CN108808675A - 一种变电站失压配网转供电方案的自动生成方法 - Google Patents

一种变电站失压配网转供电方案的自动生成方法 Download PDF

Info

Publication number
CN108808675A
CN108808675A CN201810772493.9A CN201810772493A CN108808675A CN 108808675 A CN108808675 A CN 108808675A CN 201810772493 A CN201810772493 A CN 201810772493A CN 108808675 A CN108808675 A CN 108808675A
Authority
CN
China
Prior art keywords
power supply
distribution line
line
turn
distribution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810772493.9A
Other languages
English (en)
Other versions
CN108808675B (zh
Inventor
邱桂华
汤志锐
吴树鸿
何锦飞
何炎
罗伟明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Foshan Power Supply Bureau of Guangdong Power Grid Corp
Original Assignee
Guangdong Power Grid Co Ltd
Foshan Power Supply Bureau of Guangdong Power Grid Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd, Foshan Power Supply Bureau of Guangdong Power Grid Corp filed Critical Guangdong Power Grid Co Ltd
Priority to CN201810772493.9A priority Critical patent/CN108808675B/zh
Publication of CN108808675A publication Critical patent/CN108808675A/zh
Application granted granted Critical
Publication of CN108808675B publication Critical patent/CN108808675B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明提供一种变电站失压配网转供电方案的自动生成方法,该方法包括以下步骤:S1:基础数据获取,通过与各大相关系统建立数据接口,获取相关数据信息;S2:数据处理分析,结合S1数据生成可转供配网线路转供电方案、无法转供配网线路10kV母线串供方案、转供电对侧配网线路所属主变及主网线路负荷情况分析、变电站失压影响重要用户分析及预案支持;S3:数据全方位展示。

