- 238000003754 machining Methods 0.000 description 5
- 238000005553 drilling Methods 0.000 description 3
- 230000008859 change Effects 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 229910000760 Hardened steel Inorganic materials 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 239000003034 coal gas Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 239000000155 melt Substances 0.000 description 1
- 239000003129 oil well Substances 0.000 description 1
- 230000010355 oscillation Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 230000006032 tissue transformation Effects 0.000 description 1
Classifications
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D9/00—Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
- C21D9/08—Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for tubular bodies or pipes
- C21D9/085—Cooling or quenching
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P15/00—Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D11/00—Process control or regulation for heat treatments
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Crystallography & Structural Chemistry (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Heat Treatment Of Articles (AREA)
Abstract
The invention discloses a kind of processing technology of steel level oil bushing, specific procedure of processing is as follows: melt is made steel in electric furnace, and pipe is made in vacuum gas filling;It is perforated to pipe, tube rolling, sizing, and the press quenching in quenching press;It is sufficiently tempered and keeps the temperature after quenching, obtain petroleum casing pipe;It is machined after cooling and shaping.A kind of processing technology of steel level oil bushing of the present invention, step 1 tempering heating and thermal insulation time are 160 minutes, can guarantee abundant tempering of the steel pipe in furnace, it is ensured that the transformation of tissue is abundant;For step 2 when quenching steel pipe tail portion, because there are difference for harden ability end to end, entire lowering is to 790 DEG C when producing steel pipe tail portion, to guarantee that performance is substantially close end to end;Product quality is improved, petroleum casing pipe mechanical property adjusted significantly improves, and qualification rate is significantly promoted, and improves economic benefit, brings better prospect of the application.
Description
Technical field
The present invention relates to petroleum casing pipe field, in particular to a kind of processing technology of steel level oil bushing.
Background technique
Petroleum casing pipe is the steel pipe for being used to support oil, the gas well borehole wall, to guarantee that drilling process carries out and oil entire after complete well
The normal operation of well.Every mouth well will use several layers of casings according to different drilling depth and geological condition.Casing is wanted after going into the well
Using well cementing of cement, it is different from oil pipe, drilling rod, it is not possible to reuse, belong to disposable consumable material.So casing
Consumption accounts for 70% or more of whole oil well pipes;
Petroleum casing pipe is a kind of tube product that petroleum industry is widely used, standard oil casing grade mechanical performance index
It is required that stringenter, yield strength range is very narrow, and difficulty is very big for existing quenching, tempering furnace situation.When production
The fluctuation of steel pipe yield strength is larger, and the product mechanical property after processing is bad, cannot fully meet standard requirements, one when processing
Secondary inspection qualification rate is less than 60%.The processing technology of steel pipe is promoted, release production capacity becomes the task of top priority;For this purpose, it is proposed that one
The processing technology of kind steel level oil bushing.
Summary of the invention
The main purpose of the present invention is to provide a kind of processing technologys of steel level oil bushing, can effectively solve background skill
The problems in art.
To achieve the above object, the technical scheme adopted by the invention is as follows:
A kind of processing technology of steel level oil bushing, the procedure of processing of the petroleum casing pipe are as follows:
(1), melt is made steel in electric furnace, and pipe is made in vacuum gas filling;
(2), it is perforated to pipe, tube rolling, sizing, and the press quenching in quenching press;
(3), it is sufficiently tempered and keeps the temperature after quenching, obtain petroleum casing pipe;
(4), it is machined after being cooled and shaped.
Preferably, tempering insulation time is 127-160 minutes in the step (3).
Preferably, in the step (2) when quenching steel pipe tail portion, temperature is 790 DEG C -800 DEG C.
Preferably, irrigation pressure is 1.5kg-4.0kg in quenching press in the step (2).
Preferably, the support wheel rotation speed in the step (2) in quenching press is 75r/min-95r/min.
Preferably, adjustment again all is carried out to whole burners of electric furnace before each step (1) production.
Preferably, it is utilized after the step (1) during stop production to overhaul and clears up gas piping, calibrated meter precision.
Preferably, the finished product length of step (4) machining is less than 11.5 meters.
Preferably, the melt in the step (1) in electric furnace is steel scrap.
Preferably, irrigation pressure is 1.5kg-3.0kg in quenching press in the step (2).
Compared with prior art, the invention has the following beneficial effects:
(1) the step 1 tempering heating and thermal insulation time is 160 minutes, can guarantee abundant tempering of the steel pipe in furnace, it is ensured that tissue
Transformation it is abundant;
(2) step 2 is when quenching steel pipe tail portion, because harden ability is there are difference end to end, entire lowering when producing steel pipe tail portion
To 790 DEG C, to guarantee that performance is substantially close end to end;Irrigation pressure is forced into 3.0kg in quenching press in step 2, can reduce
Performance difference end to end;Support wheel rotation speed in step 2 in quenching press is 95r/min, and steel pipe can be made circumferentially to organize more
Uniformly;
The present invention improves product quality, and petroleum casing pipe mechanical property adjusted significantly improves, and qualification rate significantly mentions
It rises, improves economic benefit, using effect is more preferable relative to traditional approach.
Detailed description of the invention
Fig. 1 is a kind of overall structure flow chart of the processing technology of steel level oil bushing of the present invention.
Specific embodiment
To be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, below with reference to
Specific embodiment, the present invention is further explained.
Tempering insulation time is 127 minutes in step (1) in original processing technology, in hardened steel in step (2)
Temperature is 800 DEG C when pipe tail portion, and irrigation pressure is 1.5kg in quenching press in step (2), quenching press support wheel rotation in step (2)
Rotary speed is 75r/min,
Tempering insulation time extended to 160 minutes from 127 minutes in step (1) in processing technology of the invention, guaranteed steel
Abundant tempering in Guan Lu, it is ensured that the transformation of tissue is abundant;In step (2) when quenching steel pipe tail portion, temperature is whole from 800 DEG C
Body declines 10 DEG C to 790 DEG C, because harden ability end to end is there are difference, 10 DEG C of entire lowering of steel pipe tail portion when production, to guarantee head
Tail performance is substantially close;Irrigation pressure from 1.5kg is forced into 3.0kg in quenching press in step (2), and it is poor can to reduce performance end to end
Value;95r/min of the support wheel rotation speed by original 75r/min change till now in step (2) in quenching press, makes steel pipe
Circumferential tissue is more uniform;Adjustment again all has been carried out to tempering furnace whole burner before each step (1) production, has restored burner work
Condition, temperature stability are further strengthened;Using gas piping is cleared up during stop production to overhaul after step (1), calibrate
Accuracy of instrument reduces the pressure oscillation of coal gas supply, strengthens Control for Kiln Temperature precision.
Embodiment 1
The procedure of processing of the petroleum casing pipe is as follows:
(1), melt is made steel in electric furnace, and pipe is made in vacuum gas filling;
(2), it is perforated to pipe, tube rolling, sizing, and the press quenching in quenching press;
(3), it is sufficiently tempered and keeps the temperature after quenching, obtain petroleum casing pipe;
(4), it is machined after being cooled and shaped.
Tempering insulation time is 127 minutes in the step (3).
In the step (2) when quenching steel pipe tail portion, temperature is 800 DEG C.
Irrigation pressure is 1.5kg in quenching press in the step (2).
Support wheel rotation speed in the step (2) in quenching press is 75r/min.
Adjustment again all has been carried out to whole burners of electric furnace before each step (1) production.
It is utilized after the step (1) during stop production to overhaul and clears up gas piping, calibrated meter precision.
The finished product length of step (4) machining is less than 11.5 meters.
Melt in the step (1) in electric furnace is steel scrap.
Embodiment 2
The procedure of processing of the petroleum casing pipe is as follows:
(1), melt is made steel in electric furnace, and pipe is made in vacuum gas filling;
(2), it is perforated to pipe, tube rolling, sizing, and the press quenching in quenching press;
(3), it is sufficiently tempered and keeps the temperature after quenching, obtain petroleum casing pipe;
(4), it is machined after being cooled and shaped.
Tempering insulation time is 160 minutes in the step (3).
In the step (2) when quenching steel pipe tail portion, temperature is 800 DEG C.
Irrigation pressure is 1.5kg in quenching press in the step (2).
Support wheel rotation speed in the step (2) in quenching press is 75r/min.
Adjustment again all has been carried out to tempering furnace whole burner before each step (1) production.
It is utilized after the step (1) during stop production to overhaul and clears up gas piping, calibrated meter precision.
The finished product length of step (4) machining is less than 11.5 meters.
Melt in the step (1) in electric furnace is steel scrap.
Embodiment 3
The procedure of processing of the petroleum casing pipe is as follows:
(1), melt is made steel in electric furnace, and pipe is made in vacuum gas filling;
(2), it is perforated to pipe, tube rolling, sizing, and the press quenching in quenching press;
(3), it is sufficiently tempered and keeps the temperature after quenching, obtain petroleum casing pipe;
(4), it is machined after being cooled and shaped.
Tempering insulation time is 160 minutes in the step (3).
In the step (2) when quenching steel pipe tail portion, temperature is 800 DEG C.
Irrigation pressure is 3.0kg in quenching press in the step (2).
Support wheel rotation speed in the step (2) in quenching press is 95r/min.
Adjustment again all has been carried out to tempering furnace whole burner before each step (1) production.
It is utilized after the step (1) during stop production to overhaul and clears up gas piping, calibrated meter precision.
The finished product length of step (4) machining is less than 11.5 meters.
Melt in the step (1) in electric furnace is steel scrap.
Embodiment 4
The procedure of processing of the petroleum casing pipe is as follows:
(1), melt is made steel in electric furnace, and pipe is made in vacuum gas filling;
(2), it is perforated to pipe, tube rolling, sizing, and the press quenching in quenching press;
(3), it is sufficiently tempered and keeps the temperature after quenching, obtain petroleum casing pipe;
(4), it is machined after being cooled and shaped.
Tempering insulation time is 160 minutes in the step (3).
In the step (2) when quenching steel pipe tail portion, temperature is 790 DEG C.
Irrigation pressure is 3.0kg in quenching press in the step (2).
Support wheel rotation speed in the step (2) in quenching press is 95r/min.
Adjustment again all has been carried out to tempering furnace whole burner before each step (1) production.
It is utilized after the step (1) during stop production to overhaul and clears up gas piping, calibrated meter precision.
The finished product length of step (4) machining is less than 11.5 meters.
Melt in the step (1) in electric furnace is steel scrap.
Table 1-4 is the force and energy measurement that the steel level oil bushing that embodiment 1-4 is prepared carries out, and test result is as follows
Table:
Table 1
Table 2
Table 3
Table 4
By table 1-4 experimental data it is found that the steel level oil bushing that the application is prepared has good mechanical property, mention
High product quality improves economic benefit so as to cause product qualification rate promotion, and separately the embodiment 4 known to table 1-4 is optimal
Selection.
The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention.The technology of the industry
Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this
The principle of invention, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes
Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its
Equivalent thereof.
Claims (10)
1. a kind of processing technology of steel level oil bushing, it is characterised in that: the procedure of processing of the petroleum casing pipe is as follows:
(1), melt is made steel in electric furnace, and pipe is made in vacuum gas filling;
(2), it is perforated to pipe, tube rolling, sizing, and the press quenching in quenching press;
(3), it is sufficiently tempered and keeps the temperature after quenching, obtain petroleum casing pipe;
(4), it is machined after being cooled and shaped.
2. a kind of processing technology of steel level oil bushing according to claim 1, it is characterised in that: in the step (3)
Tempering insulation time is 127-160 minutes.
3. a kind of processing technology of steel level oil bushing according to claim 1, it is characterised in that: in the step (2)
When quenching steel pipe tail portion, temperature is 790 DEG C -800 DEG C.
4. a kind of processing technology of steel level oil bushing according to claim 1, it is characterised in that: in the step (2)
Irrigation pressure is 1.5kg-4.0kg in quenching press.
5. a kind of processing technology of steel level oil bushing according to claim 1, it is characterised in that: in the step (2)
Support wheel rotation speed in quenching press is 75r/min-95r/min.
6. a kind of processing technology of steel level oil bushing according to claim 1, it is characterised in that: each step
(1) adjustment again all is carried out to whole burners of electric furnace before production.
7. a kind of processing technology of steel level oil bushing according to claim 1, it is characterised in that: step (1) knot
It is utilized after beam during stop production to overhaul and clears up gas piping, calibrated meter precision.
8. a kind of processing technology of steel level oil bushing according to claim 1, it is characterised in that: step (4) machine
The finished product length of tool processing is less than 11.5 meters.
9. a kind of processing technology of steel level oil bushing according to claim 1, it is characterised in that: in the step (1)
Melt in electric furnace is steel scrap.
10. a kind of processing technology of steel level oil bushing according to claim 4, it is characterised in that: in the step (2)
Irrigation pressure is 1.5kg-3.0kg in quenching press.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810917135.2A CN109022743A (en) | 2018-08-13 | 2018-08-13 | A kind of processing technology of steel level oil bushing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810917135.2A CN109022743A (en) | 2018-08-13 | 2018-08-13 | A kind of processing technology of steel level oil bushing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109022743A true CN109022743A (en) | 2018-12-18 |
Family
ID=64633912
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810917135.2A Pending CN109022743A (en) | 2018-08-13 | 2018-08-13 | A kind of processing technology of steel level oil bushing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109022743A (en) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101892443A (en) * | 2010-07-09 | 2010-11-24 | 天津钢管集团股份有限公司 | High strength and high toughness petroleum casing pipe at steel grade with yield strength of 170-180ksi and manufacturing method thereof |
CN103194693A (en) * | 2013-04-26 | 2013-07-10 | 宝鸡石油钢管有限责任公司 | High-strength and high-toughness oil casing and manufacturing method thereof |
-
2018
- 2018-08-13 CN CN201810917135.2A patent/CN109022743A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101892443A (en) * | 2010-07-09 | 2010-11-24 | 天津钢管集团股份有限公司 | High strength and high toughness petroleum casing pipe at steel grade with yield strength of 170-180ksi and manufacturing method thereof |
CN103194693A (en) * | 2013-04-26 | 2013-07-10 | 宝鸡石油钢管有限责任公司 | High-strength and high-toughness oil casing and manufacturing method thereof |
Non-Patent Citations (1)
Title |
---|
邵国栋等: ""大型石油钢管外淋内喷淬火装置的研制"", 《中国重型装备》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102179681A (en) | Pipe mold manufacturing process adopting continuous-casting blank to forge and roll rough blank periodically | |
CN105903766A (en) | Production system and production method used for large-size titanium and titanium alloy square and rectangular pipes | |
CN111485163B (en) | Preparation method of 125ksi casing pipe suitable for volume fracturing of shale gas/oil | |
CN109022743A (en) | A kind of processing technology of steel level oil bushing | |
CN102962291A (en) | Method for forging and forming pipe die blank by pilgrim mill | |
CN102303212B (en) | Process for manufacturing lining board of wet-spraying machine | |
CN103611907A (en) | Comprehensive control method of medium-carbon niobium-containing steel narrow face lateral fissure of thick plate blank | |
CN106319367B (en) | SAGD methods the heavy crude producing tough petroleum casing pipes of 125ksi high and its manufacturing method | |
CN106761451B (en) | Complex geological condition coal rock layer creeps into bionical flow liner drop resistance drilling rod and drilling method | |
CN109623285A (en) | A kind of manufacture craft of high rigidity papermaking hollow roll | |
CN103286151A (en) | Preparation device and method for manufacturing inside and/or outside thickened aluminum alloy pipes with variable cross sections | |
CN208532929U (en) | A kind of oil bit laser cladding apparatus | |
CN201746559U (en) | Tool for quickly processing iron notch mud sleeve | |
CN100546929C (en) | A kind of manufacturing method of transparent quartz diffusion reaction furnace tube | |
CN202530101U (en) | Drill bit for blast furnace taphole driller | |
CN104668716B (en) | Device for precisely positioning cutting torch of flame cutting machine | |
CN205732956U (en) | A kind of continuous casting production Quick change upper nozzle | |
CN102962293A (en) | Manufacturing method for pipe die by using steel ingot great-reducing-forming blank | |
CN103614613B (en) | Drill pipe joint and preparation method thereof | |
CN103451361B (en) | The method of stainless steel bottom blowing gas | |
CN103481038A (en) | Machining method for high-station structure of drill rod | |
CN105710147B (en) | Drawing type expands the production method of super-large diameter J55 sleeve pipes processed | |
CN102978365A (en) | Heat treatment method of large reducing forming pipe die | |
CN104446531A (en) | Primary-secondary opening runner for casting | |
CN105568168A (en) | Process for manufacturing lining board of concrete conveyor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181218 |