- CN108824465B CN108824465B CN201810943574.0A CN201810943574A CN108824465B CN 108824465 B CN108824465 B CN 108824465B CN 201810943574 A CN201810943574 A CN 201810943574A CN 108824465 B CN108824465 B CN 108824465B
- Authority
- CN
- China
- Prior art keywords
- pipe
- well pipe
- well
- dewatering
- aquifer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
- E02D19/10—Restraining of underground water by lowering level of ground water
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Hydrology & Water Resources (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Structures Of Non-Positive Displacement Pumps (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810943574.0A CN108824465B (zh) | 2017-04-16 | 2017-04-16 | 基坑工程降水施工结构以及施工方法 |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810943574.0A CN108824465B (zh) | 2017-04-16 | 2017-04-16 | 基坑工程降水施工结构以及施工方法 |
CN201710246596.7A CN106894429B (zh) | 2017-04-16 | 2017-04-16 | 基坑工程软土地基分层降水施工结构以及施工方法 |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710246596.7A Division CN106894429B (zh) | 2017-04-16 | 2017-04-16 | 基坑工程软土地基分层降水施工结构以及施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108824465A CN108824465A (zh) | 2018-11-16 |
CN108824465B true CN108824465B (zh) | 2020-12-08 |
Family
ID=59197149
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710246596.7A Active CN106894429B (zh) | 2017-04-16 | 2017-04-16 | 基坑工程软土地基分层降水施工结构以及施工方法 |
CN201810943574.0A Active CN108824465B (zh) | 2017-04-16 | 2017-04-16 | 基坑工程降水施工结构以及施工方法 |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710246596.7A Active CN106894429B (zh) | 2017-04-16 | 2017-04-16 | 基坑工程软土地基分层降水施工结构以及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN106894429B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113957917B (zh) * | 2021-11-11 | 2023-03-31 | 同济大学 | 一种太极式内隔壁一孔多通道混合井 |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3338909B2 (ja) * | 1994-01-19 | 2002-10-28 | 清水建設株式会社 | 層別揚水井戸 |
CN100480475C (zh) * | 2007-06-04 | 2009-04-22 | 上海地矿工程勘察有限公司 | 可控式一井分层降水施工方法 |
CN100516380C (zh) * | 2007-06-07 | 2009-07-22 | 上海交通大学 | 基坑潜水与承压含水层一井分层联合降水的方法 |
CN101363228A (zh) * | 2008-05-23 | 2009-02-11 | 上海广联建设发展有限公司 | 一种同时用于疏干和减压降水的管井及其工艺 |
CN102518141B (zh) * | 2011-12-19 | 2013-12-25 | 同济大学 | 一种分段控制的深基坑降水疏干-减压合成井 |
CN203768924U (zh) * | 2014-02-19 | 2014-08-13 | 中亿丰建设集团股份有限公司 | 一种用于同时疏干和减压降水的管井 |
CN203729314U (zh) * | 2014-02-28 | 2014-07-23 | 华南理工大学 | 一种抗浮用减压井 |
CN205444219U (zh) * | 2015-12-29 | 2016-08-10 | 上海广联环境岩土工程股份有限公司 | 基坑疏干兼减压的降水管井 |
CN206090597U (zh) * | 2016-09-28 | 2017-04-12 | 上海广联环境岩土工程股份有限公司 | 单孔多管管井 |
-
2017
- 2017-04-16 CN CN201710246596.7A patent/CN106894429B/zh active Active
- 2017-04-16 CN CN201810943574.0A patent/CN108824465B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN106894429A (zh) | 2017-06-27 |
CN106894429B (zh) | 2019-03-01 |
CN108824465A (zh) | 2018-11-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203174616U (zh) | 一种粘土地基降水节水系统 | |
CN102383412A (zh) | 采用降水回灌控制深基坑周边沉降的施工方法 | |
CN110984200B (zh) | 二元地质结构层的基坑降排水的方法 | |
CN203530996U (zh) | 多井点组合降水设施 | |
CN110847199A (zh) | 深基坑地下水暗埋引流施工方法 | |
CN108104104A (zh) | 一种波动增压式真空预压加固软土地基的方法 | |
CN110374125A (zh) | 地铁深基坑侧壁夹层水处理方法 | |
CN112081125A (zh) | 潜水砂卵石地层基坑封底结构及施工工艺 | |
CN108104144A (zh) | 基于降压减渗的强透水地层深基坑地下水控制方法及结构 | |
CN204551510U (zh) | 一种填方路基集水降压井降排水结构 | |
CN107245989A (zh) | 承受高内外水压力的隧洞结构及其施工工艺 | |
CN108824465B (zh) | 基坑工程降水施工结构以及施工方法 | |
CN105421498A (zh) | 一种基于立体帷幕-井群体系的基坑防渗水及沉降控制方法 | |
CN105714771B (zh) | 一种人工挖孔桩的施工方法 | |
CN108978693B (zh) | 基坑工程软土地基降水施工结构 | |
CN211312564U (zh) | 基于降压减渗的强透水地层深基坑地下水控制结构 | |
CN111287205A (zh) | 一种深层多级动态的基坑降水系统及其降水方法 | |
CN204551507U (zh) | 一种岩石地基小导管局部降水装置 | |
CN204435321U (zh) | 一种火力发电厂取水明渠 | |
CN110878557B (zh) | 一种用于基坑降水的分层双向疏水方法 | |
CN208594564U (zh) | 一种基于固沟保塬工程的辐射井排水装置 | |
RU2415998C1 (ru) | Способ строительства вертикального дренажа | |
CN106638641A (zh) | 基坑降水水井结构及其施工方法 | |
CN207277295U (zh) | 承受高内外水压力的隧洞结构 | |
CN111851548A (zh) | 一种深基坑内降水斜井及其施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Huang Junguang Inventor after: Zhang Xiaolun Inventor after: Li Weike Inventor before: Han Shaopeng |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20201118 Address after: 510620 Guangdong city of Guangzhou province Tianhe District Sports Sports Road East Side streets No. 3-5 Applicant after: GUANGZHOU DESIGN INSTITUTE Address before: 054000 Xingtai Province, Gao Qiao Road, No. 79, Hebei Applicant before: Han Shaopeng |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 5103-5103 TIYU East Road, Guangzhou City, Guangdong Province Patentee after: Guangzhou Design Institute Group Co.,Ltd. Address before: 510620 No. 3-5 East Sports street, sports east road, Guangzhou, Guangdong, Tianhe District Patentee before: GUANGZHOU DESIGN INSTITUTE |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230725 Address after: The first floor of Design Building, No. 3 Dongheng Street, Tiyu East Road, Tianhe District, Guangzhou City, Guangdong Province, 510000 Patentee after: Guangzhou Dian Engineering Technology Consulting Co.,Ltd. Address before: 5103-5103 TIYU East Road, Guangzhou City, Guangdong Province Patentee before: Guangzhou Design Institute Group Co.,Ltd. |