Description

一种变电站失压配网转供电方案的自动生成方法
技术领域
本发明涉及电力系统领域,更具体地,涉及一种变电站失压配网转供电方案的自动生成方法。
背景技术
随着经济的快速发展,人们生活水平的提高,人们对供电服务的要求也越来越高。在珠三角地区,经常发生一些恶劣天气状况,导致电网受到大面积停电,特别是当主网线路发生故障时,经常导致变电站失压并短时不能够及时送电。在变电站失压而不能短时送电时,为了实现用户的快速复电,一般都需将失压的配网线路进行转供电操作从而实现用户的提前复电。
配网调度员在指挥抢修人员进行转供电操作时,需通过打印配网单线图图纸核对是否可以转供电以及合环位置;更为重要的是,还需通过EMS或者配网主站核对需转供电的线路以及对侧线路的载流量、负荷电流等内容,来确认转供电后不会导致对侧线路重过载。
以上工作在执行转供电前核对时,需要花费配网调度员很多时间,并且费时又费力,准确性很难得到保证。特别是变电站失压时,其馈线需转供电的线路一般比较多,很对更需要花费很多的时间,导致转供电不能够得到及时的执行,以致变电站失压后,用户还是需要等相当久的时间才能够通过转供电实现复电,影响供电可靠性和用户满意度,并且导致更多的停电损失。
基于以上分析,急需一种在变电站失压情况下快速生成配网转供电方案的方案,来辅助配网调度员指挥抢修人员实现快速的转供电操作,是当前迫切需要解决的一个需求。
发明内容
本发明提供一种变电站失压配网转供电方案的自动生成方法,该方法为配网调度员指挥抢修人员实现快速转供电提供支撑,保障电网安全稳定运行。
为了达到上述技术效果,本发明的技术方案如下:
一种变电站失压配网转供电方案的自动生成方法,包括以下步骤:
S1:基础数据获取。通过与各大相关系统建立数据接口,获取相关数据信息:
(1)通过与电网生产系统建立数据接口,获取配网线路台账数据,配网线路所属区局、供电所以及配网线路所属主变、主网线路等信息;
(2)通过与配电GIS(Geographic Information System,GIS)建立数据接口,获取配网线路环网台账信息。环网台账信息包含本侧配网线路、对侧线路及其所属变电站、供电所及区局等相关信息,同时还包含环网点位置等信息;
(3)通过与营销系统建立数据接口,获取配网线路用户数等情况,其中用户数包含全部用户数及城区用户数等信息;
(4)通过与SCADA(Supervisory Control And Data Acquisition,SCADA)系统建立数据接口,获取配网线路允许载流量、线路电流,此外还包含主网线路及主变等设备的允许载流量及负荷相关数据。
S2:数据处理分析。结合S1数据生成可转供配网线路转供电方案、无法转供配网线路10kV母线串供方案、转供电对侧配网线路所属主变及主网线路负荷情况分析、变电站失压影响重要用户分析及预案支持。
(1)配网可转供线路转供电方案生成,环网对侧线路选择逻辑如下:
1)转供对侧配网线路所属变电站不能为失压变电站;
2)转供对侧配网线路同一个全站失压转供电方案中只能选取一次;
3)(失压站配网线路用户数+对侧配网线路用户数)<6000;
4)(失压站配网线路线路长度+对侧配网线路线路长度)*70%<15;
5)(失压站配网线路当月最大电流+转至对侧配网线路当月最大电流)<(转至对侧配网线路线路载流量与环网回路最小载流量比较最小值)。
(2)无法转供线路通过10kV母线串供来恢复供电,串供线路选择逻辑为:
1)每段10kV母线选取1条串供线路(如1个变电站有两条10kV母线,那么1M、2M母线分别选1条串供线路);
2)线路在配网可转供电线路中选取;
3)对侧配网线路载流量-失压站配网线路当月最大电流-转至对侧配网线路当月最大电流>0;
4)(失压站配网线路线路长度+对侧配网线路线路长度)*70%<12。
(3)转供电对侧配网线路所属主变及主网线路负荷情况分析。分析转供电对侧线路所属主变及主网线路等主网设备的负荷情况,主要包括设备的额定值,前一日的最高负荷及最高负载率,当前月最高负荷及负载率等数据。同时对于负载率超80%的设备通过红色底纹重点突出显示。
(4)变电站失压影响重要用户分析及预案支持。通过台账拓扑分析自动给出供电受影响的重要用户信息及相关预案,重要用户信息包括了重要用户名称、重要用户等级、是否具有自备应急电源、所属区局及供电所等内容。根据上述资料内容并下载事故处理应急预案实现用户的快速复电。
S3:数据全方位展示。在数据展示的过程中,进行分模块数据展示。主要有以下几大模块:
(1)配网可转供线路转供电方案模块:显示转供电本侧及对侧配网线路所属供电所、变电站、10kV母线、线路类型、线路载流量、用户数、前一天及当月最高负荷情况以及环网点位置等相关信息;
(2)无法转供配网线路10kV母线串供方案模块:显示变电站失压时,其所供电10kV母线本侧的串供电线、对侧线路所属供电所、变电站、10kV母线、线路类型、线路载流量、用户数、前一天及当月最高负荷情况以及环网点位置等相关信息;
(3)转供电对侧配网线路所属主变及主网线路负荷情况分析模块:显示转供电对侧线路所属主变、主网线路的额定值、前一天负荷最高值及负载率、当月负荷最高值及负载率等相关信息;
(4)变电站失压影响重要用户分析及预案支持模块:显示变电站失压受影响的重要用户名称、重要用户等级、自备应急电源、所属区局级供电所、用户联系电话及事故处理预案等相关信息。
与现有技术相比,本发明技术方案的有益效果是:
1、变电站失压后,通过系统自动快速生成的配网转供电方案实现用户的快速复电,提高了供电可靠性;
2、对于长时间停电将会带来设备损失和停电损失的用户,如敏感企业和鱼塘养殖用户,自动快速生成的配网转供电方案可实现用户的快速复电,减少了用户的损失,提升了用户满意度。
附图说明
图1为本发明的方法的流程图。
具体实施方式
附图仅用于示例性说明,不能理解为对本专利的限制;
为了更好说明本实施例,附图某些部件会有省略、放大或缩小,并不代表实际产品的尺寸;
对于本领域技术人员来说,附图中某些公知结构及其说明可能省略是可以理解的。
下面结合附图和实施例对本发明的技术方案做进一步的说明。
实施例1
本发明一种变电站失压配网转供电方案的自动生成方法原理是:通过与各大系统建立数据接口,获取配网环网台账数据、配网线路用户数、主配网设备负荷数据等信息。根据配网环网台账数据分析变电站所供电配网线路与其他变电站供电线路的联络关系,同时以环网对侧线路选择逻辑生成可转供线路转供电方案,并以串供线路选择逻辑生成无法转供电线路串供方案。根据主网线路及主变负荷情况,自动分析转供电对侧配网线路所属主变及主网线路负荷情况;并根据失压变电站所供电关系,自动分析受影响的重要用户。根据以上分析,自动快速生成总体的变电站失压配网转供电方案,为配网调度员在变电站失压情况下执行配网转供电提供方案支撑,实现转供电的快速执行。
如图1所示,用到所述的一种变电站失压配网转供电方案自动生成应用方法具体实施过程如下:
S1 失压变电站选择:选择需要分析的失压变电站。
S2 电网台账基础数据获取:获取配网线路台账数据,如配网线路所属区局、供电所以及配网线路所属主变、主网线路等信息。
S3 配网环网台账数据获取:获取配网线路环网台账信息,如环网台账信息包含本侧配网线路、对侧线路及其所属变电站、供电所及区局等相关信息,同时还包含环网点位置等信息。
S4 电网设备负荷数据获取:获取电网设备负荷数据,如配网线路允许载流量、线路电流,此外还包含主网线路及主变等设备的允许载流量及负荷相关数据。
S5 配网线路用户数获取:获取配网线路用户数等情况,如全部用户数及城区用户数等信息。
S6 可转供配网线路转供电方案生成:根据配网环网台账数据分析变电站所供电配网线路与其他变电站供电线路的联络关系,以环网对侧线路选择逻辑生成可转供线路转供电方案。
S7 无法转供配网线路10kV母线串供方案生成:根据配网环网台账数据分析变电站所供电配网线路与其他变电站供电线路的联络关系,以串供线路选择逻辑生成无法转供电线路串供方案。
S8 转供电对侧配网线路所属主变及主网线路负荷情况分析:分析转供电对侧线路所属主变及主网线路等主网设备的负荷情况,主要包括设备的额定值,前一日的最高负荷及最高负载率,当前月最高负荷及负载率等数据。
S9 变电站失压影响重要用户分析及预案支持:通过台账拓扑分析自动给出供电受影响的重要用户信息及相关预案,重要用户信息包括了重要用户名称、重要用户等级、是否具有自备应急电源、所属区局及供电所等内容。
S10 变电站失压配网转供电方案自动给生成:综合S6、S7、S8、S9内容,综合生成变电站失压配网转供点总体方案。
相同或相似的标号对应相同或相似的部件;
附图中描述位置关系的用于仅用于示例性说明,不能理解为对本专利的限制;
显然,本发明的上述实施例仅仅是为清楚地说明本发明所作的举例,而并非是对本发明的实施方式的限定。对于所属领域的普通技术人员来说,在上述说明的基础上还可以做出其它不同形式的变化或变动。这里无需也无法对所有的实施方式予以穷举。凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明权利要求的保护范围之内。

Claims (4)

1.一种变电站失压配网转供电方案的自动生成方法,其特征在于,包括以下步骤:
S1:基础数据获取,通过与各大相关系统建立数据接口,获取相关数据信息;
S2:数据处理分析,结合S1数据生成可转供配网线路转供电方案、无法转供配网线路10kV母线串供方案、转供电对侧配网线路所属主变及主网线路负荷情况分析、变电站失压影响重要用户分析及预案支持;
S3:数据全方位展示。
2.根据权利要求1所述的变电站失压配网转供电方案的自动生成方法,其特征在于,所述步骤S1的具体过程是:
1)通过与电网生产系统建立数据接口,获取配网线路台账数据,配网线路所属区局、供电所以及配网线路所属主变、主网线路信息;
2)通过与配电GIS建立数据接口,获取配网线路环网台账信息;环网台账信息包含本侧配网线路、对侧线路及其所属变电站、供电所及区局相关信息,同时还包含环网点位置信息;
3)通过与营销系统建立数据接口,获取配网线路用户数情况,其中用户数包含全部用户数及城区用户数信息;
4)通过与SCADA系统建立数据接口,获取配网线路允许载流量、线路电流,此外还包含主网线路及主变设备的允许载流量及负荷相关数据。
3.根据权利要求2所述的变电站失压配网转供电方案的自动生成方法,其特征在于,所述步骤S2中,
(1)配网可转供线路转供电方案生成,环网对侧线路选择逻辑如下:
1)转供对侧配网线路所属变电站不能为失压变电站;
2)转供对侧配网线路同一个全站失压转供电方案中只能选取一次;
3)(失压站配网线路用户数+对侧配网线路用户数<6000;
4)失压站配网线路线路长度+对侧配网线路线路长度*70%<15;
5)失压站配网线路当月最大电流+转至对侧配网线路当月最大电流<转至对侧配网线路线路载流量与环网回路最小载流量比较最小值;
(2)无法转供线路通过10kV母线串供来恢复供电,串供线路选择逻辑为:
1)每段10kV母线选取1条串供线路;
2)线路在配网可转供电线路中选取;
3)对侧配网线路载流量-失压站配网线路当月最大电流-转至对侧配网线路当月最大电流>0;
4)失压站配网线路线路长度+对侧配网线路线路长度*70%<12;
(3)转供电对侧配网线路所属主变及主网线路负荷情况分析,分析转供电对侧线路所属主变及主网线路主网设备的负荷情况,主要包括设备的额定值,前一日的最高负荷及最高负载率,当前月最高负荷及负载率数据,同时对于负载率超80%的设备通过红色底纹重点突出显示;
(4)变电站失压影响重要用户分析及预案支持,通过台账拓扑分析自动给出供电受影响的重要用户信息及相关预案,重要用户信息包括了重要用户名称、重要用户等级、是否具有自备应急电源、所属区局及供电所内容,根据上述资料内容并下载事故处理应急预案实现用户的快速复电。
4.根据权利要求3所述的变电站失压配网转供电方案的自动生成方法,其特征在于,所述步骤S3中,在数据展示的过程中,进行分模块数据展示:
(1)配网可转供线路转供电方案模块:显示转供电本侧及对侧配网线路所属供电所、变电站、10kV母线、线路类型、线路载流量、用户数、前一天及当月最高负荷情况以及环网点位置相关信息;
(2)无法转供配网线路10kV母线串供方案模块:显示变电站失压时,其所供电10kV母线本侧的串供电线、对侧线路所属供电所、变电站、10kV母线、线路类型、线路载流量、用户数、前一天及当月最高负荷情况以及环网点位置相关信息;
(3)转供电对侧配网线路所属主变及主网线路负荷情况分析模块:显示转供电对侧线路所属主变、主网线路的额定值、前一天负荷最高值及负载率、当月负荷最高值及负载率相关信息;
(4)变电站失压影响重要用户分析及预案支持模块:显示变电站失压受影响的重要用户名称、重要用户等级、自备应急电源、所属区局级供电所、用户联系电话及事故处理预案相关信息。
CN201810772493.9A 2018-07-13 2018-07-13 一种变电站失压配网转供电方案的自动生成方法 Active CN108808675B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810772493.9A CN108808675B (zh) 2018-07-13 2018-07-13 一种变电站失压配网转供电方案的自动生成方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810772493.9A CN108808675B (zh) 2018-07-13 2018-07-13 一种变电站失压配网转供电方案的自动生成方法

Publications (2)

Publication Number Publication Date
CN108808675A true CN108808675A (zh) 2018-11-13
CN108808675B CN108808675B (zh) 2021-04-02

Family

ID=64075150

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810772493.9A Active CN108808675B (zh) 2018-07-13 2018-07-13 一种变电站失压配网转供电方案的自动生成方法

Country Status (1)

Country Link
CN (1) CN108808675B (zh)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109560543A (zh) * 2018-11-14 2019-04-02 广东电网有限责任公司江门供电局 基于主配网一体化模型的动态事故预案分析方法及系统
CN109948191A (zh) * 2019-02-22 2019-06-28 广东电网有限责任公司 一种一母线一预案的滚动修编方法与系统
CN109948897A (zh) * 2019-02-01 2019-06-28 广东电网有限责任公司 一种主变过载10kV线路转供电方案自动生成系统与方法
CN110598975A (zh) * 2019-07-31 2019-12-20 广东电网有限责任公司 一种配网线路典型接线诊断分析方法
CN110610327A (zh) * 2019-10-09 2019-12-24 广东电网有限责任公司 一种考虑临时负荷转移的配网转供电能力的智能分析方法
CN110957724A (zh) * 2019-12-16 2020-04-03 深圳供电局有限公司 一种配电网运行方式及网架结构评估的方法
CN111461515A (zh) * 2020-03-26 2020-07-28 广东电网有限责任公司 一种基于电力大数据的变电站空置间隔智能分析方法
CN111915029A (zh) * 2020-05-27 2020-11-10 广东电网有限责任公司 一种母线失压智能记录系统及方法
CN112186746A (zh) * 2020-09-18 2021-01-05 国网山东省电力公司淄博供电公司 适用于变电站配网线路负荷快速转供的方法
CN112542833A (zh) * 2020-12-11 2021-03-23 深圳供电局有限公司 一种变电站10kV母线失压快速复电方法
CN113258683A (zh) * 2021-07-01 2021-08-13 广东电网有限责任公司佛山供电局 一种配网环网点变化分析方法和系统
CN113283096A (zh) * 2021-05-31 2021-08-20 广东电网有限责任公司 配网线路台账数据获取及异常数据分析的方法和相关装置
CN113313422A (zh) * 2021-06-24 2021-08-27 广东电网有限责任公司 基于拓扑结构的配电网线路损耗计算方法及相关装置
CN114421461A (zh) * 2022-01-12 2022-04-29 国网山东省电力公司青岛供电公司 基于最优算法的配电网转供辅助决策系统及方法
CN114614468A (zh) * 2022-05-11 2022-06-10 广东电网有限责任公司佛山供电局 一种配网区域负荷转移分析方法、系统及装置
CN115021253A (zh) * 2022-07-08 2022-09-06 广东电网有限责任公司 一种配网线路部分负荷转供分析方法及系统
CN116154778A (zh) * 2023-04-19 2023-05-23 广东电网有限责任公司佛山供电局 一种配电网首段环网自动分析方法、装置及设备

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103956748A (zh) * 2014-03-31 2014-07-30 国家电网公司 一种多母线失压时负荷转移的故障恢复方案生成方法
CN104201675A (zh) * 2014-09-19 2014-12-10 国家电网公司 一种过负荷线路的负荷自动倒出与恢复方法
CN105429137A (zh) * 2015-12-09 2016-03-23 云南电网有限责任公司红河供电局 配网合环转供电的方法
CN107134770A (zh) * 2017-03-24 2017-09-05 广东电网有限责任公司珠海供电局 一种主配荷协同配电网接线结构的供电系统
CN107332236A (zh) * 2017-07-13 2017-11-07 国网浙江省电力公司 一种基于全局搜索的电网负荷转供方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103956748A (zh) * 2014-03-31 2014-07-30 国家电网公司 一种多母线失压时负荷转移的故障恢复方案生成方法
CN104201675A (zh) * 2014-09-19 2014-12-10 国家电网公司 一种过负荷线路的负荷自动倒出与恢复方法
CN105429137A (zh) * 2015-12-09 2016-03-23 云南电网有限责任公司红河供电局 配网合环转供电的方法
CN107134770A (zh) * 2017-03-24 2017-09-05 广东电网有限责任公司珠海供电局 一种主配荷协同配电网接线结构的供电系统
CN107332236A (zh) * 2017-07-13 2017-11-07 国网浙江省电力公司 一种基于全局搜索的电网负荷转供方法

Cited By (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109560543B (zh) * 2018-11-14 2021-08-06 广东电网有限责任公司江门供电局 基于主配网一体化模型的动态事故预案分析方法及系统
CN109560543A (zh) * 2018-11-14 2019-04-02 广东电网有限责任公司江门供电局 基于主配网一体化模型的动态事故预案分析方法及系统
CN109948897A (zh) * 2019-02-01 2019-06-28 广东电网有限责任公司 一种主变过载10kV线路转供电方案自动生成系统与方法
CN109948191A (zh) * 2019-02-22 2019-06-28 广东电网有限责任公司 一种一母线一预案的滚动修编方法与系统
CN109948191B (zh) * 2019-02-22 2023-05-02 广东电网有限责任公司 一种一母线一预案的滚动修编方法与系统
CN110598975A (zh) * 2019-07-31 2019-12-20 广东电网有限责任公司 一种配网线路典型接线诊断分析方法
CN110598975B (zh) * 2019-07-31 2020-09-25 广东电网有限责任公司 一种配网线路典型接线诊断分析方法
CN110610327A (zh) * 2019-10-09 2019-12-24 广东电网有限责任公司 一种考虑临时负荷转移的配网转供电能力的智能分析方法
CN110957724B (zh) * 2019-12-16 2023-10-24 深圳供电局有限公司 一种配电网运行方式及网架结构评估的方法
CN110957724A (zh) * 2019-12-16 2020-04-03 深圳供电局有限公司 一种配电网运行方式及网架结构评估的方法
CN111461515A (zh) * 2020-03-26 2020-07-28 广东电网有限责任公司 一种基于电力大数据的变电站空置间隔智能分析方法
CN111461515B (zh) * 2020-03-26 2022-04-19 广东电网有限责任公司 一种基于电力大数据的变电站空置间隔智能分析方法
CN111915029A (zh) * 2020-05-27 2020-11-10 广东电网有限责任公司 一种母线失压智能记录系统及方法
CN111915029B (zh) * 2020-05-27 2023-01-20 广东电网有限责任公司 一种母线失压智能记录系统及方法
CN112186746A (zh) * 2020-09-18 2021-01-05 国网山东省电力公司淄博供电公司 适用于变电站配网线路负荷快速转供的方法
CN112542833A (zh) * 2020-12-11 2021-03-23 深圳供电局有限公司 一种变电站10kV母线失压快速复电方法
CN112542833B (zh) * 2020-12-11 2023-04-14 深圳供电局有限公司 一种变电站10kV母线失压快速复电方法
CN113283096B (zh) * 2021-05-31 2023-01-24 广东电网有限责任公司 配网线路台账数据获取及异常数据分析的方法和相关装置
CN113283096A (zh) * 2021-05-31 2021-08-20 广东电网有限责任公司 配网线路台账数据获取及异常数据分析的方法和相关装置
CN113313422B (zh) * 2021-06-24 2023-03-14 广东电网有限责任公司 基于拓扑结构的配电网线路损耗计算方法及相关装置
CN113313422A (zh) * 2021-06-24 2021-08-27 广东电网有限责任公司 基于拓扑结构的配电网线路损耗计算方法及相关装置
CN113258683B (zh) * 2021-07-01 2021-09-14 广东电网有限责任公司佛山供电局 一种配网环网点变化分析方法和系统
CN113258683A (zh) * 2021-07-01 2021-08-13 广东电网有限责任公司佛山供电局 一种配网环网点变化分析方法和系统
CN114421461A (zh) * 2022-01-12 2022-04-29 国网山东省电力公司青岛供电公司 基于最优算法的配电网转供辅助决策系统及方法
CN114614468A (zh) * 2022-05-11 2022-06-10 广东电网有限责任公司佛山供电局 一种配网区域负荷转移分析方法、系统及装置
CN115021253A (zh) * 2022-07-08 2022-09-06 广东电网有限责任公司 一种配网线路部分负荷转供分析方法及系统
CN115021253B (zh) * 2022-07-08 2024-06-14 广东电网有限责任公司 一种配网线路部分负荷转供分析方法及系统
CN116154778A (zh) * 2023-04-19 2023-05-23 广东电网有限责任公司佛山供电局 一种配电网首段环网自动分析方法、装置及设备
CN116154778B (zh) * 2023-04-19 2023-07-04 广东电网有限责任公司佛山供电局 一种配电网首段环网自动分析方法、装置及设备

Also Published As

Publication number Publication date
CN108808675B (zh) 2021-04-02

Similar Documents

Publication Publication Date Title
CN108808675A (zh) 一种变电站失压配网转供电方案的自动生成方法
Pansini Electrical distribution engineering
Smallwood Distributed generation in autonomous and nonautonomous micro grids
Billinton et al. A reliability test system for educational purposes-basic data
CA2544474C (en) Electric utility storm outage management
CN108933437A (zh) 一种配电网的供电能力自动分析方法
Davis et al. The future of distribution system resiliency
Gan et al. Strategic assessment of alternative design options for multivoltage-level distribution networks
CN106940826B (zh) 模块化供电方案自动生成方法
Devanand et al. Advanced distribution management system: Improving distribution efficiency through an integrated approach
EP2819260B1 (en) Synchronization of control applications for a grid network
Camille et al. Roadmap for the transformation of the south Cameroon interconnected network (RIS) into smart-grid
Balakrishna et al. A method of low voltage residential micro-grids management using AMI/GIS systems and its application benefits
CN112803412B (zh) 一种配网联络点类型识别方法和系统
CN106940827A (zh) 基于ar技术和vr技术的模块化供电方案自动生成方法
Celli et al. Reference scenarios for Active Distribution System according to ATLANTIDE project planning models
Eren et al. A ubiquitous Web-based dispatcher information system for effective monitoring and analysis of the electricity transmission grid
Brown et al. Utility system demonstration of six phase power transmission
Cunningham et al. Distributed generation in 1900?: How the Edison Co. of New York met short-term needs [History]
Ma et al. Extended common information model for distribution network production repair platform
Agarwal et al. Application of PMU-based information in the Indian power system
CN106383924A (zh) 一种实现调控范围全覆盖的线路正交图绘制方法
Bettencourt et al. Hydro one approach to smart grid
CN106597210B (zh) 一种基于sim卡状态的配网星空图监测方法
CN118917672B (zh) 电力系统的风险预警方法、装置、存储介质和计算机设备

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant