[go: up one dir, main page]

CN108941465A - Coremaking curing method, system and equipment - Google Patents

Coremaking curing method, system and equipment Download PDF

Info

Publication number
CN108941465A
CN108941465A CN201810908133.7A CN201810908133A CN108941465A CN 108941465 A CN108941465 A CN 108941465A CN 201810908133 A CN201810908133 A CN 201810908133A CN 108941465 A CN108941465 A CN 108941465A
Authority
CN
China
Prior art keywords
coremaking
temperature
curing
adjusting parameter
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810908133.7A
Other languages
Chinese (zh)
Other versions
CN108941465B (en
Inventor
桑海峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Mingzhi Technology Co Ltd
Original Assignee
Suzhou Mingzhi Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Mingzhi Technology Co Ltd filed Critical Suzhou Mingzhi Technology Co Ltd
Priority to CN201810908133.7A priority Critical patent/CN108941465B/en
Publication of CN108941465A publication Critical patent/CN108941465A/en
Application granted granted Critical
Publication of CN108941465B publication Critical patent/CN108941465B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C9/00Moulds or cores; Moulding processes
    • B22C9/12Treating moulds or cores, e.g. drying, hardening
    • B22C9/123Gas-hardening

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Molds, Cores, And Manufacturing Methods Thereof (AREA)
  • Heating, Cooling, Or Curing Plastics Or The Like In General (AREA)

Abstract

The embodiment of the invention discloses a kind of coremaking curing method, system and equipment.The described method includes: including: temperature, the pressure in blowing pipe channel and the current curing time span for acquiring core box interior, as process data;Coremaking is constantly updated according to the process data and solidifies adjusting parameter, and adjusting parameter is solidified according to updated coremaking and adjusts coremaking curing operation.The embodiment of the present invention can increase process monitoring in coremaking solidification process, realize feedback regulation control, reduce the cost of labor in coremaking solidification process.

Description

Coremaking curing method, system and equipment
Technical field
The present embodiments relate to core-making technique more particularly to a kind of coremaking curing methods, system and equipment.
Background technique
Core making machine is the general designation of core shooter and shell core machine, is the equipment for manufacturing overlay film sand shell core using hot box process, uses In producing the sand core for casting, wherein sand core is the cavity body structure being used to form in casting.Core making machine needs are completed at the same time Back-up sand and the work of consolidation, and hardened in the core box of heat immediately, it is now widely used in foundry machinery industry.
Existing core making machine can realize life by setting heter temperature and curing time in production solidification process It produces, if the solidification temperature or solidifying pressure of blowout are not up to demand, will affect product solidification effect and product quality.Wherein, Solidifying Conventional process parameters involved in control includes heter temperature, solidifying pressure, curing time, clarification time.
But these Conventional process parameters can only be set by technical staff by human-computer interaction interface.Usually, technology Personnel rule of thumb set above-mentioned parameter, if the temperature of heating is fixed, will cause energy waste;If curing time is solid It is fixed, production efficiency can be reduced.Moreover, during coremaking is cured, influence factor (environment, sand, mold temperature) can be with Environment, seasonal variations cause to be difficult to targetedly adjust parameters, it is difficult to guarantee product quality.
Summary of the invention
The embodiment of the invention provides a kind of coremaking curing method, system and equipment, can increase in coremaking solidification process Add process monitoring, realize feedback regulation control, reduces the cost of labor in coremaking solidification process.
In a first aspect, the embodiment of the invention provides a kind of coremaking curing methods, comprising:
Temperature, the pressure in blowing pipe channel and the current curing time span for acquiring core box interior, as process Data;
Coremaking is constantly updated according to the process data and solidifies adjusting parameter, and adjustment ginseng is solidified according to updated coremaking Number adjustment coremaking curing operation.
Second aspect, the embodiment of the invention also provides a kind of coremaking curing systems, using described in the embodiment of the present invention Method, comprising:
Process data acquisition module, for acquiring the temperature of core box interior, pressure and solidification in blowing pipe channel Time span, as process data;
Coremaking solidifies adjusting parameter determining module, for constantly updating coremaking solidification adjustment ginseng according to the process data Number, and adjusting parameter is solidified according to updated coremaking and adjusts coremaking curing operation.
The third aspect, the embodiment of the invention also provides a kind of coremaking curing apparatus, including it is as described in the embodiments of the present invention Coremaking curing system.
The embodiment of the present invention by monitoring and according in coremaking solidification process temperature, pressure and the current curing time it is long Degree, constantly updates coremaking and solidifies adjusting parameter, adjusts coremaking curing operation with this, to solve coremaking cure parameter can only pass through The problem of technical staff sets adjusting parameter by human-computer interaction interface is realized and is carried out instead according to the data in coremaking solidification process Feedback control coremaking curing operation, reduce error caused by artificial setup parameter, at the same reduce in coremaking solidification process it is artificial at This, improves the flexibility of coremaking curing operation, while improving production efficiency.
Detailed description of the invention
Fig. 1 is a kind of flow chart for coremaking curing method that the embodiment of the present invention one provides;
Fig. 2 is a kind of structural schematic diagram of coremaking curing system provided by Embodiment 2 of the present invention;
Fig. 3 is a kind of structural schematic diagram for coremaking curing apparatus that the embodiment of the present invention three provides.
Specific embodiment
The present invention is described in further detail with reference to the accompanying drawings and examples.It is understood that this place is retouched The specific embodiment stated is used only for explaining the present invention rather than limiting the invention.It also should be noted that in order to just Only the parts related to the present invention are shown in description, attached drawing rather than entire infrastructure.
It should be mentioned that some exemplary embodiments are described as before exemplary embodiment is discussed in greater detail The processing or method described as flow chart.Although operations (or step) are described as the processing of sequence by flow chart, Many of these operations can be implemented concurrently, concomitantly or simultaneously.In addition, the sequence of operations can be pacified again Row.The processing can be terminated when its operations are completed, it is also possible to have the additional step being not included in attached drawing.Institute Stating processing can correspond to method, function, regulation, subroutine, subprogram etc..
Embodiment one
Fig. 1 is a kind of flow chart for coremaking curing method that the embodiment of the present invention one provides, and the present embodiment is applicable to make The coremaking process of core machine, this method can be executed by coremaking curing system provided in an embodiment of the present invention, which can be used The mode of software and/or hardware is realized, and can be generally integrated in computer equipment, for example, PC machine etc..
Specifically, core making machine is the equipment using core box craftwork manufacture film covered sand core, wherein the effect of sand core is for shape At the cavity in casting.Core making machine needs to fill sand into core box, and makes in core box under set temperature and setting pressure Sand solidification, forms sand core.Specifically can choose solidifies the sand in core box using gaseous catalyst, that is, solidification work of blowing Skill, the technique must make catalyst " atomization " within the regular hour, under the temperature of setting, pressure condition, and can reach and In uniformly distributed entire core box, make to form cohesive force and curing molding between the sand grains and resin in type chamber.
As shown in Figure 1, the method for the present embodiment specifically includes:
S110 acquires the temperature, the pressure in blowing pipe channel and current curing time span of core box interior, as Process data.
In the present embodiment, the temperature of core box interior can be for making the cured temperature of sand in core box, wherein core box It is internal that there are three types of medium temperatures, specifically, the mild gas temperature of mold temperature, sand.In the present embodiment, the temperature of core box interior Specifically refer to sand temperature or gas temperature, wherein the mild gas temperature of sand can be directly adjusted, such as can pass through heating Gas is inputted, and the input gas with temperature is transported to core box interior, increase gas temperature and sand temperature in core box.Its In, the frequency acquisition of sand temperature is less than the frequency acquisition of gas temperature.Pressure in blowing pipe channel can be for making core box The interior cured pressure of sand, current curing time span can refer to the cured duration.In the curing process, core box interior The data such as temperature, the pressure in blowing pipe channel and current curing time span can constantly change, so as to by its Make the curing operation of sand core more for parameter involved in subsequent adjustment curing operation as the process data in curing operation It is flexibly accurate to add.Since curing process is higher to time, temperature, pressure requirements, need in the curing process constantly according to reality When data, adjust solidification process involved in each equipment operation.
Optionally, multiple time points can be preset as setting time point, core box is acquired at the setting time point Pressure in internal temperature and blowing pipe channel.Alternatively, can be begun to warm up from heater to when setting with continuous acquisition Between core box interior in duration for putting temperature, take the average value of the temperature in this section of duration as setting time point The temperature of the core box interior at place;It can be started to work simultaneously from gas generator to the duration of setting time point with continuous acquisition Pressure in interior blowing pipe channel takes the average value of the pressure in this section of duration as the air blowing at setting time point Pressure in pipe passage.
Meanwhile using the duration of beginning curing operation to setting time point as current curing time span, specifically may be used To be, when the temperature of core box interior is greater than default initial temperature, starting timing, and will start the system time of timing as First moment;When system time reaches predetermined time, stop timing, and when using stopping the system time of timing as second It carves;The time interval for counting the first moment Yu the second moment obtains current curing time span.
Wherein it is possible to whether be greater than default initial temperature by the temperature of detection core box interior, judge whether to start to solidify Operation.At the time of beginning at the time of when the temperature of core box interior is greater than preset temperature as curing operation, and work as system time Reach predetermined time when, at the time of predetermined time to curing operation is started between time interval it is long as the current curing time Degree.
S120 constantly updates coremaking according to the process data and solidifies adjusting parameter, and solidified according to updated coremaking Adjusting parameter adjusts coremaking curing operation.
In the present embodiment, it can be determined according to the process data of acquisition and need to adjust coremaking in subsequent coremaking solidification process Cure parameter.Wherein, process data include the temperature of core box interior, the pressure in blowing pipe channel and current curing time it is long Degree, correspondingly, coremaking solidification adjusting parameter includes temperature adjusting parameter, pressure adjusting parameter and curing time adjusting parameter, from And temperature adjusting parameter, pressure adjusting parameter and curing time adjusting parameter can be distinguished, and corresponding adjustment is for controlling The heater of temperature in core box, each equipment for controlling the gas generator of pressure in core box and for controlling curing operation Run duration.
For example, the temperature of the core box interior for acquisition, updates coremaking according to process data and solidifies adjusting parameter, comprising: According to the temperature and preset temperature of core box interior, determination deviation temperature;According to offset temperature and the first predetermined deviation temperature, really Determine temperature adjusting parameter, and solidifies adjusting parameter as updated coremaking.
Wherein it is possible to which multiple moment are arranged, and the multiple preset temperatures of setting are respectively corresponded, for each moment, Yi Jiyu Each moment corresponding preset temperature, determines corresponding offset temperature of each moment.First predetermined deviation temperature can be pre- from one Any one value chosen in the offset temperature range first set, the e.g. maximum value of the offset temperature range.When deviation temperature Degree has been more than the first predetermined deviation temperature, that is, offset temperature determines core box interior except preset offset temperature range It is too high or too low for temperature, it needs to be adjusted, and according to offset temperature and the first predetermined deviation temperature, temperature adjustment ginseng Number solidifies adjusting parameter as updated coremaking.
In a specific example, it is based on following formula temperature adjusting parameter:
If (temperature > preset temperature of core box interior)
Temperature-preset temperature=offset temperature of then core box interior
If (offset temperature > the first predetermined deviation temperature)
The-the first predetermined deviation of then offset temperature temperature=temperature adjusting parameter
End if
Else if (temperature < preset temperature of core box interior)
Then preset temperature-core box interior temperature=offset temperature
If (offset temperature > the first predetermined deviation temperature)
The-the first predetermined deviation of then offset temperature temperature=temperature adjusting parameter
End if
End if
For another example, for the pressure in the blowing pipe channel of acquisition, coremaking is updated according to process data and solidifies adjusting parameter, It include: according to the pressure and preset pressure in blowing pipe channel, determination deviation pressure;It is default according to deviation pressure and first Deviation pressure determines pressure adjusting parameter, and solidifies adjusting parameter as updated coremaking.Wherein, deviation pressure and pressure The method of determination of adjusting parameter is identical as the method for determination of offset temperature and temperature adjusting parameter.
It should be noted that since the standard value that temperature and pressure is located in different time points is different, to need specific aim The the first predetermined deviation temperature corresponding with various time points of setting in different time points and the first predetermined deviation pressure.
For another example, for the current curing time span of acquisition, coremaking is updated according to process data and solidifies adjusting parameter, packet It includes: according to current curing time span and predetermined time period, determination deviation time span;According to deviation time length and in advance If curing time length, curing time adjusting parameter is determined, and solidify adjusting parameter as updated coremaking.Wherein, deviation The method of determination of time span and curing time adjusting parameter is identical as the method for determination of offset temperature and temperature adjusting parameter.
In a specific example, curing time adjusting parameter (curing time adjusting parameter is determined based on following formula Can be indicated with percents):
If (temperature of core box interior > default initial temperature)
Then obtains current curing time span
If (current curing time span > predetermined time period)
Current curing time span-predetermined time period=deviation time the length of then
Curing time adjusting parameter=(default curing time length+deviation time length) * %
Else if (current curing time span < predetermined time period)
The current curing time span of then predetermined time period -=deviation time length
Curing time adjusting parameter=(default curing time length-deviation time length) * %
End if
End if
On the basis of the above embodiments, optionally, according to the process data update coremaking solidification adjusting parameter it Afterwards, before solidifying adjusting parameter adjustment coremaking curing operation according to updated coremaking, further includes: join when updating temperature adjustment The offset temperature that calculates is greater than the second predetermined deviation temperature when number, and or the deviation pressure that calculates of while updating pressure adjusting parameter When greater than the second predetermined deviation pressure, determines that coremaking fails, stop coremaking curing operation.
Specifically, can be during the pressure in the temperature and blowing pipe channel for monitoring core box interior, by sentencing Whether disconnected temperature and pressure meets the requirement of coremaking curing operation, if there is any one is not met, it is determined that coremaking solidification It is unqualified to operate the sand core being eventually fabricated, i.e. coremaking fails.By being supervised in the cured operation of coremaking to temperature and pressure Control obtains the core box state in coremaking curing operation in time, and stops coremaking process in the failure of coremaking curing operation, releases in time Resource is put, avoids to judge whether coremaking success after coremaking solidification process, result in waste of resources.
Further, after starting timing, can also stop when the temperature of core box interior is greater than default initial temperature Count current curing time span.Specifically: it is default inclined that the offset temperature calculated when updating temperature adjusting parameter is greater than second Differential temperature degree, and or when the deviation pressure that calculates is greater than the second predetermined deviation pressure when updating pressure adjusting parameter, stop timing.
Optionally, described when the temperature of the core box interior is greater than default initial temperature, start timing, comprising: work as institute The temperature for stating core box interior is greater than default initial temperature, and the offset temperature calculated when updating temperature adjusting parameter is default less than second Offset temperature, and when the deviation pressure that calculates is less than the second predetermined deviation pressure when updating pressure adjusting parameter, start timing.
Specifically, needing to detect in the temperature and blowing pipe channel of core box interior before counting curing time length Pressure whether meet the requirements.If offset temperature is less than the second predetermined deviation temperature, and deviation pressure is default less than second inclined When differential pressure, determine that the pressure in the temperature and blowing pipe channel of core box interior meets the requirements, when starting to count current curing Between length.Wherein, the absolute value of the second predetermined deviation temperature is greater than the absolute value of the first predetermined deviation temperature;Second is pre- simultaneously If the absolute value of deviation pressure is greater than the absolute value of the first predetermined deviation pressure.That is, if offset temperature is second Within predetermined deviation temperature and the first predetermined deviation temperature, temperature can be adjusted by adjusting heater to normal temperature model In enclosing, if it exceeds the second predetermined deviation temperature, temperature can not adjust by adjusting heater to normal temperature, So that it is determined that coremaking solidification failure, equally, deviation pressure is also such.
From there through being further monitored to the pressure in the temperature of core box interior and blowing pipe channel, and in temperature Coremaking curing operation is continued to execute in the case where meeting the requirements with pressure, persistently monitors the cured duration, is realized and is combined Temperature detection, pressure detecting and curing time detection, feedback regulation control coremaking curing operation, can flexibly, accurately control system Core curing operation.
The embodiment of the present invention by monitoring and according in coremaking solidification process temperature, pressure and the current curing time it is long Degree, constantly updates coremaking and solidifies adjusting parameter, adjusts coremaking curing operation with this, to solve coremaking cure parameter can only pass through The problem of technical staff sets adjusting parameter by human-computer interaction interface is realized and is carried out instead according to the data in coremaking solidification process Feedback control coremaking curing operation, reduce error caused by artificial setup parameter, at the same reduce in coremaking solidification process it is artificial at This, improves the flexibility of coremaking curing operation, while improving production efficiency.
Embodiment two
On the basis of the above embodiment 1, second embodiment of the present invention provides a kind of coremaking curing system, application implementations Method described in example one, can specifically include:
Process data acquisition module 210, for acquiring the temperature of core box interior, the pressure in blowing pipe channel and Curing time length, as process data;
Coremaking solidifies adjusting parameter determining module 220, for constantly updating coremaking solidification adjustment according to the process data Parameter, and adjusting parameter is solidified according to updated coremaking and adjusts coremaking curing operation.
The embodiment of the present invention by monitoring and according in coremaking solidification process temperature, pressure and the current curing time it is long Degree, constantly updates coremaking and solidifies adjusting parameter, adjusts coremaking curing operation with this, to solve coremaking cure parameter can only pass through The problem of technical staff sets adjusting parameter by human-computer interaction interface is realized and is carried out instead according to the data in coremaking solidification process Feedback control coremaking curing operation, reduce error caused by artificial setup parameter, at the same reduce in coremaking solidification process it is artificial at This, improves the flexibility of coremaking curing operation, while improving production efficiency.
Further, the process data acquisition module 210, for acquiring the temperature of core box interior at a set point in time.
Further, the coremaking solidifies adjusting parameter determining module 220, for according to the temperature of the core box interior and Preset temperature, determination deviation temperature;According to the offset temperature and the first predetermined deviation temperature, temperature adjusting parameter, And solidify adjusting parameter as updated coremaking.
Further, the process data acquisition module 210, for being acquired in blowing pipe channel at a set point in time Pressure.
Further, the coremaking solidifies adjusting parameter determining module 220, for according in the blowing pipe channel Pressure and preset pressure, determination deviation pressure;According to the deviation pressure and the first predetermined deviation pressure, determine that pressure adjusts Parameter, and solidify adjusting parameter as updated coremaking.
Further, the process data acquisition module 210, comprising: the first moment determining module, for working as the core box When internal temperature is greater than default initial temperature, start timing, and the system time of timing will be started as the first moment;Second Moment determining module, for stopping timing when system time reaches predetermined time, and will stop the system time of timing as Second moment;Current curing time span obtains module, for counting between first moment and the time at second moment Every obtaining current curing time span.
Further, the coremaking solidifies adjusting parameter determining module 220, for according to the current curing time span And predetermined time period, determination deviation time span;According to the deviation time length and default curing time length, determine Curing time adjusting parameter, and solidify adjusting parameter as updated coremaking.
Further, the system is also used to: it is pre- that the offset temperature calculated when updating temperature adjusting parameter is greater than second If offset temperature, and or when the deviation pressure that calculates is greater than the second predetermined deviation pressure when updating pressure adjusting parameter, determine system Core failure, stops coremaking curing operation.
Further, the first moment determining module is greater than default starting temperature for the temperature when the core box interior Degree, the offset temperature that calculates is less than the second predetermined deviation temperature when updating temperature adjusting parameter, and when updating pressure adjusting parameter When the deviation pressure of calculating is less than the second predetermined deviation pressure, start timing.
Coremaking curing method provided by any embodiment of the invention can be performed in above-mentioned coremaking curing system, has execution The corresponding functional module of coremaking curing method and beneficial effect.
Embodiment three
On the basis of the above embodiments, the embodiment of the present invention three provides a kind of coremaking curing apparatus, including as implemented Coremaking curing system described in example two.Specifically as shown in figure 3, the equipment further include:
Temperature sensor 301 is connected with coremaking curing system 309, for the temperature of the core box interior of acquisition to be sent to Coremaking curing system 309;
Pressure sensor 302 is connected with coremaking curing system 309, the gas in blowing pipe channel for that will acquire Pressure be sent to coremaking curing system 309;
Programmable controller 303 is connected with coremaking curing system 309, for receiving the system of the transmission of coremaking curing system 309 Core solidifies adjusting parameter, and solidifies adjusting parameter according to coremaking and control heater 304 and/or gas generator 305;
Heater 304 is connected, for the gas that is heating and curing with programmable controller 303;
Gas generator 305 is connected, for generating solid gas with programmable controller 303.
Pipeline 306 is connected with heater 304 and gas generator 305 respectively, and the solid gas after being used for transmission heating is extremely Pressure sensor 302 has can be set in air blowing shield 307, inside;
Air blowing shield 307 is connected with pipeline 306, forms closed space and contains the solid gas that pipeline 306 conveys, entrance Temperature sensor 301 has can be set in place;
Human-computer interaction interface 308 is connected with coremaking curing system 309, for receive user input setup parameter and Show the real time data in coremaking solidification process.
The embodiment of the present invention is by being arranged coremaking curing system, heater and gas in feedback regulation coremaking solidification process Generator realizes the quality monitoring to coremaking curing operation, avoids the mistake of artificial rule of thumb setup parameter, system is adjusted flexibly Core curing operation, to improve the qualification rate of sand core.
Note that the above is only a better embodiment of the present invention and the applied technical principle.It will be appreciated by those skilled in the art that The invention is not limited to the specific embodiments described herein, be able to carry out for a person skilled in the art it is various it is apparent variation, It readjusts and substitutes without departing from protection scope of the present invention.Therefore, although being carried out by above embodiments to the present invention It is described in further detail, but the present invention is not limited to the above embodiments only, without departing from the inventive concept, also It may include more other equivalent embodiments, and the scope of the invention is determined by the scope of the appended claims.

Claims (10)

1. a kind of coremaking curing method characterized by comprising
Temperature, the pressure in blowing pipe channel and the current curing time span for acquiring core box interior, as process data;
Coremaking is constantly updated according to the process data and solidifies adjusting parameter, and adjusting parameter tune is solidified according to updated coremaking Whole coremaking curing operation.
2. the method according to claim 1, wherein the temperature of the acquisition core box interior, comprising:
The temperature of core box interior is acquired at a set point in time;
It is described that coremaking solidification adjusting parameter is updated according to the process data, comprising:
According to the temperature and preset temperature of the core box interior, determination deviation temperature;
According to the offset temperature and the first predetermined deviation temperature, temperature adjusting parameter, and as updated coremaking Solidify adjusting parameter.
3. the method according to claim 1, wherein the pressure in the acquisition blowing pipe channel, comprising:
The pressure in blowing pipe channel is acquired at a set point in time;
It is described that coremaking solidification adjusting parameter is updated according to the process data, comprising:
According to the pressure and preset pressure in the blowing pipe channel, determination deviation pressure;
According to the deviation pressure and the first predetermined deviation pressure, pressure adjusting parameter is determined, and as updated coremaking Solidify adjusting parameter.
4. the method according to claim 1, wherein the current curing time span of acquisition, comprising:
When the temperature of the core box interior is greater than default initial temperature, start timing, and the system time for starting timing is made For the first moment;
When system time reaches predetermined time, stop timing, and the system time of timing will be stopped as the second moment;
The time interval for counting first moment Yu second moment, obtains current curing time span;
It is described that coremaking solidification adjusting parameter is updated according to the process data, comprising:
According to the current curing time span and predetermined time period, determination deviation time span;
According to the deviation time length and default curing time length, curing time adjusting parameter is determined, and as update Coremaking afterwards solidifies adjusting parameter.
5. the method stated according to claim 1, which is characterized in that solidify adjusting parameter updating coremaking according to the process data Later, before solidifying adjusting parameter adjustment coremaking curing operation according to updated coremaking, further includes:
The offset temperature calculated when updating temperature adjusting parameter be greater than the second predetermined deviation temperature, and or update pressure adjustment When the deviation pressure calculated when parameter is greater than the second predetermined deviation pressure, determines that coremaking fails, stop coremaking curing operation.
6. according to the method described in claim 4, it is characterized in that, described when the temperature of the core box interior is greater than default starting When temperature, start timing, comprising:
When the temperature of the core box interior is greater than default initial temperature, the offset temperature calculated when updating temperature adjusting parameter is less than Second predetermined deviation temperature, and when the deviation pressure that calculates is less than the second predetermined deviation pressure when updating pressure adjusting parameter, it opens Beginning timing.
7. a kind of coremaking curing system, which is characterized in that method of the application as described in claim 1-6 is any, comprising:
Process data acquisition module, for acquiring the temperature of core box interior, the pressure in blowing pipe channel and current curing Time span, as process data;
Coremaking solidifies adjusting parameter determining module, solidifies adjusting parameter for constantly updating coremaking according to the process data, and Solidify adjusting parameter according to updated coremaking and adjusts coremaking curing operation.
8. a kind of coremaking curing apparatus, which is characterized in that including coremaking curing system as claimed in claim 7.
9. equipment according to claim 8, which is characterized in that further include:
Temperature sensor is connected with the coremaking curing system, for the temperature of the core box interior of acquisition to be sent to the system Core curing system;
Pressure sensor is connected with the coremaking curing system, the pressure of the gas in blowing pipe channel for that will acquire It is sent to the coremaking curing system;
Programmable controller is connected with the coremaking curing system, solid for receiving the coremaking that the coremaking curing system is sent Change adjusting parameter, and adjusting parameter is solidified according to the coremaking, heater and/or gas generator are controlled;
Heater is connected, for the gas that is heating and curing with the programmable controller;
Gas generator is connected, for generating solid gas with the programmable controller.
10. equipment according to claim 9, which is characterized in that further include:
Pipeline is connected with the heater and the gas generator respectively, the solid gas after being used for transmission heating to air blowing Cover;
Air blowing shield is connected with the pipeline, forms the solid gas that closed space contains the Pipeline transport;
Human-computer interaction interface is connected with the coremaking curing system, for receiving the setup parameter and display system of user's input Real time data in core solidification process.
CN201810908133.7A 2018-08-10 2018-08-10 Core making curing method, system and equipment Active CN108941465B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810908133.7A CN108941465B (en) 2018-08-10 2018-08-10 Core making curing method, system and equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810908133.7A CN108941465B (en) 2018-08-10 2018-08-10 Core making curing method, system and equipment

Publications (2)

Publication Number Publication Date
CN108941465A true CN108941465A (en) 2018-12-07
CN108941465B CN108941465B (en) 2020-01-14

Family

ID=64468803

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810908133.7A Active CN108941465B (en) 2018-08-10 2018-08-10 Core making curing method, system and equipment

Country Status (1)

Country Link
CN (1) CN108941465B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020177031A1 (en) * 2019-03-01 2020-09-10 苏州明志科技股份有限公司 Core-making machine and core-making machine control method and system
CN115283649A (en) * 2022-10-10 2022-11-04 中信戴卡股份有限公司 A method and system for closed-loop control of mold temperature in wheel casting process

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1119972A (en) * 1994-06-01 1996-04-10 丰田自动车株式会社 Casting method with improved resin core removing step and apparatus for performing the method
CA2170858C (en) * 1995-03-03 2000-02-22 Yuji Okada Casting method with improved resin core removal step
JP2002192305A (en) * 2000-12-26 2002-07-10 Aisin Takaoka Ltd Method for manufacturing core for casting
CN101062518A (en) * 2006-04-24 2007-10-31 卢伯股份有限公司 Hardening of inorganic foundry cores and molds
CN203133629U (en) * 2012-12-28 2013-08-14 江苏恒立高压油缸股份有限公司 Casting hot core box temperature control apparatus
FR3025445A1 (en) * 2014-09-05 2016-03-11 Peugeot Citroen Automobiles Sa BLASTING DEVICE FOR GRAVITY FOUNDRY
CN206732062U (en) * 2017-03-22 2017-12-12 苏州明志科技有限公司 A kind of coremaking system
CN108044046A (en) * 2018-02-01 2018-05-18 成都桐林铸造实业有限公司 A kind of thermostatic type sand core drawn needle and precoated sand coremaking equipment

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1119972A (en) * 1994-06-01 1996-04-10 丰田自动车株式会社 Casting method with improved resin core removing step and apparatus for performing the method
CA2170858C (en) * 1995-03-03 2000-02-22 Yuji Okada Casting method with improved resin core removal step
JP2002192305A (en) * 2000-12-26 2002-07-10 Aisin Takaoka Ltd Method for manufacturing core for casting
CN101062518A (en) * 2006-04-24 2007-10-31 卢伯股份有限公司 Hardening of inorganic foundry cores and molds
CN203133629U (en) * 2012-12-28 2013-08-14 江苏恒立高压油缸股份有限公司 Casting hot core box temperature control apparatus
FR3025445A1 (en) * 2014-09-05 2016-03-11 Peugeot Citroen Automobiles Sa BLASTING DEVICE FOR GRAVITY FOUNDRY
CN206732062U (en) * 2017-03-22 2017-12-12 苏州明志科技有限公司 A kind of coremaking system
CN108044046A (en) * 2018-02-01 2018-05-18 成都桐林铸造实业有限公司 A kind of thermostatic type sand core drawn needle and precoated sand coremaking equipment

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020177031A1 (en) * 2019-03-01 2020-09-10 苏州明志科技股份有限公司 Core-making machine and core-making machine control method and system
CN111801180A (en) * 2019-03-01 2020-10-20 苏州明志科技股份有限公司 Core making machine and control method and system thereof
CN111801180B (en) * 2019-03-01 2022-04-22 苏州明志科技股份有限公司 Core making machine and control method and system thereof
CN115283649A (en) * 2022-10-10 2022-11-04 中信戴卡股份有限公司 A method and system for closed-loop control of mold temperature in wheel casting process
CN115283649B (en) * 2022-10-10 2022-12-13 中信戴卡股份有限公司 Mold temperature closed-loop control method and system in wheel casting process

Also Published As

Publication number Publication date
CN108941465B (en) 2020-01-14

Similar Documents

Publication Publication Date Title
US20200362770A1 (en) Design method for optimization of transient control law of aero-engine
JP4219278B2 (en) Rapid prototype injection molding
US20130032961A1 (en) Control device and control method for injection molding machine
US4559991A (en) Method and system of controlling injection molding machines
CN108941465A (en) Coremaking curing method, system and equipment
CN103296940B (en) Self-adaptive PI (proportional-integral) control method and self-adaptive PI control system
CN112689546B (en) Method and system for generating device-specific machine learning models
JPH05507659A (en) Injection molding machine control method and device
CN103802265A (en) Simulating device and method
CN111037951B (en) Composite material liquid molding injection device and method
CN104722757A (en) Moulding sand special for laser 3D printing and preparation process and application thereof
EP3760409A1 (en) Foam molding method and injection molding machine
CN109049582A (en) A kind of partition heating method, system, device and storage medium
JPS5962131A (en) Control on vulcanization of tire
US8377350B2 (en) Method for controlling temperatures in hot runners of multi-cavity injection mold, method for warning, and control system based on those methods
JP2003039451A (en) Rtm resin flow control method and apparatus
CN115328061B (en) Method for generating production mold maintenance tasks
CN105246617A (en) Casting device and casting method
JPH05245894A (en) Method for determining mold-cooling water flow rate in injection molding
CN108673884B (en) 3D printing method and device for controlling consistency of coaxial powder feeding tissues
CN103047768B (en) Method for controlling temperature of heat-transfer medium (HTM) furnace evaporator
CN114041137A (en) Process for producing components for adapting a component set
CN118700580B (en) Control method and system for hot pressing equipment
CN104772881B (en) Method and device for adjusting runner balance of multi-cavity mold
CN119159770B (en) A mold injection molding speed control method and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 215217, No. 1999, Xiao Xi Road, Tongli Town, Wujiang District, Jiangsu, Suzhou

Patentee after: Suzhou Mingzhi Technology Co., Ltd

Address before: 215217, No. 1999, Xiao Xi Road, Tongli Town, Wujiang District, Jiangsu, Suzhou

Patentee before: SUZHOU MINGZHI TECHNOLOGY Co.,Ltd.

CP01 Change in the name or title of a patent holder