[go: up one dir, main page]

CN108949132A - A method of for the solid sand de-plugging treatment fluid of fine silt oil reservoir sand control, sand control treatment fluid system and with its sand control - Google Patents

A method of for the solid sand de-plugging treatment fluid of fine silt oil reservoir sand control, sand control treatment fluid system and with its sand control Download PDF

Info

Publication number
CN108949132A
CN108949132A CN201710390271.6A CN201710390271A CN108949132A CN 108949132 A CN108949132 A CN 108949132A CN 201710390271 A CN201710390271 A CN 201710390271A CN 108949132 A CN108949132 A CN 108949132A
Authority
CN
China
Prior art keywords
sand
treatment fluid
fluid
sand control
plugging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710390271.6A
Other languages
Chinese (zh)
Other versions
CN108949132B (en
Inventor
刘约安
李景全
秦世群
马兆斌
杨学文
张薇
李莉
李苗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Sinopec Henan Oilfield Branch Co No 1 Oil Production Plant
Original Assignee
China Petroleum and Chemical Corp
Sinopec Henan Oilfield Branch Co No 1 Oil Production Plant
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Sinopec Henan Oilfield Branch Co No 1 Oil Production Plant filed Critical China Petroleum and Chemical Corp
Priority to CN201710390271.6A priority Critical patent/CN108949132B/en
Publication of CN108949132A publication Critical patent/CN108949132A/en
Application granted granted Critical
Publication of CN108949132B publication Critical patent/CN108949132B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/56Compositions for consolidating loose sand or the like around wells without excessively decreasing the permeability thereof
    • C09K8/57Compositions based on water or polar solvents
    • C09K8/575Compositions based on water or polar solvents containing organic compounds

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
  • Lubricants (AREA)

Abstract

The present invention relates to a kind of for the solid sand de-plugging treatment fluid of fine silt oil reservoir sand control, sand control treatment fluid system and with the method for its sand control, belongs to technical field of petroleum extraction.The solid sand de-plugging treatment fluid includes each component of following mass content: 8 ~ 12% solid sand de-plugging agents, 0.5 ~ 1.5% cleanup additive, 0.5 ~ 1.5% corrosion inhibiter, 1 ~ 2% ferrous stability, 1 ~ 2% mutual solvent, 1 ~ 2% ammonium chloride, surplus is water.The sand control treatment fluid system is made of pretreatment fluid, prepad fluid, treatment fluid and displacement fluid, and volume ratio is successively are as follows: 4 ~ 6:1 ~ 2:2-3:1-2, while also disclosing the method with the sand control treatment fluid system sand control.Sand control treatment fluid system each component synergistic effect forms bonding coat in fine sandstone and clay particle surface, cementing solid sand, after which implements, sand control obvious effect of increasing production.

