[go: up one dir, main page]

CN108898358A - A kind of management system of landscape design project - Google Patents

A kind of management system of landscape design project Download PDF

Info

Publication number
CN108898358A
CN108898358A CN201810637479.8A CN201810637479A CN108898358A CN 108898358 A CN108898358 A CN 108898358A CN 201810637479 A CN201810637479 A CN 201810637479A CN 108898358 A CN108898358 A CN 108898358A
Authority
CN
China
Prior art keywords
module
landscape design
gardens
construction
place
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810637479.8A
Other languages
Chinese (zh)
Inventor
张永坚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Hui Heng Advertising Planning Co Ltd
Original Assignee
Guangzhou Hui Heng Advertising Planning Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Hui Heng Advertising Planning Co Ltd filed Critical Guangzhou Hui Heng Advertising Planning Co Ltd
Priority to CN201810637479.8A priority Critical patent/CN108898358A/en
Publication of CN108898358A publication Critical patent/CN108898358A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • G06T17/05Geographic models

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Software Systems (AREA)
  • General Business, Economics & Management (AREA)
  • Geometry (AREA)
  • Tourism & Hospitality (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Computer Graphics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Data Mining & Analysis (AREA)
  • Remote Sensing (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of management systems of landscape design project, including with lower unit:Business receiving module, the real-time acquisition module of live three-dimensional data, gardens place obtain module, controller, auditing module, work order creation module, site operation and implement acquisition module and Construction Comparison module, wherein the real-time acquisition module of live three-dimensional data obtains module by gardens place and connect with controller, and the controller is connect with business receiving module, auditing module, construction creation module, site operation implementation acquisition module, Construction Comparison module.Without going to scene to watch the layout in gardens when the present invention is to landscape design, information can be provided according to client, recycling, which is taken photo by plane, carries out live tracking enquiry, improve the efficiency of landscape design management, the final online management for realizing whole process, and entirely manage it is relatively easy, it is more efficient.

Description

A kind of management system of landscape design project
Technical field
The present invention relates to a kind of technical field of landscape design management, especially a kind of management system of landscape design project System.
Background technique
Landscape design is exactly, with landscape art and engineering technology means, to pass through transformation ground in certain territorial scope Shape (or further building mountain, piling and layout of stones, Li Shui), plants trees, flowers and plants, and the approach such as constructing architecture and arrangement garden road are created and build up beauty Natural environment and life, condition of strolling about or have a rest process.Current landscape design needs designer arriving first scene in design goes The layout for watching gardens, then creates into three-dimensional gardens, then the design on computer three-dimensional gardens are carried out with links, if Items in order leader carries out printing to each link and examines examination & approval after the completion of meter, could notify employee more after examination & approval qualification Add examination & approval drawing to be designed, is easy to cause landscape design complicated in this way, and manage also very complicated, it is therefore desirable to change Into.
Summary of the invention
A kind of management of landscape design project is provided the purpose of the present invention is to solve above-mentioned the deficiencies in the prior art System.
To achieve the goals above, the management system of a kind of landscape design project designed by the present invention, including to place an order Member:
Business receiving module, for receiving the business information of landscape design and the configuration setting of team;
The live real-time acquisition module of three-dimensional data, according to the landscape design field positioning that business receiving module provides, then Using high-altitude video capture data, three-dimensional place real time data acquisition is carried out,
Gardens place obtains module, for connecting with the real-time acquisition module of live three-dimensional data, obtains final planning gardens Internal data information;
Controller connect for obtaining module with gardens place, obtains real-time gardens place information, is built into gardens three-dimensional Place, then the people of each department of team is according to requiring to carry out each place landscape design scheme;
Auditing module audits the landscape design scheme of each department one by one, after auditing all qualifications, is examined Label are generated to examine and be signed a bill after examining label qualification;
Work order creation module is signed a bill according to examining, acquisition design drawing, printed design construction drawing, then construction personnel Site operation can be removed according to construction drawing;
Site operation implements acquisition module, for obtaining the condition of construction of field conduct in real time;
Construction Comparison module is set for implementing the gardens in condition of construction and controller on acquisition module with site operation Meter scheme compares;It is reminded when not meeting landscape design scheme;
Wherein the real-time acquisition module of live three-dimensional data obtains module by gardens place and connect with controller, institute Controller and business receiving module, auditing module, construction creation module, the site operation stated implement acquisition module, Construction Comparison Module connection.
Further, it is also connected with design scheme modified module on the controller.
Further, the business receiving module include to the registration of the require information of landscape design, the registration of gardens location information, The assessment of the landscape design amount of money.
Further, it is total that it is also connected with the achievement that achievement three-dimensional display is carried out to the gardens for having designed completion on the controller Enjoy module.
The invention also discloses a kind of control method of the management system of landscape design project is as follows:
S1, preferred service receiving module obtain the gardens address of user, landscape design requirement, and create landscape design and want It asks;
S2, according to the gardens address on business receiving module, utilize the real-time acquisition module of live three-dimensional data to carry out scene Then landscape design field positioning utilizes high-altitude video capture data, carry out three-dimensional place real time data acquisition,
S3, it is used to connect with the real-time acquisition module of live three-dimensional data, obtains the internal data information in final planning gardens; Real-time gardens place information is obtained, gardens three-dimensional place is built into, then the people of each department of team is each according to requiring to carry out Place landscape design scheme;And obtain design and construction drawing;
S4, it is audited one by one using landscape design scheme of the auditing module to each department, after auditing all qualifications, into Row examines label, after careful label are qualified, generate to examine and sign a bill;
S5, using work order creation module obtain it is careful signing a bill, obtain design drawing, printed design construction drawing, then Construction personnel can remove site operation according to construction drawing;
S6, then implement acquisition module using site operation and obtain the condition of construction of field conduct in real time, then with control Landscape design scheme on device compares, and is reminded when not meeting landscape design scheme;Until all landscape designs are whole A project is completed.
The management system for a kind of landscape design project that the present invention obtains, without going live sight when the present invention is to landscape design It sees the layout in gardens, information can be provided according to client, recycling, which is taken photo by plane, carries out live tracking enquiry, improves landscape design management Efficiency, then automatically generate three-dimensional scenic, designer directly designs according to three-dimensional scenic, create at three-dimensional gardens, then Design on computer three-dimensional gardens are carried out with links, after the completion of then designing, leader carries out each link Online examination & approval, examination & approval qualification are automatically generated to examine and be signed a bill, and construction personnel signs a bill according to careful, obtain design drawing, printed design construction Then drawing arranges construction personnel to remove site operation, the final online management for realizing whole process, and entire management is relatively simple It is single, it is more efficient.