Description

A kind of solid sand de-plugging treatment fluid for fine silt oil reservoir sand control, sand control processing Liquid system and method with its sand control
Technical field
It is a kind of for the solid sand de-plugging treatment fluid of fine silt oil reservoir sand control, sand control treatment fluid system and with its sand control Method belongs to technical field of petroleum extraction.
Background technique
In oilfield development process, the low fine silt oil reservoir oil well of some cementing strengths in process of production, often can be with out Sand influences, and to conventional sand output well, can be solved with conventional mechanical sand control method, but part producing well output be fine silt, Shale or clay-type substance cause frequent holddown and well workover.It shakes out for this kind of, conventional mechanical sand control difficulty is larger, even if anti- Sand success will also result in oil well output decline, ideal sand control purpose be not achieved.
Chinese patent (publication No.: 105019870 A, date of publication: 2015.11.04) discloses a kind of sand control side Method, method includes the following steps: 1) using derrick by sand control pipe tripping in oil well, and the sand control pipe is made to reach oil reservoir Top 9m-11m;Wellhead assembly is installed in oil well mouth again;2) pump truck for being used to convey sand prevention material is passed through into manifold of ground and well Mouth device connection;3) oil pipe is made just to squeeze prepad fluid, so that prepad fluid and low-temperature setting promotor are squeezed to the stratum for needing sand control; 4) so that oil pipe is just squeezed sand prevention material, the sand prevention material that load fluid carries is squeezed to the stratum for needing sand control;5) make oil pipe just Displacement fluid is squeezed, to sand prevention material sufficiently be squeezed to stratum, sand prevention material is avoided excessively to remain in pit shaft;6) closing well 2 days- 3 days, so that sand prevention material solidifies on stratum.The well sand prevention method that the invention provides can be such that stratum solidifies, and prevent oil well from sending out The case where giving birth in debt, collapsing, or even scrapping, it is ensured that oil exploitation is gone on smoothly.
Chinese patent (publication No.: CN 102330545A, date of publication: 2012.01.25) discloses a kind of heavy crude reservoir oil Well anti-sand method, and specifically disclose the following contents: firstly, preparation has: acting flow string, tripping in sand-flushing pipe column is visited Sand face and sand washing, and pitching pressure testing act sand-flushing pipe column;Drifting pipe cleaning, well-flushing are carried out, acts drifting tubing string.Sand control construction packet Include: it is deep to carry out magnetic orientation school for tripping in sand control pipe;It is qualified to carry out pressure testing;Setting, open fill channel;Direct circulation load fluid with Quartz sand carries out back-up sand;It gives up, above mention sand control pipe, act Back-off Pipe String;Complete well, tripping in oil recovery flow string.The invention The sand that method is ejected oil reservoir using the quartz sand filled in nitriding cutting seam sieve tube is kept off in outside, is avoided stratum sand drain and is entered pump Cylinder, causes holddown.But this method is only preferable to the sand control effect of common heavy oil, is applied to heavy oil wells sand control, primary success Rate 100%, individual well continuous production are more than 600 days.
But following disadvantage is still had with the above-mentioned prior art:
(1) mechanical sand control method can not prevent and treat the lesser fine silt of partial size, shale and clay-type substance;
(2) sand control screen is easily blocked by fine silt and shale, and oil well drop is caused to produce or do not go out;
(3) sand control pipe of the G.I.H Yi Beisha that gives up is buried, and when salvaging easily causes overhaul accident;
(4) fracturing sand control or filling anti-sand complex procedures, operating cost are high;
(5) it is higher to block Capability Requirement to interlayer for fracturing sand control technique;
(6) part shallow-layer unconsolidated reservoir crude oil freezing point is higher, and external treatment fluid easily causes cold damage to stratum.
Summary of the invention
First mesh of the invention is to provide a kind of solid sand de-plugging treatment fluid for fine silt oil reservoir sand control, be somebody's turn to do Gu sand de-plugging treatment fluid can be used in the sand control processing of fine silt oil reservoir oil well.
Second mesh of the invention is to provide a kind of sand control treatment fluid system for fine silt oil reservoir oil well, the sand control Treatment fluid system is made of pretreatment fluid, prepad fluid, solid sand de-plugging treatment fluid and displacement fluid, treatment fluid system each component collaboration Effect forms bonding coat, cementing solid sand in fine sandstone and clay particle surface.
Third mesh of the invention be to provide it is a kind of with above-mentioned sand control treatment fluid system to fine silt oil reservoir sand control Method, this method successively injects into well pretreatment fluid, prepad fluid, treatment fluid, displacement fluid, and closing well reacts after a certain period of time, Can the production of complete well, after which implements, sand control obvious effect of increasing production.
To achieve the goals above, technical scheme is as follows:
A kind of solid sand de-plugging treatment fluid for fine silt oil reservoir sand control, each component comprising following mass content: 8 ~ 12% Gu sand de-plugging agent, 0.5 ~ 1.5% cleanup additive, 0.5 ~ 1.5% corrosion inhibiter, 1 ~ 2% ferrous stability, 1 ~ 2% mutual solvent, 1 ~ 2% Ammonium chloride, surplus are water.
The solid sand de-plugging agent is that XT-68 consolidates sand de-plugging agent.
The cleanup additive is polyol non-ionic surfactant.The cleanup additive is XT-05 cleanup additive.
The corrosion inhibiter is condensed-nuclei aromatics quaternary ammonium salt.Preferably IS-130 corrosion inhibiter.
The mutual solvent is ethylene glycol monoethyl ether, can reduce the absorption of corrosion inhibiter and surfactant in the earth formation, Prevent emulsion plugging.Preferably TH-11 mutual solvent.
The ferrous stability is made of iron-retention agent and iron reducer etc., can delay iron gel in acidization Precipitating, prevents secondary injury.Preferably SCA ferrous stability.
A kind of sand control treatment fluid system for fine silt oil reservoir oil well, by pretreatment fluid, prepad fluid, solid sand de-plugging processing Liquid and displacement fluid composition, the volume ratio of the pretreatment fluid, prepad fluid, solid sand de-plugging treatment fluid and displacement fluid are as follows: 40 ~ 60:10 ~ 20:20-30:10-20;The solid sand de-plugging treatment fluid is solid sand de-plugging treatment fluid described above.
The pretreatment fluid includes each component of following mass content: 2 ~ 4% cleaning agents, surplus are water.Described is clear Lotion is nonionic surfactant.The cleaning agent is AE-121 cleaning agent.
The prepad fluid include following mass content each component: 8 ~ 12% hydrochloric acid, 0.5 ~ 1.5% cleanup additive, 0.5 ~ 1.5% corrosion inhibiter, 1 ~ 2% ferrous stability, 1 ~ 2% mutual solvent, 1 ~ 2% ammonium chloride, surplus are water.
The displacement fluid includes each component of following mass content: 0.5 ~ 1.5% cleanup additive, 1 ~ 2% mutual solvent, 1 ~ 2% Ammonium chloride, surplus are water.
A method of using above-mentioned sand control treatment fluid system to fine silt oil reservoir sand control, comprising the following steps: with The discharge capacity of the L/min of 260 L/min ~ 420 successively injects into well pretreatment fluid, prepad fluid, solid sand de-plugging treatment fluid, displacement fluid, After closing well reacts 12 ~ 48 h, with 500 m3The discharge capacity of/h is passed through nitrogen to shaft bottom and helps 1 ~ 3 h of row.
After pretreatment fluid, prepad fluid, solid sand de-plugging treatment fluid, displacement fluid are injected into well, working solution enter after reservoir with Physical-chemical reaction occurs for bottom mineral, forms bonding coat, cementing solid sand, to hinder in fine sandstone and clay particle surface Stop the fine migration because of caused by liquid flowing, achievees the purpose that solid sand, Gu while sand, further reaction hydrolysis is realized The purpose of removing clog in deep reservoir solves the problems, such as that oil well drop caused by being blocked as formation sand production and fine migration is produced and even stops well.
Part shallow-layer unconsolidated reservoir crude oil freezing point is higher, and external treatment fluid can cause cold damage to stratum, in order to avoid Cold damage is caused to stratum, the temperature of the pretreatment fluid is higher than oil well measure well section formation temperature 8 ~ 15.
Compared with the prior art, beneficial effects of the present invention are as follows:
(1) present invention can effectively prevent the lesser fine silt of partial size, shale and the clay class that mechanical sand control method can not prevent and treat Substance;
(2) purpose that removing clog in deep reservoir may be implemented while solid sand, avoids seepage channel and sand screen is blocked by fine silt And the problem of causing oil well drop to produce;
(3) the construction technology step is simple, is not required to sand fracturing sand control, and underground is given up without sand screen, it is possible to prevente effectively from overhaul Fishing, condition be suitble to when can fixed tubular column construction, reduce flow chart, reduce measure risk;
(4) construction pump injection pressure power is lower than formation fracture pressure, and it is lower to block Capability Requirement to interlayer;
(5) loose sand production petroleum reservoir crude oil freezing point is high, which heats pretreatment fluid, can avoid external liquid and makes to stratum At cold damage, meet the production requirement to fine silt sand control of oil recovery factory.
Specific embodiment
1, raw materials used and equipment is as follows in the present invention:
AE-121 cleaning agent: Nanyang Teng Yuan petroleum Engineering Technological Service Co., Ltd provides;
XT-68 consolidates sand de-plugging agent: Xuan Tai Industrial Co., Ltd. of Xinxiang City provides;