Appended drawing reference
Fig. 1 is a kind of connection schematic diagram of the management system of landscape design project in embodiment 1;
Fig. 2 is a kind of connection schematic diagram of the management system of landscape design project in embodiment 2;
Fig. 3 is a kind of connection schematic diagram of the management system of landscape design project in embodiment 3.
In appended drawing reference:1. the real-time acquisition module of live three-dimensional data;2. gardens place obtains module;3. controller;4. Business receiving module;5. auditing module;6. creation module of constructing;7. site operation implements acquisition module;8. Construction Comparison module; 10. advertisement modification prediction scheme module;11. achievement-sharing module.
Specific embodiment
Innovation and creation are preferably illustrated below with reference to embodiment.
Embodiment 1:
As shown in Figure 1, a kind of management system of landscape design project provided in this embodiment, including with lower unit:
Business receiving module 4, for receiving the business information of landscape design and the configuration setting of team;
The live real-time acquisition module 1 of three-dimensional data, according to the landscape design field positioning that business receiving module 4 provides, so High-altitude video capture data are utilized afterwards, carry out three-dimensional place real time data acquisition,
Gardens place obtains module 2, for connecting with the real-time acquisition module 1 of live three-dimensional data, obtains final planning garden The internal data information of woods;
Controller 3 connect for obtaining module 2 with gardens place, obtains real-time gardens place information, be built into gardens three Place is tieed up, then the people of each department of team is according to requiring to carry out each place landscape design scheme;
Auditing module 5 audits the landscape design scheme of each department one by one, after auditing all qualifications, is examined Label are generated to examine and be signed a bill after examining label qualification;
Work order creation module 6 is signed a bill according to examining, acquisition design drawing, printed design construction drawing, then construction personnel Site operation can be removed according to construction drawing;
Site operation implements acquisition module 7, for obtaining the condition of construction of field conduct in real time;
Construction Comparison module 8, for implementing the condition of construction on acquisition module 7 and the garden on controller 3 with site operation Woods design scheme compares;It is reminded when not meeting landscape design scheme;
Wherein the real-time acquisition module 1 of live three-dimensional data obtains module 2 by gardens place and controller 3 connects It connects, the controller 3 and business receiving module 4, auditing module 5, construction creation module 6, site operation implement acquisition module 7, Construction Comparison module 8 connects.
The control method that the present embodiment also discloses a kind of management system of landscape design project is as follows:
S1, preferred service receiving module 4 obtain the gardens address of user, landscape design requirement, and create landscape design and want It asks;
S2, according to the gardens address on business receiving module 4, showed using the real-time acquisition module 1 of live three-dimensional data Field landscape design field positioning, then utilizes high-altitude video capture data, carries out three-dimensional place real time data acquisition,
S3, it is used to connect with the real-time acquisition module 1 of live three-dimensional data, obtains the internal data letter in final planning gardens Breath;Real-time gardens place information is obtained, gardens three-dimensional place is built into, then the people of each department of team is each according to requiring to carry out A place landscape design scheme;And obtain design and construction drawing;
S4, it is audited one by one using landscape design scheme of the auditing module 5 to each department, after auditing all qualifications, It carries out examining label, after examining label qualification, generates to examine and sign a bill;
S5, using work order creation module 6 obtain it is careful signing a bill, obtain design drawing, printed design construction drawing, then Construction personnel can remove site operation according to construction drawing;
S6, then using site operation implement acquisition module 7 in real time obtain field conduct condition of construction, then with control Landscape design scheme on device 3 compares, and is reminded when not meeting landscape design scheme;Until all landscape designs are whole A project is completed.
Further, the business receiving module 4 includes stepping on to the require information registration of landscape design, gardens location information Note, the assessment of the landscape design amount of money.
Embodiment 2:
As shown in Fig. 2, a kind of management system of landscape design project provided in this embodiment, further, on controller 3 It is also connected with design scheme modified module 10, online modification is carried out to scheme.
Embodiment 3:
As shown in figure 3, a kind of management system of landscape design project provided in this embodiment, further, on controller 3 It is also connected with the achievement-sharing module 11 that the gardens for having designed completion are carried out with achievement three-dimensional display, user is facilitated to check online Landscape design achievement.
The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention, for this field skill For art personnel, it is clear that invention is not limited to the details of the above exemplary embodiments, and without departing substantially from spirit of the invention or In the case where essential characteristic, the present invention can be realized in other specific forms.Therefore, in all respects, should all incite somebody to action Embodiment regards exemplary as, and is non-limiting, the scope of the present invention by appended claims rather than on state Bright restriction, it is intended that including all changes that fall within the meaning and scope of the equivalent elements of the claims in the present invention It is interior.Any reference signs in the claims should not be construed as limiting the involved claims.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (6)

1. a kind of management system of landscape design project, it is characterised in that:Including with lower unit:
Business receiving module (4), for receiving the business information of landscape design and the configuration setting of team;
The live real-time acquisition module of three-dimensional data (1), according to the landscape design field positioning that business receiving module (4) provide, so High-altitude video capture data are utilized afterwards, carry out three-dimensional place real time data acquisition,
Gardens place obtains module (2), for connecting with the real-time acquisition module of live three-dimensional data (1), obtains final planning garden The internal data information of woods;
Controller (3) connect for obtaining module (2) with gardens place, obtains real-time gardens place information, be built into gardens three Place is tieed up, then the people of each department of team is according to requiring to carry out each place landscape design scheme;
Auditing module (5) audits the landscape design scheme of each department one by one, after auditing all qualifications, carries out examining label, After examining label qualification, generates to examine and sign a bill;
Work order creation module (6) is signed a bill according to examining, and obtains design drawing, printed design construction drawing, then construction personnel can To remove site operation according to construction drawing;
Site operation implements acquisition module (7), for obtaining the condition of construction of field conduct in real time;
Construction Comparison module (8), for implementing on condition of construction and controller (3) on acquisition module (7) with site operation Landscape design scheme compares;It is reminded when not meeting landscape design scheme;
Wherein the real-time acquisition module of live three-dimensional data (1) obtains module (2) and controller (3) even by gardens place It connects, the controller (3) and business receiving module (4), auditing module (5), construction creation module (6), site operation are implemented Acquisition module (7), Construction Comparison module (8) connection.
2. a kind of management system of landscape design project according to claim 1, it is characterised in that:On controller (3) It is also connected with design scheme modified module (10).
3. a kind of management system of landscape design project according to claim 1 or 2, which is characterized in that the business connects Receiving module (4) includes require information registration, the registration of gardens location information, the assessment of the landscape design amount of money to landscape design.
4. a kind of management system of landscape design project according to claim 1 or 2, which is characterized in that in controller (3) On be also connected with to designed completion gardens carry out achievement three-dimensional display achievement-sharing module (11).
5. a kind of management system of landscape design project according to claim 3, which is characterized in that on controller (3) It is also connected with the achievement-sharing module (11) that the gardens for having designed completion are carried out with achievement three-dimensional display.
6. a kind of management system of landscape design project according to claim 1 or 2, which is characterized in that the advertisement The control method for designing multimedia information system is as follows:
S1, preferred service receiving module (4) obtain the gardens address of user, landscape design requirement, and create landscape design requirement;
S2, according to the gardens address on business receiving module (4), showed using the real-time acquisition module of live three-dimensional data (1) Field landscape design field positioning, then utilizes high-altitude video capture data, carries out three-dimensional place real time data acquisition,
S3, it is used to connect with the real-time acquisition module of live three-dimensional data (1), obtains the internal data information in final planning gardens; Real-time gardens place information is obtained, gardens three-dimensional place is built into, then the people of each department of team is each according to requiring to carry out Place landscape design scheme;And obtain design and construction drawing;
S4, it is audited one by one using landscape design scheme of the auditing module (5) to each department, after auditing all qualifications, into Row examines label, after careful label are qualified, generate to examine and sign a bill;
S5, using work order creation module (6) obtain it is careful signing a bill, obtain design drawing, then printed design construction drawing applies Worker person can remove site operation according to construction drawing;
S6, then using site operation implement acquisition module (7) in real time obtain field conduct condition of construction, then with controller (3) the landscape design scheme on compares, and is reminded when not meeting landscape design scheme;Until all landscape designs are whole A project is completed.
CN201810637479.8A 2018-06-20 2018-06-20 A kind of management system of landscape design project Pending CN108898358A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810637479.8A CN108898358A (en) 2018-06-20 2018-06-20 A kind of management system of landscape design project

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810637479.8A CN108898358A (en) 2018-06-20 2018-06-20 A kind of management system of landscape design project

Publications (1)

Publication Number Publication Date
CN108898358A true CN108898358A (en) 2018-11-27

Family

ID=64345621

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810637479.8A Pending CN108898358A (en) 2018-06-20 2018-06-20 A kind of management system of landscape design project

Country Status (1)

Country Link
CN (1) CN108898358A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111008780A (en) * 2019-12-03 2020-04-14 池州学院 A management system for garden design projects
CN113077223A (en) * 2020-01-03 2021-07-06 上海昂珀信息科技有限公司 Landscape project filing management system
CN113112218A (en) * 2021-03-22 2021-07-13 福建升晖工程管理有限公司 Landscape engineering measurement system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105956825A (en) * 2016-04-29 2016-09-21 广州建皓信息技术有限公司 Project management design platform
CN106897861A (en) * 2017-02-16 2017-06-27 龙岩学院 A kind of project management system
CN107239932A (en) * 2017-05-17 2017-10-10 广州普邦园林股份有限公司 A kind of management system of landscape design project
CN108168521A (en) * 2017-12-14 2018-06-15 福建农林大学 One kind realizes landscape three-dimensional visualization method based on unmanned plane

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105956825A (en) * 2016-04-29 2016-09-21 广州建皓信息技术有限公司 Project management design platform
CN106897861A (en) * 2017-02-16 2017-06-27 龙岩学院 A kind of project management system
CN107239932A (en) * 2017-05-17 2017-10-10 广州普邦园林股份有限公司 A kind of management system of landscape design project
CN108168521A (en) * 2017-12-14 2018-06-15 福建农林大学 One kind realizes landscape three-dimensional visualization method based on unmanned plane

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111008780A (en) * 2019-12-03 2020-04-14 池州学院 A management system for garden design projects
CN113077223A (en) * 2020-01-03 2021-07-06 上海昂珀信息科技有限公司 Landscape project filing management system
CN113112218A (en) * 2021-03-22 2021-07-13 福建升晖工程管理有限公司 Landscape engineering measurement system

Similar Documents

Publication Publication Date Title
US8033049B2 (en) Floral arrangement rendering an image and applications thereof
CN108898358A (en) A kind of management system of landscape design project
CN103886398B (en) Business monitoring method and system under a kind of cross-system isomerous environment
CN108197779A (en) Build service management
CN109389358A (en) Project management system and method based on GIS
Muthusamy et al. A comprehensive model and holistic approach for implementing an integrated management systems
CN109617951A (en) A kind of traffic safety facilities acquisition system and acquisition method for Internet of Things control
CN104732358A (en) Tobacco production mobile application management system and method
WO2008046176A1 (en) Floral arrangement rendering an image and applications thereof
CN109829180A (en) A kind of autonomous controllable electronic equipment experimentation refers to aobvious system
Campbell et al. A roadmap for building climate resilience at higher education institutions: a case study of arizona state university
DE202007018985U1 (en) Electronic advertising pillar goods fair with one or more screen (LCD plasma OLEDs or the like) for advertising of all kinds worldwide in public places with virtual advisor and integrated biometric detection camera and in addition with biological weapons o.d. similar early detection system, solar energy
Eales et al. Sustainable delivery models for achieving SDG7: Lessons from an energy services social enterprise in Malawi
Chan et al. Long term management of a corporate GIS
CN109598026A (en) A kind of Landscape Design management system and application method
CN108288246A (en) A kind of method of village fair planning and designing and its network are announced platform and are realized
Adinarayana et al. Village Level Information System- A Tool for Decentralized Planning at District Level in India
Sobajo Environmental impact (light pollution and energy wastage) of artificial grow lighting to replenish grass pitches in sports stadiums
Jia et al. [Retracted] Optimization Design of Mountain and Water Landscape of Traditional Mountain Village Based on New Robot Visual Technology
CN215987474U (en) Intelligent service cabinet with functions of photographing and evidence obtaining of contraband
CA2565023A1 (en) Floral arrangement rendering an image and applications thereof
Giacomelli et al. Participatory dark sky quality monitoring from Italy: interactions between awareness raising and research
Mehdi-Schulz et al. Quantifying nitrogen flows from agricultural land using an ABM to inform future land use change for ecohydrological modelling
Kelly Utility Arborist Newsline
Kim et al. Project management for ground-based telescope array development

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181127