XT-05 cleanup additive: Beijing Baofeng spring Petrotechnik Ltd. provides;
IS-130 corrosion inhibiter: Henan Oil Field Fei Ya industry parent company provides;
SCA ferrous stability: Beijing Baofeng spring Petrotechnik Ltd. provides;
TH-11 mutual solvent: Henan Oil Field Fei Ya industry parent company provides;
Hydrochloric acid and ammonium chloride are general commercial goods;
Equipment: 700 type pump trucks.
2, embodiment
Embodiment 1
The sand control treatment fluid system of the present embodiment is made of pretreatment fluid, prepad fluid, solid sand de-plugging treatment fluid and displacement fluid, described The volume ratio of pretreatment fluid, prepad fluid, solid sand de-plugging treatment fluid and displacement fluid are as follows: 50:10:20:10.
The pretreatment fluid is grouped as by each group of following mass content: 2% AE-121 cleaning agent, 98% water.
The prepad fluid is grouped as by each group of following mass content: 12% hydrochloric acid, 0.5% XT-05 cleanup additive, 1.5% IS-130 corrosion inhibiter, 2%SCA ferrous stability, 2%TH-11 mutual solvent, 2%NH4Cl, 80% water, the hydrochloric acid are technical grade The hydrochloric acid that mass fraction is 31%.
The solid sand de-plugging treatment fluid is grouped as by each group of following mass content: 10% XT-68 consolidate sand de-plugging agent, 0.5%XT-05 cleanup additive, 2% IS-130 corrosion inhibiter, 2%SCA ferrous stability, 2% TH-11 mutual solvent, 1%NH4Cl, surplus For water.
The displacement fluid is grouped as by each group of following mass content: 0.5% XT-05 cleanup additive, 2% TH-11 dissolve each other Agent, 1% ammonium chloride, surplus are water.
Pretreatment fluid, prepad fluid, solid sand de-plugging treatment fluid and the displacement fluid is stirring evenly preparation with liquid pool respectively It forms.
Embodiment 2
The sand control treatment fluid system of the present embodiment is made of pretreatment fluid, prepad fluid, solid sand de-plugging treatment fluid and displacement fluid, described The volume ratio of pretreatment fluid, prepad fluid, solid sand de-plugging treatment fluid and displacement fluid are as follows: 45:12:30:15.
The pretreatment fluid is grouped as by each group of following mass content: 2% AE-121 cleaning agent and 98% water are being matched Stirring mixture forms in liquid pool.
The prepad fluid is grouped as by each group of following mass content: 10% hydrochloric acid, 0.5% XT-05 cleanup additive, 1.5% IS-130 corrosion inhibiter, 2%SCA ferrous stability, 2%TH-11 mutual solvent, 2% NH4Cl and the water of surplus in liquid pool with stirring Uniformly form.
The solid sand de-plugging treatment fluid is grouped as by each group of following mass content: 12% XT-68 consolidate sand de-plugging agent, 0.5% XT-05 cleanup additive, 2% IS-130 corrosion inhibiter, 2%SCA ferrous stability, 2% TH-11 mutual solvent, 1%NH4Cl and remaining The water of amount is with stirring evenly in liquid pool.
The displacement fluid is grouped as by each group of following mass content: 0.5% XT-05 cleanup additive, 2% TH-11 dissolve each other The water of agent, 1% ammonium chloride and surplus is with stirring evenly in liquid pool.
Pretreatment fluid, prepad fluid, solid sand de-plugging treatment fluid and the displacement fluid is stirring evenly preparation with liquid pool respectively It forms.
Embodiment 3
The sand control treatment fluid system of the present embodiment is made of pretreatment fluid, prepad fluid, solid sand de-plugging treatment fluid and displacement fluid, described The volume ratio of pretreatment fluid, prepad fluid, solid sand de-plugging treatment fluid and displacement fluid are as follows: 60:20:25:20.
The pretreatment fluid is grouped as by each group of following mass content: 3.5% AE-121 type cleaning agent and 96.5% Water is formed with stirring mixture in liquid pool.
The prepad fluid is grouped as by each group of following mass content: 8.0 % hydrochloric acid, 1.0% XT-05 cleanup additive, 0.5% IS-130 corrosion inhibiter, 1.0%SCA ferrous stability, 1.8%TH-11 mutual solvent, 1.0% NH4Cl and the water of surplus exist With being stirred evenly in liquid pool.
The solid sand de-plugging treatment fluid is grouped as by each group of following mass content: 8% XT-68 consolidate sand de-plugging agent, 1.0% XT-05 cleanup additive, 1.5% IS-130 corrosion inhibiter, 1.2%SCA ferrous stability, 1.0% TH-11 mutual solvent, 1.7% NH4Cl and the water of surplus in liquid pool with stirring evenly.
The displacement fluid is grouped as by each group of following mass content: 1.5% XT-05 cleanup additive, 1.2% TH-11 are mutual The water of solvent, 2.0% ammonium chloride and surplus is with stirring evenly in liquid pool.
The pretreatment fluid, prepad fluid, solid sand de-plugging treatment fluid and displacement fluid are matched stirring evenly with liquid pool respectively It makes.
Embodiment 4
The sand control treatment fluid system of the present embodiment is made of pretreatment fluid, prepad fluid, solid sand de-plugging treatment fluid and displacement fluid, described The volume ratio of pretreatment fluid, prepad fluid, solid sand de-plugging treatment fluid and displacement fluid are as follows: 40:15:22:18.
The pretreatment fluid is grouped as by each group of following mass content: 5% AE-121 cleaning agent and 95% water are being matched Stirring mixture forms in liquid pool.
The prepad fluid is grouped as by each group of following mass content: 9 % hydrochloric acid, 1.5% XT-05 cleanup additive, 1.0% IS-130 corrosion inhibiter, 1.4%SCA sections ion stabilizer, 1.0%TH-11 mutual solvent, 1.2% NH4Cl and the water of surplus are matching liquid It is stirred evenly in pond.
The solid sand de-plugging treatment fluid is grouped as by each group of following mass content: 9.0% XT-68 consolidate sand de-plugging agent, 1.5% XT-05 cleanup additive, 1.8% IS-130 corrosion inhibiter, 1.0%SCA ferrous stability, 1.5% TH-11 mutual solvent, 2.0% NH4Cl and the water of surplus in liquid pool with stirring evenly.
The displacement fluid is grouped as by each group of mass content: 0.8% XT-05 cleanup additive, 1.0%TH-11 mutual solvent, 1.6% ammonium chloride and the water of surplus in liquid pool with stirring evenly.
The pretreatment fluid, prepad fluid, solid sand de-plugging treatment fluid and displacement fluid are matched stirring evenly with liquid pool respectively It makes.
Embodiment 5
Sand control treatment fluid system in embodiment 1 is acted on a bite producing well of two sections of the oil field Shuan He core, Quan Jing by the present embodiment Produce H 222Layer, well spacing detachment layer 8m, formation sand production is serious, and sample examination analysis, the median particle size that shakes out is 0.125mm, adds Upper viscosity of crude is higher (stock tank oil viscosity 3866mPas at 46.5 DEG C), gum asphaltic content 40.36%, shale Content 10.1% can not be produced normally always, and successively carrying out extension filter sand control, frac-pack, oxidation de-plugging etc., repeatedly sand control de-plugging is arranged It applies, still can not normally be produced after measure, effect of increasing production is undesirable.
Sand control measure site operation is carried out to the well using the sand control treatment fluid system of embodiment 1, using former well casing column, together 2 700 type pump trucks of Shi Qidong, directly successively squeeze into 50 m of pretreatment fluid from casing3, 10 m of prepad fluid3Gu sand de-plugging treatment fluid 20 m3With 10 m of displacement fluid3, in implementation process, pretreatment fluid when in use first with boiler car heat pre-treatment liquid to 60 DEG C, and Control discharge capacity is 260 L/min, after closing well reacts 24 hours, using nitrogen vehicle with 500Nm3The discharge capacity of/h is passed through nitrogen to shaft bottom The row of helping 1 hour.Using screw pump complete well production, by not going out before measure, to measure after produce 11 tons of liquid daily, 5.9 tons of oil-producing of day.Output Liquid sand content is down to 0.1 ‰ by 0.5 ‰, normally produces 487 days at present, adds up to increase 1074.5 tons of oil, still continuous and effective, keep Increase day by day 2.7 tons of oil, sand control obvious effect of increasing production.
Measure validity period 487 days after above method implementation, effective fine silt control efficiency, relatively conventional acidification are realized Radius 2-3m, the process radius 5m or more have achieved the effect that removing clog in deep reservoir, while solid using the squeezing of fixed tubular column casing Sand de-plugging saves 15.3 ten thousand yuan of operating cost, realizes the purpose of cost efficiency.
Embodiment 6
The present embodiment is tested with a bite producing well of the sand control treatment fluid system in embodiment 2 to Xia'ermen oilfield, the well Perforations adding list adopts H2Ⅱ25Substratum is opened after pumping repeatedly because of the not fuel-displaced operation rectification of well card, is finally played pipe inspection pump, is risen in pump by fine silt It blocks, tail pipe has 4 rice bran oil silt particles.Assay, median grain diameter d50=0.105mm, partial size is smaller, and conventional mechanical sand control difficulty is big, Viscosity of crude 770mPa s at 50 DEG C, gum asphaltic content 31.3%, formation sand production is serious, and frequent holddown does not go out, multiple operation Rectification, can not normally produce always.
Sand control measure site operation is carried out to the well using the sand control treatment fluid system in embodiment 2, while starting 3 700 type pump trucks, squeeze pressure control within 10Mpa, and treatment radius 4m successively squeezes into pretreatment fluid 45m3, when use needs It is heated to 60 DEG C;Prepad fluid 12m3Gu sand de-plugging treatment fluid 30m3, 15 m of displacement fluid3, after closing well reacts 48 hours, use nitrogen Vehicle is with 500Nm3The discharge capacity of/h is passed through nitrogen to shaft bottom and helps row 3 hours.
Well production is pumped using tubing string of sand setting, the well is not by going out to highest day oil-producing 11.3t, wellhead after measure Sample, production fluid sand content are reduced to 0.15 ‰, have added up to increase 894 tons of oil, still continuous and effective at present, have kept 3 tons of the oil that increases day by day, continuously Normal production 202 days, does not occur well card and stops well problem, illustrate preferably to realize fine silt oil reservoir sand control requirement.

Claims (10)

1. a kind of solid sand de-plugging treatment fluid for fine silt oil reservoir sand control, which is characterized in that at the solid sand de-plugging Manage each component that liquid includes following mass content: 8 ~ 12% solid sand de-plugging agents, 0.5 ~ 1.5% cleanup additive, 0.5 ~ 1.5% corrosion inhibiter, 1 ~ 2% ferrous stability, 1 ~ 2% mutual solvent, 1 ~ 2% ammonium chloride, surplus are water.
2. solid sand de-plugging treatment fluid according to claim 1, which is characterized in that the solid sand de-plugging agent is solid for XT-68 Sand de-plugging agent;The cleanup additive is polyol non-ionic surfactant;The corrosion inhibiter is condensed-nuclei aromatics quaternary ammonium salt; The ferrous stability includes iron-retention agent and iron reducer;The mutual solvent includes ethylene glycol monoethyl ether.
3. solid sand de-plugging treatment fluid according to claim 1, which is characterized in that the cleanup additive is XT-05 cleanup additive; The corrosion inhibiter is IS-130 corrosion inhibiter;The ferrous stability is SCA ferrous stability;The mutual solvent is TH-11 mutual solvent.
4. a kind of sand control treatment fluid system for fine silt oil reservoir oil well, which is characterized in that by pretreatment fluid, prepad fluid, consolidate Sand de-plugging treatment fluid and displacement fluid composition, the volume ratio of the pretreatment fluid, prepad fluid, solid sand de-plugging treatment fluid and displacement fluid Are as follows: 40 ~ 60:10 ~ 20:20-30:10-20;The solid sand de-plugging treatment fluid is solid sand de-plugging treatment fluid described in claim 1.
5. sand control treatment fluid system according to claim 4, which is characterized in that the pretreatment fluid includes following quality The each component of content: 2 ~ 4% cleaning agents, surplus are water;The cleaning agent is nonionic surfactant.
6. sand control treatment fluid system according to claim 5, which is characterized in that the cleaning agent is AE-121 cleaning Agent.
7. sand control treatment fluid system according to claim 4, which is characterized in that the prepad fluid includes that following quality contains The each component of amount: 8 ~ 12% hydrochloric acid, 0.5 ~ 1.5% cleanup additive, 0.5 ~ 1.5% corrosion inhibiter, 1 ~ 2% ferrous stability, 1 ~ 2% are mutually Solvent, 1 ~ 2% ammonium chloride, surplus are water.
8. sand control treatment fluid system according to claim 4, which is characterized in that the displacement fluid includes that following quality contains The each component of amount: 0.5 ~ 1.5% cleanup additive, 1 ~ 2% mutual solvent, 1 ~ 2% ammonium chloride, surplus are water.
9. a kind of method using sand control treatment fluid system as claimed in claim 4 to fine silt oil reservoir sand control, feature It is, comprising the following steps: with the discharge capacity of the L/min of 260 L/min ~ 420 successively by pretreatment fluid, prepad fluid, treatment fluid, top Inject into well for liquid, after closing well reacts 12 ~ 48 h, with 500 m3The discharge capacity of/h is passed through nitrogen to shaft bottom and helps 1 ~ 3 h of row.
10. the method for sand control according to claim 9, which is characterized in that the temperature of the pretreatment fluid is higher than oil well 8 ~ 15 DEG C of measure well section formation temperature.
CN201710390271.6A 2017-05-27 2017-05-27 Sand consolidation and blockage removal treatment fluid for sand prevention of fine silt reservoir oil well, sand prevention treatment fluid system and sand prevention method using sand consolidation and blockage removal treatment fluid system Active CN108949132B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710390271.6A CN108949132B (en) 2017-05-27 2017-05-27 Sand consolidation and blockage removal treatment fluid for sand prevention of fine silt reservoir oil well, sand prevention treatment fluid system and sand prevention method using sand consolidation and blockage removal treatment fluid system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710390271.6A CN108949132B (en) 2017-05-27 2017-05-27 Sand consolidation and blockage removal treatment fluid for sand prevention of fine silt reservoir oil well, sand prevention treatment fluid system and sand prevention method using sand consolidation and blockage removal treatment fluid system

Publications (2)

Publication Number Publication Date
CN108949132A true CN108949132A (en) 2018-12-07
CN108949132B CN108949132B (en) 2021-03-16

Family

ID=64495065

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710390271.6A Active CN108949132B (en) 2017-05-27 2017-05-27 Sand consolidation and blockage removal treatment fluid for sand prevention of fine silt reservoir oil well, sand prevention treatment fluid system and sand prevention method using sand consolidation and blockage removal treatment fluid system

Country Status (1)

Country Link
CN (1) CN108949132B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111022011A (en) * 2019-12-03 2020-04-17 中国石油化工股份有限公司 Construction method of foamable resin sand consolidation agent for argillaceous fine silt oil reservoir
CN112727422A (en) * 2020-12-21 2021-04-30 新疆永升能源有限责任公司 Sand-carrying liquid squeezing reservoir transformation method
CN112877046A (en) * 2021-01-18 2021-06-01 中国石油化工股份有限公司 Deep thickened oil blocking remover for oil well as preparation method and use method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1861980A (en) * 2006-05-17 2006-11-15 王洪新 Injection pretreatment method for oil water well
CN102226078A (en) * 2011-04-19 2011-10-26 中国石油天然气股份有限公司 Oil well sand prevention pretreatment agent for improving sand prevention effect and application thereof
CN104109528A (en) * 2013-08-13 2014-10-22 中国石油化工股份有限公司 Acidifying liquid capable of sand stabilization and plug removal, and preparation method thereof
CN105255466A (en) * 2015-10-28 2016-01-20 中国石油化工股份有限公司 Slow blockage removing agent for oil well and blockage removing method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1861980A (en) * 2006-05-17 2006-11-15 王洪新 Injection pretreatment method for oil water well
CN102226078A (en) * 2011-04-19 2011-10-26 中国石油天然气股份有限公司 Oil well sand prevention pretreatment agent for improving sand prevention effect and application thereof
CN104109528A (en) * 2013-08-13 2014-10-22 中国石油化工股份有限公司 Acidifying liquid capable of sand stabilization and plug removal, and preparation method thereof
CN105255466A (en) * 2015-10-28 2016-01-20 中国石油化工股份有限公司 Slow blockage removing agent for oil well and blockage removing method

Non-Patent Citations (8)

* Cited by examiner, † Cited by third party
Title
尹光伟等: "花场油田酸化解堵用酸液体系的评价与应用 ", 《石油化工应用》 *
张明等: "SZ36-1油田稠油储层解堵酸化技术研究 ", 《非常规油气》 *
王凯等: "下二门油田稠油热采井高压砾石充填防砂工艺 ", 《石油地质与工程》 *
袁玉柱等: "MN油田出砂原因配套技术 ", 《内蒙古石油化工》 *
陶磊等: "稠油油藏水平井泡沫酸解堵技术 ", 《石油钻探技术》 *
饶鹏等: "青海涩北气田第四系疏松粉细砂岩气藏防砂工艺试验研究与评价 ", 《天然气地球科学》 *
高翔等: "镇北油田致密储层注水井复合酸化技术 ", 《天然气与石油》 *
黄雷等: "涠洲11-1-A1井酸化实验分析 ", 《海洋石油》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111022011A (en) * 2019-12-03 2020-04-17 中国石油化工股份有限公司 Construction method of foamable resin sand consolidation agent for argillaceous fine silt oil reservoir
CN111022011B (en) * 2019-12-03 2022-03-18 中国石油化工股份有限公司 Construction method of foamable resin sand consolidation agent for argillaceous fine silt oil reservoir
CN112727422A (en) * 2020-12-21 2021-04-30 新疆永升能源有限责任公司 Sand-carrying liquid squeezing reservoir transformation method
CN112877046A (en) * 2021-01-18 2021-06-01 中国石油化工股份有限公司 Deep thickened oil blocking remover for oil well as preparation method and use method thereof
CN112877046B (en) * 2021-01-18 2024-01-05 中国石油化工股份有限公司 Deep thickened oil blocking remover for oil well and preparation method and application method thereof

Also Published As

Publication number Publication date
CN108949132B (en) 2021-03-16

Similar Documents

Publication Publication Date Title
CN112175596B (en) Temporary plugging agent for high-efficiency plugging and fracturing in deep oil and gas reservoirs, its preparation method, and large fracture high-pressure fracturing process
CN103937475B (en) Carbon dioxide acidification blocking remover and process of not reversely discharging raffinate after acidification
CN107575183B (en) Process is made in a kind of tune-uncoupling for water injection well
CN104963672B (en) Reservoir stratum transformation method for forming seam net by temporarily blocking blast holes with clean steering materials
CN106593389B (en) Fracturing method for realizing high-angle natural fracture oil reservoir by adopting permanent plugging agent
CN105255467B (en) A kind of composite blockage relieving agent for tight sandstone reservoir
CN110552656B (en) Method for fixed-point crack initiation of low-permeability layer of water flooded well
CN110159239B (en) Vertical well large-scale hydraulic fracturing oil jacket co-injection fracturing method
CN103603644A (en) Fracturing method capable of recycling fracturing fluid for sandstone gas reservoir fracturing construction
CN108949132A (en) A method of for the solid sand de-plugging treatment fluid of fine silt oil reservoir sand control, sand control treatment fluid system and with its sand control
CN109826590A (en) A kind of old well water blockoff fracturing process of hypotonic oil gas field High water cut
CN1995269A (en) Chemical formula and process for removing organic block adjacent to oil well area
CN106753299A (en) Selective water plugging agent for thin oil well and preparation method and application thereof
CN106958438B (en) A kind of method for removing blockage of polymer flooding blocking well
CN105134151B (en) Hot nitrogen energization Viscosity Reduction And Stimulation
CN114015429A (en) A method for preparing water-based fracturing fluid by using water-based fracturing flowback fluid
CN113356820A (en) Fracturing method
CN108659809B (en) Preparation method of concentrated solution based on continuous fracturing
CN115142830A (en) Yield and efficiency increasing method for fracturing and reforming heavy oil reservoir
CN103952130A (en) Temporary blocking gel for low-pressure oil-gas well and preparation method thereof
CN114686200B (en) Dry-method and acidification integrated double-thickening fracturing method, fracturing fluid and preparation method thereof
CN105694839B (en) A kind of heat from hydrogenation chemistry solution components and its application in horizontal well volume increase
CN110028946A (en) Solid acid rod for water injection well and preparation and injection method thereof
CN116220622B (en) Exploitation system and method for developing hydrate by using artificial reservoir
CN115822539B (en) A supercritical carbon dioxide injection composite foam sand-carrying fracturing method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant